Leslie Barns: Difference between revisions
m replace {{date}} in cs1|2 date-holding parameters; evaluated 34 templates; 8 parameter values modified; removed redundant |df= (5×); del |url-status= (8×); hyphenated parameters (46×); |
GreenC bot (talk | contribs) Rescued 1 archive link. Wayback Medic 2.5 |
||
(7 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Streetcar maintenance and storage facility in |
{{Short description|Streetcar maintenance and storage facility in Toronto}} |
||
{{redirect|Ashbridge's Bay Carhouse|the carhouse located near the Ashbridge Estate|Russell Carhouse}} |
{{redirect|Ashbridge's Bay Carhouse|the carhouse located near the Ashbridge Estate|Russell Carhouse}} |
||
{{Use mdy dates|date= |
{{Use mdy dates|date=January 2022}} |
||
{{Infobox station |
{{Infobox station |
||
| name = Leslie Barns |
| name = Leslie Barns |
||
Line 15: | Line 15: | ||
| tracks = |
| tracks = |
||
| facilities = |
| facilities = |
||
| opened = {{Start date|2015|11|22 |
| opened = {{Start date|2015|11|22}}<ref name="1120_leslie_barns " /> |
||
| architect = |
| architect = |
||
| closed = <!-- {{End date|YYYY|MM|DD |
| closed = <!-- {{End date|YYYY|MM|DD}} --> |
||
| rebuilt = |
| rebuilt = |
||
| owned = [[City of Toronto government|City of Toronto]] |
| owned = [[City of Toronto government|City of Toronto]] |
||
Line 26: | Line 26: | ||
}} |
}} |
||
'''Leslie Barns''' is a streetcar maintenance and storage facility at the southeast corner of [[Leslie Street]] and [[Lake Shore Boulevard]]<ref name="TTC-LB-Project-History">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/project_history.jsp |title=Project History Leslie Barns |publisher=[[Toronto Transit Commission]] |access-date=September 7, 2014}}</ref> in [[Toronto]], Ontario, Canada. It has been built to house and service the majority of [[Toronto Transit Commission]]'s fleet of [[Flexity Outlook (Toronto LRT car)|Flexity Outlook]] light rail vehicles.<ref name="TTC-LBsite">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/index.jsp |title=Leslie Barns Streetcar Maintenance & Storage Facility |publisher=[[Toronto Transit Commission]] |access-date=September 7, 2014}}</ref> |
'''Leslie Barns''' is a streetcar maintenance and storage facility at the southeast corner of [[Leslie Street]] and [[Lake Shore Boulevard]]<ref name="TTC-LB-Project-History">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/project_history.jsp |title=Project History Leslie Barns |publisher=[[Toronto Transit Commission]] |access-date=September 7, 2014 |archive-date=August 11, 2014 |archive-url=https://web.archive.org/web/20140811095355/http://ttc.ca/About_the_TTC/Projects/Leslie_Barns/project_history.jsp |url-status=live }}</ref> in [[Toronto]], Ontario, Canada. It has been built to house and service the majority of [[Toronto Transit Commission]]'s fleet of [[Flexity Outlook (Toronto LRT car)|Flexity Outlook]] light rail vehicles.<ref name="TTC-LBsite">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/index.jsp |title=Leslie Barns Streetcar Maintenance & Storage Facility |publisher=[[Toronto Transit Commission]] |access-date=September 7, 2014 |archive-date=September 13, 2014 |archive-url=https://web.archive.org/web/20140913115446/http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/index.jsp |url-status=live }}</ref> |
||
==Background== |
==Background== |
||
While the existing [[Roncesvalles Carhouse]] and [[Russell Carhouse]] will house some of the vehicles, these older facilities cannot accommodate the entire fleet of Flexity streetcars, which are considerably longer than the [[Canadian Light Rail Vehicle]]/Articulated Light Rail Vehicle fleet.<ref name="NationalPost2011-02-02">{{cite news |url=http://news.nationalpost.com/2011/02/02/ttc-moving-ahead-with-new-facility-in-leslieville |title=TTC moving ahead with new facility in Leslieville |newspaper=[[National Post]] |last=Alcoba |first=Natalie |date=February 2, 2011 |archive-date= |
While the existing [[Roncesvalles Carhouse]] and [[Russell Carhouse]] will house some of the vehicles, these older facilities cannot accommodate the entire fleet of Flexity streetcars, which are considerably longer than the [[Canadian Light Rail Vehicle]]/Articulated Light Rail Vehicle fleet.<ref name="NationalPost2011-02-02">{{cite news |url=http://news.nationalpost.com/2011/02/02/ttc-moving-ahead-with-new-facility-in-leslieville |title=TTC moving ahead with new facility in Leslieville |newspaper=[[National Post]] |last=Alcoba |first=Natalie |date=February 2, 2011 |archive-date=April 11, 2013 |url-status=live |archive-url=https://archive.today/20130411111230/http://news.nationalpost.com/2011/02/02/ttc-moving-ahead-with-new-facility-in-leslieville/ |quote=Staff are willing to look at housing some of the vehicles at the Hillcrest yard, or the Exhibition Loop, but say the Ashbridges site is necessary for, at the very least, maintenance. The plan is already nine months delayed, and deferring Wednesday's decision by 90 days means the soil removal work cannot begin until August because of migratory birds.}}</ref><ref name="Lrv2012-02-22">{{cite web |url=http://www.toronto.ca/involved/projects/lrv/ |title=New Light Rail Vehicle (LRV) Maintenance & Storage Facility |publisher=[[City of Toronto government|City of Toronto]] |date=February 22, 2012 |access-date=March 15, 2012 |archive-url=https://web.archive.org/web/20130622061926/http://www.toronto.ca/involved/projects/lrv/ |archive-date=June 22, 2013}}</ref><ref name="Durham2009-06-11">{{cite web |url=http://www.durhamregion.com/print/36960 |title=TRANSIT: TTC looking to Portlands for its storage facility |publisher=[[Durham Region]] |date=June 11, 2009 |access-date=March 16, 2012 |last=Nickle |first=David |archive-url=https://web.archive.org/web/20160304070550/http://www.durhamregion.com/print/36960 |url-status=live |archive-date=March 4, 2016}}</ref><ref name="IT-74464">{{cite news |url=http://www.insidetoronto.com/insidetoronto/article/74464 |title=EAST TORONTO: Residents not happy with possible LRV facility |newspaper=[[Inside Toronto]] |date=June 18, 2009 |access-date=March 16, 2012 |last=Nickle |first=David |archive-url=https://web.archive.org/web/20180312211351/http://www.insidetoronto.com/insidetoronto/article/74464 |url-status=live |archive-date=March 12, 2018}}</ref> |
||
The maintenance facilities at the Harvey Shops within the [[Hillcrest Complex]], as at the two carhouses, are designed for cars with underfloor equipment and maintenance access from pits under the vehicles. The Flexity streetcars have their equipment on the roof, and require a different shop layout for maintenance. Another problem at the Harvey Shops is that most of the service bays can only be accessed by a [[transfer table]] that is only {{convert|15|m|ft}} long while the Flexity cars are {{convert|30|m|ft}} long. Thus, the Harvey Shops are unsuitable for the new fleet.<ref name="SteveMunro-2011-09-09 " /> |
The maintenance facilities at the Harvey Shops within the [[Hillcrest Complex]], as at the two carhouses, are designed for cars with underfloor equipment and maintenance access from pits under the vehicles. The Flexity streetcars have their equipment on the roof, and require a different shop layout for maintenance. Another problem at the Harvey Shops is that most of the service bays can only be accessed by a [[transfer table]] that is only {{convert|15|m|ft}} long while the Flexity cars are {{convert|30|m|ft}} long. Thus, the Harvey Shops are unsuitable for the new fleet.<ref name="SteveMunro-2011-09-09 " /> |
||
Line 35: | Line 35: | ||
The TTC has ordered 204 Flexity streetcars. The plan is to house 60 of them at the west-end [[Roncesvalles Carhouse]], 40 of them at the east-end [[Russell Carhouse]], and the remaining 104 at the Leslie Barns.<ref name="1120_leslie_barns " /> |
The TTC has ordered 204 Flexity streetcars. The plan is to house 60 of them at the west-end [[Roncesvalles Carhouse]], 40 of them at the east-end [[Russell Carhouse]], and the remaining 104 at the Leslie Barns.<ref name="1120_leslie_barns " /> |
||
