The '''Triad''' <ref>[http://www.triadcentral.org Triad Resource Center]</ref> is an approach by the [[United States Environmental Protection Agency]] to decision-making for [[Hazardous waste|hazardous-waste]] [[waste dump|site]] cleanup.<ref>pp.91-111, Crumbling, Griffith, Powell</ref> During the late 1990s, technology advocates from the environmental sector in the United States developed the approach by combining innovations in management and technology with ideas from hazardous-waste site cleanup experience. |
|||
Their goal was to form a framework for real-time [[environmental sensor]]s and tools, to improve decision-making at contaminated sites. This resulted in a more formalized set of ideas in [http://pubs.acs.org/cgi-bin/article.cgi/esthag-a/0000/35/i19/html/19crumbling.html 2001] that soon became known as the Triad approach. The ideas spawned a [[Community of practice|Community of Practice]] by 2005. |
|||
⚫ | |||
The Triad Community of Practice<ref>{{Cite web | url=http://www.triadcentral.org/user/cop/ | title=Triad Resource Center | Triad User Experiences}}</ref> includes representatives of federal, state, and private sector organizations in the U.S. and abroad. By 2008, a European CoP had been formed <ref>[http://www.cysense.com/index.asp?pageID=133 European CoP Info]</ref> In 2008, a technical conference led largely by the CoP and covering the Triad Approach was held at the University of Massachusetts in Amherst, "Triad Investigations: New Approaches and Innovative Strategies.<ref>[http://www.umass.edu/tei/conferences/platforms.html 2008 Triad Conference] {{webarchive|url=https://web.archive.org/web/20110314225529/http://www.umass.edu/tei/conferences/platforms.html |date=2011-03-14 }}</ref>" |
|||
⚫ | |||
⚫ | The term Triad represents three elements: systematic project planning (SPP), dynamic work strategies, and innovative rapid sampling and analytical technologies. While elements of the Triad have long been used for site cleanup, Triad packages these [[best practices|best management practices]] together with the guiding principles: |
||
⚫ | |||
⚫ | # Use a planning process, which includes participation of all stakeholders (including a multidisciplinary project team, federal and state regulators, legal counsel, community members, and other environmental professionals), to determine the types of data required and to evaluate whether the site could benefit from real-time measurement technologies. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | Triad is an open-marketplace idea that is not owned by one entity. There is considerable U.S. Multiagency support for Triad.<ref>{{Cite web | url=http://www.triadcentral.org/multiagency/index.cfm | title=Triad Resource Center | Multiagency Support for Triad}}</ref> Beginning in 2006, The U.S. Environmental Protection Agency Office of Superfund Remediation and Technology Innovation expressed support of Triad by requesting the cooperation of its regional managers to expand the use of Triad at Superfund sites, where appropriate.<ref>http://www.triadcentral.org/ref/ref/documents/Triad_Policy_Memo.pdf EPA Memo OSWER-9200.1-55</ref> |
||
⚫ | |||
⚫ | Triad |
||
==Elements of the Triad== |
==Elements of the Triad== |
||
⚫ | Although the following elements are the legs that gave the impetus for calling the process "Triad," the goal of the Triad approach is to infuse the concepts into hazardous-waste site cleanups, no matter what the lead organization calls the process. (U.S. Army Corps of Engineers Technical Project Planning Process (TPP)<ref>{{cite web |url=http://www.usace.army.mil/publications/eng-manuals/em200-1-2/entire.pdf |title=Archived copy |accessdate=2007-08-03 |url-status=dead |archiveurl=https://web.archive.org/web/20070715135918/http://www.usace.army.mil/publications/eng-manuals/em200-1-2/entire.pdf |archivedate=2007-07-15 }}</ref> for systematic planning, for example.) |
||
⚫ | Although the following elements are the legs that gave the |
||
===Systematic Project Planning=== |
===Systematic Project Planning=== |
||
⚫ | Project planning identifies the problems and encourages stakeholders to negotiate the steps necessary to mediate the risks the environmental contamination pose to human health and ecology. The specific goals of a project (redevelopment, revitalization, etc.) may differ, but the specific objectives during the SPP process are: |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | Dynamic work strategies are strategies that can be adapted to site conditions as new information becomes available while work is underway. This adaptation may be in response to data collection activities designed to address CSM unknowns, or it may be in response to completely unexpected site conditions encountered during the course of work. |
