Jump to content

Windsor Locks station: Difference between revisions

Coordinates: 41°54′50″N 72°37′34″W / 41.91389°N 72.62611°W / 41.91389; -72.62611
From Wikipedia, the free encyclopedia
Content deleted Content added
 
(28 intermediate revisions by 15 users not shown)
Line 1: Line 1:
{{Short description|Train station in Windsor Locks, Connecticut, US}}
{{Use mdy dates|date=February 2017}}
{{Use mdy dates|date=February 2017}}
{{Infobox station
{{Infobox station
Line 6: Line 7:
| image_caption = Windsor Locks station in January 2015
| image_caption = Windsor Locks station in January 2015
| address = [[Connecticut Route 159|South Main Street]] at Stanton Road<br />[[Windsor Locks, Connecticut]]
| address = [[Connecticut Route 159|South Main Street]] at Stanton Road<br />[[Windsor Locks, Connecticut]]
| country = [[United States]]
| country = United States
| coordinates = {{Coord|41|54|50|N|72|37|34|W|region:US-CT_type:railwaystation|display=inline,title}}
| coordinates = {{Coord|41|54|50|N|72|37|34|W|region:US-CT_type:railwaystation|display=inline,title}}
| owned = {{plainlist|
| owned = {{plainlist|
Line 15: Line 16:
| platform = 1 [[side platform]]
| platform = 1 [[side platform]]
| tracks = 1
| tracks = 1
| other={{bus icon}} [[Connecticut Transit Hartford]]: 905, 905W, 915
| other={{bus icon}} [[Connecticut Transit Hartford|CTtransit Hartford]]: 24, 96, 905, 915
| parking = 30 spaces
| train_operators = Amtrak and CTrail
| parking = 30 spaces (free)
| bicycle = No
| bicycle = No
| ADA = Yes
| accessible = Yes
| opened = 1839
| opened = 1839
| rebuilt = 1875, 1971, 1981
| rebuilt = 1875, 1971, 1981
| code = WNL (Amtrak)
| code = {{Amtrak code|WNL}}
| mpassengers = {{rail pass box|system=Amtrak|pass_year=2019|passengers=25,408<ref name="fy18">{{Cite web |url=https://www.amtrak.com/content/dam/projects/dotcom/english/public/documents/corporate/statefactsheets/CONNECTICUT19.pdf |title=Amtrak Fact Sheet, Fiscal Year 2019, State of Connecticut |website=Amtrak |date=June 2020 |access-date=December 9, 2020}}</ref>|pass_percent=+38.6}}
| mpassengers = {{rail pass box|system=Amtrak|passengers={{Amtrak ridership|Windsor Locks}}{{Amtrak ridership|citationCT}}|pass_year={{Amtrak ridership|date}}}}
| services_collapsible=yes
| services = {{Adjacent stations|system1=Amtrak
| services = {{Adjacent stations
|line1=Hartford Line|left1=Windsor, Connecticut|right1=Springfield
|system1=Amtrak
|line2=Regional|left2=Windsor, Connecticut|right2=Springfield|to-right2=Springfield
|line3=Valley Flyer|left3=Windsor, Connecticut|right3=Springfield
|line1=Regional|left1=Windsor|right1=Springfield|to-right1=Springfield
|line4=Vermonter|left4=Hartford|right4=Springfield
|line2=Hartford Line|left2=Windsor|right2=Springfield
|line3=Valley Flyer|left3=Windsor|right3=Springfield
|line4=Vermonter|left4=Hartford|right4=Springfield
|system5=CTrail
|system5=CTrail
|line5=Hartford Line|left5=Windsor|right5=Springfield
|line5=Hartford Line|left5=Windsor|right5=Springfield
|line6=Hartford Line|left6=Windsor|right6=Enfield|note-right6=Future station
}}
}}
| other_services_header = Former services
| other_services_header = Former services
| other_services_collapsible = yes
| other_services_collapsible = yes
| other_services = {{Adjacent stations|system1=Amtrak
| other_services = {{Adjacent stations|system1=Amtrak|line1=Atlantic City Express|left1=Windsor|right1=Springfield|to-left1=Atlantic City|to-right1=Springfield|note-mid1=1991–1995}}
|line1=Atlantic City Express|left1=Windsor, Connecticut|right1=Springfield|to-left1=Atlantic City|to-right1=Springfield|note-mid1=1991-1995
}}
|nrhp = {{infobox nrhp
|nrhp = {{infobox nrhp
|name = Windsor Locks Passenger Station
|name = Windsor Locks Passenger Station
Line 43: Line 42:
|refnum = 75001937
|refnum = 75001937
|coordinates = {{coord|41.933611|-72.6275|display=inline}}
|coordinates = {{coord|41.933611|-72.6275|display=inline}}
| mapframe = yes
| mapframe-custom = {{Infobox mapframe |shape=none |line=none |marker=rail |marker-color=#000 |zoom=14 }}
}}
}}
}}
}}


