Jump to content

Wildorado Wind Ranch: Difference between revisions

Coordinates: 35°18′25″N 102°19′12″W / 35.307°N 102.32°W / 35.307; -102.32
From Wikipedia, the free encyclopedia
Content deleted Content added
mNo edit summary
No edit summary
 
(18 intermediate revisions by 14 users not shown)
Line 1: Line 1:
The [[Wildorado Wind Ranch]] is located on approximately{{convert|16000|acre|km2}} {{convert|25|mi|km}} west of [[Amarillo, Texas]] and consists of 161 MW of [[wind turbine]]s (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by [[Cielo Wind Power]], of [[Austin, Texas]], in conjunction with [[Edison Mission Group]] of [[Irvine, California]].<ref>[http://www.renewableenergyaccess.com/rea/news/story;jsessionid=F23262664B8EA1414B1AF4D8ABAC31C6?id=44414 Siemens Receives 70-Turbine Order for Texas Project] ''Renewable Energy Access'', 22 March 2006.</ref><ref>[http://www.renewableenergyaccess.com/rea/news/story?id=48512 EMG Completes 161 MW Wind Project in Texas]</ref>
The '''Wildorado Wind Ranch''', completed in 2007, is located on approximately {{convert|16000|acre}} {{convert|25|mi}} west of [[Amarillo, Texas]], and consists of 161 MW of [[wind turbine]]s (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by Cielo Wind Power, of [[Austin, Texas]], in conjunction with [[Edison Mission Group]] of [[Irvine, California]],<ref>[https://www.renewableenergyworld.com/2006/03/22/siemens-receives-70-turbine-order-for-texas-project-44414/ Siemens Receives 70-Turbine Order for Texas Project] ''Renewable Energy Access'', 22 March 2006.</ref><ref>[https://www.renewableenergyworld.com/2007/05/15/emg-completes-161-mw-wind-project-in-texas-48512/ EMG Completes 161 MW Wind Project in Texas]</ref> Epplament Energy and Lestis Private Capital Group.


==References==
==References==
{{reflist}}
<references/>


{{stack|{{Portal|Texas|Weather|Renewable energy}}}}
{{Wind power in the United States}}
{{Wind power in the United States}}
{{coord|35.307|-102.32|region:US-TX_type:landmark|display=title}}


[[Category:Energy infrastructure completed in 2007]]
{{coord missing|Texas}}
[[Category:Buildings and structures in Oldham County, Texas]]

[[Category:Buildings and structures in Potter County, Texas]]

[[Category:Oldham County, Texas]]
[[Category:Buildings and structures in Randall County, Texas]]
[[Category:Potter County, Texas]]
[[Category:Randall County, Texas]]
[[Category:Wind farms in Texas]]
[[Category:Wind farms in Texas]]

Latest revision as of 16:43, 25 January 2022

The Wildorado Wind Ranch, completed in 2007, is located on approximately 16,000 acres (6,500 ha) 25 miles (40 km) west of Amarillo, Texas, and consists of 161 MW of wind turbines (70 Siemens Mk II turbines each capable of generating 2.3 MW at peak wind speeds). These turbines have the capacity to meet the electricity demand of more than 50,000 households. The Wildorado Wind Ranch was developed by Cielo Wind Power, of Austin, Texas, in conjunction with Edison Mission Group of Irvine, California,[1][2] Epplament Energy and Lestis Private Capital Group.

References

[edit]

35°18′25″N 102°19′12″W / 35.307°N 102.32°W / 35.307; -102.32