||
⚫ | Dynamic work strategies as part of a Triad approach can be included in almost every activity associated with hazardous waste site characterization and remediation. This includes overall project strategies, dynamic sampling and analysis programs (DSP,<ref>Albert Robbat, Jr., 1997, A Guideline for Dynamic Workplans and Field Analytics: The Keys to Cost-Effective Site Characterization and Cleanup [http://ase.tufts.edu/chemistry/robbat/documents/DynamicWorkplans.pdf]</ref> ASAP <ref>US-DOE, 2001. Adaptive Sampling and Analysis Programs (ASAPs). Report DOE/EM-0592 [https://frtr.gov/pdf/asap_2.pdf]</ref>) for characterization purposes, remedial action design, implementation, and performance monitoring, long-term monitoring for sites that require it, closure plans, and quality assurance/quality control activities. |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | Sometimes referred to as 'real-time' measurement systems, these are analytical or measurement technologies<ref>{{Cite web | url=http://www.cluin.org/char1_tech.cfm | title=CLU-IN | Technologies > Characterization and Monitoring}}</ref> capable of producing data quickly enough to direct the progress of field activities (characterization or remediation) while they are underway [http://www.triadcentral.org/mgmt/meas/key/index.cfm], analogous to [[Real time business intelligence|Real-time business intelligence]]. Example analytical methods include portable or handheld X-ray Fluorescence (pXRF [http://www.cluin.org/char/technologies/xrf.cfm XRF]), portable gas chromatograph and mass spectrometry (GC-MS) technologies, and [[immunoassay]] [[Medical diagnosis|test kit]]s.<ref>{{Cite web | url=http://www.cluin.org/char/technologies/immunoassay.cfm | title=CLU-IN | Technologies > Characterization and Monitoring > About Characterization and Monitoring Technologies > Immunoassay and Enzymatic Assays}}</ref> New field analytical methods are fast developing. However, some have used standard laboratory approaches with quick turn-around results. The analysis enables in-field decision-making ''and'' ensures logical internal consistency among Triad concepts.<ref>{{Cite web | url=http://www.epa.gov/tio/download/char/epa542f07001.pdf | title=Technologies for Cleaning up Contaminated Sites| date=2015-01-27}}</ref> |
||
⚫ | |||
⚫ | |||
⚫ | At the core of each project is the conceptual site model (CSM).<ref>{{Cite web |url=http://www.triadcentral.org/ref/ref/documents/CSM_checklist.pdf |title=Archived copy |access-date=2007-08-03 |archive-date=2007-09-28 |archive-url=https://web.archive.org/web/20070928162939/http://www.triadcentral.org/ref/ref/documents/CSM_checklist.pdf |url-status=dead }}</ref> The term CSM is sometimes used to only describe pieces of the whole model. Geological, hydrogeological, contaminant fate and transport all may have computer models referred to as 'conceptual,' and a risk assessment may contain a CSM, but in a Triad sense, a CSM is the holistic model that can effectively portray site concerns significant to the decisions that must be made. |
||
==Citations and notes== |
|||
⚫ | Dynamic work strategies are strategies that |
||
{{reflist}} |
|||
==References== |
|||
⚫ | Dynamic work strategies as part of a Triad approach can be |
||
* ''Remediation'', Spring 2003, Crumbling, Deana M., Griffith, Jennifer, Powell, Dan M., Improving decision quality: Making the case for adopting next-generation site characterization practices, Wiley Periodicals, Inc., 2003 [http://cluin.org/download/char/spring2003v13n2p91.pdf] |
|||
* ''DSP'', Albert Robbat, Jr., 1997, A Guideline for Dynamic Workplans and Field Analytics: The Keys to Cost-Effective Site Characterization and Cleanup [http://ase.tufts.edu/chemistry/robbat/documents/DynamicWorkplans.pdf] |
|||
⚫ | |||
* ''ASAP'', US-DOE, 2001. Adaptive Sampling and Analysis Programs (ASAPs). Report DOE/EM-0592 [https://frtr.gov/pdf/asap_2.pdf] |
|||
⚫ | Sometimes referred to as 'real-time' measurement systems, these are analytical or measurement |
||
⚫ | |||
⚫ | At the core of each project is the conceptual site model ( |
||
==External links== |
==External links== |
||
<!--Any links that have not been cited in the article, but related to the article subject area--> |
|||
<!--===========================({{NoMoreLinks}})===============================--> |
|||
*[http://www.triadcentral.org Triad Resource Center] |
