Jump to content

Kanpur Monorail: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
m date format audit, refine ref details
 
(36 intermediate revisions by 28 users not shown)
Line 1: Line 1:
{{Use dmy dates|date=April 2024}}
{{Use Indian English|date=June 2018}}
{{Infobox Public transit
{{Infobox Public transit
| name = Kanpur Monorail <br>कानपूर मोनोरेल
| name = Kanpur Monorail
| image =
| image =
| imagesize = 225
| imagesize = 225
| locale = [[Kanpur]]
| locale = [[Kanpur]], [[Uttar Pradesh]]
| transit_type = [[Monorail]]
| transit_type = [[Monorail]]
| began_operation =
| began_operation =
Line 24: Line 26:
| owner = [[Government of Uttar Pradesh]]
| owner = [[Government of Uttar Pradesh]]
| map =
| map =
|alt=|caption=|area served=|line_number=|start=|end=|annual_ridership=|character=|map_state=}}
}}


The '''Kanpur Monorail''' was a proposed [[monorail]] system for the city of [[Kanpur]].<ref>{{cite web |url=http://www.monorails.org/tmspages/News.html |title=Monorail News Briefs |publisher=Monorails.org |access-date=2010-09-16 |url-status=dead |archive-url=https://web.archive.org/web/20100613055508/http://monorails.org/tMspages/News.html |archive-date=2010-06-13 }}</ref><ref>http://www.niua.org/projects/tpt/introduction.pdf {{Bare URL PDF|date=March 2022}}</ref>
The '''Kanpur Monorail''' is a proposed [[monorail]] system for the city of [[Kanpur]].


==Lines==
==Lines==
There are three lines proposed in phase I are as follows:<ref name="thehindu1">{{cite web|author=Sujay Mehdudia |url=http://beta.thehindu.com/news/cities/Kanpur/article87665.ece |title=The Hindu : Cities / Kanpur : Kanpur likely to get monorail |publisher=Beta.thehindu.com |date=2010-01-21 |accessdate=2010-08-11}}</ref>
There are three lines proposed in phase I are as follows:<ref name="thehindu1">{{cite news |author=Sujay Mehdudia |url=http://beta.thehindu.com/news/cities/Kanpur/article87665.ece |title=The Hindu : Cities / Kanpur : Kanpur likely to get monorail |publisher=Beta.thehindu.com |date=2010-01-21 |access-date=2010-08-11 |location=Chennai, India }}{{Dead link|date=February 2020 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>


*From [[Panki]] Sector 18 to [[Shuklaganj]] via Govind Puri - Jarib Chauki - Central - Ghantaghar 8 Point - Shuklaganj. Length of this line would be 24.5&nbsp;km
*From [[Panki, Kanpur|Panki]] Sector 18 to [[Shuklaganj]] via Govind Puri Jarib Chauki Central Ghantaghar 8 Point Shuklaganj. Length of this line would be 24.5&nbsp;km
*From Chobepur to Maharajpur via IIT Kanpur - Kalyanpur - Rawatpur - [[Kanpur Anwarganj]] - [[Kanpur Central]]. Length of this line would be 28.5&nbsp;km
*From Chobepur to Maharajpur via IIT Kanpur Kalyanpur Rawatpur [[Kanpur Anwarganj]] [[Kanpur Central]]. Length of this line would be 28.5&nbsp;km
*From [[Allen Forest Zoo|Kanpur Zoo]] to [[Kanpur Cantonment]] via Old Kanpur - [[Civil Lines]] - Wazid Pur. Length of this line would be 16.0&nbsp;km
*From [[Allen Forest Zoo|Kanpur Zoo]] to [[Kanpur Cantonment]] via Old Kanpur [[Civil Lines]] Wazid Pur. Length of this line would be 16.0&nbsp;km


'''Total length of Phase I would be 63.0&nbsp;km.'''
'''Total length of Phase I would be 63.0&nbsp;km.'''