'''Windsor Locks station''' is an [[Amtrak]] and [[CTrail]] [[train station]] in [[Windsor Locks, Connecticut]], on the [[New Haven–Springfield Line]]. It is served by four Amtrak services - the {{lnl|Amtrak|Hartford Line}} shuttles, {{lnl|Amtrak|Northeast Regional}}, {{lnl|Amtrak|Valley Flyer}}, and {{lnl|Amtrak|Vermonter}} - as well as [[CTrail]] [[Hartford Line]] [[commuter rail]] trains.
'''Windsor Locks station''' is an [[Amtrak]] and [[CT Rail]] [[train station]] in [[Windsor Locks, Connecticut]], on the [[New Haven–Springfield Line]]. It is served by four Amtrak services - the {{lnl|Amtrak|Hartford Line}} shuttles, {{lnl|Amtrak|Northeast Regional}}, {{lnl|Amtrak|Valley Flyer}}, and {{lnl|Amtrak|Vermonter}} - as well as CT Rail [[Hartford Line]] [[commuter rail]] trains.


The current station has only a small platform and shelter. A new station with high-level platforms is planned to be built in downtown Windsor Locks, where the station was located until 1981. The former station building at that site is listed on the [[National Register of Historic Places]] as '''Windsor Locks Passenger Station'''.
The current station has only a small platform and shelter. A new station with full-length high-level platform is under construction in downtown Windsor Locks, where the station was located until 1981. The former station building at that site is listed on the [[National Register of Historic Places]] as '''Windsor Locks Passenger Station'''.


==History==
==History==
[[File:Amtrak train at Windsor Locks station, October 1979.jpg|thumb|left|An Amtrak train at the 1875-built station in 1979]]
[[File:Amtrak train at Windsor Locks station, October 1979.jpg|thumb|left|An Amtrak train at the 1875-built station in 1979]]
[[File:Former Windsor Locks station (1), January 2015.JPG|thumb|left|The derelict station in 2015]]
[[File:Former Windsor Locks station (1), January 2015.JPG|thumb|left|The derelict station in 2015]]
The [[Hartford and New Haven Railroad]] opened through Windsor Locks in 1839. The [[New York, New Haven and Hartford Railroad|New York, New Haven, and Hartford Railroad]], its successor, built a new station in the town center in 1875. The station building was closed by [[Penn Central Transportation Company|Penn Central]] in 1971; Penn Central and later [[Amtrak]] passengers continued to use the platform, but Penn Central used the interior as a signal workshop.<ref name="great">{{Cite web |url=http://www.greatamericanstations.com/stations/windsor-locks-ct-wnl/ |title=Windsor Locks (WNL) |website=Great American Stations |publisher=Amtrak |access-date=September 12, 2016}}</ref> Penn Central later attempted to demolish the station, but a local group succeeded in having it listed on the [[National Register of Historic Places]] in 1975. Amtrak bought the [[New Haven–Springfield Line|Springfield Line]] infrastructure, including the "remarkably intact" station, in 1976.<ref name="great" /> Service moved to the current location - a new [[park and ride]] stop just south of [[Interstate 91]] - in 1981.<ref>{{Cite book |url=http://www.timetables.org/browse/?group=19810201&item=0057 |title=National Train Timetables Effective February 1, 1981 through April 25, 1981 |date=February 1, 1981 |publisher=National Railroad Passenger Corporation (Amtrak) |page=57 |via=Museum of Railway Timetables}}</ref><ref>{{Cite book |url=http://www.timetables.org/browse/?group=19810426&item=0057 |title=National Train Timetables Effective April 26, 1981 through October 24, 1981. Includes Northeast Corridor Schedules Effective April 26, 1981 through August 1, 1981. |date=April 26, 1981 |publisher=National Railroad Passenger Corporation (Amtrak) |page=57 |via=Museum of Railway Timetables}}</ref>
The [[Hartford and New Haven Railroad]] opened through Windsor Locks in 1839. The [[New York, New Haven and Hartford Railroad|New York, New Haven, and Hartford Railroad]], its successor, built a new station in the town center in 1875. The station building was closed by [[Penn Central Transportation Company|Penn Central]] in 1971; Penn Central and later [[Amtrak]] passengers continued to use the platform, but Penn Central used the interior as a signal workshop.<ref name="great">{{Cite web |url=http://www.greatamericanstations.com/stations/windsor-locks-ct-wnl/ |title=Windsor Locks (WNL) |website=Great American Stations |publisher=Amtrak |access-date=September 12, 2016}}</ref> Penn Central later attempted to demolish the station, but a local group succeeded in having it listed on the [[National Register of Historic Places]] in 1975. Amtrak bought the [[New Haven–Springfield Line|Springfield Line]] infrastructure, including the "remarkably intact" station, in 1976.<ref name="great" /> Service moved to the current location&nbsp;– a new [[park and ride]] stop just south of [[Interstate 91]]&nbsp;– in 1981.<ref>{{Cite book |url=http://www.timetables.org/browse/?group=19810201&item=0057 |title=National Train Timetables Effective February 1, 1981 through April 25, 1981 |date=February 1, 1981 |publisher=National Railroad Passenger Corporation (Amtrak) |page=57 |via=Museum of Railway Timetables}}</ref><ref>{{Cite book |url=http://www.timetables.org/browse/?group=19810426&item=0057 |title=National Train Timetables Effective April 26, 1981 through October 24, 1981. Includes Northeast Corridor Schedules Effective April 26, 1981 through August 1, 1981. |date=April 26, 1981 |publisher=National Railroad Passenger Corporation (Amtrak) |page=57 |via=Museum of Railway Timetables}}</ref>


