Line 1: Line 1:
{{Short description|Key rail transport link in western Austria}}
{| {{Railway line header}}
{{Infobox rail line
{{BS-header|Innsbruck bypass}}
|name=Innsbruck bypass
{{BS-daten
|image = Inntaltunnel, Südportal 01.jpg
| AT-KBS=
|image_width = 300px
| AT-STRECKENNR= 305 01
|caption = South portal of the Inntal Tunnel
| LÄNGE= 14,853
|linenumber = 305 01
| SPURWEITE= 1435
|linelength = 14,853
| STROMW= 15 kV 16,7 Hz
|gauge = 1435
| NEIGUNG= 0,9
|electrification = 15 kV 16,7 Hz [[Alternating current|AC]]
| RADIUS=
|maxincline = 0,9  [[Percent sign|%]]
| V-MAX= 160
|speed = 160 max.
| BILDPFAD_FOTO= Inntaltunnel, Südportal 01.jpg
|map={{routemap|inline=1|map=
| PIXEL_FOTO= 300px
STR~~ ~~ ~~[[New Lower Inn Valley railway|New Lower Inn Valley line (HSL) from Wörgl]]
| TEXT_FOTO= South portal of the Inntal Tunnel
ABZg+r~~ ~~ ~~[[Lower Inn Valley railway|Lower Inn Valley railway from Wörgl]]
| BILDPFAD_KARTE=
BST~~0.561~~Fritzens-Wattens 2 junction~~(L 558 m)
| PIXEL_KARTE=
ABZgr~~ ~~ ~~[[Lower Inn Valley railway|Lower Inn Valley railway to Innsbruck]]
| TEXT_KARTE=
hKRZWa~~ ~~ ~~[[Inn (river)|Inn]] bridge (L 488 m)
}}
hSTR~~ ~~ ~~[[Inntal Autobahn|Inntalautobahn A12]]
{{BS-table}}
htSTRa~~2.315~~ ~~Inntal Tunnel north portal (L 12,696 km)
{{BS|STR|||[[New Lower Inn Valley railway|New Lower Inn Valley line (HSL) from Wörgl]]}}
tBST~~4.174~~[[Automatic Block Signal|ABS]] Fritzens-Wattens 13
{{BS|ABZlg|||[[Lower Inn Valley railway|Lower Inn Valley railway from Wörgl]]}}
{{BS|BST|0.561|Fritzens-Wattens 1 junction|(L 558 m)}}
tÜST~~9.966~~Fritzens-Wattens 14 crossover
etABZgl~~10.050~~ ~~To [[Brenner Base Tunnel]] (as prepared)
{{BS|ABZrf|||[[Lower Inn Valley railway|Lower Inn Valley railway to Innsbruck]]}}
tBST~~13.242~~[[Automatic Block Signal|ABS]] Fritzens-Wattens 15
{{BS|WBRÜCKEa|||[[Inn (river)|Inn]] bridge (L 488 m)}}
tSTRe~~15,011~~ ~~Inntal Tunnel south portal
{{BS|hSTR|||[[Inntal Autobahn|Inntalautobahn A12]]}}
ABZg+r~~ ~~ ~~[[Brenner railway]] from Innsbruck
{{BS|hTUNNELa|2.315||Inntal Tunnel north portal (L 12,696 km)}}
BST~~15.414~~Innsbruck 1 junction~~(L 716 m)
{{BS|tBST|4.174|[[Automatic Block Signal|ABS]] Fritzens-Wattens 13}}
STR~~ ~~ ~~[[Brenner railway]] to [[Brenner, South Tyrol|Brenner]]
{{BS|tÜST|9.966| Fritzens-Wattens 14 crossover }}
}}}}
{{BS|etABZlf|10.050||To [[Brenner Base Tunnel]] (as prepared)|}}
The '''Innsbruck bypass''' ([[German language|German]]: ''Umfahrung Innsbruck'' or sometimes ''Güterzugumfahrung Innsbruck'', that is ''the Innsbruck freight railway bypass'') is a {{Convert|14.853|km|adj=on}}-long double-track electrified main line of the [[Rail transport in Austria|Austrian railways]]. It connects the [[Lower Inn Valley railway]] with the [[Brenner railway]], bypassing [[Innsbruck]]. It was opened on 29 May 1994. The line is at a major part of the rail freight network of [[Austrian Federal Railways]] (ÖBB).
{{BS|tBST|13.242|[[Automatic Block Signal|ABS]] Fritzens-Wattens 15}}
{{BS|TUNNELe|15,011||Inntal Tunnel south portal}}
{{BS|ABZlg|||[[Brenner railway]] from Innsbruck}}
{{BS|BST|15.414|Innsbruck 1 junction|(L 716 m)}}
{{BS|STR|||[[Brenner railway]] to [[Brenner, South Tyrol|Brenner]]}}
|}
|}


