Jump to content

Danube–Bucharest Canal: Difference between revisions

Coordinates: 44°17′41″N 26°01′30″E / 44.2947°N 26.02494°E / 44.2947; 26.02494
From Wikipedia, the free encyclopedia
Content deleted Content added
Addbot (talk | contribs)
m Bot: Migrating 2 interwiki links, now provided by Wikidata on d:q2512832
Citation bot (talk | contribs)
Add: date, title. | Use this bot. Report bugs. | Suggested by Jay8g | #UCB_toolbar
 
(23 intermediate revisions by 17 users not shown)
Line 1: Line 1:
{{Short description|Canal project in Romania}}
[[Image:Ecluza copaceni (05.2007).JPG|thumb|right|Copaceni lock]]
[[Image:Ecluza copaceni (05.2007).JPG|thumb|right|Copăceni lock]]
[[File:1986, 5 august. Festivitatea de deschidere a Santierului National al Tineretului Canalului Dunare-Bucuresti.jpg|thumb|Opening ceremony of the Building-Site, Danube-Bucharest Canal, August 5, 1986]]


The '''Danube–Bucharest Canal''' is a {{convert|73|km|adj=on}} long [[canal]] project that is planned to link [[Bucharest]], Romania, to the [[Danube]] via [[Argeş River]].
The '''Danube–Bucharest Canal''' is a {{convert|73|km|adj=on}} long [[canal]] project that is planned to link [[Bucharest]], Romania to the [[Danube]] via the [[Argeș River]], and ultimately create direct access to the [[Black Sea]] via the existing [[Danube–Black Sea Canal]]. The total capacity of the waterway will be 24 million tons/year. The minimum depth is of 4.5 metres and the ships will rise 67 metres over their voyage through six locks and 73km.<ref name=eme1/>


==History==
The earliest plans, made by engineer Nicolae Cucu in 1880, sought to link Bucharest to the Danube at [[Oltenița]]. In 1927, a study by Alexandru Davidescu was published at the [[Polytechnic University of Bucharest|Polytechnic School]]. Two years later, the Romanian parliament passed Law no. 2749 on the building of the [[Argeş River|Argeş]]–Bucharest–Danube Canal and of a port in Bucharest; the law was published in [[Monitorul Oficial]] in August 1929. However, the world recession of the early 1930s prevented the government from investing large amounts of money in such projects. Various studies were published, but as [[World War II]] began, they were ignored.
The earliest plans, made by engineer Nicolae Cucu in 1880, sought to link Bucharest to the Danube at [[Oltenița]].


In 1927, a study by Alexandru Davidescu was published at the [[Polytechnic University of Bucharest|Polytechnic School]]. Two years later, the Romanian parliament passed Law no. 2749 on the building of the [[Argeș River|Argeș]]–Bucharest–Danube Canal and of a port in Bucharest; the law was published in [[Monitorul Oficial]] in August 1929. However, the world recession of the early 1930s prevented the government from investing large amounts of money in such projects. Various studies were published, but as [[World War II]] began, they were ignored.
New plans were made in 1982, the main goal being the regularization of the Argeş River, which flooded in 1970. Communist leader [[Nicolae Ceauşescu]] also wanted to have a direct link to Northern Europe, as [[Rhine-Main-Danube Canal]] was also built then. The building of the canal began in 1986, the project was supposed to have five [[Lock (water transport)|locks]] and four [[Hydroelectricity|hydroelectric plants]] (the only one that is currently working is the one at [[Mihăilești]]). The final project was supposed to generate 62 GWh/year.


New plans were made in 1982, the main goal being the regularization of the Argeș River, which flooded in 1970. Communist leader [[Nicolae Ceaușescu]] also wanted to have a direct link to Northern Europe, as [[Rhine-Main-Danube Canal]] was also built then. The building of the canal began in 1986, the project was supposed to have five [[Lock (water transport)|locks]] and four [[Hydroelectricity|hydroelectric plants]] (the only one that is currently working is the one at [[Mihăilești]]). The final project was supposed to generate 62 GWh/year.
In February 1990, the building of the canal was stopped, although it was 60% completed. Currently, just the dam at Mihăileşti and the micro-hydro plant are functional. In 1997, [[Traian Băsescu]], who was Minister of Transport at the time, announced that the finalizing of the canal would require about [[United States dollar|US$]] 400 million and take four years, but the financing was not found at the time. In 2005, [[Adriean Videanu]], the [[mayor of Bucharest]] announced that he intends to finish the work.

In February 1990, the building of the canal was stopped, although it was 60% completed. Currently, just the dam at [[Mihăilești]] and the micro-hydro plant are functional.

In 1997, [[Traian Băsescu]], who was Minister of Transport at the time, announced that the finalizing of the canal would require about [[United States dollar|US$]] 400 million and take four years, but the financing was not found at the time.

In 2005, [[Adriean Videanu]], the [[mayor of Bucharest]] announced that he intends to finish the work.