The 2004 Recommended Action of the New Haven Hartford Springfield Commuter Rail Implementation Study included the construction of a new Windsor Locks station on the existing south-of-downtown site. A single high-level platform was to be constructed, with a pedestrian bridge leading to an added parking area on the west side of [[Route 159 (Connecticut–Massachusetts)|South Main Street]].<ref>{{Cite web |url=http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-11_Windsor_Locks_Station_Startup.pdf |title=Windsor Locks Start-up Conceptual Site Plan |last=URS |publisher=Connecticut Department of Transportation |archive-url=https://web.archive.org/web/20060919194519/http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-11_Windsor_Locks_Station_Startup.pdf |archive-date=September 19, 2006 |url-status=dead |access-date=April 3, 2013}}</ref> A second platform serving a restored second track would have been added later.<ref>{{Cite web |url=http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-19_Windsor_Locks_Station_Full.pdf |title=Windsor Locks Full-Build Conceptual Site Plan |last=URS |publisher=Connecticut Department of Transportation |archive-url=https://web.archive.org/web/20060919194519/http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-19_Windsor_Locks_Station_Full.pdf |archive-date=September 19, 2006 |url-status=dead |access-date=April 3, 2013}}</ref>
The 2004 Recommended Action of the New Haven Hartford Springfield Commuter Rail Implementation Study included the construction of a new Windsor Locks station on the existing south-of-downtown site. A single high-level platform was to be constructed, with a pedestrian bridge leading to an added parking area on the west side of [[Route 159 (Connecticut–Massachusetts)|South Main Street]].<ref>{{Cite web |url=http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-11_Windsor_Locks_Station_Startup.pdf |title=Windsor Locks Start-up Conceptual Site Plan |last=URS |publisher=Connecticut Department of Transportation |archive-url=https://web.archive.org/web/20060919194519/http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-11_Windsor_Locks_Station_Startup.pdf |archive-date=September 19, 2006 |url-status=dead |access-date=April 3, 2013}}</ref> A second platform serving a restored second track would have been added later.<ref>{{Cite web |url=http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-19_Windsor_Locks_Station_Full.pdf |title=Windsor Locks Full-Build Conceptual Site Plan |last=URS |publisher=Connecticut Department of Transportation |archive-url=https://web.archive.org/web/20060919194519/http://www.ct.gov/dotinfo/lib/dotinfo/nhr/docs/final/Figure_4-19_Windsor_Locks_Station_Full.pdf |archive-date=September 19, 2006 |url-status=dead |access-date=April 3, 2013}}</ref>
Line 59: Line 60:
However, local preference was to move the station stop back to the original downtown site. Spurred by a 2000 arson that damaged the structure, the Windsor Locks Preservation Association (WLPA) was formed in 2004 to support repair and reuse of the building.<ref name="great" /> By 2007, the WLPA and the town had secured $274,000 of the estimated $700,000 to purchase and repair the station, and serious consideration was being given to moving the Amtrak stop there as well. However, after years of unsuccessful negotiations about the sale and future use, the WLPA disbanded in 2011. The town took over negotiations and purchased the station from Amtrak in December 2014.<ref name="great" /> In 2015, the town began planning renovations of the station building for future use as a "shared workspace".<ref>{{Cite news |url=http://www.courant.com/community/windsor-locks/hc-wl-historic-train-station-1008-20151002-story.html |title=Historic Train Station To Be Given Second Life |last=Walsh |first=Michael |date=October 2, 2015 |work=Hartford Courant |access-date=September 12, 2016}}</ref>
However, local preference was to move the station stop back to the original downtown site. Spurred by a 2000 arson that damaged the structure, the Windsor Locks Preservation Association (WLPA) was formed in 2004 to support repair and reuse of the building.<ref name="great" /> By 2007, the WLPA and the town had secured $274,000 of the estimated $700,000 to purchase and repair the station, and serious consideration was being given to moving the Amtrak stop there as well. However, after years of unsuccessful negotiations about the sale and future use, the WLPA disbanded in 2011. The town took over negotiations and purchased the station from Amtrak in December 2014.<ref name="great" /> In 2015, the town began planning renovations of the station building for future use as a "shared workspace".<ref>{{Cite news |url=http://www.courant.com/community/windsor-locks/hc-wl-historic-train-station-1008-20151002-story.html |title=Historic Train Station To Be Given Second Life |last=Walsh |first=Michael |date=October 2, 2015 |work=Hartford Courant |access-date=September 12, 2016}}</ref>


