Chennai Elevated Expressways: Difference between revisions
Appearance
Content deleted Content added
m r2.7.3) (Robot: Adding ta:சென்னை உயர்மட்ட விரைவுச்சாலைகள் |
tag with {{Bare URL PDF}} |
||
(14 intermediate revisions by 13 users not shown) | |||
Line 1: | Line 1: | ||
{{Use dmy dates|date=June 2016}} |
|||
{{Use Indian English|date=June 2016}} |
|||
{{update|date=August 2019}} |
|||
{{infobox road |
{{infobox road |
||
|country=IND |
|country=IND |
||
|marker_image=non |
|||
|name= Chennai Elevated Expressways |
|name= Chennai Elevated Expressways |
||
|map= |
|map= |
||
Line 8: | Line 10: | ||
|formed= |
|formed= |
||
|history=Scheduled for completion in 2019–2020 |
|history=Scheduled for completion in 2019–2020 |
||
| |
|system1=[[Chennai HSCTC]] |
||
}} |
}} |
||
'''Chennai Elevated Expressways''' is a |
'''Chennai Elevated Expressways''' is a road network development scheme of the Second Master Plan by CMDA for [[Chennai]] city, [[India]].<ref>http://www.cmdachennai.gov.in/Volume1_English_PDF/Vol1_Chapter04_Transport.pdf {{Bare URL PDF|date=March 2022}}</ref> |
||
== Corridors == |
== Corridors == |
||
Five elevated corridors have been proposed as a medium-term scheme.<ref>[https://web.archive.org/web/20121023071453/http://articles.timesofindia.indiatimes.com/2008-09-03/chennai/27892711_1_chennai-port-ennore-port-new-bus Multi-crore infrastructure plan - Times Of India]. Articles.timesofindia.indiatimes.com (2008-09-03). Retrieved on 2013-12-06.</ref> |
|||
{| class="wikitable |
{| class="wikitable" |
||
|- |
|- |
||
! Type |
! Type |
||
! Along/ |
! Along/across |
||
! From |
! From |
||
! To |
! To |
||
! via |
! via |
||
! Length (km) |
! Length (km) |
||
! Cost in INR crores ( |
! Cost in INR crores (estimated) |
||
! Status |
! Status |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Arcot Road |
| Arcot Road |
||
| Vadapalani |
| Vadapalani |
||
| Porur |
| Porur |
||
| Saligramam |
|||
| |
|||
| |
| |
||
| 300 |
| 300 |
||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Thiruvottiyur High Road |
| Thiruvottiyur High Road |
||
| Tollgate |
| Tollgate |
||
Line 44: | Line 46: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Rajaji Salai |
| Rajaji Salai |
||
| Parrys Corner |
| Parrys Corner |
||
Line 53: | Line 55: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Nungambakkam High Road |
| Nungambakkam High Road |
||
| |
| |
||
Line 62: | Line 64: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| GST |
| GST |
||
| Chennai Port |
| Chennai Port |
||
Line 70: | Line 72: | ||
| 1400 |
| 1400 |
||
| |
| |
||
|- |
|||
|} |
|} |
||
The following 12 |
The following 12 corridors have been proposed in the long term scheme |
||
{| class="wikitable |
{| class="wikitable" |
||
|- |
|- |
||
! Type |
! Type |
||
! Along/ |
! Along/across |
||
! From |
! From |
||
! To |
! To |
||
! via |
! via |
||
! Length (km) |
! Length (km) |
||
! Cost in INR crores ( |
! Cost in INR crores (estimated) |
||
! Status |
! Status |
||
|- |
|- |
||
| Elevated |
| Elevated freight corridor |
||
| |
| |
||
| Ennore Port (Northern Gate) |
| Ennore Port (Northern Gate) |
||
Line 94: | Line 95: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated freight corridor |
||
| |
| |
||
| Ennore Port (Northern Gate) |
| Ennore Port (Northern Gate) |
||
Line 103: | Line 104: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated freight corridor |
||
| Beach |
| Beach |
||
| Ennore Port |
| Ennore Port |
||
Line 112: | Line 113: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Anna Salai |
| Anna Salai |
||
| |
| |
||
Line 121: | Line 122: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| EVR Salai |
| EVR Salai |
||
| |
| |
||
Line 130: | Line 131: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Kamarajar Salai |
| Kamarajar Salai |
||
| |
| |
||
Line 139: | Line 140: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Rajiv Gandhi Salai (IT Expressway) |
| Rajiv Gandhi Salai (IT Expressway) |
||
| |
| |
||
Line 148: | Line 149: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Arcot Road |
| Arcot Road |
||
| |
| |
||
Line 157: | Line 158: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| |
| |
||
| Aminjikarai |
| Aminjikarai |
||
Line 166: | Line 167: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Kathivakkam High Road |
| Kathivakkam High Road |
||
| |
| |
||
Line 175: | Line 176: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Thiruvottiyur High Road |
| Thiruvottiyur High Road |
||
| Monroe Statue |
| Monroe Statue |
||
Line 184: | Line 185: | ||
| |
| |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| NH45 |
| NH45 |
||
| Kathipara |
| Kathipara |
||
Line 192: | Line 193: | ||
| 1350 |
| 1350 |
||
| |
| |
||
|- |
|||
|} |
|} |
||
* Revised cost during tender process. |
* Revised cost during tender process. |
||
==Other |
==Other corridors== |
||