The TTC has been considering adding 60 more Flexitys to the current 204-car order to handle growth in demand and possible new streetcar lines along the Waterfront. The Leslie Barns is designed with enough storage so that it plus the two existing carhouses could handle a fleet of 264 vehicles.<ref name="SteveMunro-2015-01-27">{{cite web |url=http://stevemunro.ca/2015/01/27/below-the-line/ |title=Below The Line |first=Steve |last=Munro |author-link=Steve Munro |date=January 27, 2015 |access-date=2015- |
The TTC has been considering adding 60 more Flexitys to the current 204-car order to handle growth in demand and possible new streetcar lines along the Waterfront. The Leslie Barns is designed with enough storage so that it plus the two existing carhouses could handle a fleet of 264 vehicles.<ref name="SteveMunro-2015-01-27">{{cite web |url=http://stevemunro.ca/2015/01/27/below-the-line/ |title=Below The Line |first=Steve |last=Munro |author-link=Steve Munro |date=January 27, 2015 |access-date=November 9, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/http://stevemunro.ca/2015/01/27/below-the-line/ |url-status=live }}</ref> |
||
==Sites considered== |
==Sites considered== |
||
The TTC considered six sites for the new facility.<ref>{{cite web |url=https://swanboatsteve.files.wordpress.com/2009/05/carhousesites2c.jpg |title=Map with locations of sites considered}}</ref> They were:<ref name="SteveMunro-2009-05-29">{{cite web |url=http://stevemunro.ca/2009/05/29/port-lands-carhouse-and-maintenance-facility/ |title=Port Lands Carhouse and Maintenance Facility |author-link=Steve Munro |last=Munro |first=Steve |date=May 29, 2009 |access-date=2015- |
The TTC considered six sites for the new facility.<ref>{{cite web |url=https://swanboatsteve.files.wordpress.com/2009/05/carhousesites2c.jpg |title=Map with locations of sites considered |access-date=November 11, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/https://swanboatsteve.files.wordpress.com/2009/05/carhousesites2c.jpg |url-status=live }}</ref> They were:<ref name="SteveMunro-2009-05-29">{{cite web |url=http://stevemunro.ca/2009/05/29/port-lands-carhouse-and-maintenance-facility/ |title=Port Lands Carhouse and Maintenance Facility |author-link=Steve Munro |last=Munro |first=Steve |date=May 29, 2009 |access-date=November 11, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/http://stevemunro.ca/2009/05/29/port-lands-carhouse-and-maintenance-facility/ |url-status=live }}</ref> |
||
*Site 1: Ashbridges Bay, the site chosen, at the southeast corner of [[Leslie Street]] and [[Lake Shore Boulevard]] on surplus land at the [[Ashbridges Bay Wastewater Treatment Plant]]. |
*Site 1: Ashbridges Bay, the site chosen, at the southeast corner of [[Leslie Street]] and [[Lake Shore Boulevard]] on surplus land at the [[Ashbridges Bay Wastewater Treatment Plant]]. |
||
*Site 2: Between [[Eastern Avenue (Toronto)|Eastern Avenue]] and Lake Shore Boulevard east of Heward Avenue (currently used as trailer storage) |
*Site 2: Between [[Eastern Avenue (Toronto)|Eastern Avenue]] and Lake Shore Boulevard east of Heward Avenue (currently used as trailer storage) |
||
Line 52: | Line 52: | ||
|image3=[https://swanboatsteve.files.wordpress.com/2011/07/20110706cnelooplrvstorage.jpg Exhibition Loop] |
|image3=[https://swanboatsteve.files.wordpress.com/2011/07/20110706cnelooplrvstorage.jpg Exhibition Loop] |
||
|image4=[https://swanboatsteve.files.wordpress.com/2011/07/20110706danforthlrvstorage.jpg Danforth Garage] }} |
|image4=[https://swanboatsteve.files.wordpress.com/2011/07/20110706danforthlrvstorage.jpg Danforth Garage] }} |
||
After the TTC announced its choice, local councillors asked the TTC to investigate additional sites away from their wards. (A local complaint was that the Ashbridges choice would deny the community future additional parkland, and there were concerns about streetcar traffic on Leslie Street.) Thus, four additional sites were briefly studied:<ref name="SteveMunro-2011-09-09">{{cite web |url=http://stevemunro.ca/2011/02/09/the-ashbridge-carhouse-debate/ |title=The Ashbridge Carhouse Debate |author-link=Steve Munro |last=Munro |first=Steve |date=February 9, 2011 |access-date=2015- |
After the TTC announced its choice, local councillors asked the TTC to investigate additional sites away from their wards. (A local complaint was that the Ashbridges choice would deny the community future additional parkland, and there were concerns about streetcar traffic on Leslie Street.) Thus, four additional sites were briefly studied:<ref name="SteveMunro-2011-09-09">{{cite web |url=http://stevemunro.ca/2011/02/09/the-ashbridge-carhouse-debate/ |title=The Ashbridge Carhouse Debate |author-link=Steve Munro |last=Munro |first=Steve |date=February 9, 2011 |access-date=November 11, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/http://stevemunro.ca/2011/02/09/the-ashbridge-carhouse-debate/ |url-status=live }}</ref><ref name="SteveMunro-2011-07-07">{{cite web |url=http://stevemunro.ca/2011/07/07/the-route-to-ashbridge-carhouse/ |title=The Route to Ashbridge Carhouse |author-link=Steve Munro |last=Munro |first=Steve |date=July 7, 2011 |access-date=November 11, 2015 |archive-date=March 4, 2016 |archive-url=https://web.archive.org/web/20160304092709/http://stevemunro.ca/2011/07/07/the-route-to-ashbridge-carhouse/ |url-status=live }}</ref> |
||
* Hillcrest Complex: Rejected because only 24 cars could be stored and serviced and because of high staffing costs for a small carhouse. |
* Hillcrest Complex: Rejected because only 24 cars could be stored and serviced and because of high staffing costs for a small carhouse. |
||
* Hillcrest Hydro Corridor: Not recommended because of electrical interference, the cost of burying [[Toronto Hydro]]'s plant, and the added cost of a property lease. |
* Hillcrest Hydro Corridor: Not recommended because of electrical interference, the cost of burying [[Toronto Hydro]]'s plant, and the added cost of a property lease. |
||
Line 58: | Line 58: | ||
* Danforth Garage (former Danforth Carhouse): Rejected as it can hold only 20 cars resulting in high staffing costs for a small carhouse. |
* Danforth Garage (former Danforth Carhouse): Rejected as it can hold only 20 cars resulting in high staffing costs for a small carhouse. |
||
In 2020, with respect to a [[Hillcrest Complex#Carhouse|carhouse at the Hillcrest Complex]], the TTC somewhat reversed its previous opinion and proposed a carhouse there for 25 vehicles in order to provide more storage space for future fleet expansion and to eliminate the travel time between [[Roncesvalles Carhouse]] and the [[512 St. Clair]] line.<ref name="TTC-2020-10-22A">{{cite web |url=http://ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2020/October_22/Reports/5_TTC_Fleet_Procurement_Strategy_and_Plan.pdf |title=TTC Fleet Procurement Strategy and Plan |publisher=[[Toronto Transit Commission]] |date=October 22, 2020 |access-date=October 17, 2020 |archive-url=https://web.archive.org/web/20201019101440/http://ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2020/October_22/Reports/5_TTC_Fleet_Procurement_Strategy_and_Plan.pdf | archive-date=October 19, 2020 }}</ref><ref name="RwyAge-2018-08-09">{{cite web |url=https://www.railwayage.com/passenger/repurposing-ttcs-hillcrest-complex/ |title=Repurposing TTC’s Hillcrest Complex |publisher=[[Railway Age]] |first=John |last=Thompson |date=August 9, 2018 |access-date=August 11, 2018 }}</ref> |
In 2020, with respect to a [[Hillcrest Complex#Carhouse|carhouse at the Hillcrest Complex]], the TTC somewhat reversed its previous opinion and proposed a carhouse there for 25 vehicles in order to provide more storage space for future fleet expansion and to eliminate the travel time between [[Roncesvalles Carhouse]] and the [[512 St. Clair]] line.<ref name="TTC-2020-10-22A">{{cite web |url=http://ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2020/October_22/Reports/5_TTC_Fleet_Procurement_Strategy_and_Plan.pdf |title=TTC Fleet Procurement Strategy and Plan |publisher=[[Toronto Transit Commission]] |date=October 22, 2020 |access-date=October 17, 2020 |archive-url=https://web.archive.org/web/20201019101440/http://ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2020/October_22/Reports/5_TTC_Fleet_Procurement_Strategy_and_Plan.pdf | archive-date=October 19, 2020 }}</ref><ref name="RwyAge-2018-08-09">{{cite web |url=https://www.railwayage.com/passenger/repurposing-ttcs-hillcrest-complex/ |title=Repurposing TTC’s Hillcrest Complex |publisher=[[Railway Age]] |first=John |last=Thompson |date=August 9, 2018 |access-date=August 11, 2018 |archive-date=August 12, 2018 |archive-url=https://web.archive.org/web/20180812053950/https://www.railwayage.com/passenger/repurposing-ttcs-hillcrest-complex/ |url-status=live }}</ref> |