Hartford Line plans from 2012 included two possible station sites: one at the existing station with an enlargement of the current parking lot, and one at the former location with a new parking lot. Either location would have {{convert|500|ft|m|adj=on}}-long high level platforms serving the current track plus a restored second track, with a pedestrian bridge connecting the two platforms.<ref>{{Cite web |url=http://www.nhhsrail.com/pdfs/ea/volii_1_03.pdf |title=Station and Layover Site Concept Plans |last=CDM Smith |date=February 24, 2012 |website=New Haven-Hartford-Springfield Environmental Assessment |publisher=Connecticut Department of Transportation |access-date=May 10, 2016}}</ref> Funding for the new station and second track were not included in initial Hartford Line funding. Service, which started on June 16, 2018, uses the existing station.<ref>{{Cite web |url=http://www.hartfordline.com/pdf/Hartford_Line_official_inagural_timetable.pdf |title=Hartford Line Official Inaugural Schedule |date=June 16, 2018 |website=Hartford Line |access-date=June 18, 2018}}</ref> In February 2017, the state announced an additional $50 million in funds, including money to complete design of the relocated Windsor Locks station.<ref>{{Cite press release |title=CTDOT ANNOUNCES $50 MILLION IN ADDITIONAL FUNDING FOR NHHS RAIL PROGRAM |date=February 20, 2017 |publisher=Connecticut Department of Transportation |url=http://www.ct.gov/dot/cwp/view.asp?A=1373&Q=590304}}</ref> Design work will be completed by 2020.<ref>{{Cite magazine |date=Summer 2017 |title=Design Continues for New Hartford Line Stations |url=http://nhhsrail.com/pdfs/nhhs%20rail%20program%20summer%202017%20newsletter%20final.pdf |magazine=New Haven-Hartford Springfield Rail Program Newsletter |publisher=Connecticut Department of Transportation |page=3}}</ref>
Hartford Line plans from 2012 included two possible station sites: one at the existing station with an enlargement of the current parking lot, and one at the former location with a new parking lot. Either location would have {{convert|500|ft|m|adj=on}}-long high level platforms serving the current track plus a restored second track, with a pedestrian bridge connecting the two platforms.<ref>{{Cite web |url=http://www.nhhsrail.com/pdfs/ea/volii_1_03.pdf |title=Station and Layover Site Concept Plans |last=CDM Smith |date=February 24, 2012 |website=New Haven-Hartford-Springfield Environmental Assessment |publisher=Connecticut Department of Transportation |access-date=May 10, 2016}}</ref> Funding for the new station and second track were not included in initial Hartford Line funding. Service, which started on June 16, 2018, uses the existing station.<ref>{{Cite web |url=http://www.hartfordline.com/pdf/Hartford_Line_official_inagural_timetable.pdf |title=Hartford Line Official Inaugural Schedule |date=June 16, 2018 |website=Hartford Line |access-date=June 18, 2018}}</ref> In February 2017, the state announced an additional $50&nbsp;million in funds, including money to complete design of the relocated Windsor Locks station.<ref>{{Cite press release |title=CTDOT ANNOUNCES $50 MILLION IN ADDITIONAL FUNDING FOR NHHS RAIL PROGRAM |date=February 20, 2017 |publisher=Connecticut Department of Transportation |url=http://www.ct.gov/dot/cwp/view.asp?A=1373&Q=590304}}</ref> Design work will be completed by 2020.<ref>{{Cite magazine |date=Summer 2017 |title=Design Continues for New Hartford Line Stations |url=http://nhhsrail.com/pdfs/nhhs%20rail%20program%20summer%202017%20newsletter%20final.pdf |magazine=New Haven-Hartford Springfield Rail Program Newsletter |publisher=Connecticut Department of Transportation |page=3}}</ref>


