Talk:Wind power in the United Kingdom: Difference between revisions
m Archiving 1 discussion(s) to Talk:Wind power in the United Kingdom/Archive 1) (bot |
m Removed deprecated parameters in {{Talk header}} that are now handled automatically (Task 30) |
||
(13 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
{{Talk header<!-- |search=yes -->|disclaimer=no|bottom=yes}} |
{{Talk header<!-- |search=yes -->|disclaimer=no|bottom=yes }} |
||
{{WikiProject banner shell|1= |
{{WikiProject banner shell|class=C|1= |
||
{{WikiProject United Kingdom |importance=High }} |
|||
{{WikiProject Energy |importance=Mid }} |
|||
{{WikiProject Environment |importance=Mid }} |
|||
}} |
}} |
||
{{User:MiszaBot/config |
{{User:MiszaBot/config |
||
Line 14: | Line 14: | ||
|archive = Talk:Wind power in the United Kingdom/Archive %(counter)d |
|archive = Talk:Wind power in the United Kingdom/Archive %(counter)d |
||
}} |
}} |
||
{{Auto archiving notice|bot=Lowercase sigmabot III |age=60 |dounreplied=yes\|small=Yes}} |
|||
== Confusing citation == |
|||
Looking at Ref 52 https://en.wikipedia.org/wiki/Wind_power_in_the_United_Kingdom#cite_note-Oswald_2008_2312%E2%80%932325-52 |
|||
didn't seem to (at least obviously) contain the information referenced. Am I missing something, or should the article be changed? <!-- Template:Unsigned IP --><small class="autosigned">— Preceding [[Wikipedia:Signatures|unsigned]] comment added by [[Special:Contributions/2A00:23C8:8B03:DC01:9368:7ABF:DFF2:A1EA|2A00:23C8:8B03:DC01:9368:7ABF:DFF2:A1EA]] ([[User talk:2A00:23C8:8B03:DC01:9368:7ABF:DFF2:A1EA#top|talk]]) 23:06, 5 October 2020 (UTC)</small> <!--Autosigned by SineBot--> |
|||
== Missing information == |
== Missing information == |
||
I recall a single experimental wind turbine located near the North Yorkshire coast about 30 years ago well before the current boom. I came here looking for some more information on that but couldn't find anything in the history section even though it must have been one of the very first in the UK. |
I recall a single experimental wind turbine located near the North Yorkshire coast about 30 years ago well before the current boom. I came here looking for some more information on that but couldn't find anything in the history section even though it must have been one of the very first in the UK. |
||
Yes, lots of the extensive early UK wind history is missing. WEG (Wind Energy Group), [[Andrew_Garrad | Andrew Garrad]] and friends, [[Renewable_Energy_Systems|RES]], [[RenewableUK|BWEA]], etc, etc, etc. An article about WEG would be welcome. Most of the information out there about WEG is pre-internet, all in paper, but a few YouTubes around. |
|||
--[[User:Davagh|Davagh]] ([[User talk:Davagh|talk]]) 14:59, 7 December 2022 (UTC) |
|||
== The lead should be more readable == |
|||
I just copyedited the first para and the last sentence of the lead is fine. How about moving the rest down into the body and summarizing in the lead as: |
|||
From 2023 all windpower reduces the price of electricity: but in earlier years onshore wind built before the mid-2010s and offshore wind built before the late 2010s (sometimes) increased the price of electricity.(cite https://www.ft.com/content/f0e1496b-a535-4227-b39c-a2c6befffa87) |
|||
Or do you have a better suggestion for lead readability? |
|||
[[User:Chidgk1|Chidgk1]] ([[User talk:Chidgk1|talk]]) 18:59, 15 October 2022 (UTC) |
|||
:done [[User:Chidgk1|Chidgk1]] ([[User talk:Chidgk1|talk]]) 18:18, 19 October 2022 (UTC) |
Latest revision as of 15:25, 18 July 2024
Please place new discussions at the bottom of the talk page. |
This is the talk page for discussing improvements to the Wind power in the United Kingdom article. This is not a forum for general discussion of the article's subject. |
Article policies
|
Find sources: Google (books · news · scholar · free images · WP refs) · FENS · JSTOR · TWL |
Archives: 1Auto-archiving period: 2 months |
This article is rated C-class on Wikipedia's content assessment scale. It is of interest to the following WikiProjects: | |||||||||||||||||||||||||||||||
|
Missing information
[edit]I recall a single experimental wind turbine located near the North Yorkshire coast about 30 years ago well before the current boom. I came here looking for some more information on that but couldn't find anything in the history section even though it must have been one of the very first in the UK.
Yes, lots of the extensive early UK wind history is missing. WEG (Wind Energy Group), Andrew Garrad and friends, RES, BWEA, etc, etc, etc. An article about WEG would be welcome. Most of the information out there about WEG is pre-internet, all in paper, but a few YouTubes around.
--Davagh (talk) 14:59, 7 December 2022 (UTC)
The lead should be more readable
[edit]I just copyedited the first para and the last sentence of the lead is fine. How about moving the rest down into the body and summarizing in the lead as:
From 2023 all windpower reduces the price of electricity: but in earlier years onshore wind built before the mid-2010s and offshore wind built before the late 2010s (sometimes) increased the price of electricity.(cite https://www.ft.com/content/f0e1496b-a535-4227-b39c-a2c6befffa87)
Or do you have a better suggestion for lead readability?