====Other Lines====
===Other lines===


Other lines which are being proposed in addition to Phase I are:<ref>{{cite web|author=Megha Suri, TNN, 21 February 2008, 07:56pm IST |url=http://timesofindia.indiatimes.com/Monorail_to_hit_Kanpur_streets_by_2010/rssarticleshow/2802311.cms |title=Monorail to hit Kanpur streets by 2010 - Kanpur - City - The Times of India |publisher=Timesofindia.indiatimes.com |date=2008-02-21 |accessdate=2010-08-11}}</ref>
Other lines which are being proposed in addition to Phase I are:<ref>{{cite news|author=Megha Suri|url=http://timesofindia.indiatimes.com/Monorail_to_hit_Kanpur_streets_by_2010/rssarticleshow/2802311.cms |title=Monorail to hit Kanpur streets by 2010 |work=The Times of India |date=2008-02-21 |access-date=2010-08-11}}</ref>


*From Daheli Sujanpur to [[Govind Nagar]].
*From Daheli Sujanpur to [[Govind Nagar]].
*From [[J K Temple]] to Kidwai Nagar via Kamla Club - [[Govindpuri]].
*From [[J K Temple]] to Kidwai Nagar via Kamla Club [[Govindpuri]].
*From Gangotri Township to Sahara City via [[Green Park Stadium]] - [[Rave 3]] - Old Kanpur - New Kanpur City
*From Gangotri Township to Sahara City via [[Green Park Stadium]] [[Rave 3]] Old Kanpur New Kanpur City


==Status==
==Status==
Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016.<ref name="thehindu1"/> {{As of|2021}} no work has commenced.


In 2016 the State Government approved the rail based [[Kanpur Metro]], which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans.
Feasibility study has been completed for Phase I corridors. Work likely to start after 2016 ref name="thehindu1"/>


==Reference==
== References ==
{{reflist}}
{{Reflist}}


{{Rapid transit in India}}
{{Rapid transit in India}}

{{coord missing|Uttar Pradesh}}
{{coord missing|Uttar Pradesh}}


[[Category:Monorails in India]]
[[Category:Proposed monorails in India]]
[[Category:Proposed public transport in India]]
[[Category:Transport in Kanpur]]
[[Category:Transport in Kanpur]]
[[Category:Proposed infrastructure in Uttar Pradesh]]


{{India-rail-transport-stub}}
{{Asia-metro-stub}}

Latest revision as of 17:12, 9 April 2024

Kanpur Monorail
Overview
OwnerGovernment of Uttar Pradesh
LocaleKanpur, Uttar Pradesh
Transit typeMonorail
Number of lines3 (planned)
Daily ridership35,000 (Estd.)
HeadquartersMonorail
Operation
Train length4 coaches
Technical
Electrification750 V DC
Average speed31 km/h (19 mph)
Top speed80 km/h (50 mph)

The Kanpur Monorail was a proposed monorail system for the city of Kanpur.[1][2]

Lines

[edit]

There are three lines proposed in phase I are as follows:[3]

  • From Panki Sector 18 to Shuklaganj via Govind Puri – Jarib Chauki – Central – Ghantaghar 8 Point – Shuklaganj. Length of this line would be 24.5 km
  • From Chobepur to Maharajpur via IIT Kanpur – Kalyanpur – Rawatpur – Kanpur AnwarganjKanpur Central. Length of this line would be 28.5 km
  • From Kanpur Zoo to Kanpur Cantonment via Old Kanpur – Civil Lines – Wazid Pur. Length of this line would be 16.0 km

Total length of Phase I would be 63.0 km.

Other lines

[edit]

Other lines which are being proposed in addition to Phase I are:[4]

Status

[edit]

Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016.[3] As of 2021 no work has commenced.

In 2016 the State Government approved the rail based Kanpur Metro, which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans.

References

[edit]
  1. ^ "Monorail News Briefs". Monorails.org. Archived from the original on 13 June 2010. Retrieved 16 September 2010.
  2. ^ http://www.niua.org/projects/tpt/introduction.pdf [bare URL PDF]
  3. ^ a b Sujay Mehdudia (21 January 2010). "The Hindu : Cities / Kanpur : Kanpur likely to get monorail". Chennai, India: Beta.thehindu.com. Retrieved 11 August 2010.[permanent dead link]
  4. ^ Megha Suri (21 February 2008). "Monorail to hit Kanpur streets by 2010". The Times of India. Retrieved 11 August 2010.