Jump to content

Pickwick Landing Dam: Difference between revisions

Coordinates: 35°03′50″N 88°14′50″W / 35.06389°N 88.24722°W / 35.06389; -88.24722
From Wikipedia, the free encyclopedia
Content deleted Content added
SporkBot (talk | contribs)
m Translate and/or remove deprecated parameters per Template talk:Infobox dam
m Location: removed subjective language.
 
(19 intermediate revisions by 14 users not shown)
Line 1: Line 1:
{{Infobox dam
{{Infobox dam
| name = Pickwick Landing Dam
| name = Pickwick Landing Dam
| image = Pickwick Landing Dam .jpg
| image =Pickwick_Landing_Dam.jpg
| image_caption = Pickwick Landing Dam from upstream
| image_caption = Pickwick Landing Dam from upstream
| name_official = Pickwick Landing Dam
| name_official = Pickwick Landing Dam
| dam_crosses = [[Tennessee River]]
| dam_crosses = [[Tennessee River]]
| res_name = [[Pickwick Lake]]
| res_name = [[Pickwick Lake]]
| location =[[Hardin County, Tennessee]], United States
| location = [[Pickwick Dam, Tennessee|Pickwick Dam]], [[Hardin County, Tennessee]], United States
| maintainer = [[Tennessee Valley Authority]]
| operator = [[Tennessee Valley Authority]]
| dam_length = {{convert|7715|ft|m|abbr=on}}
| dam_length = {{convert|7715|ft|m|abbr=on}}
| dam_height = {{convert|113|ft|m|abbr=on}}
| dam_height = {{convert|113|ft|m|abbr=on}}
Line 13: Line 13:
| construction_began = March 1935
| construction_began = March 1935
| opening = May 8, 1938
| opening = May 8, 1938
| coordinates = {{coord|35|03|50|N|88|14|50|W|type:landmark|display=inline,title}}
| closed =
| coordinates = {{coord|35|03|50|N|88|14|50|W|display=inline,title}}
| lat_d =
| long_d =
| extra =
| extra =
}}
}}
'''Pickwick Landing Dam''' is a [[hydroelectric dam]] on the [[Tennessee River]] in [[Hardin County, Tennessee|Hardin County]], in the [[U.S. state]] of [[Tennessee]]. The dam is one of nine dams on the river owned and operated by the [[Tennessee Valley Authority]], which built the dam in the 1930s as part of a [[New Deal]]-era initiative to create a continuous navigation channel between the river's mouth and [[Knoxville, Tennessee|Knoxville]], and bring economic development to the area. The dam impounds the {{convert|43100|acre|ha|sing=on}} [[Pickwick Lake]] and its tailwaters are part of [[Kentucky Lake]].
'''Pickwick Landing Dam''' is a [[hydroelectric dam]] on the [[Tennessee River]] in [[Hardin County, Tennessee|Hardin County]], in the [[U.S. state]] of [[Tennessee]]. The dam is one of nine dams on the river owned and operated by the [[Tennessee Valley Authority]], which built the dam in the 1930s as part of a [[New Deal]]-era initiative to create a continuous navigation channel between the river's mouth and [[Knoxville, Tennessee|Knoxville]], and bring economic development to the area. The dam impounds the {{convert|43100|acre|ha|adj=on}} [[Pickwick Lake]] and its tailwaters are part of [[Kentucky Lake]].


Pickwick Landing Dam is named for a community situated near the dam site at the time of construction. The community had been named after the title character in the [[Charles Dickens]] novel, ''[[The Pickwick Papers]]''.<ref name=report1>Tennessee Valley Authority, ''The Pickwick Landing Project: A Comprehensive Report on the Planning, Design, Construction, and Initial Operations of the Pickwick Landing Project'', Technical Report No. 3 (Knoxville, Tenn.: Tennessee Valley Authority, 1941), pp. 1-11, 20, 249, 257, 272, 289.</ref>
Pickwick Landing Dam is named for a community situated near the dam site at the time of construction. The community had been named after the title character in the [[Charles Dickens]] novel, ''[[The Pickwick Papers]]''.<ref name=report1>Tennessee Valley Authority, ''The Pickwick Landing Project: A Comprehensive Report on the Planning, Design, Construction, and Initial Operations of the Pickwick Landing Project'', Technical Report No. 3 (Knoxville, Tenn.: Tennessee Valley Authority, 1941), pp. 1-11, 20, 249, 257, 272, 289.</ref>