[[File:Windsor Locks CT 23 Nov 2021.jpg|thumb|left|Site of the new station in November 2021]]
{{As of|September 2019}}, the state plans for the station replacement to be a $65 million project. A {{convert|510|ft|adj=on}}-long high-level platform, brick shelter, and parking lot will be built at the downtown site, just north of the former station building. A {{convert|5000|ft|adj=on}}-long passing siding will be built, and the connection to the Suffield Branch reconfigured. A new maintenance-of-way yard will be built at the existing station site. The project also includes the reconstruction of Route 159 between Bridge Street and the station, including a multi-use path to connect with the [[Windsor Locks Canal State Park Trail]] at Bridge Street. Construction is anticipated to start in late 2020 and be completed in late 2023.<ref>{{cite web |url=https://www.nhhsrail.com/pdfs/proj%20320-0016%20windsor%20locks%20_%20fact%20sheet_sep_19.pdf |title=Fact Sheet: Windsor Locks |date=August 2019 |publisher=Connecticut Department of Transportation}}</ref><ref>{{cite web |url=https://www.nhhsrail.com/pdfs/windsor%20locks%20public%20meeting%20ppt%209-19-19.pdf |title=Hartford Line Windsor Locks Station Public Information Meeting |date=September 19, 2019 |publisher=Connecticut Department of Transportation}}</ref>
{{As of|September 2019}}, the state plans for the station replacement to be a $65&nbsp;million project. A {{convert|510|ft|adj=on}}-long high-level platform, brick shelter, and parking lot will be built at the downtown site, just north of the former station building. A {{convert|5000|ft|adj=on}}-long passing siding will be built, and the connection to the Suffield Branch reconfigured. A new maintenance-of-way yard will be built at the existing station site. The project also includes the reconstruction of Route&nbsp;159 between Bridge Street and the station, including a multi-use path to connect with the [[Windsor Locks Canal State Park Trail]] at Bridge Street. Construction is anticipated to start in late 2020 and be completed in late 2023.<ref>{{cite web |url=https://www.nhhsrail.com/pdfs/proj%20320-0016%20windsor%20locks%20_%20fact%20sheet_sep_19.pdf |title=Fact Sheet: Windsor Locks |date=August 2019 |publisher=Connecticut Department of Transportation}}</ref><ref>{{cite web |url=https://www.nhhsrail.com/pdfs/windsor%20locks%20public%20meeting%20ppt%209-19-19.pdf |title=Hartford Line Windsor Locks Station Public Information Meeting |date=September 19, 2019 |publisher=Connecticut Department of Transportation}}</ref>


In February 2020, the state received a $17.4 million federal grant for the project.<ref>{{cite press release |url=https://portal.ct.gov/Office-of-the-Governor/News/Press-Releases/2020/02-2020/Governor-Lamont-Announces-State-Receives-Federal-Grant-to-Build-a-New-Train-Station-in-Windsor-Locks |title=Governor Lamont Announces State Receives $17.4 Million Federal Grant to Build a New Train Station in Windsor Locks |date=February 29, 2020 |publisher=Office of Governor Ned Lamont}}</ref> Demolition of a nearby structure began in March 2020.<ref>{{cite news |url=https://www.journalinquirer.com/towns/windsor_locks/windsor-locks-set-to-start-demolition-for-new-train-station/article_4cb67cd6-6544-11ea-a919-8f315a1c0263.html |title=Windsor Locks set to start demolition for new train station |newspaper=Journal Inquirer |date=March 13, 2020 |first=Joe |last=Chaisson}}</ref> The state approved $45 million in bonds for the project in April 2020.<ref>{{cite news |url=https://www.journalinquirer.com/politics_and_government/windsor-locks-train-station-funding-approved-towns-finally-get-state-bond-money/article_0f799634-80c2-11ea-9733-73fde943c005.html |title=Windsor Locks train station funding approved, towns finally get state bond money |newspaper=Journal Inquirer |date=April 17, 2020 |first=Eric |last=Bedner}}</ref> The town plans for [[transit-oriented development]] adjacent to the station, including a public market and apartment buildings.<ref>{{cite news |url=https://www.hartfordbusiness.com/article/windsor-locks-eyes-45m-mixed-use-development-around-planned-train-station |title=Windsor Locks eyes $45M mixed-use development around planned train station |newspaper=Hartford Business Journal |date=May 4, 2020 |first=Greg |last=Bordonaro}}</ref> The town was awarded $130,000 in December 2020 for restoration of the station building.<ref>{{cite news |url=https://www.journalinquirer.com/towns/windsor_locks/windsor-locks-celebrate-130-000-train-station-grant/article_fd250148-363e-11eb-b7ad-d363688382e0.html |title=Windsor Locks celebrate $130,000 train station grant |first=Matthew P. |last=Knox |date=December 4, 2020 |newspaper=Journal Inquirer |accessdate=January 10, 2021}}</ref> In March 2021, the town reached an agreement with a developer to restore the building for use as a welcome center, cafe, and brewery.<ref>{{cite news |url=https://www.hartfordbusiness.com/article/windsor-locks-working-with-developer-to-restore-historic-train-station |title=Windsor Locks working with developer to restore historic train station |newspaper=Hartford Business Journal |date=March 4, 2021 |first=Joe |last=Chaisson |accessdate=March 5, 2021}}</ref>
In February 2020, the state received a $17.4&nbsp;million federal grant for the project.<ref>{{cite press release |url=https://portal.ct.gov/Office-of-the-Governor/News/Press-Releases/2020/02-2020/Governor-Lamont-Announces-State-Receives-Federal-Grant-to-Build-a-New-Train-Station-in-Windsor-Locks |title=Governor Lamont Announces State Receives $17.4 Million Federal Grant to Build a New Train Station in Windsor Locks |date=February 29, 2020 |publisher=Office of Governor Ned Lamont}}</ref> Demolition of a nearby structure began in March 2020.<ref>{{cite news |url=https://www.journalinquirer.com/towns/windsor_locks/windsor-locks-set-to-start-demolition-for-new-train-station/article_4cb67cd6-6544-11ea-a919-8f315a1c0263.html |title=Windsor Locks set to start demolition for new train station |newspaper=Journal Inquirer |date=March 13, 2020 |first=Joe |last=Chaisson}}</ref> The state approved $45&nbsp;million in bonds for the project in April 2020.<ref>{{cite news |url=https://www.journalinquirer.com/politics_and_government/windsor-locks-train-station-funding-approved-towns-finally-get-state-bond-money/article_0f799634-80c2-11ea-9733-73fde943c005.html |title=Windsor Locks train station funding approved, towns finally get state bond money |newspaper=Journal Inquirer |date=April 17, 2020 |first=Eric |last=Bedner}}</ref> The town plans for [[transit-oriented development]] adjacent to the station, including a public market and apartment buildings.<ref>{{cite news |url=https://www.hartfordbusiness.com/article/windsor-locks-eyes-45m-mixed-use-development-around-planned-train-station |title=Windsor Locks eyes $45M mixed-use development around planned train station |newspaper=Hartford Business Journal |date=May 4, 2020 |first=Greg |last=Bordonaro}}</ref> The town was awarded $130,000 in December 2020 for restoration of the station building.<ref>{{cite news |url=https://www.journalinquirer.com/towns/windsor_locks/windsor-locks-celebrate-130-000-train-station-grant/article_fd250148-363e-11eb-b7ad-d363688382e0.html |title=Windsor Locks celebrate $130,000 train station grant |first=Matthew P. |last=Knox |date=December 4, 2020 |newspaper=Journal Inquirer |accessdate=January 10, 2021}}</ref> In March 2021, the town reached an agreement with a developer to restore the building for use as a welcome center, cafe, and brewery.<ref>{{cite news |url=https://www.hartfordbusiness.com/article/windsor-locks-working-with-developer-to-restore-historic-train-station |title=Windsor Locks working with developer to restore historic train station |newspaper=Hartford Business Journal |date=March 4, 2021 |first=Joe |last=Chaisson |accessdate=March 5, 2021}}</ref>