||
==Connecting track== |
==Connecting track== |
||
[[File:Tracks to Leslie Barns under construction D.JPG|thumb|right|Tracks under construction]] |
[[File:Tracks to Leslie Barns under construction D.JPG|thumb|right|Tracks under construction]] |
||
The Leslie Barns has a double-track, non-revenue streetcar line connecting the facility to the rest of the streetcar network. The line runs about {{convert|800|m}} along Leslie Street from Queen Street East south to North Service Road where the facility entrance is located.<ref name="GoogleMaps">{{cite web |url=https://www.google.com/maps/@43.6598984,-79.3262042,16z |title=North Service Road & Leslie Street |publisher=[[Google]] |access-date=2015- |
The Leslie Barns has a double-track, non-revenue streetcar line connecting the facility to the rest of the streetcar network. The line runs about {{convert|800|m}} along Leslie Street from Queen Street East south to North Service Road where the facility entrance is located.<ref name="GoogleMaps">{{cite web |url=https://www.google.com/maps/@43.6598984,-79.3262042,16z |title=North Service Road & Leslie Street |publisher=[[Google]] |access-date=November 9, 2015 |archive-date=September 13, 2022 |archive-url=https://web.archive.org/web/20220913194825/https://www.google.com/maps/@43.6598984,-79.3262042,16z |url-status=live }}</ref> |
||
The track on Leslie Street is specially designed to minimize noise and vibration.<ref name="1120_leslie_barns " /> The track is laid within a concrete channel or "tub" which has vertical concrete wings along a concrete base. This tub will contain a rubber-like substance that will provide vibration isolation between the track and the roadbed.<ref name="SteveMunro2015-05-28">{{cite news |url=http://stevemunro.ca/2015/05/28/another-delay-for-leslie-street |title=Another Delay For Leslie Street |publisher=Steve Munro |last=Munro |first=Steve |date= |
The track on Leslie Street is specially designed to minimize noise and vibration.<ref name="1120_leslie_barns " /> The track is laid within a concrete channel or "tub" which has vertical concrete wings along a concrete base. This tub will contain a rubber-like substance that will provide vibration isolation between the track and the roadbed.<ref name="SteveMunro2015-05-28">{{cite news |url=http://stevemunro.ca/2015/05/28/another-delay-for-leslie-street |title=Another Delay For Leslie Street |publisher=Steve Munro |last=Munro |first=Steve |date=May 28, 2015 |access-date=May 28, 2015 |quote=The purpose of the [concrete] "tub" track structure turns out to not be a function of load distribution on the soil below, but to act as a container for a "hockey puck" like substance that will provide vibration isolation between the track and the roadbed. This is similar to the design used on new subway lines where there is a layer of large discs between the concrete ties under the track and the floor of the tunnel. |archive-date=May 30, 2015 |archive-url=https://web.archive.org/web/20150530210942/http://stevemunro.ca/2015/05/28/another-delay-for-leslie-street/ |url-status=live }}</ref> |
||
Before City Council approved the Leslie Street connection, there were community concerns about introducing streetcar traffic on that street which is residential between Queen Street and Mosley Street. Thus, an alternative was suggested to run the connecting track further east through the Russell Carhouse and via the industrial Knox Street to Lake Shore Boulevard.<ref>{{cite web |title=Knox Avenue Route Reassessment |url=https://swanboatsteve.files.wordpress.com/2011/07/20110706knoxrevisedchse.jpg |publisher=TTC |date=July 2011}}</ref> The TTC rejected this proposal because of lower storage capacity at the Russell Carhouse, extra street and bicycle path crossings, extra time for streetcars to enter and leave service and project delays to switch plans.<ref name="SteveMunro-2011-07-07" /> |
Before City Council approved the Leslie Street connection, there were community concerns about introducing streetcar traffic on that street which is residential between Queen Street and Mosley Street. Thus, an alternative was suggested to run the connecting track further east through the Russell Carhouse and via the industrial Knox Street to Lake Shore Boulevard.<ref>{{cite web |title=Knox Avenue Route Reassessment |url=https://swanboatsteve.files.wordpress.com/2011/07/20110706knoxrevisedchse.jpg |publisher=TTC |date=July 2011 |access-date=November 12, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/https://swanboatsteve.files.wordpress.com/2011/07/20110706knoxrevisedchse.jpg |url-status=live }}</ref> The TTC rejected this proposal because of lower storage capacity at the Russell Carhouse, extra street and bicycle path crossings, extra time for streetcars to enter and leave service and project delays to switch plans.<ref name="SteveMunro-2011-07-07" /> |
||
As of April 2016, most streetcars enter service via Leslie Street at about 7:25{{nbsp}}a.m. and return to the carhouse around 9{{nbsp}}p.m.<ref name="TheStar-2016-04-10" /> |
As of April 2016, most streetcars enter service via Leslie Street at about 7:25{{nbsp}}a.m. and return to the carhouse around 9{{nbsp}}p.m.<ref name="TheStar-2016-04-10" /> |
||
==Facilities== |
==Facilities== |
||
The facility will consist of four buildings: the Carhouse {{convert|17510|sqm|sqft}}, the Traction Power Substation {{convert|685|sqm|sqft}}, the Yard Control Huts {{convert|16|sqm|sqft}}, and the Irrigation Hut {{convert|25|sqm|sqft}}, for a combined floor area of {{convert|18236|sqm|sqft}}. The plot of land for the facility occupies {{convert|26000|sqm|acre}}. The facility has indoor service bays for 30 Flexity streetcars and can store 100 more in the yard. It can provide fleet repair services for up to 20 vehicles at a time. Outside, there is a {{convert|250|m|ft}} long [[braking test track]].<ref name="1120_leslie_barns" /><ref name="UrbanToronto2012-11-23">{{cite news |url=http://urbantoronto.ca/news/2012/11/everything-you-ever-wanted-know-about-ttcs-new-leslie-barn |title=Everything You Ever Wanted to Know About TTC's New 'Leslie Barn' |newspaper=Urban Toronto |last=Terpstra |first=Nigel |date=November 23, 2012 |archive-date= |
The facility will consist of four buildings: the Carhouse {{convert|17510|sqm|sqft}}, the Traction Power Substation {{convert|685|sqm|sqft}}, the Yard Control Huts {{convert|16|sqm|sqft}}, and the Irrigation Hut {{convert|25|sqm|sqft}}, for a combined floor area of {{convert|18236|sqm|sqft}}. The plot of land for the facility occupies {{convert|26000|sqm|acre}}. The facility has indoor service bays for 30 Flexity streetcars and can store 100 more in the yard. It can provide fleet repair services for up to 20 vehicles at a time. Outside, there is a {{convert|250|m|ft}} long [[braking test track]].<ref name="1120_leslie_barns" /><ref name="UrbanToronto2012-11-23">{{cite news |url=http://urbantoronto.ca/news/2012/11/everything-you-ever-wanted-know-about-ttcs-new-leslie-barn |title=Everything You Ever Wanted to Know About TTC's New 'Leslie Barn' |newspaper=Urban Toronto |last=Terpstra |first=Nigel |date=November 23, 2012 |archive-date=April 30, 2013 |url-status=live |archive-url=https://web.archive.org/web/20130430074745/http://urbantoronto.ca/news/2012/11/everything-you-ever-wanted-know-about-ttcs-new-leslie-barn |quote=Another vital but less-talked about piece of Toronto's evolving transit network is the Ashbridges Bay Streetcar Maintenance & Storage Facility, recently redubbed 'The Leslie Barn.' This 279,463 square foot facility will be sited on a piece of vacant land at the southeast corner of Leslie Street and Lake Shore Blvd.}}</ref><ref name="TT-4305">{{cite web |url=http://transit.toronto.on.ca/streetcar/4305.shtml |title=Leslie Barns |publisher=Transit Toronto |last=Bow |first=James |date=September 7, 2015 |access-date=November 9, 2015 |archive-date=September 25, 2015 |archive-url=https://web.archive.org/web/20150925032123/http://transit.toronto.on.ca/streetcar/4305.shtml |url-status=live }}</ref> In all, there are {{convert|8.3|km|abbr=on}} of track on the property.<ref name=TheStar-2016-04-10/> |
