Kanpur Monorail: Difference between revisions
Appearance
Content deleted Content added
m Dating maintenance tags: {{Tone}} |
m date format audit, refine ref details |
||
(21 intermediate revisions by 18 users not shown) | |||
Line 1: | Line 1: | ||
{{Use dmy dates|date=April 2024}} |
|||
{{Use Indian English|date=June 2018}} |
|||
{{Infobox Public transit |
{{Infobox Public transit |
||
| name = Kanpur Monorail |
| name = Kanpur Monorail |
||
| image = |
| image = |
||
| imagesize = 225 |
| imagesize = 225 |
||
Line 24: | Line 26: | ||
| owner = [[Government of Uttar Pradesh]] |
| owner = [[Government of Uttar Pradesh]] |
||
| map = |
| map = |
||
|alt=|caption=|area served=|line_number=|start=|end=|annual_ridership=|character=|map_state=}} |
|||
}} |
|||
The '''Kanpur Monorail''' |
The '''Kanpur Monorail''' was a proposed [[monorail]] system for the city of [[Kanpur]].<ref>{{cite web |url=http://www.monorails.org/tmspages/News.html |title=Monorail News Briefs |publisher=Monorails.org |access-date=2010-09-16 |url-status=dead |archive-url=https://web.archive.org/web/20100613055508/http://monorails.org/tMspages/News.html |archive-date=2010-06-13 }}</ref><ref>http://www.niua.org/projects/tpt/introduction.pdf {{Bare URL PDF|date=March 2022}}</ref> |
||
==Project== |
|||
{{Tone|section|date=August 2014}} |
|||
Promises are meant to be broken, the adage goes. And Kanpurites, it seems, are having a fair share of promises made and broken by politicians and bureaucrats alike. |
|||
Chief minister Mulayam Singh Yadav, while addressing entrepreneurs of UP origin from across the globe at the "UP-Calling 2004" on February 20, had announced to launch a magnetic monorail between Lucknow and Kanpur. For this purpose, the UP Development Council (UPDC) was in touch with a consortium of Japanese companies, he had added. That was the first and the last mention of the project.<ref>{{cite news| url=http://articles.timesofindia.indiatimes.com/2004-07-22/lucknow/27161962_1_monorail-kanpurites-anil-sharma | work=The Times Of India | title=Monorail & other projects: Kanpurites taken for a ride | date=2004-07-22}}</ref> |
|||
==Lines== |
==Lines== |
||
There are three lines proposed in phase I are as follows:<ref name="thehindu1">{{cite news|author=Sujay Mehdudia |url=http://beta.thehindu.com/news/cities/Kanpur/article87665.ece |title=The Hindu : Cities / Kanpur : Kanpur likely to get monorail |publisher=Beta.thehindu.com |date=2010-01-21 | |
There are three lines proposed in phase I are as follows:<ref name="thehindu1">{{cite news |author=Sujay Mehdudia |url=http://beta.thehindu.com/news/cities/Kanpur/article87665.ece |title=The Hindu : Cities / Kanpur : Kanpur likely to get monorail |publisher=Beta.thehindu.com |date=2010-01-21 |access-date=2010-08-11 |location=Chennai, India }}{{Dead link|date=February 2020 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> |
||
*From [[Panki, Kanpur|Panki]] Sector 18 to [[Shuklaganj]] via Govind Puri |
*From [[Panki, Kanpur|Panki]] Sector 18 to [[Shuklaganj]] via Govind Puri – Jarib Chauki – Central – Ghantaghar 8 Point – Shuklaganj. Length of this line would be 24.5 km |
||
*From Chobepur to Maharajpur via IIT Kanpur |
*From Chobepur to Maharajpur via IIT Kanpur – Kalyanpur – Rawatpur – [[Kanpur Anwarganj]] – [[Kanpur Central]]. Length of this line would be 28.5 km |
||
*From [[Allen Forest Zoo|Kanpur Zoo]] to [[Kanpur Cantonment]] via Old Kanpur |
*From [[Allen Forest Zoo|Kanpur Zoo]] to [[Kanpur Cantonment]] via Old Kanpur – [[Civil Lines]] – Wazid Pur. Length of this line would be 16.0 km |
||
'''Total length of Phase I would be 63.0 km.''' |