The bypass is part of the [[Berlin–Palermo railway axis|Line 1]] of [[Trans-European Transport Networks]] (TEN-T). It was intended to increase the capacity of the line and to reduce the noise created by [[Freight rail transport|freight trains]] on the city of Innsbruck. It cost an estimated €211 million to build.<ref name=Schienenverkehr>{{cite journal|first=Helmut |last=Petrovitsch |journal= Schienenverkehr aktuell (Modern railways) |issue=7 |year= 1994 |pages= 2–3 |title= Inbetriebnahme der Umfahrung Innsbruck (Commissioning of the Innsbruck bypass) |language=German}}</ref>
The '''Innsbruck bypass''' ([[German language|German]]: ''Umfahrung Innsbruck'' or sometimes ''Güterzugumfahrung Innsbruck'', that is ''the Innsbruck freight railway bypass'') is a 14.853 kilometre-long double-track electrified main line of the [[Rail transport in Austria|Austrian railways]]. It connects the [[Lower Inn Valley railway]] with the [[Brenner railway]], bypassing [[Innsbruck]]. It was opened on 29 May 1994. The line is at a major part of the rail freight network of [[Austrian Federal Railways]] (ÖBB).


The bypass is part of the [[Berlin–Palermo railway axis|Line 1]] of [[Trans-European Transport Networks]] (TEN-T). It was intended to increase the capacity of the line and to reduce the noise created by [[Freight rail transport|freight trains]] on the city of Innsbruck. It cost an estimated €211 million to build.<ref name=Schienenverkehr>{{cite journal|first=Helmut |last=Petrovitsch |journal= Schienenverkehr aktuell (Modern railways) |issue=7 |year= 1994 |pages= 2–3 |title= Inbetriebnahme der Umfahrung Innsbruck (Commissioning of the Innsbruck bypass) |language=German}}</ref>
The [[Deutsche Reichsbahn]] (German Imperial Railways) built a local bypass of [[Innsbruck Hauptbahnhof|Innsbruck station]] during [[World War II]] in 1944, which was demolished in 1945.<ref name=Modelleisenbahn7>{{cite journal |journal=Eisenbahn-Modelleisenbahn Österreich (Model Railway Magazine Austria) | issue=7 |year= 1994 |page= 1|title=Betriebsaufnahme der Umfahrung Innsbruck (Entry into operation of the bypass Innsbruck) |language=German}}</ref>

The [[Deutsche Bahn]] (German Railways) built a local bypass of [[Innsbruck Hauptbahnhof|Innsbruck station]] during [[World War II]] in 1944, which was demolished in 1945.<ref name=Modelleisenbahn7>{{cite journal |journal=Eisenbahn-Modelleisenbahn Österreich (Model Railway Magazine Austria) | issue=7 |year= 1994 |page= 1|title=Betriebsaufnahme der Umfahrung Innsbruck (Entry into operation of the bypass Innsbruck) |language=German}}</ref>


Major components of the Bypass Innsbruck are:
Major components of the Bypass Innsbruck are:
*the grade-separated [[Fritzens]]-[[Wattens]] 1 junction,
*the grade-separated [[Fritzens]]-[[Wattens]] 2 junction,
*the 488 metre-long bridge over the [[Inn (river)|Inn]],
*the 488 metre-long bridge over the [[Inn (river)|Inn]],
*the 12,696 metre-long Inntal (Inn valley) tunnel
*the 12,696 metre-long Inntal (Inn valley) tunnel
*the Innsbruck 1 junction
*the Innsbruck 1 junction


==Route==
==Route==
{{Empty section|date=July 2010}}
{{Empty section|date=July 2010}}