==Location==
==Location==
{{Unsourced|section|date=November 2021}}
[[File:USACE Pickwick Landing Dam.jpg|thumb|left|210px|Aerial view of Pickwick Landing's lock]]
[[File:USACE Pickwick Landing Dam.jpg|thumb|left|210px|Aerial view of Pickwick Landing's lock]]


Pickwick Landing Dam is located nearly {{convert|207|mi|km}} above the mouth of the Tennessee River, a few miles north of the point where the states of Tennessee, [[Alabama]], and [[Mississippi]] meet. This stretch of the river is also a geological boundary between the scattered hills of the Western [[Highland Rim]] to the northeast and the flatlands of [[West Tennessee]] to the northwest. Most of the land just south of the dam and its immediate lakeshore is part of [[Pickwick Landing State Park]], and [[Shiloh National Military Park]] is located a few miles to the north. Pickwick Lake stretches nearly {{convert|53|mi|km}} to the base of [[Wilson Dam]] at [[Muscle Shoals, Alabama]], and includes parts of Hardin County in Tennessee, [[Lauderdale County, Alabama|Lauderdale]] and [[Colbert County, Alabama|Colbert]] counties in Alabama, and [[Tishomingo County, Mississippi|Tishomingo County]] in Mississippi. The area around Pickwick Landing Dam is sparsely populated, the nearest community of note being the small community of [[Counce, Tennessee]] 2 miles to the southwest. Tennessee State Highway 128 crosses the top of the dam, connecting the area to [[Savannah, Tennessee|Savannah]] to the north.
Pickwick Landing Dam is located nearly {{convert|207|mi|km}} above the mouth of the Tennessee River, a few miles north of the point where the states of Tennessee, [[Alabama]], and [[Mississippi]] meet. This stretch of the river is also a geological boundary between the scattered hills of the Western [[Highland Rim]] to the northeast and the flatlands of [[West Tennessee]] to the northwest.<ref>{{Cite web |date=June 20, 2023 |title=Pickwick Landing |url=https://www.tva.com/energy/our-power-system/hydroelectric/pickwick-landing |website=Tennessee Valley Authority}}</ref>
Most of the land just south of the dam and its immediate lakeshore is part of [[Pickwick Landing State Park]], and [[Shiloh National Military Park]] is located a few miles to the north. Pickwick Lake stretches nearly {{convert|53|mi|km}} to the base of [[Wilson Dam]] at [[Muscle Shoals, Alabama]], and includes parts of Hardin County in Tennessee, [[Lauderdale County, Alabama|Lauderdale]] and [[Colbert County, Alabama|Colbert]] counties in Alabama, and [[Tishomingo County, Mississippi|Tishomingo County]] in Mississippi. The area around Pickwick Landing Dam is sparsely populated. The nearest community of note being [[Counce, Tennessee]] two (2) miles to the southwest with a population of 316 as of 2020.<ref>{{Cite web |title=Explore Census Data |url=https://data.census.gov/profile/Counce_CDP,_Tennessee?g=160XX00US4717520 |access-date=2024-05-21 |website=data.census.gov}}</ref> [[Tennessee State Route 128]] crosses the top of the dam, connecting the area to [[Savannah, Tennessee|Savannah]] to the north.


==Capacity==
==Capacity==
Pickwick Landing Dam is {{convert|113|ft|m}} high and {{convert|7715|ft|m}} long, and has a generating capacity of 240,200 [[kilowatt]]s. The dam's spillway has 22 bays with a combined discharge of {{convert|650000|cuft/s}}. Pickwick Lake has {{convert|496|mi|km}} of shoreline and {{convert|43100|acre|ha}} of water surface, and has a flood-storage capacity of {{convert|417700|acre.ft}}.<ref name=web1>Tennessee Valley Authority, [http://www.tva.com/sites/pickwick.htm Pickwick Reservoir]. Retrieved: 20 January 2009.</ref>Pickwick Landing Dam is serviced by two locks&mdash; one measuring {{convert|110|by|1000|ft|m}} and the other measuring {{convert|110|by|600|ft|m}}. The locks' lift raises and lowers vessels up to {{convert|63|ft|m}} between Pickwick and Kentucky lakes.<ref name=web1 />
Pickwick Landing Dam is {{convert|113|ft|m}} high and {{convert|7715|ft|m}} long, and has a generating capacity of 240,200 [[kilowatt]]s. The dam's spillway has 22 bays with a combined discharge of {{convert|650000|cuft/s}}. Pickwick Lake has {{convert|496|mi|km}} of shoreline and {{convert|43100|acre|ha}} of water surface, and has a flood-storage capacity of {{convert|417700|acre.ft}}.<ref name=web1>Tennessee Valley Authority, [http://www.tva.com/sites/pickwick.htm Pickwick Reservoir]. Retrieved: 20 January 2009.</ref> Pickwick Landing Dam is serviced by two locks&mdash; one measuring {{convert|110|by|1000|ft|m}} and the other measuring {{convert|110|by|600|ft|m}}. The locks' lift raises and lowers vessels up to {{convert|63|ft|m}} between Pickwick and Kentucky lakes.<ref name=web1 />