Bidding for the project began in November 2021.<ref>{{cite news |url=https://www.journalinquirer.com/towns/windsor_locks/windsor-locks-to-get-new-railroad-station-goal-is-to-spur-development/article_87acec64-286e-11ec-a9f5-974e5124a53f.html |title=WIndsor Locks to get new railroad station; goal is to spur development |first=Skyler |last=Frazer |newspaper=Journal Inquirer |date=October 8, 2021}}</ref> Construction began in September 2022 and is expected to be complete in mid-2025, with a total project cost of $87 million.<ref>{{cite press release |url=https://portal.ct.gov/Office-of-the-Governor/News/Press-Releases/2022/09-2022/Governor-Lamont-Breaks-Ground-on-New-Train-Station-in-Windsor-Locks |title=Governor Lamont Breaks Ground on New Train Station in Windsor Locks |date=September 14, 2022 |publisher=Office of Governor Ned Lamont}}</ref> In September 2023, the state awarded the town $4.8 million to restore the station building and add bathrooms, as well as to acquire an adjacent strip mall property for eventual construction of transit-oriented housing.<ref>{{cite news |url=https://www.ctinsider.com/capitalregion/article/ct-community-investment-fund-hartford-18387904.php |title=CT OKs $101M for projects such as Bloomfield's center, a Windsor park and public housing in Enfield |newspaper=CT Insider |date=September 27, 2023 |first=Emily |last=DiSalvo |access-date=December 3, 2023}}</ref>
{{clear left}}
{{clear left}}


Line 75: Line 79:
{{Commons category}}
{{Commons category}}
{{Amtrak web|WNL|Windsor Locks, CT}}
{{Amtrak web|WNL|Windsor Locks, CT}}
*[http://www.hartfordline.com/route_stations/windsor_locks.aspx Windsor Locks – Hartford Line]
*[https://hartfordline.com/route_stations/windsor_locks/ Windsor Locks – Hartford Line]
*[http://www.trainweb.org/usarail/windsorlocks.htm Windsor Locks Amtrak Station (USA Rail Guide -- Train Web)]
*[http://www.trainweb.org/usarail/windsorlocks.htm Windsor Locks Amtrak Station (USA Rail Guide -- Train Web)]
*[http://www.greatamericanstations.com/Stations/WNL/Station_view Windsor Locks Station (WNL) Great American Stations (Amtrak)]


{{Amtrak Connecticut stations}}
{{Hartford Line stations navbox}}
{{Hartford Line stations navbox}}