|||
<!--| DO NOT ADD MORE LINKS TO THIS ARTICLE. WIKIPEDIA IS NOT A COLLECTION OF |--> |
|||
*[http://www.triadcentral.org/ref/ref/documents/Triad_Policy_Memo.pdf EPA Memo OSWER-9200.1-55] |
|||
<!--| LINKS. If you think that your link might be useful, do not add it here, |--> |
|||
<!--| but put it on this article's discussion page first or submit your link |--> |
|||
<!--| to the appropriate category at the Open Directory Project (www.dmoz.org)|--> |
|||
<!--| and link back to that category using the {{dmoz}} template. |--> |
|||
<!--| |--> |
|||
<!--| Links that have not been verified WILL BE DELETED. |--> |
|||
<!--| See [[Wikipedia:External links]] and [[Wikipedia:Spam]] for details |--> |
|||
<!--===========================({{NoMoreLinks}})===============================--> |
|||
*[http://www.itrcweb.org/documents/SCM-1.pdf ITRC Triad Technical and Regulatory Guidance 2003] |
*[http://www.itrcweb.org/documents/SCM-1.pdf ITRC Triad Technical and Regulatory Guidance 2003] |
||
*[http://www.itrcweb.org/Documents/SCM-3.pdf ITRC Triad Implementation Guide 2007] |
*[http://www.itrcweb.org/Documents/SCM-3.pdf ITRC Triad Implementation Guide 2007] |
||
*[http:// |
*[http://pubs.acs.org/cgi-bin/article.cgi/esthag-a/0000/35/i19/html/19crumbling.html Crumbling, D.M., C. Groenjes, B. Lesnik, K. Lynch, J. Shockley, J Van EE, R Howe, L Keith, and J McKenna. Managing Uncertainty in Environmental Decisions. ES&T Vol. 35, No 19, pp 405A-409A.] |
||
* |
|||
[[Category:Environmental science]] |
|||
⚫ |
Latest revision as of 19:35, 20 August 2022
This article needs additional citations for verification. (August 2008) |
The Triad [1] is an approach by the United States Environmental Protection Agency to decision-making for hazardous-waste site cleanup.[2] During the late 1990s, technology advocates from the environmental sector in the United States developed the approach by combining innovations in management and technology with ideas from hazardous-waste site cleanup experience.
Their goal was to form a framework for real-time environmental sensors and tools, to improve decision-making at contaminated sites. This resulted in a more formalized set of ideas in 2001 that soon became known as the Triad approach. The ideas spawned a Community of Practice by 2005.
The Triad Community of Practice[3] includes representatives of federal, state, and private sector organizations in the U.S. and abroad. By 2008, a European CoP had been formed [4] In 2008, a technical conference led largely by the CoP and covering the Triad Approach was held at the University of Massachusetts in Amherst, "Triad Investigations: New Approaches and Innovative Strategies.[5]"
The term Triad represents three elements: systematic project planning (SPP), dynamic work strategies, and innovative rapid sampling and analytical technologies. While elements of the Triad have long been used for site cleanup, Triad packages these best management practices together with the guiding principles:
- Use a planning process, which includes participation of all stakeholders (including a multidisciplinary project team, federal and state regulators, legal counsel, community members, and other environmental professionals), to determine the types of data required and to evaluate whether the site could benefit from real-time measurement technologies.
- Discussion of uncertainty management, data representativeness, and site closure strategies.
- Use of a site model that recognizes site characterization is an element used at all stages of remediation.
- Use of sampling, measurement, and data management technologies to support uncertainty management strategies.
- Project teams that have communication, trust, discussion of individual interests and goals, and expertise in the appropriate fields.
Triad is an open-marketplace idea that is not owned by one entity. There is considerable U.S. Multiagency support for Triad.[6] Beginning in 2006, The U.S. Environmental Protection Agency Office of Superfund Remediation and Technology Innovation expressed support of Triad by requesting the cooperation of its regional managers to expand the use of Triad at Superfund sites, where appropriate.[7]
Elements of the Triad
[edit]Although the following elements are the legs that gave the impetus for calling the process "Triad," the goal of the Triad approach is to infuse the concepts into hazardous-waste site cleanups, no matter what the lead organization calls the process. (U.S. Army Corps of Engineers Technical Project Planning Process (TPP)[8] for systematic planning, for example.)