||
Service bays in the Leslie Barns accommodate a two-tiered maintenance system. The undersides of the low-floor streetcars are accessed via pits. TTC workers access the HVAC and propulsion systems, which are built into the roof of the low-floor Flexity Outlook vehicles, via overhead catwalks. The carhouse is wired with the overhead catenary system that supplies power to the vehicles. The exception is the paint booth, into which the streetcars are "muled" or pushed.<ref name="TheStar-2016-04-10" /> |
Service bays in the Leslie Barns accommodate a two-tiered maintenance system. The undersides of the low-floor streetcars are accessed via pits. TTC workers access the HVAC and propulsion systems, which are built into the roof of the low-floor Flexity Outlook vehicles, via overhead catwalks. The carhouse is wired with the overhead catenary system that supplies power to the vehicles. The exception is the paint booth, into which the streetcars are "muled" or pushed.<ref name="TheStar-2016-04-10" /> |
||
Line 81: | Line 81: | ||
The carhouse building has a north-sloping green roof, and a stormwater management pond at the east end of the yard to irrigate the rooftop plantings, a mix of alliums and sedums. Three hundred native trees will also be planted on the property. The carhouse building has specially glazed windows striped to deter birds from flying into the building.<ref name="TheStar-2016-04-10" /> |
The carhouse building has a north-sloping green roof, and a stormwater management pond at the east end of the yard to irrigate the rooftop plantings, a mix of alliums and sedums. Three hundred native trees will also be planted on the property. The carhouse building has specially glazed windows striped to deter birds from flying into the building.<ref name="TheStar-2016-04-10" /> |
||
A noise reduction wall was erected around the perimeter of the Leslie Barns to meet Ontario Ministry of the Environment noise limit requirements. The wall will include decorative features such as a red panel design and greenery.<ref name="TTC-LBFAQ">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/Construction_Overview.jsp |title=Construction Overview and FAQs |publisher=[[Toronto Transit Commission]] |access-date=2015- |
A noise reduction wall was erected around the perimeter of the Leslie Barns to meet Ontario Ministry of the Environment noise limit requirements. The wall will include decorative features such as a red panel design and greenery.<ref name="TTC-LBFAQ">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/Construction_Overview.jsp |title=Construction Overview and FAQs |publisher=[[Toronto Transit Commission]] |access-date=November 9, 2015 |archive-date=October 24, 2015 |archive-url=https://web.archive.org/web/20151024151428/http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/Construction_Overview.jsp |url-status=live }}</ref> |
||
The facility also has a Flexity simulator consisting of the interior of the operator cab for training operators.<ref>{{cite news |title=Fast cars, slow pedestrians, swerving cyclists: How difficult is it to drive a streetcar? |url=http://www.cbc.ca/news/canada/toronto/matt-galloway-drives-streetcar-simulator-1.4270147 |date=September 4, 2017 |publisher=[[CBC News]]|first=Salma |last=Ibrahim |access-date=November 30, 2019}}</ref> |
The facility also has a Flexity simulator consisting of the interior of the operator cab for training operators.<ref>{{cite news |title=Fast cars, slow pedestrians, swerving cyclists: How difficult is it to drive a streetcar? |url=http://www.cbc.ca/news/canada/toronto/matt-galloway-drives-streetcar-simulator-1.4270147 |date=September 4, 2017 |publisher=[[CBC News]] |first=Salma |last=Ibrahim |access-date=November 30, 2019 |archive-date=June 12, 2019 |archive-url=https://web.archive.org/web/20190612025217/https://www.cbc.ca/news/canada/toronto/matt-galloway-drives-streetcar-simulator-1.4270147 |url-status=live }}</ref> |
||
==Parkland== |
==Parkland== |
||
Outside the facility walls, along Leslie Street and Lakeshore Boulevard, there is a linear park incorporating the Martin Goodman Trail, wide multi-use paths, grass, plants and benches. Grading will also reduce the perimeter wall's perceived height. Peek-a-boo panels will permit passersby to watch activity inside the yard. Vines will be trained up mesh panels on the wall.<ref name="TheStar-2016-04-10">{{cite news |url=https://www.thestar.com/news/gta/transportation/2016/04/10/a-peek-inside-leslie-barns-the-ttcs-new-high-tech-garage.html |title=A peek inside Leslie Barns, the TTC's new high-tech garage |newspaper=[[Toronto Star]] |first=Tess |last=Kalinowski |date=April 10, 2016 |access-date=2016-04- |
Outside the facility walls, along Leslie Street and Lakeshore Boulevard, there is a linear park incorporating the Martin Goodman Trail, wide multi-use paths, grass, plants and benches. Grading will also reduce the perimeter wall's perceived height. Peek-a-boo panels will permit passersby to watch activity inside the yard. Vines will be trained up mesh panels on the wall.<ref name="TheStar-2016-04-10">{{cite news |url=https://www.thestar.com/news/gta/transportation/2016/04/10/a-peek-inside-leslie-barns-the-ttcs-new-high-tech-garage.html |title=A peek inside Leslie Barns, the TTC's new high-tech garage |newspaper=[[Toronto Star]] |first=Tess |last=Kalinowski |date=April 10, 2016 |access-date=April 11, 2016 |archive-date=April 11, 2016 |archive-url=https://web.archive.org/web/20160411102026/http://www.thestar.com/news/gta/transportation/2016/04/10/a-peek-inside-leslie-barns-the-ttcs-new-high-tech-garage.html |url-status=live }}</ref> |
||
==History== |
==History== |
||
In June 2009, the Ashbridges Bay Streetcar Maintenance & Storage Facility (now the Leslie Barns) was projected to cost $345{{nbsp}}million [[Canadian dollars|CAD]],<ref name="Durham2009-06-11" /> but this did not include provision for soil removal and site remediation, nor for the connection track to Queen Street.<ref name="SteveMunro-2013-04-13">{{cite web |url=http://stevemunro.ca/2013/04/13/the-saga-of-leslie-barns/ |title=The Saga of Leslie Barns |first=Steve |last=Munro |author-link=Steve Munro |date=April 13, 2013 |access-date=2015- |
In June 2009, the Ashbridges Bay Streetcar Maintenance & Storage Facility (now the Leslie Barns) was projected to cost $345{{nbsp}}million [[Canadian dollars|CAD]],<ref name="Durham2009-06-11" /> but this did not include provision for soil removal and site remediation, nor for the connection track to Queen Street.<ref name="SteveMunro-2013-04-13">{{cite web |url=http://stevemunro.ca/2013/04/13/the-saga-of-leslie-barns/ |title=The Saga of Leslie Barns |first=Steve |last=Munro |author-link=Steve Munro |date=April 13, 2013 |access-date=November 9, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/http://stevemunro.ca/2013/04/13/the-saga-of-leslie-barns/ |url-status=live }}</ref> Site remediation was complicated by the site's prior history as landfill of Lake Ontario.<ref>{{cite news |last1=Tigchelaar |first1=Mark |title=Making the Land Under the Leslie Barns Buildable |url=http://urbantoronto.ca/news/2019/01/guest-column-making-land-under-leslie-barns-buildable |access-date=January 25, 2019 |work=Urban Toronto |date=January 25, 2019 |archive-date=January 26, 2019 |archive-url=https://web.archive.org/web/20190126001015/http://urbantoronto.ca/news/2019/01/guest-column-making-land-under-leslie-barns-buildable |url-status=live }}</ref> |
||
On November 11, 2009, [[Toronto City Council]] chose the site for the Ashbridges Bay Streetcar Maintenance & Storage Facility at the southeast corner of [[Leslie Street]] and [[Lake Shore Boulevard]]. |