[[Category:Amtrak stations in Connecticut]]
[[Category:Amtrak stations in Connecticut]]
[[Category:Stations on the New Haven–Springfield Line]]
[[Category:Stations on the New Haven–Springfield Line]]
[[Category:Stations along New York, New Haven and Hartford Railroad lines]]
[[Category:Former New York, New Haven and Hartford Railroad stations]]
[[Category:Railway stations in Hartford County, Connecticut]]
[[Category:Railway stations in Hartford County, Connecticut]]
[[Category:Windsor Locks, Connecticut]]
[[Category:Windsor Locks, Connecticut]]

Latest revision as of 17:15, 5 June 2024

Windsor Locks, CT
Windsor Locks station in January 2015
General information
LocationSouth Main Street at Stanton Road
Windsor Locks, Connecticut
United States
Coordinates41°54′50″N 72°37′34″W / 41.91389°N 72.62611°W / 41.91389; -72.62611
Owned by
Line(s)New Haven–Springfield Line
Platforms1 side platform
Tracks1
ConnectionsBus transport CTtransit Hartford: 24, 96, 905, 915
Construction
Parking30 spaces
Bicycle facilitiesNo
AccessibleYes
Other information
Station codeAmtrak: WNL
History
Opened1839
Rebuilt1875, 1971, 1981
Passengers
FY 202327,271[1] (Amtrak)
Services
Preceding station Amtrak Following station
Windsor Northeast Regional Springfield
Terminus
Windsor
toward New Haven
Amtrak Hartford Line
Valley Flyer Springfield
toward Greenfield
Hartford Vermonter Springfield
toward St. Albans
Preceding station CT Rail Following station
Windsor Hartford Line Springfield
Terminus
Former services
Preceding station Amtrak Following station
Windsor Atlantic City Express
1991–1995
Springfield
Terminus
Windsor Locks Passenger Station
Map
Coordinates41°56′01″N 72°37′39″W / 41.933611°N 72.6275°W / 41.933611; -72.6275
NRHP reference No.75001937

Windsor Locks station is an Amtrak and CT Rail train station in Windsor Locks, Connecticut, on the New Haven–Springfield Line. It is served by four Amtrak services - the Amtrak Hartford Line shuttles, Northeast Regional, Valley Flyer, and Vermonter - as well as CT Rail Hartford Line commuter rail trains.

The current station has only a small platform and shelter. A new station with full-length high-level platform is under construction in downtown Windsor Locks, where the station was located until 1981. The former station building at that site is listed on the National Register of Historic Places as Windsor Locks Passenger Station.

History

[edit]
An Amtrak train at the 1875-built station in 1979
The derelict station in 2015

The Hartford and New Haven Railroad opened through Windsor Locks in 1839. The New York, New Haven, and Hartford Railroad, its successor, built a new station in the town center in 1875. The station building was closed by Penn Central in 1971; Penn Central and later Amtrak passengers continued to use the platform, but Penn Central used the interior as a signal workshop.[2] Penn Central later attempted to demolish the station, but a local group succeeded in having it listed on the National Register of Historic Places in 1975. Amtrak bought the Springfield Line infrastructure, including the "remarkably intact" station, in 1976.[2] Service moved to the current location – a new park and ride stop just south of Interstate 91 – in 1981.[3][4]

The 2004 Recommended Action of the New Haven Hartford Springfield Commuter Rail Implementation Study included the construction of a new Windsor Locks station on the existing south-of-downtown site. A single high-level platform was to be constructed, with a pedestrian bridge leading to an added parking area on the west side of South Main Street.[5] A second platform serving a restored second track would have been added later.[6]

However, local preference was to move the station stop back to the original downtown site. Spurred by a 2000 arson that damaged the structure, the Windsor Locks Preservation Association (WLPA) was formed in 2004 to support repair and reuse of the building.[2] By 2007, the WLPA and the town had secured $274,000 of the estimated $700,000 to purchase and repair the station, and serious consideration was being given to moving the Amtrak stop there as well. However, after years of unsuccessful negotiations about the sale and future use, the WLPA disbanded in 2011. The town took over negotiations and purchased the station from Amtrak in December 2014.[2] In 2015, the town began planning renovations of the station building for future use as a "shared workspace".[7]

Hartford Line plans from 2012 included two possible station sites: one at the existing station with an enlargement of the current parking lot, and one at the former location with a new parking lot. Either location would have 500-foot (150 m)-long high level platforms serving the current track plus a restored second track, with a pedestrian bridge connecting the two platforms.[8] Funding for the new station and second track were not included in initial Hartford Line funding. Service, which started on June 16, 2018, uses the existing station.[9] In February 2017, the state announced an additional $50 million in funds, including money to complete design of the relocated Windsor Locks station.[10] Design work will be completed by 2020.[11]

Site of the new station in November 2021

As of September 2019, the state plans for the station replacement to be a $65 million project. A 510-foot (160 m)-long high-level platform, brick shelter, and parking lot will be built at the downtown site, just north of the former station building. A 5,000-foot (1,500 m)-long passing siding will be built, and the connection to the Suffield Branch reconfigured. A new maintenance-of-way yard will be built at the existing station site. The project also includes the reconstruction of Route 159 between Bridge Street and the station, including a multi-use path to connect with the Windsor Locks Canal State Park Trail at Bridge Street. Construction is anticipated to start in late 2020 and be completed in late 2023.[12][13]