==Background and construction==
==Background and construction==
[[Image:Pickwick-landing-dam-design-tva1.jpg|thumb|250px|right|The original design plan for Pickwick Landing Dam, circa 1935]]
[[Image:Pickwick-landing-dam-design-tva1.jpg|thumb|250px|right|The original design plan for Pickwick Landing Dam, circa 1935]]


Throughout the 19th century, a series of river rapids known as the Muscle Shoals (in northern Alabama) were a major impediment to navigation along the Tennessee River and effectively isolated the upper stretches of the river (namely Knoxville and [[Chattanooga, Tennessee|Chattanooga]]) from the nation's major inland waterways. The construction of Wilson Dam by the [[U.S. Army Corps of Engineers]] in the 1920s and the construction of [[Wheeler Dam]] by the Tennessee Valley Authority in the 1930s flooded a large section of the shoals, but serious obstacles still remained between [[Riverton, Alabama|Riverton]] and [[Florence, Alabama|Florence]], especially in the vicinity of [[Tuscumbia, Alabama|Tuscumbia]]. As Wheeler Dam neared completion in 1935, TVA knew a third dam would be necessary to connect the reservoirs at Muscle Shoals with the lower part of the river. Several private entities had investigated the possibility of building a dam at Parker's Landing (a few miles upstream from Pickwick), but the Corps of Engineers&mdash; which had surveyed the area in the 1920s&mdash; suggested TVA build a dam at Pickwick Landing. The Pickwick Landing project was authorized on November 19, 1934, and work began in March 1935.<ref name=report1 />
Throughout the 19th century, a series of river rapids known as the Muscle Shoals (in northern Alabama) were a major impediment to navigation along the Tennessee River and effectively isolated the upper stretches of the river (namely Knoxville and [[Chattanooga, Tennessee|Chattanooga]]) from the nation's major inland waterways. The construction of Wilson Dam by the [[U.S. Army Corps of Engineers]] in the 1920s and the construction of [[Wheeler Dam]] by the Tennessee Valley Authority in the 1930s flooded a large section of the shoals, but serious obstacles still remained between [[Riverton, Alabama|Riverton]] and [[Florence, Alabama|Florence]], especially in the vicinity of [[Tuscumbia, Alabama|Tuscumbia]].
As Wheeler Dam neared completion in 1935, TVA knew a third dam would be necessary to connect the reservoirs at Muscle Shoals with the lower part of the river. Several private entities had investigated the possibility of building a dam at Parker's Landing (a few miles upstream from Pickwick), but the Corps of Engineers&mdash; which had surveyed the area in the 1920s&mdash; suggested TVA build a dam at Pickwick Landing. The Pickwick Landing project was authorized on November 19, 1934, and work began in March 1935.<ref name=report1 />


[[Image:Pickwick-landing-dam-testing-tva1.jpg|thumb|200px|left|Laboratory testing for Pickwick's spillway, circa 1935-1938]]
[[Image:Pickwick-landing-dam-testing-tva1.jpg|thumb|200px|left|Laboratory testing for Pickwick's spillway, circa 1935-1938]]


The construction of Pickwick Landing Dam and its accompanying reservoir required the purchase of {{convert|63700|acre|ha}} of land, {{convert|12590|acre|ha}} of which had to be cleared. 506 families, 407 graves, and {{convert|70|mi|km}} of roads had to be relocated. Parts of Riverton and [[Waterloo, Alabama]] were flooded. The residents of the latter demanded TVA purchase the whole town, claiming the reservoir would destroy property values, but TVA declined, citing a study that suggested the reservoir would not have a serious or detrimental impact on the town's economy. Pickwick Landing Dam's original turbines were among the largest propeller-type turbines in the world at the time in which they were installed.<ref name=report1 /><ref name=web1 />
The construction of Pickwick Landing Dam and its accompanying reservoir required the purchase of {{convert|63700|acre|ha}} of land, {{convert|12590|acre|ha}} of which had to be cleared. 506 families, 407 graves, and {{convert|70|mi|km}} of roads had to be relocated. Parts of Riverton and [[Waterloo, Alabama]] were flooded. The residents of the latter demanded TVA purchase the whole town, claiming the reservoir would destroy property values, but TVA declined, citing a study that suggested the reservoir would not have a serious or detrimental impact on the town's economy. Pickwick Landing Dam's original turbines were among the largest propeller-type turbines in the world at the time in which they were installed.<ref name=report1 /><ref name=web1 />