Apart from the Master Plan, other corridors are being planned by the [[Corporation of Chennai]], [[Chennai Port]] Trust and [[Ennore Port]] Trust. The following are the details of these elevated roads. |
Apart from the Master Plan, other corridors are being planned by the [[Corporation of Chennai]], [[Chennai Port]] Trust and [[Ennore Port]] Trust. The following are the details of these elevated roads. |
||
{| class="wikitable |
{| class="wikitable" |
||
|- |
|- |
||
! Type |
! Type |
||
! Along/ |
! Along/across |
||
! From |
! From |
||
! To |
! To |
||
! via |
! via |
||
! Length (km) |
! Length (km) |
||
! Cost in INR crores ( |
! Cost in INR crores (estimated) |
||
! Status |
! Status |
||
|- |
|- |
||
| Elevated |
| Elevated freight corridor |
||
| NH4 |
| NH4 |
||
| [[Maduravoyal]] |
| [[Maduravoyal]] |
||
Line 219: | Line 219: | ||
| Pre-feasibility study under process |
| Pre-feasibility study under process |
||
|- |
|- |
||
| Elevated |
| Elevated road |
||
| Sardar Patel Road |
| Sardar Patel Road |
||
| Halda |
| Halda |
||
| Madhya Kailash Junction |
| Madhya Kailash Junction |
||
| |
| |
||
| 3.6 |
| 3.6 (approx) |
||
| 100 |
| 100 |
||
| Proposed under JNNURM |
| Proposed under JNNURM |
||
|} |
|} |
||
==Project |
==Project deadline== |
||
Ten years from the commencement of the project ( |
Ten years from the commencement of the project (January 2009). The corridors are expected to be completed by 2019–2020. |
||
== References == |
== References == |
||
Line 239: | Line 239: | ||
{{Transport in Tamil Nadu}} |
{{Transport in Tamil Nadu}} |
||
[[Category:Expressways in |
[[Category:Expressways in Tamil Nadu]] |
||
[[Category:Urban transit in Chennai]] |
[[Category:Urban transit in Chennai]] |
||
[[Category:Urban road transit in Chennai]] |
[[Category:Urban road transit in Chennai]] |
||
[[Category:Proposed roads in India]] |
[[Category:Proposed roads in India]] |
||
[[Category:Urban planning in India]] |
|||
[[ta:சென்னை உயர்மட்ட விரைவுச்சாலைகள்]] |
Latest revision as of 04:40, 12 March 2022
This article needs to be updated.(August 2019) |
Chennai Elevated Expressways | |
---|---|
Route information | |
History | Scheduled for completion in 2019–2020 |
Location | |
Country | India |
Major cities | Chennai |
Highway system | |
Chennai HSCTC |
Chennai Elevated Expressways is a road network development scheme of the Second Master Plan by CMDA for Chennai city, India.[1]
Corridors
[edit]Five elevated corridors have been proposed as a medium-term scheme.[2]
Type | Along/across | From | To | via | Length (km) | Cost in INR crores (estimated) | Status |
---|---|---|---|---|---|---|---|
Elevated road | Arcot Road | Vadapalani | Porur | Saligramam | 300 | ||
Elevated road | Thiruvottiyur High Road | Tollgate | Ernavur Bridge | 250 | |||
Elevated road | Rajaji Salai | Parrys Corner | Tollgate | 350 | |||
Elevated road | Nungambakkam High Road | Valluvarkottam High Road, Mc. Nichols High Road, College Road and Haddows Road | 300 | ||||
Elevated road | GST | Chennai Port | Tambaram | 1400 |
The following 12 corridors have been proposed in the long term scheme
Type | Along/across | From | To | via | Length (km) | Cost in INR crores (estimated) | Status |
---|---|---|---|---|---|---|---|
Elevated freight corridor | Ennore Port (Northern Gate) | NH5 | Tachur | 100.68 | |||
Elevated freight corridor | Ennore Port (Northern Gate) | TPP (Thiruvottiyur Ponneri-Panjetty Road) | Vallur | 142.98 | |||
Elevated freight corridor | Beach | Ennore Port | Chennai Port | 1500 | |||
Elevated road | Anna Salai | 750 | |||||
Elevated road | EVR Salai | 600 | |||||
Elevated road | Kamarajar Salai | 480 | |||||
Elevated road | Rajiv Gandhi Salai (IT Expressway) | 900 | |||||
Elevated road | Arcot Road | 360 | |||||
Elevated road | Aminjikarai | Sterling Road | 225 | ||||
Elevated road | Kathivakkam High Road | 600 | |||||
Elevated road | Thiruvottiyur High Road | Monroe Statue | Manali | 600 | |||
Elevated road | NH45 | Kathipara | Tambaram | 1350 |
* Revised cost during tender process.
Other corridors
[edit]Apart from the Master Plan, other corridors are being planned by the Corporation of Chennai, Chennai Port Trust and Ennore Port Trust. The following are the details of these elevated roads.
Type | Along/across | From | To | via | Length (km) | Cost in INR crores (estimated) | Status |
---|---|---|---|---|---|---|---|
Elevated freight corridor | NH4 | Maduravoyal | Sriperumbudur Dry Port | 20 (approx) | Pre-feasibility study under process | ||
Elevated road | Sardar Patel Road | Halda | Madhya Kailash Junction | 3.6 (approx) | 100 | Proposed under JNNURM |
Project deadline
[edit]Ten years from the commencement of the project (January 2009). The corridors are expected to be completed by 2019–2020.
References
[edit]- ^ http://www.cmdachennai.gov.in/Volume1_English_PDF/Vol1_Chapter04_Transport.pdf [bare URL PDF]
- ^ Multi-crore infrastructure plan - Times Of India. Articles.timesofindia.indiatimes.com (2008-09-03). Retrieved on 2013-12-06.