==Junction structure at Fritzens-Watten 1==
==Junction structure at Fritzens-Wattens 2==
The Fritzens-Wattens 1 junction is located at the 60.980&nbsp;km mark on the Kufstein–Innsbruck line (Lower Inn Valley line) near [[Volders]]-[[Baumkirchen]] station. The junction is a grade-separated structure that allows trains to run on and off without crossing on-coming trains on the level. The two bypass tracks run between the tracks to and from Innsbruck where they separate. The turnouts have radii of 1,200 m, allowing trains to operate at full speed. When the [[New Lower Inn Valley railway|New Lower Inn Valley line]] is opened it will connect to the inner pair of tracks, allowing trains to run between the new line and bypass without any change. The bypass will in effect become part of the new line.
The Fritzens-Wattens 2 junction is located at the {{Cvt|60.980|km}} mark on the Kufstein–Innsbruck line (Lower Inn Valley line) near [[Volders]]-[[Baumkirchen]] station. The junction is a grade-separated structure that allows trains to run on and off without crossing on-coming trains on the level. The two bypass tracks run between the tracks to and from Innsbruck where they separate. The turnouts have radii of {{Cvt|1200|m}}, allowing trains to operate at full speed. When the [[New Lower Inn Valley railway|New Lower Inn Valley line]] is opened it will connect to the inner pair of tracks, allowing trains to run between the new line and bypass without any change. The bypass will in effect become part of the new line.


[[File:Bruecke beim Inntaltunnel.JPG|thumb|Inn bridge from the north portal of the Inntal tunnel]]
[[File:Bruecke beim Inntaltunnel.JPG|thumb|Inn bridge from the north portal of the Inntal tunnel]]

===Inn bridge===
===Inn bridge===
The Inn bridge is a 488 m long prestressed concrete structure. It crosses the Inn and the [[Inntal Autobahn|Inntal Autobahn A12]] and leads directly to the north portal of the Inntal tunnel. In order to strengthen the structure, the side walls rise to 2.2 metres above the level of the track. The interior of the walls are equipped with material that absorbs traffic noise. The construction of the bridge was time-consuming in order to maintain the minimum clearance of 4.20 m above the Inntal Autobahn, requiring a 52 m-long 2,800 ton concrete box bridge.<ref name=Schienenverkehr/>
The Inn bridge is a {{Cvt|488|m}} long prestressed concrete structure. It crosses the Inn and the [[Inntal Autobahn|Inntal Autobahn A12]] and leads directly to the north portal of the Inntal tunnel. In order to strengthen the structure, the side walls rise to {{Convert|2.2|m}} above the level of the track. The interior of the walls are equipped with material that absorbs traffic noise. The construction of the bridge was time-consuming in order to maintain the minimum clearance of {{Cvt|4.20|m|ftin}} above the Inntal Autobahn, requiring a {{Cvt|52|m}}-long 2,800 ton concrete box bridge.<ref name=Schienenverkehr/>
[[File:Inntaltunnel-Südportal-Einsatzzentrale.jpg|thumb|Control room and tunnel rescue site at the south entrance of Inntal tunnel]]
[[File:Inntaltunnel-Südportal-Einsatzzentrale.jpg|thumb|Control room and tunnel rescue site at the south entrance of Inntal tunnel]]

===Inntal tunnel===
===Inntal tunnel===
The Inntal tunnel is a two line tunnel between Inn Valley and the [[Wipptal|Wipp valley]]. With a length of 12.696 kilometers, it is currently the longest railway tunnel in Austria. It cost approximately €120 million to build.<ref name=Schienenverkehr/>
The Inntal tunnel is a two line tunnel between Inn Valley and the [[Wipptal|Wipp valley]]. With a length of {{Convert|12.696|km|adj=}}, it is currently the longest railway tunnel in Austria. It cost approximately €120 million to build.<ref name=Schienenverkehr/>


Construction of the Inn valley tunnel started in September 1989, with tunnelling from both ends. On 12 December 1992 in the tunnel was broken through<ref name=Modelleisenbahn7/> and the tunnel was completed in July 1993. After the track-laying, the wiring of the overhead electrical line and the installation of signalling in the tunnel, operations started on 29 May 1994. The tunnel was built using the [[New Austrian Tunnelling method]]. In contrast to other new tunnel, it is not built with [[Railroad tie#Ballastless track|slab track]] but instead is equipped with conventional [[Track ballast|ballasted track]] and [[Railroad tie#Concrete|concrete sleepers]].
Construction of the Inn valley tunnel started in September 1989, with tunnelling from both ends. On 12 December 1992 in the tunnel was broken through<ref name=Modelleisenbahn7/> and the tunnel was completed in July 1993. After the track-laying, the wiring of the overhead electrical line and the installation of signalling in the tunnel, operations started on 29 May 1994. The tunnel was built using the [[New Austrian Tunnelling method]]. In contrast to other new tunnel, it is not built with [[Railroad tie#Ballastless track|slab track]] but instead is equipped with conventional [[Track ballast|ballasted track]] and [[Railroad tie#Concrete|concrete sleepers]].