In February 2020, the state received a $17.4 million federal grant for the project.[14] Demolition of a nearby structure began in March 2020.[15] The state approved $45 million in bonds for the project in April 2020.[16] The town plans for transit-oriented development adjacent to the station, including a public market and apartment buildings.[17] The town was awarded $130,000 in December 2020 for restoration of the station building.[18] In March 2021, the town reached an agreement with a developer to restore the building for use as a welcome center, cafe, and brewery.[19]

Bidding for the project began in November 2021.[20] Construction began in September 2022 and is expected to be complete in mid-2025, with a total project cost of $87 million.[21] In September 2023, the state awarded the town $4.8 million to restore the station building and add bathrooms, as well as to acquire an adjacent strip mall property for eventual construction of transit-oriented housing.[22]

See also

[edit]

References

[edit]
  1. ^ "Amtrak Fact Sheet, Fiscal Year 2023: State of Connecticut" (PDF). Amtrak. March 2024. Retrieved June 26, 2024.
  2. ^ a b c d "Windsor Locks (WNL)". Great American Stations. Amtrak. Retrieved September 12, 2016.
  3. ^ National Train Timetables Effective February 1, 1981 through April 25, 1981. National Railroad Passenger Corporation (Amtrak). February 1, 1981. p. 57 – via Museum of Railway Timetables.
  4. ^ National Train Timetables Effective April 26, 1981 through October 24, 1981. Includes Northeast Corridor Schedules Effective April 26, 1981 through August 1, 1981. National Railroad Passenger Corporation (Amtrak). April 26, 1981. p. 57 – via Museum of Railway Timetables.
  5. ^ URS. "Windsor Locks Start-up Conceptual Site Plan" (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on September 19, 2006. Retrieved April 3, 2013.
  6. ^ URS. "Windsor Locks Full-Build Conceptual Site Plan" (PDF). Connecticut Department of Transportation. Archived from the original (PDF) on September 19, 2006. Retrieved April 3, 2013.
  7. ^ Walsh, Michael (October 2, 2015). "Historic Train Station To Be Given Second Life". Hartford Courant. Retrieved September 12, 2016.
  8. ^ CDM Smith (February 24, 2012). "Station and Layover Site Concept Plans" (PDF). New Haven-Hartford-Springfield Environmental Assessment. Connecticut Department of Transportation. Retrieved May 10, 2016.
  9. ^ "Hartford Line Official Inaugural Schedule" (PDF). Hartford Line. June 16, 2018. Retrieved June 18, 2018.
  10. ^ "CTDOT ANNOUNCES $50 MILLION IN ADDITIONAL FUNDING FOR NHHS RAIL PROGRAM" (Press release). Connecticut Department of Transportation. February 20, 2017.
  11. ^ "Design Continues for New Hartford Line Stations" (PDF). New Haven-Hartford Springfield Rail Program Newsletter. Connecticut Department of Transportation. Summer 2017. p. 3.
  12. ^ "Fact Sheet: Windsor Locks" (PDF). Connecticut Department of Transportation. August 2019.
  13. ^ "Hartford Line Windsor Locks Station Public Information Meeting" (PDF). Connecticut Department of Transportation. September 19, 2019.
  14. ^ "Governor Lamont Announces State Receives $17.4 Million Federal Grant to Build a New Train Station in Windsor Locks" (Press release). Office of Governor Ned Lamont. February 29, 2020.
  15. ^ Chaisson, Joe (March 13, 2020). "Windsor Locks set to start demolition for new train station". Journal Inquirer.
  16. ^ Bedner, Eric (April 17, 2020). "Windsor Locks train station funding approved, towns finally get state bond money". Journal Inquirer.
  17. ^ Bordonaro, Greg (May 4, 2020). "Windsor Locks eyes $45M mixed-use development around planned train station". Hartford Business Journal.
  18. ^ Knox, Matthew P. (December 4, 2020). "Windsor Locks celebrate $130,000 train station grant". Journal Inquirer. Retrieved January 10, 2021.
  19. ^ Chaisson, Joe (March 4, 2021). "Windsor Locks working with developer to restore historic train station". Hartford Business Journal. Retrieved March 5, 2021.
  20. ^ Frazer, Skyler (October 8, 2021). "WIndsor Locks to get new railroad station; goal is to spur development". Journal Inquirer.
  21. ^ "Governor Lamont Breaks Ground on New Train Station in Windsor Locks" (Press release). Office of Governor Ned Lamont. September 14, 2022.
  22. ^ DiSalvo, Emily (September 27, 2023). "CT OKs $101M for projects such as Bloomfield's center, a Windsor park and public housing in Enfield". CT Insider. Retrieved December 3, 2023.
[edit]