Muranów metro station: Difference between revisions
Appearance
Content deleted Content added
No edit summary Tags: Mobile edit Mobile web edit Advanced mobile edit |
|||
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Warsaw metro station}} |
|||
{{Multiple issues| |
|||
⚫ | |||
{{Unreferenced|date=December 2009}} |
|||
{{update|date=May 2021}} |
|||
}} |
|||
The original plans for the construction were temporarily dropped in 1989 due to budget constraints. In September 2019, the Warsaw city council announced that the project would finally take place. A contractor was decided, having until 2026 to build the station.<ref>{{cite web|last=Urbanowicz|first=Witold|url=https://www.transport-publiczny.pl/wiadomosci/warszawa-jest-umowa-na-projekt-stacji-plac-konstytucji-i-muranow-na-i-linii-metra-63173.html|title=Warszawa: Jest umowa na projekt stacji Plac Konstytucji i Muranów na I linii metra|website=Transport Publiczny|language=pl|date=20 November 2019|access-date=8 June 2023}}</ref> |
|||
⚫ | |||
⚫ | |||
==See also== |
|||
*[[List of Warsaw Metro stations]] |
|||
==References== |
|||
{{reflist}} |
|||
⚫ | |||
{{Coord|52|15|0|N|20|59|56|E|region:PL_scale:1000_type:railwaystation|display=title}} |
{{Coord|52|15|0|N|20|59|56|E|region:PL_scale:1000_type:railwaystation|display=title}} |
||
{{DEFAULTSORT:Muranow (Warsaw Metro)}} |
{{DEFAULTSORT:Muranow (Warsaw Metro)}} |
||
[[Category:Proposed Warsaw Metro stations]] |
[[Category:Proposed Warsaw Metro stations]] |
||
[[Category: |
[[Category:Muranów (City Information System area)]] |
||
{{Warsaw-metro-stub}} |
{{Warsaw-metro-stub}} |
Latest revision as of 11:22, 26 May 2024
A-16 Muranów is a planned Warsaw Metro station in the Muranów neighbourhood (crossroads of Anielewicza and Andersa streets), 635 metres north of A-15 Ratusz Arsenał and 899 metres south of A-17 Dworzec Gdański.
The original plans for the construction were temporarily dropped in 1989 due to budget constraints. In September 2019, the Warsaw city council announced that the project would finally take place. A contractor was decided, having until 2026 to build the station.[1]
See also
[edit]References
[edit]- ^ Urbanowicz, Witold (20 November 2019). "Warszawa: Jest umowa na projekt stacji Plac Konstytucji i Muranów na I linii metra". Transport Publiczny (in Polish). Retrieved 8 June 2023.
Preceding station | Warsaw Metro | Following station | ||
---|---|---|---|---|
Dworzec Gdański towards Młociny
|
M1 line | Ratusz Arsenał towards Kabaty
|