The excavated cross-section where it is not lined is 95 square metres, where lining was planned it was 108 square metres. The distance between the centres of the tracks is 4.70 m, corresponding with that of high-speed lines.
The excavated cross-section where it is not lined is {{Convert|95|m2}}, where lining was planned it was {{Convert|108|m2}}. The distance between the centres of the tracks is {{Cvt|4.70|m|ftin}}, corresponding with that of high-speed lines.

A cross-over (''Üst Fritzens-Wattens 14'') was built about halfway through the tunnel at the 9.966 kilometre mark. Immediately after the crossover, a branch in the tunnel was driven to which the two tracks of the planned [[Brenner Base Tunnel]] are to be connected. It was built to enable the easy installation of the [[Railroad switch|turnouts]] and overhead electrification to connect the lines of the base tunnel and the bypass.


A cross-over (''Üst Fritzens-Wattens 14'') was built about halfway through the tunnel at the 9.966 kilometre mark. Immediately after the crossover, a branch in the tunnel was driven to which the two tracks of the planned [[Brenner Base Tunnel]] were planned to be connected. It was built to enable the easy installation of the [[Railroad switch|turnouts]] and overhead electrification to connect the lines of the base tunnel and the bypass.
===Innsbruck 1 junction===
===Innsbruck 1 junction===
After a short distance in the open air, the bypass line joins the [[Brenner railway]] from Innsbruck at the 79.646&nbsp;km mark from the German border at [[Kufstein]]. The junction is equipped with eight sets of points and designed so that freight trains can run on and off the branch in both directions simultaneously without slowing down.
After a short distance in the open air, the bypass line joins the [[Brenner railway]] from Innsbruck at the {{Cvt|79.646|km}} mark from the German border at [[Kufstein]]. The junction is equipped with eight sets of points and designed so that freight trains can run on and off the branch in both directions simultaneously without slowing down.


==Operations==
==Operations==
Line 73: Line 69:
With the exception of Fritzens-Wattens 1 junction, the entire route is controlled from the remote signalling centre at Innsbruck. After completion of the new Innsbruck operations control centre (German: ''Betriebsfernsteuerzentrale''), which is currently under construction, it will control Fritzens-Wattens 1 junction.
With the exception of Fritzens-Wattens 1 junction, the entire route is controlled from the remote signalling centre at Innsbruck. After completion of the new Innsbruck operations control centre (German: ''Betriebsfernsteuerzentrale''), which is currently under construction, it will control Fritzens-Wattens 1 junction.


Since the bypass joins the Brenner Railway, which has slopes of up to 2.9%, virtually all goods trains need a [[bank engine]], attached to the front. When train loads exceed 1,060 tonnes, a third locomotive is also atached to push the train. Due to local opposition to the construction of a facility for attaching and detaching locomotives in [[Baumkirchen]]. this operation has to be carried out in [[Wörgl]] terminal north or [[Wörgl Hbf|Wörgl station]], requiring an additional journey of up to 44 kilometres per trip.
Since the bypass joins the Brenner Railway, which has slopes of up to 2.9%, virtually all goods trains need a [[bank engine]], attached to the front. When train loads exceed 1,060 tonnes, a third locomotive is also attached to push the train. Due to local opposition to the construction of a facility for attaching and detaching locomotives in [[Baumkirchen]], this operation has to be carried out in [[Wörgl]] terminal north or [[Wörgl Hbf|Wörgl station]], requiring an additional journey of up to 44 kilometres per trip.


