Jump to content

Chennai Elevated Expressways: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
tag with {{Bare URL PDF}}
 
(14 intermediate revisions by 13 users not shown)
Line 1: Line 1:
{{Use dmy dates|date=June 2016}}
{{Use Indian English|date=June 2016}}
{{update|date=August 2019}}
{{infobox road
{{infobox road
|country=IND
|country=IND
|marker_image=non
|name= Chennai Elevated Expressways
|name= Chennai Elevated Expressways
|map=
|map=
Line 8: Line 10:
|formed=
|formed=
|history=Scheduled for completion in 2019–2020
|history=Scheduled for completion in 2019–2020
|system=[[Chennai HSCTC]]
|system1=[[Chennai HSCTC]]
}}
}}
'''Chennai Elevated Expressways''' is a Road Network Development Scheme of the Second Master Plan by CMDA for the [[Chennai]] city.<ref>http://www.cmdachennai.gov.in/Volume1_English_PDF/Vol1_Chapter04_Transport.pdf</ref>
'''Chennai Elevated Expressways''' is a road network development scheme of the Second Master Plan by CMDA for [[Chennai]] city, [[India]].<ref>http://www.cmdachennai.gov.in/Volume1_English_PDF/Vol1_Chapter04_Transport.pdf {{Bare URL PDF|date=March 2022}}</ref>


== Corridors ==
== Corridors ==
A total of 5 Elevated Corridors have been proposed as a medium-term Scheme.<ref>http://timesofindia.indiatimes.com/articleshow/3438868.cms</ref>
Five elevated corridors have been proposed as a medium-term scheme.<ref>[https://web.archive.org/web/20121023071453/http://articles.timesofindia.indiatimes.com/2008-09-03/chennai/27892711_1_chennai-port-ennore-port-new-bus Multi-crore infrastructure plan - Times Of India]. Articles.timesofindia.indiatimes.com (2008-09-03). Retrieved on 2013-12-06.</ref>


{| class="wikitable" border="1"
{| class="wikitable"
|-
|-
! Type
! Type
! Along/Across
! Along/across
! From
! From
! To
! To
! via
! via
! Length (km)
! Length (km)
! Cost in INR crores (Estimated)
! Cost in INR crores (estimated)
! Status
! Status
|-
|-
| Elevated Road
| Elevated road
| Arcot Road
| Arcot Road
| Vadapalani
| Vadapalani
| Porur
| Porur
| Saligramam
|
|
|
| 300
| 300
|
|
|-
|-
| Elevated Road
| Elevated road
| Thiruvottiyur High Road
| Thiruvottiyur High Road
| Tollgate
| Tollgate
Line 44: Line 46:
|
|
|-
|-
| Elevated Road
| Elevated road
| Rajaji Salai
| Rajaji Salai
| Parrys Corner
| Parrys Corner
Line 53: Line 55:
|
|
|-
|-
| Elevated Road
| Elevated road
| Nungambakkam High Road
| Nungambakkam High Road
|
|
Line 62: Line 64:
|
|
|-
|-
| Elevated Road
| Elevated road
| GST
| GST
| Chennai Port
| Chennai Port
Line 70: Line 72:
| 1400
| 1400
|
|
|-
|}
|}


The following 12 Corridors have been proposed in the Long term Scheme
The following 12 corridors have been proposed in the long term scheme
{| class="wikitable" border="1"
{| class="wikitable"
|-
|-
! Type
! Type
! Along/Across
! Along/across
! From
! From
! To
! To
! via
! via
! Length (km)
! Length (km)
! Cost in INR crores (Estimated)
! Cost in INR crores (estimated)
! Status
! Status
|-
|-
| Elevated Freight Corridor
| Elevated freight corridor
|
|
| Ennore Port (Northern Gate)
| Ennore Port (Northern Gate)
Line 94: Line 95:
|
|
|-
|-
| Elevated Freight Corridor
| Elevated freight corridor
|
|
| Ennore Port (Northern Gate)
| Ennore Port (Northern Gate)
Line 103: Line 104:
|
|
|-
|-
| Elevated Freight Corridor
| Elevated freight corridor
| Beach
| Beach
| Ennore Port
| Ennore Port
Line 112: Line 113:
|
|
|-
|-
| Elevated Road
| Elevated road
| Anna Salai
| Anna Salai
|
|
Line 121: Line 122:
|
|
|-
|-
| Elevated Road
| Elevated road
| EVR Salai
| EVR Salai
|
|
Line 130: Line 131:
|
|
|-
|-
| Elevated Road
| Elevated road
| Kamarajar Salai
| Kamarajar Salai
|
|
Line 139: Line 140:
|
|
|-
|-
| Elevated Road
| Elevated road
| Rajiv Gandhi Salai (IT Expressway)
| Rajiv Gandhi Salai (IT Expressway)
|
|
Line 148: Line 149:
|
|
|-
|-
| Elevated Road
| Elevated road
| Arcot Road
| Arcot Road
|
|
Line 157: Line 158:
|
|
|-
|-
| Elevated Road
| Elevated road
|
|
| Aminjikarai
| Aminjikarai
Line 166: Line 167:
|
|
|-
|-
| Elevated Road
| Elevated road
| Kathivakkam High Road
| Kathivakkam High Road
|
|
Line 175: Line 176:
|
|
|-
|-
| Elevated Road
| Elevated road
| Thiruvottiyur High Road
| Thiruvottiyur High Road
| Monroe Statue
| Monroe Statue
Line 184: Line 185:
|
|
|-
|-
| Elevated Road
| Elevated road
| NH45
| NH45
| Kathipara
| Kathipara
Line 192: Line 193:
| 1350
| 1350
|
|
|-
|}
|}


* Revised cost during tender process.
* Revised cost during tender process.


