WaHu Student Apartments: Difference between revisions
m phab:T291704 and/or H:BR fixes, plus WP:GENFIXES |
wl |
||
(4 intermediate revisions by 4 users not shown) | |||
Line 2: | Line 2: | ||
{{good article}} |
{{good article}} |
||
{{Infobox building |
{{Infobox building |
||
| name |
| name = WaHu Student Apartments |
||
| former_names |
| former_names = |
||
| alternate_names |
| alternate_names = {{hlist|WaHu|Wahu}} |
||
| image |
| image = WaHu Student Apartments, Minneapolis, January 2023.jpg |
||
| caption |
| caption = The building in 2023 |
||
| image_alt = WaHu Student Apartments on a clear day with snow on the ground. The left side is lower, six stories; the right side is eleven. |
|||
| map_type = |
|||
| |
| map_type = |
||
| |
| altitude = |
||
| building_type = {{hlist|[[Multi-family residential|Residential]]|[[Mixed-use development|mixed-use]]}} |
|||
| architectural_style = [[Modern architecture|Modern]] |
| architectural_style = [[Modern architecture|Modern]] |
||
| structural_system |
| structural_system = |
||
| cost |
| cost = $90 million ([[United States dollar|USD]]) |
||
| ren_cost |
| ren_cost = |
||
| location |
| location = [[Minneapolis, Minnesota|Minneapolis]], [[Minnesota]] |
||
| address |
| address = 1016 Washington Avenue Southeast |
||
| client |
| client = CPM Development |
||
| owner |
| owner = |
||
| current_tenants |
| current_tenants = |
||
| landlord |
| landlord = B.HOM Student Living LLC |
||
| coordinates |
| coordinates = {{Coord|44|58|23|N|93|13|21|W |type:landmark_region:US-MN |display=inline,title}} |
||
| start_date |
| start_date = December 2013 |
||
| completion_date |
| completion_date = August 2015 |
||
| inauguration_date |
| inauguration_date = |
||
| renovation_date |
| renovation_date = |
||
| demolition_date |
| demolition_date = |
||
| destruction_date |
| destruction_date = |
||
| height |
| height = 132 ft (40 m) |
||
| diameter |
| diameter = |
||
| other_dimensions |
| other_dimensions = |
||
| floor_count |
| floor_count = 11 |
||
| floor_area |
| floor_area = {{convert|550000|sqft|abbr=on}} |
||
| main_contractor |
| main_contractor = |
||
| architect |
| architect = |
||
| architecture_firm |
| architecture_firm = BKV Group |
||
| developer |
| developer = {{hlist|North Bay Companies|Reuter Walton Development}} |
||
| structural_engineer = |
| structural_engineer = |
||
| services_engineer |
| services_engineer = |
||
| civil_engineer |
| civil_engineer = |
||
| other_designers |
| other_designers = |
||
| quantity_surveyor |
| quantity_surveyor = |
||
| awards |
| awards = |
||
| references |
| references = |
||
}} |
}} |
||
Line 53: | Line 54: | ||
[[File:WaHu Student Apartments, Minneapolis, November 2014.jpg|thumb|left|alt=A wide apartment building under construction|WaHu under construction in 2014]] |
[[File:WaHu Student Apartments, Minneapolis, November 2014.jpg|thumb|left|alt=A wide apartment building under construction|WaHu under construction in 2014]] |
||
The CSL Plasma center prevented construction of the site from beginning due to their inability to lock down a new, suitable location. On September 20, 2013, ''[[Finance & Commerce]]'' magazine confirmed that the company was able to lease a suitably-zoned space for medical research, allowing work on WaHu Student Apartments to start, beginning in December 2013.<ref name="Finance & Commerce pre construction article" /> Construction on the project was completed in August 2015. Its developers consisted of locally-based North Bay Companies and Reuter Walton Development.<ref name="Reuter Walton Development portfolio">{{cite web |title=Development Portfolio |url=https://www.reuterwaltondevelopment.com |publisher=Reuter Walton Development |access-date=April 25, 2020 |archive-url=https://web.archive.org/web/20200410171146/https://www.reuterwaltondevelopment.com/ |archive-date=April 10, 2020 |url-status=live }}</ref><ref name="North Bay Companies portfolio" /> |