On November 11, 2009, [[Toronto City Council]] chose the site for the Ashbridges Bay Streetcar Maintenance & Storage Facility at the southeast corner of [[Leslie Street]] and [[Lake Shore Boulevard]]. |
||
In November 2012, the TTC decided to change the name of the carhouse from the "Ashbridges Bay Streetcar Maintenance & Storage Facility" to the more colloquial "Leslie Barns" at the request of the local community and councillors.<ref name="SteveMunro-2012-12-30">{{cite web |url=http://stevemunro.ca/2012/12/30/ttc-meeting-wrapup-for-december-19-2012/ |title=TTC Meeting Wrapup for December 19, 2012 |first=Steve |last=Munro |author-link=Steve Munro |date=December 30, 2012 |access-date=2015- |
In November 2012, the TTC decided to change the name of the carhouse from the "Ashbridges Bay Streetcar Maintenance & Storage Facility" to the more colloquial "Leslie Barns" at the request of the local community and councillors.<ref name="SteveMunro-2012-12-30">{{cite web |url=http://stevemunro.ca/2012/12/30/ttc-meeting-wrapup-for-december-19-2012/ |title=TTC Meeting Wrapup for December 19, 2012 |first=Steve |last=Munro |author-link=Steve Munro |date=December 30, 2012 |access-date=November 9, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/http://stevemunro.ca/2012/12/30/ttc-meeting-wrapup-for-december-19-2012/ |url-status=live }}</ref> |
||
By June 2013, the capital cost of the facility was budgeted at $497{{nbsp}}million CAD.<ref name="Ctv2013-06-20">{{cite news |url=http://toronto.ctvnews.ca/new-streetcars-will-roll-out-on-spadina-bathurst-first-1.1332068 |title=New streetcars will roll out on Spadina, Bathurst first |newspaper=[[CTV News]] |last=Kitchings |first=Chris |date=June 20, 2013 |access-date=June 20, 2013 |quote=According to the implementation plan, the capital costs for the streetcars and upgrades have surpassed $2{{nbsp}}billion. That figure includes the $1.1-billion price tag for the streetcars themselves, $497{{nbsp}}million for a new Leslie Street facility where the streetcars will be stored and maintained, and infrastructure modifications.}}</ref> |
By June 2013, the capital cost of the facility was budgeted at $497{{nbsp}}million CAD.<ref name="Ctv2013-06-20">{{cite news |url=http://toronto.ctvnews.ca/new-streetcars-will-roll-out-on-spadina-bathurst-first-1.1332068 |title=New streetcars will roll out on Spadina, Bathurst first |newspaper=[[CTV News]] |last=Kitchings |first=Chris |date=June 20, 2013 |access-date=June 20, 2013 |quote=According to the implementation plan, the capital costs for the streetcars and upgrades have surpassed $2{{nbsp}}billion. That figure includes the $1.1-billion price tag for the streetcars themselves, $497{{nbsp}}million for a new Leslie Street facility where the streetcars will be stored and maintained, and infrastructure modifications. |archive-date=June 23, 2013 |archive-url=https://web.archive.org/web/20130623060705/http://toronto.ctvnews.ca/new-streetcars-will-roll-out-on-spadina-bathurst-first-1.1332068 |url-status=live }}</ref> |
||
By June 2013, the TTC had a contingency plan to store up to 22 older CLRV streetcars at [[Exhibition Loop]] in 2014 to make space for Flexity streetcars arriving before the availability of Leslie Barns.<ref name="SteveMunro-2013-06-25">{{cite web |url=http://stevemunro.ca/2013/06/25/ttc-low-floor-lrv-roll-out-plan-released/ |title=TTC Low Floor LRV Roll Out Plan Released |first=Steve |last=Munro |author-link=Steve Munro |date=June 25, 2013 |access-date=2015- |
By June 2013, the TTC had a contingency plan to store up to 22 older CLRV streetcars at [[Exhibition Loop]] in 2014 to make space for Flexity streetcars arriving before the availability of Leslie Barns.<ref name="SteveMunro-2013-06-25">{{cite web |url=http://stevemunro.ca/2013/06/25/ttc-low-floor-lrv-roll-out-plan-released/ |title=TTC Low Floor LRV Roll Out Plan Released |first=Steve |last=Munro |author-link=Steve Munro |date=June 25, 2013 |access-date=November 9, 2015 |archive-date=February 3, 2016 |archive-url=https://web.archive.org/web/20160203081646/http://stevemunro.ca/2013/06/25/ttc-low-floor-lrv-roll-out-plan-released/ |url-status=live }}</ref> |
||
In September 2013, construction began on the spur along Leslie Street from the facility to Queen Street East.<ref name="IT-2013-09-19">{{cite news |url=http://www.insidetoronto.com/news-story/4115466-leslie-street-closure-at-lake-shore-boulevard-expected-to-last-12-weeks/ |title=Leslie Street closure at Lake Shore Boulevard expected to last 12 weeks |newspaper=[[Inside Toronto]] |date=September 19, 2013 |access-date=September 23, 2013 |archive-date= |
In September 2013, construction began on the spur along Leslie Street from the facility to Queen Street East.<ref name="IT-2013-09-19">{{cite news |url=http://www.insidetoronto.com/news-story/4115466-leslie-street-closure-at-lake-shore-boulevard-expected-to-last-12-weeks/ |title=Leslie Street closure at Lake Shore Boulevard expected to last 12 weeks |newspaper=[[Inside Toronto]] |date=September 19, 2013 |access-date=September 23, 2013 |archive-date=February 10, 2018 |url-status=live |archive-url=https://web.archive.org/web/20180210181449/https://www.insidetoronto.com/news-story/4115466-leslie-street-closure-at-lake-shore-boulevard-expected-to-last-12-weeks/ |quote=The TTC was expecting a 12-week closure of Leslie Street immediately north of Lake Shore Boulevard to begin as soon as this week.}}</ref><ref name="TTC-LB-News">{{cite web |url=http://www.ttc.ca/About_the_TTC/Projects/Leslie_Barns/news.jsp |title=Leslie Barns: September 13, 2013 – Construction Update, Closure on Leslie Street |publisher=[[Toronto Transit Commission]] |date=September 13, 2013 |archive-date=September 1, 2013 |url-status=dead |archive-url=https://web.archive.org/web/20130901153316/http://ttc.ca/About_the_TTC/Projects/Leslie_Barns/news.jsp}}</ref> The construction was projected to require 12 weeks of road closures. |
||
On January 28, 2015, Natalie Alcoba wrote in the ''[[National Post]]'' that the facility was expected to be almost empty when it opened later in 2015 because Bombardier had fallen far behind delivery of the new vehicles.<ref name="NatPost2015-01-29" /> As of October 2015 only ten new Flexity vehicles were in operation, when the delivery schedule said 43 vehicles should have been delivered. |
On January 28, 2015, Natalie Alcoba wrote in the ''[[National Post]]'' that the facility was expected to be almost empty when it opened later in 2015 because Bombardier had fallen far behind delivery of the new vehicles.<ref name="NatPost2015-01-29" /> As of October 2015 only ten new Flexity vehicles were in operation, when the delivery schedule said 43 vehicles should have been delivered. |
||
In May 2015, {{convert|60|m|ft}} of track was laid {{convert|9|cm|in}} too high by the contractor and had to be rebuilt, resulting in delays to the track project time line to mid-July 2015.<ref name="CBC-2015-05-28">{{cite web |url=http://www.cbc.ca/news/canada/toronto/leslie-street-barns-delayed-by-faulty-streetcar-track-installation-1.3090842 |title=Leslie Street Barns delayed by faulty streetcar track installation |publisher=Canadian Broadcasting Corporation |date=May 28, 2015 |access-date=2015- |
In May 2015, {{convert|60|m|ft}} of track was laid {{convert|9|cm|in}} too high by the contractor and had to be rebuilt, resulting in delays to the track project time line to mid-July 2015.<ref name="CBC-2015-05-28">{{cite web |url=http://www.cbc.ca/news/canada/toronto/leslie-street-barns-delayed-by-faulty-streetcar-track-installation-1.3090842 |title=Leslie Street Barns delayed by faulty streetcar track installation |publisher=Canadian Broadcasting Corporation |date=May 28, 2015 |access-date=May 28, 2015 |archive-date=May 29, 2015 |archive-url=https://web.archive.org/web/20150529081031/http://www.cbc.ca/news/canada/toronto/leslie-street-barns-delayed-by-faulty-streetcar-track-installation-1.3090842 |url-status=live }}</ref> |
||