Systematic Project Planning
[edit]Project planning identifies the problems and encourages stakeholders to negotiate the steps necessary to mediate the risks the environmental contamination pose to human health and ecology. The specific goals of a project (redevelopment, revitalization, etc.) may differ, but the specific objectives during the SPP process are:
- Frame the problem: identify project objectives, constraints, stakeholders, the regulatory framework, and primary/secondary decisions.
- Develop a site model: construct and maintain a site model that captures information pertinent to the primary/secondary decisions that must be made. The term CSM is updated by identifying data gaps, and developing a dynamic work strategy to fill in the data gaps.
- Evaluate and manage uncertainty: evaluate and manage the uncertainty associated with decision-making in the context of the CSM so that decisions can be made with acceptable levels of confidence.
Dynamic work strategies
[edit]Dynamic work strategies are strategies that can be adapted to site conditions as new information becomes available while work is underway. This adaptation may be in response to data collection activities designed to address CSM unknowns, or it may be in response to completely unexpected site conditions encountered during the course of work.
Dynamic work strategies as part of a Triad approach can be included in almost every activity associated with hazardous waste site characterization and remediation. This includes overall project strategies, dynamic sampling and analysis programs (DSP,[9] ASAP [10]) for characterization purposes, remedial action design, implementation, and performance monitoring, long-term monitoring for sites that require it, closure plans, and quality assurance/quality control activities.
Innovative rapid sampling
[edit]Sometimes referred to as 'real-time' measurement systems, these are analytical or measurement technologies[11] capable of producing data quickly enough to direct the progress of field activities (characterization or remediation) while they are underway [3], analogous to Real-time business intelligence. Example analytical methods include portable or handheld X-ray Fluorescence (pXRF XRF), portable gas chromatograph and mass spectrometry (GC-MS) technologies, and immunoassay test kits.[12] New field analytical methods are fast developing. However, some have used standard laboratory approaches with quick turn-around results. The analysis enables in-field decision-making and ensures logical internal consistency among Triad concepts.[13]
Conceptual site models
[edit]At the core of each project is the conceptual site model (CSM).[14] The term CSM is sometimes used to only describe pieces of the whole model. Geological, hydrogeological, contaminant fate and transport all may have computer models referred to as 'conceptual,' and a risk assessment may contain a CSM, but in a Triad sense, a CSM is the holistic model that can effectively portray site concerns significant to the decisions that must be made.
Citations and notes
[edit]- ^ Triad Resource Center
- ^ pp.91-111, Crumbling, Griffith, Powell
- ^ "Triad Resource Center | Triad User Experiences".
- ^ European CoP Info
- ^ 2008 Triad Conference Archived 2011-03-14 at the Wayback Machine
- ^ "Triad Resource Center | Multiagency Support for Triad".
- ^ http://www.triadcentral.org/ref/ref/documents/Triad_Policy_Memo.pdf EPA Memo OSWER-9200.1-55
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 2007-07-15. Retrieved 2007-08-03.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ Albert Robbat, Jr., 1997, A Guideline for Dynamic Workplans and Field Analytics: The Keys to Cost-Effective Site Characterization and Cleanup [1]
- ^ US-DOE, 2001. Adaptive Sampling and Analysis Programs (ASAPs). Report DOE/EM-0592 [2]
- ^ "CLU-IN | Technologies > Characterization and Monitoring".
- ^ "CLU-IN | Technologies > Characterization and Monitoring > About Characterization and Monitoring Technologies > Immunoassay and Enzymatic Assays".
- ^ "Technologies for Cleaning up Contaminated Sites" (PDF). 2015-01-27.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 2007-09-28. Retrieved 2007-08-03.
{{cite web}}
: CS1 maint: archived copy as title (link)
References
[edit]- Remediation, Spring 2003, Crumbling, Deana M., Griffith, Jennifer, Powell, Dan M., Improving decision quality: Making the case for adopting next-generation site characterization practices, Wiley Periodicals, Inc., 2003 [4]
- DSP, Albert Robbat, Jr., 1997, A Guideline for Dynamic Workplans and Field Analytics: The Keys to Cost-Effective Site Characterization and Cleanup [5]
- ASAP, US-DOE, 2001. Adaptive Sampling and Analysis Programs (ASAPs). Report DOE/EM-0592 [6]