The [[CSL Plasma]] center prevented construction of the site from beginning due to their inability to lock down a new, suitable location. On September 20, 2013, ''[[Finance & Commerce]]'' magazine confirmed that the company was able to lease a suitably-zoned space for medical research, allowing work on WaHu Student Apartments to start, beginning in December 2013.<ref name="Finance & Commerce pre construction article" /> Construction on the project was completed in August 2015. Its developers consisted of locally-based North Bay Companies and Reuter Walton Development.<ref name="Reuter Walton Development portfolio">{{cite web |title=Development Portfolio |url=https://www.reuterwaltondevelopment.com |publisher=Reuter Walton Development |access-date=April 25, 2020 |archive-url=https://web.archive.org/web/20200410171146/https://www.reuterwaltondevelopment.com/ |archive-date=April 10, 2020 |url-status=live }}</ref><ref name="North Bay Companies portfolio" /> B.HOM Student Living LLC manages the residential units of WaHu Student Apartments, while [[Colliers International]] handles the retail tenants.<ref name="Cardinal Group Companies portfolio">{{cite web |title=Our Portfolio |url=https://cardinalgroup.com/portfolio/ |publisher=Cardinal Group Companies |access-date=April 25, 2020 |archive-url=https://web.archive.org/web/20200511145929/https://cardinalgroup.com/portfolio/ |archive-date=May 11, 2020 |url-status=live }}</ref><ref name="Colliers International brochure" /> |
||
== Design and location == |
== Design and location == |
Latest revision as of 11:11, 3 March 2024
WaHu Student Apartments | |
---|---|
Alternative names |
|
General information | |
Type | |
Architectural style | Modern |
Location | Minneapolis, Minnesota |
Address | 1016 Washington Avenue Southeast |
Coordinates | 44°58′23″N 93°13′21″W / 44.97306°N 93.22250°W |
Construction started | December 2013 |
Completed | August 2015 |
Cost | $90 million (USD) |
Client | CPM Development |
Landlord | B.HOM Student Living LLC |
Height | 132 ft (40 m) |
Technical details | |
Floor count | 11 |
Floor area | 550,000 sq ft (51,000 m2) |
Design and construction | |
Architecture firm | BKV Group |
Developer |
|
WaHu Student Apartments (also known simply as WaHu or Wahu) is a luxury residential apartment building located in Minneapolis, Minnesota. It was first announced in 2012 with intent to cater to the campus population of the nearby University of Minnesota. The complex comprises 327 residential units within three apartment towers. It also contains designated retail space, currently leased by tenants such as Bank of America, Blaze Pizza, and local restaurants.
Its name is a combination of the two roads at its adjacent intersection, Huron Boulevard Southeast and Washington Avenue Southeast. WaHu Student Apartments is located in the Stadium Village neighborhood of Minneapolis, built atop the site of a former blood plasma clinic that contributed to several construction delays for the complex. Neighboring structures to the apartment complex include TCF Bank Stadium and the Stadium Village light rail station. Construction of WaHu Student Apartments was completed in August 2015, in time for the start of the academic year.
