The '''Sistema Interconectado del Norte Grande''' ([[Spanish language|Spanish]] for ''Interconnected System of Norte Grande'') or '''SING''' is an [[alternating current]] [[power grid]] serving the [[Norte Grande]] zone of [[Chile]], it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including [[Arica y Parinacota Region|Arica y Parinacota]], [[Tarapacá Region|Tarapacá]] and [[Antofagasta Region]].
:''"SING" redirects here. If yoJjhhhghbbhhhhhhhhhhhhJjjjjkakkkkkkkkkklkkkk,khknn nmmjhhhkmhhhhnu are looking for "sing", the act of singing, or a number of other topics, please see [[sing]].''
The '''Sistema Interconectado del Norte Grande''' ([[Spanish language|Spanish]] for ''Interconnected System of Norte Grande'') or '''SING''' is a [[alternating current]] [[power grid]] serving the [[Norte Grande]] zone of [[Chile]], it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including [[Arica y Parinacota Region|Arica y Parinacota]], [[Tarapacá Region|Tarapacá]] and [[Antofagasta Region]].


As of December, 2011, it had a total installed capacity of 4,550 [[Watt#Megawatt|MW]] (gross) <ref>[http://www.centralenergia.cl/en/power-plants-chile/sing-installed-capacity/ SING installed capacity]. Central Energía. Retrieved: 15-05-2012</ref>
==Sources==Jk

*[http://www.geni.org/globalenergy/library/national_energy_grid/chile/index.shtml Global Energy Network Institute]
==References==
{{reflist}}


==External links==
==External links==
{{Portal|Chile|Energy}}
* [http://www.geni.org/globalenergy/library/national_energy_grid/chile/index.shtml Global Energy Network Institute]
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System]
* [http://www.cdec-sing.cl Centro de Despacho Económico de Carga del Sistema Interconectado del Norte Grande (CDEC-SING) - Economic Load Dispatch Center of the Big North Interconnected System]


{{Chile-stub}}
{{Energy in Chile}}
{{Energy in Chile}}


[[Category:Electric grid interconnections]]
[[Category:Wide area synchronous grids|Norte Grande]]
[[Category:Electric power transmission systems in Chile]]
[[Category:Electric power transmission systems in Chile]]


{{Chile-stub}}

Latest revision as of 14:26, 18 April 2022

The Sistema Interconectado del Norte Grande (Spanish for Interconnected System of Norte Grande) or SING is an alternating current power grid serving the Norte Grande zone of Chile, it produces 19% of the national power generation. The SING covers the three northernmost regions of Chile including Arica y Parinacota, Tarapacá and Antofagasta Region.

As of December, 2011, it had a total installed capacity of 4,550 MW (gross) [1]

References

[edit]
  1. ^ SING installed capacity. Central Energía. Retrieved: 15-05-2012