'''Total length of Phase I would be 63.0 km.''' |
||
===Other |
===Other lines=== |
||
⚫ | Other lines which are being proposed in addition to Phase I are:<ref>{{cite news|author=Megha Suri|url=http://timesofindia.indiatimes.com/Monorail_to_hit_Kanpur_streets_by_2010/rssarticleshow/2802311.cms |title=Monorail to hit Kanpur streets by 2010 |work=The Times of India |date=2008-02-21 |access-date=2010-08-11}}</ref> |
||
⚫ | Other lines which are being proposed in addition to Phase I are:<ref>{{cite news|author=Megha Suri |
||
*From Daheli Sujanpur to [[Govind Nagar]]. |
*From Daheli Sujanpur to [[Govind Nagar]]. |
||
*From [[J K Temple]] to Kidwai Nagar via Kamla Club |
*From [[J K Temple]] to Kidwai Nagar via Kamla Club – [[Govindpuri]]. |
||
*From Gangotri Township to Sahara City via [[Green Park Stadium]] |
*From Gangotri Township to Sahara City via [[Green Park Stadium]] – [[Rave 3]] – Old Kanpur – New Kanpur City |
||
==Status== |
==Status== |
||
⚫ | |||
In 2016 the State Government approved the rail based [[Kanpur Metro]], which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans. |
|||
⚫ | |||
== References == |
== References == |
||
{{ |
{{Reflist}} |
||
{{Rapid transit in India}} |
{{Rapid transit in India}} |
||
Line 63: | Line 60: | ||
[[Category:Proposed monorails in India]] |
[[Category:Proposed monorails in India]] |
||
[[Category:Transport in Kanpur]] |
[[Category:Transport in Kanpur]] |
||
[[Category:Proposed infrastructure in Uttar Pradesh]] |
|||
{{ |
{{India-rail-transport-stub}} |
||
{{Asia-metro-stub}} |
Latest revision as of 17:12, 9 April 2024
Kanpur Monorail | |
---|---|
Overview | |
Owner | Government of Uttar Pradesh |
Locale | Kanpur, Uttar Pradesh |
Transit type | Monorail |
Number of lines | 3 (planned) |
Daily ridership | 35,000 (Estd.) |
Headquarters | Monorail |
Operation | |
Train length | 4 coaches |
Technical | |
Electrification | 750 V DC |
Average speed | 31 km/h (19 mph) |
Top speed | 80 km/h (50 mph) |
The Kanpur Monorail was a proposed monorail system for the city of Kanpur.[1][2]
Lines
[edit]There are three lines proposed in phase I are as follows:[3]
- From Panki Sector 18 to Shuklaganj via Govind Puri – Jarib Chauki – Central – Ghantaghar 8 Point – Shuklaganj. Length of this line would be 24.5 km
- From Chobepur to Maharajpur via IIT Kanpur – Kalyanpur – Rawatpur – Kanpur Anwarganj – Kanpur Central. Length of this line would be 28.5 km
- From Kanpur Zoo to Kanpur Cantonment via Old Kanpur – Civil Lines – Wazid Pur. Length of this line would be 16.0 km
Total length of Phase I would be 63.0 km.
Other lines
[edit]Other lines which are being proposed in addition to Phase I are:[4]
- From Daheli Sujanpur to Govind Nagar.
- From J K Temple to Kidwai Nagar via Kamla Club – Govindpuri.
- From Gangotri Township to Sahara City via Green Park Stadium – Rave 3 – Old Kanpur – New Kanpur City
Status
[edit]Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016.[3] As of 2021[update] no work has commenced.
In 2016 the State Government approved the rail based Kanpur Metro, which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans.
References
[edit]- ^ "Monorail News Briefs". Monorails.org. Archived from the original on 13 June 2010. Retrieved 16 September 2010.
- ^ http://www.niua.org/projects/tpt/introduction.pdf [bare URL PDF]
- ^ a b Sujay Mehdudia (21 January 2010). "The Hindu : Cities / Kanpur : Kanpur likely to get monorail". Chennai, India: Beta.thehindu.com. Retrieved 11 August 2010.[permanent dead link ]
- ^ Megha Suri (21 February 2008). "Monorail to hit Kanpur streets by 2010". The Times of India. Retrieved 11 August 2010.