Construction and completion
[edit]WaHu Student Apartments was designed by the Minneapolis-based architectural firm BKV Group.[1] The project was first discussed in 2012, along with plans to relocate current businesses on the site, including a blood plasma donation center called CSL.[2] Construction of WaHu Student Apartments was estimated to reach completion in 2014 in time for the start of the academic year, although this was later pushed back to 2015 due to CSL's decision to complete their original leasing agreement, which ended in August 2014. The plasma clinic initially explored relocating options as early as 2012, but the city of Minneapolis disapproved of a plan to rezone a lot across the street from its current location to allow for medical research.[3] WaHu Student Apartment's client was local apartment developer CPM Development, the company behind 15 other housing projects in Minneapolis.[4] Daniel Oberpriller, a co-founder of CPM Development, formally announced the project in mid-2013 and labeled it as a luxury student housing project.[5]
The CSL Plasma center prevented construction of the site from beginning due to their inability to lock down a new, suitable location. On September 20, 2013, Finance & Commerce magazine confirmed that the company was able to lease a suitably-zoned space for medical research, allowing work on WaHu Student Apartments to start, beginning in December 2013.[3] Construction on the project was completed in August 2015. Its developers consisted of locally-based North Bay Companies and Reuter Walton Development.[6][7] B.HOM Student Living LLC manages the residential units of WaHu Student Apartments, while Colliers International handles the retail tenants.[8][9]
Design and location
[edit]WaHu Student Apartments consists of eleven stories with a total of 327 residential units.[4] With an angular design, it contains two 6-story residential towers and one 11-story tower.[10][11] The apartment units range from studio efficiencies to four bedroom and four bathroom units.[12] The peak height of the tallest tower is 132 ft (40 m), comparable to neighboring apartment buildings in Stadium Village.[13] The first floor of the apartment complex contains 24,000 sq ft (2,200 m2) of leasable retail space, designated for restaurants, bars, and shops.[7] Tenants include Blaze Pizza, Bank of America, Sprouts Salad Company, and the MuMu bubble teahouse, formerly called Bambu.[9][14] Two other available retail suites sit vacant.[9]
The complex's design contains elements of modern architecture, with "materials such as glass, metal panels, metal siding, and cement board panels".[1] The first floor storefronts contain large quantities of glass, with certain sections of windows repeating upwards to the eleventh floor.[1]
WaHu Student Apartments is located at the intersection of Huron Boulevard Southeast and Washington Avenue Southeast,[7] adjacent to other student housing projects like Stadium View Apartments, Solhaus, and Solhaus Tower.[13] Set within the Stadium Village neighborhood of Minneapolis, it was constructed on the site of the former plasma donation center and an Arby's restaurant.[3] WaHu Student Apartments is adjacent to the University of Minnesota's TCF Bank Stadium and across the street from the Stadium Village station for the Metro Green Line light rail line.[15] According to officials from the city of Minneapolis, the project was compliant with the university's "master plan" for student housing, which calls for residential projects with similar unit densities and building heights.[13]
References
[edit]- ^ a b c "Wahu Student Apartments – Minneapolis, MN". BKV Group. Archived from the original on April 22, 2020. Retrieved April 25, 2020.
- ^ "Community Development Committee Agenda: 10/23/2012". City of Minneapolis. October 23, 2012. Retrieved April 25, 2020.
- ^ a b c Newmarker, Chris (September 20, 2013). "WaHu development near U clears final hurdle (Update)". Finance & Commerce. Archived from the original on March 6, 2016. Retrieved April 25, 2020.
- ^ a b Gilyard, Burl (October 24, 2017). "CPM Leaders Launch New, Separate Companies". Twin Cities Business. Archived from the original on October 28, 2017. Retrieved April 25, 2020.
- ^ Buchta, Jim (June 15, 2013). "Luxury housing boom transforms student life at U of M". Star Tribune. Archived from the original on August 31, 2019. Retrieved April 25, 2020.
- ^ "Development Portfolio". Reuter Walton Development. Archived from the original on April 10, 2020. Retrieved April 25, 2020.
- ^ a b c "Development Portfolio: WaHu". North Bay Companies. Archived from the original on October 5, 2018. Retrieved April 25, 2020.
- ^ "Our Portfolio". Cardinal Group Companies. Archived from the original on May 11, 2020. Retrieved April 25, 2020.
- ^ a b c "Retail For Lease: The WaHu" (PDF). Colliers International. Archived (PDF) from the original on May 31, 2021. Retrieved May 30, 2021.
- ^ Hemming, Jared (June 1, 2016). "Luxury apartments are swarming the U, but students can't buy serenity". City Pages. Archived from the original on November 19, 2019. Retrieved April 25, 2020.
- ^ Link, Jeff (June 15, 2015). "Finding Ways to Fit In". American Builders Quarterly. Archived from the original on May 31, 2021. Retrieved April 25, 2020.
- ^ "WaHu Apartment Rentals: Our Floor Plans". WaHu Student Apartments. Archived from the original on May 31, 2021. Retrieved May 30, 2021.
- ^ a b c "Minneapolis – City of Lakes, CPED Staff Report: Land Use Application Summary" (PDF). City of Minneapolis. May 11, 2015. Archived (PDF) from the original on February 15, 2017. Retrieved April 25, 2020.
- ^ "Retail". WaHu Student Apartments. Archived from the original on April 3, 2018. Retrieved April 25, 2020.
- ^ "Completed Development Projects". Prospect Park 2020. Retrieved April 25, 2020.