Pickwick Landing Dam was completed and the gates closed on February 8, 1938, although dredge work continued until 1941. The first generator went online in August 1938. The lock was designed by the Corps of Engineers, and its {{convert|63|ft|m|sing=on}} lift was among the highest in the world when the lock became operational on February 19, 1938. Pickwick Landing Dam was constructed at a cost of just over $45 million.<ref name=report1 />
Pickwick Landing Dam was completed and the gates closed on February 8, 1938, although dredge work continued until 1941. The first generator went online in August 1938. The lock was designed by the Corps of Engineers, and its {{convert|63|ft|m|adj=on}} lift was among the highest in the world when the lock became operational on February 19, 1938. Pickwick Landing Dam was constructed at a cost of just over $45 million.<ref name=report1 />


==See also==
==See also==
{{stack|{{Portal|United States|Water|Renewable energy}}}}
*[[Dams and reservoirs of the Tennessee River]]
*[[Dams and reservoirs of the Tennessee River]]
*[[List of crossings of the Tennessee River]]
*[[List of crossings of the Tennessee River]]
Line 48: Line 51:
==References==
==References==
{{reflist}}
{{reflist}}
*{{cite web | url={{Gnis3|1297406}} | title=Pickwick Landing Dam | work=[[Geographic Names Information System]] | publisher=[[United States Geological Survey]] | accessdate=2006-05-02 }}
*{{cite web | url={{Gnis3|1297406}} | title=Pickwick Landing Dam | work=[[Geographic Names Information System]] | publisher=[[United States Geological Survey]] | access-date=2006-05-02 }}


==External links==
==External links==
{{Commons category}}
{{Commons category|Pickwick Landing Dam}}
* [http://www.tva.com/sites/pickwick.htm TVA: Pickwick Reservoir]
* [http://www.tva.com/sites/pickwick.htm TVA: Pickwick Reservoir]


Line 59: Line 62:
|place = [[Tennessee River]]
|place = [[Tennessee River]]
|bridge = Pickwick Landing Dam
|bridge = Pickwick Landing Dam
|bridge signs = '''[[Tennessee State Route 128|TN 128]]
|bridge signs = '''[[Tennessee State Route 128|TN 128]]'''
|upstream = Natchez Trace Parkway Bridge
|upstream = Natchez Trace Parkway Bridge
|upstream signs = [[Natchez Trace Parkway]]
|upstream signs = [[Natchez Trace Parkway]]
Line 76: Line 79:
[[Category:Energy infrastructure completed in 1938]]
[[Category:Energy infrastructure completed in 1938]]
[[Category:1938 establishments in Tennessee]]
[[Category:1938 establishments in Tennessee]]
[[Category:Road bridges in Tennessee]]

Latest revision as of 00:02, 22 May 2024

Pickwick Landing Dam
Pickwick Landing Dam from upstream
Official namePickwick Landing Dam
LocationPickwick Dam, Hardin County, Tennessee, United States
Coordinates35°03′50″N 88°14′50″W / 35.06389°N 88.24722°W / 35.06389; -88.24722
Construction beganMarch 1935
Opening dateMay 8, 1938
Operator(s)Tennessee Valley Authority
Dam and spillways
ImpoundsTennessee River
Height113 ft (34 m)
Length7,715 ft (2,352 m)
Reservoir
CreatesPickwick Lake

Pickwick Landing Dam is a hydroelectric dam on the Tennessee River in Hardin County, in the U.S. state of Tennessee. The dam is one of nine dams on the river owned and operated by the Tennessee Valley Authority, which built the dam in the 1930s as part of a New Deal-era initiative to create a continuous navigation channel between the river's mouth and Knoxville, and bring economic development to the area. The dam impounds the 43,100-acre (17,400 ha) Pickwick Lake and its tailwaters are part of Kentucky Lake.