==Notes==
==Notes==
{{refs}}
{{Reflist}}

==References==
==References==
{{cite book|first=Dimitrios |last=Kolymbas |title= Geotechnik – Tunnelbau und Tunnelmechanik (Geotechnics - Tunnel and Tunnel Mechanics) |publisher= Springer-Verlag |location= Berlin, Heidelberg |year= 1998| isbn=3-540-62805-3 }}
*{{cite book|first=Dimitrios |last=Kolymbas |title= Geotechnik – Tunnelbau und Tunnelmechanik (Geotechnics - Tunnel and Tunnel Mechanics) |publisher= Springer-Verlag |location= Berlin, Heidelberg |year= 1998| isbn=3-540-62805-3 }}


==External links==
==External links==
{{Commons category}}
{{Commonscat|Innsbruck bypass}}
*[http://en.structurae.de/structures/data/index.cfm?ID=s0007955 Inntaltunnel], Structurae
*[http://en.structurae.de/structures/data/index.cfm?ID=s0007955 Inntaltunnel], Structurae


{{Berlin–Palermo railway axis}}
{{Berlin–Palermo railway axis}}
{{Authority control}}


{{coord|47|16|55|N|11|32|29|E|region:AT-7_type:landmark_source:kolossus-dewiki|display=title}}
{{Coord|47|16|55|N|11|32|29|E|region:AT-7_type:landmark_source:kolossus-dewiki|display=title}}


[[Category:Railway lines in Austria]]
[[Category:Railway lines in Austria]]
[[Category:Innsbruck|Bypass]]
[[Category:Innsbruck|Bypass]]
[[Category:Transport in Tyrol (state)]]
[[Category:Transport in Tyrol (federal state)]]
[[Category:Railroad cutoffs]]
[[Category:Railroad cutoffs]]
[[Category:Tunnels in the Alps]]

Latest revision as of 16:41, 14 July 2024

Innsbruck bypass
South portal of the Inntal Tunnel
Overview
Line number305 01
Technical
Line length14,853
Track gauge1435
Electrification15 kV 16,7 Hz AC
Operating speed160 max.
Maximum incline0,9  %
Route map

0.561
Fritzens-Wattens 2 junction
(L 558 m)
Inn bridge (L 488 m)
2.315
Inntal Tunnel north portal (L 12,696 km)
4.174
ABS Fritzens-Wattens 13
9.966
Fritzens-Wattens 14 crossover
10.050
To Brenner Base Tunnel (as prepared)
13.242
ABS Fritzens-Wattens 15
15,011
Inntal Tunnel south portal
Brenner railway from Innsbruck
15.414
Innsbruck 1 junction
(L 716 m)

The Innsbruck bypass (German: Umfahrung Innsbruck or sometimes Güterzugumfahrung Innsbruck, that is the Innsbruck freight railway bypass) is a 14.853-kilometre (9.229 mi)-long double-track electrified main line of the Austrian railways. It connects the Lower Inn Valley railway with the Brenner railway, bypassing Innsbruck. It was opened on 29 May 1994. The line is at a major part of the rail freight network of Austrian Federal Railways (ÖBB).

The bypass is part of the Line 1 of Trans-European Transport Networks (TEN-T). It was intended to increase the capacity of the line and to reduce the noise created by freight trains on the city of Innsbruck. It cost an estimated €211 million to build.[1]

The Deutsche Reichsbahn (German Imperial Railways) built a local bypass of Innsbruck station during World War II in 1944, which was demolished in 1945.[2]

Major components of the Bypass Innsbruck are:

  • the grade-separated Fritzens-Wattens 2 junction,
  • the 488 metre-long bridge over the Inn,
  • the 12,696 metre-long Inntal (Inn valley) tunnel
  • the Innsbruck 1 junction

Route

[edit]

Junction structure at Fritzens-Wattens 2

[edit]

The Fritzens-Wattens 2 junction is located at the 60.980 km (37.891 mi) mark on the Kufstein–Innsbruck line (Lower Inn Valley line) near Volders-Baumkirchen station. The junction is a grade-separated structure that allows trains to run on and off without crossing on-coming trains on the level. The two bypass tracks run between the tracks to and from Innsbruck where they separate. The turnouts have radii of 1,200 m (3,900 ft), allowing trains to operate at full speed. When the New Lower Inn Valley line is opened it will connect to the inner pair of tracks, allowing trains to run between the new line and bypass without any change. The bypass will in effect become part of the new line.