==Other Corridors==
==Other corridors==
Apart from the Master Plan, other corridors are being planned by the [[Corporation of Chennai]], [[Chennai Port]] Trust and [[Ennore Port]] Trust. The following are the details of these elevated roads.
Apart from the Master Plan, other corridors are being planned by the [[Corporation of Chennai]], [[Chennai Port]] Trust and [[Ennore Port]] Trust. The following are the details of these elevated roads.
{| class="wikitable" border="1"
{| class="wikitable"
|-
|-
! Type
! Type
! Along/Across
! Along/across
! From
! From
! To
! To
! via
! via
! Length (km)
! Length (km)
! Cost in INR crores (Estimated)
! Cost in INR crores (estimated)
! Status
! Status
|-
|-
| Elevated Freight Corridor
| Elevated freight corridor
| NH4
| NH4
| [[Maduravoyal]]
| [[Maduravoyal]]
Line 219: Line 219:
| Pre-feasibility study under process
| Pre-feasibility study under process
|-
|-
| Elevated Road
| Elevated road
| Sardar Patel Road
| Sardar Patel Road
| Halda
| Halda
| Madhya Kailash Junction
| Madhya Kailash Junction
|
|
| 3.6 {approx}
| 3.6 (approx)
| 100
| 100
| Proposed under JNNURM
| Proposed under JNNURM
|}
|}


==Project Deadline==
==Project deadline==
Ten years from the commencement of the project (Jan,2009). The corridors are expected to be completed by 2019-2020.
Ten years from the commencement of the project (January 2009). The corridors are expected to be completed by 2019–2020.


== References ==
== References ==
Line 239: Line 239:
{{Transport in Tamil Nadu}}
{{Transport in Tamil Nadu}}


[[Category:Expressways in India]]
[[Category:Expressways in Tamil Nadu]]
[[Category:Urban transit in Chennai]]
[[Category:Urban transit in Chennai]]
[[Category:Urban road transit in Chennai]]
[[Category:Urban road transit in Chennai]]
[[Category:Proposed roads in India]]
[[Category:Proposed roads in India]]
[[Category:Urban planning in India]]

[[ta:சென்னை உயர்மட்ட விரைவுச்சாலைகள்]]

Latest revision as of 04:40, 12 March 2022

Chennai Elevated Expressways
Route information
HistoryScheduled for completion in 2019–2020
Location
CountryIndia
Major citiesChennai
Highway system
Chennai HSCTC

Chennai Elevated Expressways is a road network development scheme of the Second Master Plan by CMDA for Chennai city, India.[1]

Corridors

[edit]

Five elevated corridors have been proposed as a medium-term scheme.[2]

Type Along/across From To via Length (km) Cost in INR crores (estimated) Status
Elevated road Arcot Road Vadapalani Porur Saligramam 300
Elevated road Thiruvottiyur High Road Tollgate Ernavur Bridge 250
Elevated road Rajaji Salai Parrys Corner Tollgate 350
Elevated road Nungambakkam High Road Valluvarkottam High Road, Mc. Nichols High Road, College Road and Haddows Road 300
Elevated road GST Chennai Port Tambaram 1400

The following 12 corridors have been proposed in the long term scheme

Type Along/across From To via Length (km) Cost in INR crores (estimated) Status
Elevated freight corridor Ennore Port (Northern Gate) NH5 Tachur 100.68
Elevated freight corridor Ennore Port (Northern Gate) TPP (Thiruvottiyur Ponneri-Panjetty Road) Vallur 142.98
Elevated freight corridor Beach Ennore Port Chennai Port 1500
Elevated road Anna Salai 750
Elevated road EVR Salai 600
Elevated road Kamarajar Salai 480
Elevated road Rajiv Gandhi Salai (IT Expressway) 900
Elevated road Arcot Road 360
Elevated road Aminjikarai Sterling Road 225
Elevated road Kathivakkam High Road 600
Elevated road Thiruvottiyur High Road Monroe Statue Manali 600
Elevated road NH45 Kathipara Tambaram 1350
* Revised cost during tender process.

Other corridors

[edit]

Apart from the Master Plan, other corridors are being planned by the Corporation of Chennai, Chennai Port Trust and Ennore Port Trust. The following are the details of these elevated roads.

Type Along/across From To via Length (km) Cost in INR crores (estimated) Status
Elevated freight corridor NH4 Maduravoyal Sriperumbudur Dry Port 20 (approx) Pre-feasibility study under process
Elevated road Sardar Patel Road Halda Madhya Kailash Junction 3.6 (approx) 100 Proposed under JNNURM

Project deadline

[edit]

Ten years from the commencement of the project (January 2009). The corridors are expected to be completed by 2019–2020.

References

[edit]