With the opening of the Leslie Barns on November 22, 2015, the temporary storage of cars at Exhibition Loop ended.<ref name="SteveMunro-2015-10-30">{{cite news |url=http://stevemunro.ca/2015/10/30/ttc-service-changes-effective-november-22-and-december-20-2015/ |title=TTC Service Changes Effective November 22 and December 20, 2015 |first=Steve |last=Munro |author-link=Steve Munro |date=October 30, 2015 |access-date=2015-10- |
With the opening of the Leslie Barns on November 22, 2015, the temporary storage of cars at Exhibition Loop ended.<ref name="SteveMunro-2015-10-30">{{cite news |url=http://stevemunro.ca/2015/10/30/ttc-service-changes-effective-november-22-and-december-20-2015/ |title=TTC Service Changes Effective November 22 and December 20, 2015 |first=Steve |last=Munro |author-link=Steve Munro |date=October 30, 2015 |access-date=October 31, 2015 |archive-date=October 30, 2015 |archive-url=https://web.archive.org/web/20151030235058/http://stevemunro.ca/2015/10/30/ttc-service-changes-effective-november-22-and-december-20-2015/ |url-status=live }}</ref> Although the Flexity streetcars started operating out of the facility on November 22, 2015, the barns were still under construction and would not be fully occupied by the TTC until early 2016.<ref name="1120_leslie_barns">{{cite web |url=https://ttc.ca/News/2015/November/1120_leslie_barns.jsp |title=TTC's new streetcar facility to enter service this Sunday |date=November 20, 2015 |work=News |publisher=TTC |quote=This Sun., Nov. 22, the TTC's new low-floor streetcars will begin operating out of Leslie Barns, the TTC's new streetcar facility at the corner of Leslie St. and Lake Shore Blvd. E. The Barns is still under construction and won't be fully occupied by the TTC until early next year. |access-date=November 23, 2015 |archive-date=October 10, 2019 |archive-url=https://web.archive.org/web/20191010223803/https://ttc.ca/News/2015/November/1120_leslie_barns.jsp |url-status=dead }}</ref> |
||
On May 28, 2016, the TTC officially opened the Leslie Barns in a ceremony starting off a [[Doors Open Toronto|Doors Open]] event with the public visiting the facility.<ref name="TTC-2016-05-26">{{cite web |url=https://ttc.ca/News/2016/May/05-26-16NR2.jsp |title=Doors officially open at TTC's Leslie Barns |publisher=[[Toronto Transit Commission]] |date=May 26, 2016 |access-date=2016-05- |
On May 28, 2016, the TTC officially opened the Leslie Barns in a ceremony starting off a [[Doors Open Toronto|Doors Open]] event with the public visiting the facility.<ref name="TTC-2016-05-26">{{cite web |url=https://ttc.ca/News/2016/May/05-26-16NR2.jsp |title=Doors officially open at TTC's Leslie Barns |publisher=[[Toronto Transit Commission]] |date=May 26, 2016 |access-date=May 29, 2016 |archive-date=May 29, 2016 |archive-url=https://web.archive.org/web/20160529184147/http://ttc.ca/News/2016/May/05-26-16NR2.jsp |url-status=live }}</ref> However, the Leslie Barns had been in at least partial operation since November 22, 2015.<ref name=1120_leslie_barns /> |
||
==References== |
==References== |
||
{{reflist| |
{{reflist| |
||
refs= |
refs= |
||
<ref name="NatPost2015-01-29">{{cite news |url=http://news.nationalpost.com/2015/01/28/massive-500m-facility-for-new-ttc-streetcars-might-sit-nearly-empty-when-it-opens/ |title=Massive $500M facility for new TTC streetcars might sit nearly empty when it opens |publisher=[[National Post]] |last=Alcoba |first=Natalie |date= |
<ref name="NatPost2015-01-29">{{cite news |url=http://news.nationalpost.com/2015/01/28/massive-500m-facility-for-new-ttc-streetcars-might-sit-nearly-empty-when-it-opens/ |title=Massive $500M facility for new TTC streetcars might sit nearly empty when it opens |publisher=[[National Post]] |last=Alcoba |first=Natalie |date=January 28, 2015 |location=[[Toronto]] |quote=<!-- The mammoth facility at the corner of Leslie Street and Lake Shore Boulevard will house and maintain Bombardier's low-floor vehicles. --> The problem is, the order is delayed. Instead of the 43 originally anticipated by this time, or even the scaled-back expectation of 15, only three are in service. <!-- A fourth is expected next month, but beyond that it's anyone's guess, although the TTC insists it will get all 204 by 2019. --> |access-date=January 30, 2015 |archive-date=January 29, 2015 |archive-url=https://archive.today/20150129040331/http://news.nationalpost.com/2015/01/28/massive-500m-facility-for-new-ttc-streetcars-might-sit-nearly-empty-when-it-opens/ |url-status=live }}</ref> |
||
}} |
}} |
||
Line 118: | Line 118: | ||
{{Commons category|Leslie Barns}} |
{{Commons category|Leslie Barns}} |
||
*{{YouTube| id= 4ci9RKmG9OY | title= TTC Leslie Barns: Home of your new streetcar! }} |
*{{YouTube| id= 4ci9RKmG9OY | title= TTC Leslie Barns: Home of your new streetcar! }} |
||
* {{cite news |url=http://dcnonl.com/article/id57154/--streetcar-storage |title=Latest news: Streetcar storage |publisher=[[Daily Commercial News]] |date= |
* {{cite news |url=http://dcnonl.com/article/id57154/--streetcar-storage |title=Latest news: Streetcar storage |publisher=[[Daily Commercial News]] |date=September 27, 2013 |access-date=September 28, 2013 |archive-date=July 17, 2014 |url-status=dead |archive-url=https://web.archive.org/web/20140717222449/http://dcnonl.com/article/id57154/--streetcar-storage}} |
||
* [http://transit.toronto.on.ca/photos/images/leslie-barns-layout-2015.jpg Plan of the Leslie Barns] |
* [http://transit.toronto.on.ca/photos/images/leslie-barns-layout-2015.jpg Plan of the Leslie Barns] |
||
Latest revision as of 04:45, 6 May 2024
Leslie Barns | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | 1165 Lake Shore Boulevard East Toronto, Ontario Canada | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 43°39′31″N 79°19′37″W / 43.65861°N 79.32694°W | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owned by | City of Toronto | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operated by | Toronto Transit Commission | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Structure type | Flexity Outlook streetcar maintenance and storage facility | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other information | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Active | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | November 22, 2015[1] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Leslie Barns is a streetcar maintenance and storage facility at the southeast corner of Leslie Street and Lake Shore Boulevard[2] in Toronto, Ontario, Canada. It has been built to house and service the majority of Toronto Transit Commission's fleet of Flexity Outlook light rail vehicles.[3]
Background
[edit]While the existing Roncesvalles Carhouse and Russell Carhouse will house some of the vehicles, these older facilities cannot accommodate the entire fleet of Flexity streetcars, which are considerably longer than the Canadian Light Rail Vehicle/Articulated Light Rail Vehicle fleet.[4][5][6][7]
The maintenance facilities at the Harvey Shops within the Hillcrest Complex, as at the two carhouses, are designed for cars with underfloor equipment and maintenance access from pits under the vehicles. The Flexity streetcars have their equipment on the roof, and require a different shop layout for maintenance. Another problem at the Harvey Shops is that most of the service bays can only be accessed by a transfer table that is only 15 metres (49 ft) long while the Flexity cars are 30 metres (98 ft) long. Thus, the Harvey Shops are unsuitable for the new fleet.[8]
The TTC has ordered 204 Flexity streetcars. The plan is to house 60 of them at the west-end Roncesvalles Carhouse, 40 of them at the east-end Russell Carhouse, and the remaining 104 at the Leslie Barns.[1]
The TTC has been considering adding 60 more Flexitys to the current 204-car order to handle growth in demand and possible new streetcar lines along the Waterfront. The Leslie Barns is designed with enough storage so that it plus the two existing carhouses could handle a fleet of 264 vehicles.[9]
Sites considered
[edit]The TTC considered six sites for the new facility.[10] They were:[11]
- Site 1: Ashbridges Bay, the site chosen, at the southeast corner of Leslie Street and Lake Shore Boulevard on surplus land at the Ashbridges Bay Wastewater Treatment Plant.