Inn bridge from the north portal of the Inntal tunnel

Inn bridge

[edit]

The Inn bridge is a 488 m (1,601 ft) long prestressed concrete structure. It crosses the Inn and the Inntal Autobahn A12 and leads directly to the north portal of the Inntal tunnel. In order to strengthen the structure, the side walls rise to 2.2 metres (7 ft 3 in) above the level of the track. The interior of the walls are equipped with material that absorbs traffic noise. The construction of the bridge was time-consuming in order to maintain the minimum clearance of 4.20 m (13 ft 9 in) above the Inntal Autobahn, requiring a 52 m (171 ft)-long 2,800 ton concrete box bridge.[1]

Control room and tunnel rescue site at the south entrance of Inntal tunnel

Inntal tunnel

[edit]

The Inntal tunnel is a two line tunnel between Inn Valley and the Wipp valley. With a length of 12.696 kilometres (7.889 mi), it is currently the longest railway tunnel in Austria. It cost approximately €120 million to build.[1]

Construction of the Inn valley tunnel started in September 1989, with tunnelling from both ends. On 12 December 1992 in the tunnel was broken through[2] and the tunnel was completed in July 1993. After the track-laying, the wiring of the overhead electrical line and the installation of signalling in the tunnel, operations started on 29 May 1994. The tunnel was built using the New Austrian Tunnelling method. In contrast to other new tunnel, it is not built with slab track but instead is equipped with conventional ballasted track and concrete sleepers.

The excavated cross-section where it is not lined is 95 square metres (1,020 sq ft), where lining was planned it was 108 square metres (1,160 sq ft). The distance between the centres of the tracks is 4.70 m (15 ft 5 in), corresponding with that of high-speed lines.

A cross-over (Üst Fritzens-Wattens 14) was built about halfway through the tunnel at the 9.966 kilometre mark. Immediately after the crossover, a branch in the tunnel was driven to which the two tracks of the planned Brenner Base Tunnel are to be connected. It was built to enable the easy installation of the turnouts and overhead electrification to connect the lines of the base tunnel and the bypass.

Innsbruck 1 junction

[edit]

After a short distance in the open air, the bypass line joins the Brenner railway from Innsbruck at the 79.646 km (49.490 mi) mark from the German border at Kufstein. The junction is equipped with eight sets of points and designed so that freight trains can run on and off the branch in both directions simultaneously without slowing down.

Operations

[edit]

Although the Inntal tunnel is fully equipped with all the required signalling and rescue facilities for the operation of all types of trains, it is used almost exclusively by freight trains,[3] including rolling highway trains. Passenger trains only run on it in exceptional circumstances.

With the exception of Fritzens-Wattens 1 junction, the entire route is controlled from the remote signalling centre at Innsbruck. After completion of the new Innsbruck operations control centre (German: Betriebsfernsteuerzentrale), which is currently under construction, it will control Fritzens-Wattens 1 junction.

Since the bypass joins the Brenner Railway, which has slopes of up to 2.9%, virtually all goods trains need a bank engine, attached to the front. When train loads exceed 1,060 tonnes, a third locomotive is also attached to push the train. Due to local opposition to the construction of a facility for attaching and detaching locomotives in Baumkirchen, this operation has to be carried out in Wörgl terminal north or Wörgl station, requiring an additional journey of up to 44 kilometres per trip.

Notes

[edit]
  1. ^ a b c Petrovitsch, Helmut (1994). "Inbetriebnahme der Umfahrung Innsbruck (Commissioning of the Innsbruck bypass)". Schienenverkehr aktuell (Modern railways) (in German) (7): 2–3.
  2. ^ a b "Betriebsaufnahme der Umfahrung Innsbruck (Entry into operation of the bypass Innsbruck)". Eisenbahn-Modelleisenbahn Österreich (Model Railway Magazine Austria) (in German) (7): 1. 1994.
  3. ^ "Umfahrung Innsbruck – wenig befahren (Innsbruck Bypass - very little traffic)". Eisenbahn-Modelleisenbahn Österreich (Model Railway Magazine Austria) (in German) (8): 6. 1994.

References

[edit]
  • Kolymbas, Dimitrios (1998). Geotechnik – Tunnelbau und Tunnelmechanik (Geotechnics - Tunnel and Tunnel Mechanics). Berlin, Heidelberg: Springer-Verlag. ISBN 3-540-62805-3.
[edit]

47°16′55″N 11°32′29″E / 47.28194°N 11.54139°E / 47.28194; 11.54139