Pickwick Landing Dam is named for a community situated near the dam site at the time of construction. The community had been named after the title character in the Charles Dickens novel, The Pickwick Papers.[1]

Location

[edit]
Aerial view of Pickwick Landing's lock

Pickwick Landing Dam is located nearly 207 miles (333 km) above the mouth of the Tennessee River, a few miles north of the point where the states of Tennessee, Alabama, and Mississippi meet. This stretch of the river is also a geological boundary between the scattered hills of the Western Highland Rim to the northeast and the flatlands of West Tennessee to the northwest.[2]

Most of the land just south of the dam and its immediate lakeshore is part of Pickwick Landing State Park, and Shiloh National Military Park is located a few miles to the north. Pickwick Lake stretches nearly 53 miles (85 km) to the base of Wilson Dam at Muscle Shoals, Alabama, and includes parts of Hardin County in Tennessee, Lauderdale and Colbert counties in Alabama, and Tishomingo County in Mississippi. The area around Pickwick Landing Dam is sparsely populated. The nearest community of note being Counce, Tennessee two (2) miles to the southwest with a population of 316 as of 2020.[3] Tennessee State Route 128 crosses the top of the dam, connecting the area to Savannah to the north.

Capacity

[edit]

Pickwick Landing Dam is 113 feet (34 m) high and 7,715 feet (2,352 m) long, and has a generating capacity of 240,200 kilowatts. The dam's spillway has 22 bays with a combined discharge of 650,000 cubic feet per second (18,000 m3/s). Pickwick Lake has 496 miles (798 km) of shoreline and 43,100 acres (17,400 ha) of water surface, and has a flood-storage capacity of 417,700 acre-feet (515,200,000 m3).[4] Pickwick Landing Dam is serviced by two locks— one measuring 110 by 1,000 feet (34 by 305 m) and the other measuring 110 by 600 feet (34 by 183 m). The locks' lift raises and lowers vessels up to 63 feet (19 m) between Pickwick and Kentucky lakes.[4]

Background and construction

[edit]
The original design plan for Pickwick Landing Dam, circa 1935

Throughout the 19th century, a series of river rapids known as the Muscle Shoals (in northern Alabama) were a major impediment to navigation along the Tennessee River and effectively isolated the upper stretches of the river (namely Knoxville and Chattanooga) from the nation's major inland waterways. The construction of Wilson Dam by the U.S. Army Corps of Engineers in the 1920s and the construction of Wheeler Dam by the Tennessee Valley Authority in the 1930s flooded a large section of the shoals, but serious obstacles still remained between Riverton and Florence, especially in the vicinity of Tuscumbia.

As Wheeler Dam neared completion in 1935, TVA knew a third dam would be necessary to connect the reservoirs at Muscle Shoals with the lower part of the river. Several private entities had investigated the possibility of building a dam at Parker's Landing (a few miles upstream from Pickwick), but the Corps of Engineers— which had surveyed the area in the 1920s— suggested TVA build a dam at Pickwick Landing. The Pickwick Landing project was authorized on November 19, 1934, and work began in March 1935.[1]

Laboratory testing for Pickwick's spillway, circa 1935-1938

The construction of Pickwick Landing Dam and its accompanying reservoir required the purchase of 63,700 acres (25,800 ha) of land, 12,590 acres (5,090 ha) of which had to be cleared. 506 families, 407 graves, and 70 miles (110 km) of roads had to be relocated. Parts of Riverton and Waterloo, Alabama were flooded. The residents of the latter demanded TVA purchase the whole town, claiming the reservoir would destroy property values, but TVA declined, citing a study that suggested the reservoir would not have a serious or detrimental impact on the town's economy. Pickwick Landing Dam's original turbines were among the largest propeller-type turbines in the world at the time in which they were installed.[1][4]

Pickwick Landing Dam was completed and the gates closed on February 8, 1938, although dredge work continued until 1941. The first generator went online in August 1938. The lock was designed by the Corps of Engineers, and its 63-foot (19 m) lift was among the highest in the world when the lock became operational on February 19, 1938. Pickwick Landing Dam was constructed at a cost of just over $45 million.[1]

See also

[edit]

References

[edit]
  1. ^ a b c d Tennessee Valley Authority, The Pickwick Landing Project: A Comprehensive Report on the Planning, Design, Construction, and Initial Operations of the Pickwick Landing Project, Technical Report No. 3 (Knoxville, Tenn.: Tennessee Valley Authority, 1941), pp. 1-11, 20, 249, 257, 272, 289.
  2. ^ "Pickwick Landing". Tennessee Valley Authority. June 20, 2023.
  3. ^ "Explore Census Data". data.census.gov. Retrieved 2024-05-21.
  4. ^ a b c Tennessee Valley Authority, Pickwick Reservoir. Retrieved: 20 January 2009.
[edit]