- Site 2: Between Eastern Avenue and Lake Shore Boulevard east of Heward Avenue (currently used as trailer storage)
- Site 3: Unwin Avenue, just east of Regatta Road, TEDCO site and now used by Toronto Parks and Recreation Urban Forestry Tree Nursery and Operations
- Site 4: 495 Commissioners Street, just west of the turning basin, site of the former Cascade paper mill.
- Site 5: 535 Commissioners Street just east of the turning basin, site of the Lafarge concrete plant.
- Site 6: Unwin Avenue, on the western portion of the old Hearn Generating Station property.
Site 1 was the TTC's preferred site. Site 2 was rejected because of its proximity to the Film Studio district and the need for an access track through a residential neighbourhood. Sites 3–6 were rejected because they were further from the existing streetcar system than sites 1 and 2.[12]
Sites considered | |
---|---|
Hillcrest Complex | |
Hillcrest Hyro corridor | |
Exhibition Loop | |
Danforth Garage |
After the TTC announced its choice, local councillors asked the TTC to investigate additional sites away from their wards. (A local complaint was that the Ashbridges choice would deny the community future additional parkland, and there were concerns about streetcar traffic on Leslie Street.) Thus, four additional sites were briefly studied:[8][13]
- Hillcrest Complex: Rejected because only 24 cars could be stored and serviced and because of high staffing costs for a small carhouse.
- Hillcrest Hydro Corridor: Not recommended because of electrical interference, the cost of burying Toronto Hydro's plant, and the added cost of a property lease.
- Exhibition Loop: Rejected because of lack of room for a servicing facility.
- Danforth Garage (former Danforth Carhouse): Rejected as it can hold only 20 cars resulting in high staffing costs for a small carhouse.
In 2020, with respect to a carhouse at the Hillcrest Complex, the TTC somewhat reversed its previous opinion and proposed a carhouse there for 25 vehicles in order to provide more storage space for future fleet expansion and to eliminate the travel time between Roncesvalles Carhouse and the 512 St. Clair line.[14][15]
Connecting track
[edit]The Leslie Barns has a double-track, non-revenue streetcar line connecting the facility to the rest of the streetcar network. The line runs about 800 metres (2,600 ft) along Leslie Street from Queen Street East south to North Service Road where the facility entrance is located.[16]
The track on Leslie Street is specially designed to minimize noise and vibration.[1] The track is laid within a concrete channel or "tub" which has vertical concrete wings along a concrete base. This tub will contain a rubber-like substance that will provide vibration isolation between the track and the roadbed.[17]
Before City Council approved the Leslie Street connection, there were community concerns about introducing streetcar traffic on that street which is residential between Queen Street and Mosley Street. Thus, an alternative was suggested to run the connecting track further east through the Russell Carhouse and via the industrial Knox Street to Lake Shore Boulevard.[18] The TTC rejected this proposal because of lower storage capacity at the Russell Carhouse, extra street and bicycle path crossings, extra time for streetcars to enter and leave service and project delays to switch plans.[13]
As of April 2016, most streetcars enter service via Leslie Street at about 7:25 a.m. and return to the carhouse around 9 p.m.[19]
Facilities
[edit]The facility will consist of four buildings: the Carhouse 17,510 square metres (188,500 sq ft), the Traction Power Substation 685 square metres (7,370 sq ft), the Yard Control Huts 16 square metres (170 sq ft), and the Irrigation Hut 25 square metres (270 sq ft), for a combined floor area of 18,236 square metres (196,290 sq ft). The plot of land for the facility occupies 26,000 square metres (6.4 acres). The facility has indoor service bays for 30 Flexity streetcars and can store 100 more in the yard. It can provide fleet repair services for up to 20 vehicles at a time. Outside, there is a 250 metres (820 ft) long braking test track.[1][20][21] In all, there are 8.3 km (5.2 mi) of track on the property.[19]
Service bays in the Leslie Barns accommodate a two-tiered maintenance system. The undersides of the low-floor streetcars are accessed via pits. TTC workers access the HVAC and propulsion systems, which are built into the roof of the low-floor Flexity Outlook vehicles, via overhead catwalks. The carhouse is wired with the overhead catenary system that supplies power to the vehicles. The exception is the paint booth, into which the streetcars are "muled" or pushed.[19]
Leslie Barns has an electronic streetcar-dispatch system to show the position of streetcars in the yard. With the electronic system, operators coming on shift can monitor the location of their assigned streetcar from the lounge. A maintenance worker or "yard jockey" delivers the vehicle to the operator on the west side of the barn.[19]
About 200 TTC maintenance and operations workers will work at the Leslie Barns once all the new streetcars are delivered.[19] The facility will also be the site for all streetcar operator and maintenance training.[1]
The carhouse building has a north-sloping green roof, and a stormwater management pond at the east end of the yard to irrigate the rooftop plantings, a mix of alliums and sedums. Three hundred native trees will also be planted on the property. The carhouse building has specially glazed windows striped to deter birds from flying into the building.[19]
A noise reduction wall was erected around the perimeter of the Leslie Barns to meet Ontario Ministry of the Environment noise limit requirements. The wall will include decorative features such as a red panel design and greenery.[22]
The facility also has a Flexity simulator consisting of the interior of the operator cab for training operators.[23]
Parkland
[edit]Outside the facility walls, along Leslie Street and Lakeshore Boulevard, there is a linear park incorporating the Martin Goodman Trail, wide multi-use paths, grass, plants and benches. Grading will also reduce the perimeter wall's perceived height. Peek-a-boo panels will permit passersby to watch activity inside the yard. Vines will be trained up mesh panels on the wall.[19]
History
[edit]In June 2009, the Ashbridges Bay Streetcar Maintenance & Storage Facility (now the Leslie Barns) was projected to cost $345 million CAD,[6] but this did not include provision for soil removal and site remediation, nor for the connection track to Queen Street.[12] Site remediation was complicated by the site's prior history as landfill of Lake Ontario.[24]
On November 11, 2009, Toronto City Council chose the site for the Ashbridges Bay Streetcar Maintenance & Storage Facility at the southeast corner of Leslie Street and Lake Shore Boulevard.
In November 2012, the TTC decided to change the name of the carhouse from the "Ashbridges Bay Streetcar Maintenance & Storage Facility" to the more colloquial "Leslie Barns" at the request of the local community and councillors.[25]
By June 2013, the capital cost of the facility was budgeted at $497 million CAD.[26]
By June 2013, the TTC had a contingency plan to store up to 22 older CLRV streetcars at Exhibition Loop in 2014 to make space for Flexity streetcars arriving before the availability of Leslie Barns.[27]
In September 2013, construction began on the spur along Leslie Street from the facility to Queen Street East.[28][29] The construction was projected to require 12 weeks of road closures.
On January 28, 2015, Natalie Alcoba wrote in the National Post that the facility was expected to be almost empty when it opened later in 2015 because Bombardier had fallen far behind delivery of the new vehicles.[30] As of October 2015 only ten new Flexity vehicles were in operation, when the delivery schedule said 43 vehicles should have been delivered.