As of 2013, a joint Romanian-EU project planned to complete the canal from 2014 to 2020 using national and [[Structural Funds and Cohesion Fund|Cohesion]] funds as part of the [[Danube Strategy|EU strategy for the Danube Region]].<ref>{{cite web |url=http://www.danube-navigation.eu/pages/projects/wwinfra |title=Projects: Waterway Infrastructure |publisher=EU Strategy for the Danube Region |date=12 April 2013 |language=English |url-status=dead |archiveurl=https://web.archive.org/web/20151110034521/http://www.danube-navigation.eu/pages/projects/wwinfra |archivedate=10 November 2015 }}</ref>

In May 2024 the request for issuing the Environmental Agreement was submitted to the Ministry of the Environment.<ref name="eme1">{{cite news |url=https://economedia.ro/canalul-bucuresti-dunare-costul-total-estimat-este-de-22-miliarde-lei-cu-6-ani-pentru-lucrari-studiu-de-fezabilitate.html |title=Canalul București -Dunăre : Costul total estimat este de 22 miliarde lei cu 6 ani pentru lucrări (Studiu de Fezabilitate) |date=June 2024 }}</ref>


==References==
==References==
{{reflist}}
*{{cite web |url=http://www.jurnalul.ro/campaniile-jurnalul/descoperirea-romaniei/canalul-broastelor-40819.html|title=Canalul broaştelor |publisher=[[Jurnalul Naţional]] |date=22 July 2005 |language=Romanian}}
*{{cite web |url=http://www.jurnalul.ro/campaniile-jurnalul/descoperirea-romaniei/canalul-broastelor-40819.html |title=Canalul broaștelor |publisher=[[Jurnalul Național]] |date=22 July 2005 |language=Romanian |access-date=27 April 2011 |archive-url=https://web.archive.org/web/20130311215426/http://jurnalul.ro/campaniile-jurnalul/descoperirea-romaniei/canalul-broastelor-40819.html |archive-date=11 March 2013 |url-status=dead }}


{{coord|44.2947|26.02494|display=title|type:landmark_region:RO}}
{{coord|44.2947|26.02494|display=title|type:landmark_region:RO}}
{{Transport in Bucharest}}


{{DEFAULTSORT:Danube-Bucharest Canal}}
[[Category:Buildings and structures in Bucharest]]
[[Category:Buildings and structures in Bucharest]]
[[Category:Canals in Romania]]
[[Category:Canals in Romania]]
[[Category:Danube basin]]
[[Category:Danube basin|CDanube–Bucharest Canal]]
[[Category:Buildings and structures in Ilfov County]]
[[Category:Buildings and structures in Ilfov County]]
[[Category:Buildings and structures in Giurgiu County]]
[[Category:Buildings and structures in Giurgiu County]]

Latest revision as of 06:50, 3 June 2024

Copăceni lock
Opening ceremony of the Building-Site, Danube-Bucharest Canal, August 5, 1986

The Danube–Bucharest Canal is a 73-kilometre (45 mi) long canal project that is planned to link Bucharest, Romania to the Danube via the Argeș River, and ultimately create direct access to the Black Sea via the existing Danube–Black Sea Canal. The total capacity of the waterway will be 24 million tons/year. The minimum depth is of 4.5 metres and the ships will rise 67 metres over their voyage through six locks and 73km.[1]

History

[edit]

The earliest plans, made by engineer Nicolae Cucu in 1880, sought to link Bucharest to the Danube at Oltenița.

In 1927, a study by Alexandru Davidescu was published at the Polytechnic School. Two years later, the Romanian parliament passed Law no. 2749 on the building of the Argeș–Bucharest–Danube Canal and of a port in Bucharest; the law was published in Monitorul Oficial in August 1929. However, the world recession of the early 1930s prevented the government from investing large amounts of money in such projects. Various studies were published, but as World War II began, they were ignored.

New plans were made in 1982, the main goal being the regularization of the Argeș River, which flooded in 1970. Communist leader Nicolae Ceaușescu also wanted to have a direct link to Northern Europe, as Rhine-Main-Danube Canal was also built then. The building of the canal began in 1986, the project was supposed to have five locks and four hydroelectric plants (the only one that is currently working is the one at Mihăilești). The final project was supposed to generate 62 GWh/year.

In February 1990, the building of the canal was stopped, although it was 60% completed. Currently, just the dam at Mihăilești and the micro-hydro plant are functional.

In 1997, Traian Băsescu, who was Minister of Transport at the time, announced that the finalizing of the canal would require about US$ 400 million and take four years, but the financing was not found at the time.

In 2005, Adriean Videanu, the mayor of Bucharest announced that he intends to finish the work.

As of 2013, a joint Romanian-EU project planned to complete the canal from 2014 to 2020 using national and Cohesion funds as part of the EU strategy for the Danube Region.[2]

In May 2024 the request for issuing the Environmental Agreement was submitted to the Ministry of the Environment.[1]

References

[edit]
  1. ^ a b "Canalul București -Dunăre : Costul total estimat este de 22 miliarde lei cu 6 ani pentru lucrări (Studiu de Fezabilitate)". June 2024.
  2. ^ "Projects: Waterway Infrastructure". EU Strategy for the Danube Region. 12 April 2013. Archived from the original on 10 November 2015.

44°17′41″N 26°01′30″E / 44.2947°N 26.02494°E / 44.2947; 26.02494