In May 2015, 60 metres (200 ft) of track was laid 9 centimetres (3.5 in) too high by the contractor and had to be rebuilt, resulting in delays to the track project time line to mid-July 2015.[31]
With the opening of the Leslie Barns on November 22, 2015, the temporary storage of cars at Exhibition Loop ended.[32] Although the Flexity streetcars started operating out of the facility on November 22, 2015, the barns were still under construction and would not be fully occupied by the TTC until early 2016.[1]
On May 28, 2016, the TTC officially opened the Leslie Barns in a ceremony starting off a Doors Open event with the public visiting the facility.[33] However, the Leslie Barns had been in at least partial operation since November 22, 2015.[1]
References
[edit]- ^ a b c d e f g "TTC's new streetcar facility to enter service this Sunday". News. TTC. November 20, 2015. Archived from the original on October 10, 2019. Retrieved November 23, 2015.
This Sun., Nov. 22, the TTC's new low-floor streetcars will begin operating out of Leslie Barns, the TTC's new streetcar facility at the corner of Leslie St. and Lake Shore Blvd. E. The Barns is still under construction and won't be fully occupied by the TTC until early next year.
- ^ "Project History Leslie Barns". Toronto Transit Commission. Archived from the original on August 11, 2014. Retrieved September 7, 2014.
- ^ "Leslie Barns Streetcar Maintenance & Storage Facility". Toronto Transit Commission. Archived from the original on September 13, 2014. Retrieved September 7, 2014.
- ^ Alcoba, Natalie (February 2, 2011). "TTC moving ahead with new facility in Leslieville". National Post. Archived from the original on April 11, 2013.
Staff are willing to look at housing some of the vehicles at the Hillcrest yard, or the Exhibition Loop, but say the Ashbridges site is necessary for, at the very least, maintenance. The plan is already nine months delayed, and deferring Wednesday's decision by 90 days means the soil removal work cannot begin until August because of migratory birds.
- ^ "New Light Rail Vehicle (LRV) Maintenance & Storage Facility". City of Toronto. February 22, 2012. Archived from the original on June 22, 2013. Retrieved March 15, 2012.
- ^ a b Nickle, David (June 11, 2009). "TRANSIT: TTC looking to Portlands for its storage facility". Durham Region. Archived from the original on March 4, 2016. Retrieved March 16, 2012.
- ^ Nickle, David (June 18, 2009). "EAST TORONTO: Residents not happy with possible LRV facility". Inside Toronto. Archived from the original on March 12, 2018. Retrieved March 16, 2012.
- ^ a b Munro, Steve (February 9, 2011). "The Ashbridge Carhouse Debate". Archived from the original on February 3, 2016. Retrieved November 11, 2015.
- ^ Munro, Steve (January 27, 2015). "Below The Line". Archived from the original on February 3, 2016. Retrieved November 9, 2015.
- ^ "Map with locations of sites considered". Archived from the original on February 3, 2016. Retrieved November 11, 2015.
- ^ Munro, Steve (May 29, 2009). "Port Lands Carhouse and Maintenance Facility". Archived from the original on February 3, 2016. Retrieved November 11, 2015.
- ^ a b Munro, Steve (April 13, 2013). "The Saga of Leslie Barns". Archived from the original on February 3, 2016. Retrieved November 9, 2015.
- ^ a b Munro, Steve (July 7, 2011). "The Route to Ashbridge Carhouse". Archived from the original on March 4, 2016. Retrieved November 11, 2015.
- ^ "TTC Fleet Procurement Strategy and Plan" (PDF). Toronto Transit Commission. October 22, 2020. Archived from the original (PDF) on October 19, 2020. Retrieved October 17, 2020.
- ^ Thompson, John (August 9, 2018). "Repurposing TTC's Hillcrest Complex". Railway Age. Archived from the original on August 12, 2018. Retrieved August 11, 2018.
- ^ "North Service Road & Leslie Street". Google. Archived from the original on September 13, 2022. Retrieved November 9, 2015.
- ^ Munro, Steve (May 28, 2015). "Another Delay For Leslie Street". Steve Munro. Archived from the original on May 30, 2015. Retrieved May 28, 2015.
The purpose of the [concrete] "tub" track structure turns out to not be a function of load distribution on the soil below, but to act as a container for a "hockey puck" like substance that will provide vibration isolation between the track and the roadbed. This is similar to the design used on new subway lines where there is a layer of large discs between the concrete ties under the track and the floor of the tunnel.
- ^ "Knox Avenue Route Reassessment". TTC. July 2011. Archived from the original on February 3, 2016. Retrieved November 12, 2015.
- ^ a b c d e f g Kalinowski, Tess (April 10, 2016). "A peek inside Leslie Barns, the TTC's new high-tech garage". Toronto Star. Archived from the original on April 11, 2016. Retrieved April 11, 2016.
- ^ Terpstra, Nigel (November 23, 2012). "Everything You Ever Wanted to Know About TTC's New 'Leslie Barn'". Urban Toronto. Archived from the original on April 30, 2013.
Another vital but less-talked about piece of Toronto's evolving transit network is the Ashbridges Bay Streetcar Maintenance & Storage Facility, recently redubbed 'The Leslie Barn.' This 279,463 square foot facility will be sited on a piece of vacant land at the southeast corner of Leslie Street and Lake Shore Blvd.
- ^ Bow, James (September 7, 2015). "Leslie Barns". Transit Toronto. Archived from the original on September 25, 2015. Retrieved November 9, 2015.
- ^ "Construction Overview and FAQs". Toronto Transit Commission. Archived from the original on October 24, 2015. Retrieved November 9, 2015.
- ^ Ibrahim, Salma (September 4, 2017). "Fast cars, slow pedestrians, swerving cyclists: How difficult is it to drive a streetcar?". CBC News. Archived from the original on June 12, 2019. Retrieved November 30, 2019.
- ^ Tigchelaar, Mark (January 25, 2019). "Making the Land Under the Leslie Barns Buildable". Urban Toronto. Archived from the original on January 26, 2019. Retrieved January 25, 2019.
- ^ Munro, Steve (December 30, 2012). "TTC Meeting Wrapup for December 19, 2012". Archived from the original on February 3, 2016. Retrieved November 9, 2015.
- ^ Kitchings, Chris (June 20, 2013). "New streetcars will roll out on Spadina, Bathurst first". CTV News. Archived from the original on June 23, 2013. Retrieved June 20, 2013.
According to the implementation plan, the capital costs for the streetcars and upgrades have surpassed $2 billion. That figure includes the $1.1-billion price tag for the streetcars themselves, $497 million for a new Leslie Street facility where the streetcars will be stored and maintained, and infrastructure modifications.
- ^ Munro, Steve (June 25, 2013). "TTC Low Floor LRV Roll Out Plan Released". Archived from the original on February 3, 2016. Retrieved November 9, 2015.
- ^ "Leslie Street closure at Lake Shore Boulevard expected to last 12 weeks". Inside Toronto. September 19, 2013. Archived from the original on February 10, 2018. Retrieved September 23, 2013.
The TTC was expecting a 12-week closure of Leslie Street immediately north of Lake Shore Boulevard to begin as soon as this week.
- ^ "Leslie Barns: September 13, 2013 – Construction Update, Closure on Leslie Street". Toronto Transit Commission. September 13, 2013. Archived from the original on September 1, 2013.
- ^ Alcoba, Natalie (January 28, 2015). "Massive $500M facility for new TTC streetcars might sit nearly empty when it opens". Toronto: National Post. Archived from the original on January 29, 2015. Retrieved January 30, 2015.
The problem is, the order is delayed. Instead of the 43 originally anticipated by this time, or even the scaled-back expectation of 15, only three are in service.
- ^ "Leslie Street Barns delayed by faulty streetcar track installation". Canadian Broadcasting Corporation. May 28, 2015. Archived from the original on May 29, 2015. Retrieved May 28, 2015.
- ^ Munro, Steve (October 30, 2015). "TTC Service Changes Effective November 22 and December 20, 2015". Archived from the original on October 30, 2015. Retrieved October 31, 2015.
- ^ "Doors officially open at TTC's Leslie Barns". Toronto Transit Commission. May 26, 2016. Archived from the original on May 29, 2016. Retrieved May 29, 2016.
External links
[edit]- TTC Leslie Barns: Home of your new streetcar! on YouTube
- "Latest news: Streetcar storage". Daily Commercial News. September 27, 2013. Archived from the original on July 17, 2014. Retrieved September 28, 2013.
- Plan of the Leslie Barns