Jump to content

Nashua, Acton and Boston Railroad: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Added later history.
m Operating history: Removed redundant phrase
 
(37 intermediate revisions by 12 users not shown)
Line 1: Line 1:
{{good article}}
{{Short description|Defunct railroad in Massachusetts and New Hampshire}}
{{Short description|Defunct railroad in Massachusetts and New Hampshire}}
{{Infobox Railroad
{{Infobox Railroad
|railroad_name=Nashua, Acton and Boston Railroad
|railroad_name=Nashua, Acton and Boston Railroad
|system_map={{maplink-road|from=Nashua and Acton Railroad.map}}
|image=Former Pine Ridge station, November 2016.JPG
|image=Graniteville arch bridge, November 2016.jpg
|image_size=300px
|image_size=300px
|caption=The former Pine Ridge station in Westford, Massachusetts
|caption=The former arch bridge in [[Westford, Massachusetts]]
|start_year=1871
|start_year=1873
|end_year=1876 (independent operations)<br/>1876–1921 (as a corporate entity)
|end_year=1907
|locale=Massachusetts and New Hampshire
|locale=Massachusetts and New Hampshire
|successor=Boston and Maine Corporation
|successor=[[Boston and Maine Railroad]]
|linelength=24 miles}}
|linelength={{convert|24.3|miles}}
|gauge={{Track gauge|ussg|allk=on}}
|notrack=1|image_alt=A stone arch bridge crossing a small river, within a forested area.}}


The '''Nashua, Acton and Boston Railroad''' was a railroad formed in 1871 to build a line between [[Nashua, New Hampshire]] [[Acton, Massachusetts]]. After opening in 1873, the railroad expanded to [[Concord, Massachusetts]] and offered a commuter connection to [[Boston]].<ref name=":0">{{Cite book|last=Karr|first=Ronald Dale|url=https://www.worldcat.org/oclc/32604470|title=The rail lines of southern New England : a handbook of railroad history|date=1995|publisher=Branch Line Press|isbn=0-942147-02-2|location=Pepperell, Mass.|pages=215–217, 220–222|oclc=32604470}}</ref> The railroad was leased by the [[Concord Railroad]] in 1876, with the lease later passing to the [[Boston and Maine Corporation]] in 1895. Most of the railroad line was abandoned in the 1920s, though a short portion in Nashua continued to be operated until 1980.<ref name=":0" />
The '''Nashua, Acton and Boston Railroad (NA&B)''' was a railroad formed in 1871 to build a line between [[Nashua, New Hampshire]], and [[Acton, Massachusetts]]. After opening in 1873, the railroad expanded to [[Concord, Massachusetts]], and offered a commuter connection to [[Boston]]. It was leased by the [[Concord Railroad]] in 1876, with the lease later passing to the [[Boston and Maine Railroad]] in 1895. Most of the railroad line was abandoned in the 1920s, though a short portion in Nashua continued to be operated until 1980.


==History==
==History==


=== Construction and opening ===
=== Construction and opening ===
The Nashua, Acton and Boston Railroad was formed in 1871 by an act passed by the [[Massachusetts General Court]], with Nashua resident E. H. Spalding as its first president. The founders of the new railroad were upset with the management of the [[Nashua and Lowell Railroad]], and it was later alleged by a local newspaper that Spalding incorporated the company because the Nashua and Lowell's president refused to renew his annual pass to ride the railroad.<ref name=":1" /> In June 1871, Spalding petitioned the governor and [[New Hampshire General Court]] for a charter:
The Nashua, Acton and Boston Railroad was formed in 1871 by an act passed by the [[Massachusetts General Court]], with Nashua resident Edward H. Spalding as its first president. The founders of the new railroad were upset with the management of the [[Nashua and Lowell Railroad]], and it was later alleged by a local newspaper that Spalding incorporated the company because the Nashua and Lowell's president refused to renew his annual pass to ride the railroad.<ref name=":1" /> In June 1871, Spalding petitioned the governor and [[New Hampshire General Court]] for a charter:


{{Block quote|text=...from some convenient point on the State line between the towns of Nashua, in this state, and and Dunstable, in the State of Massachusetts, and running to the City of Nashua to connect with the Worcester & Nashua railroad, the Nashua & Lowell railroad, the Wilton railroad, the Concord railroad, and the proposed Nashua & Rochester railroad, at said Nashua.<ref>{{Cite news|last=Spalding|first=E. H.|date=May 8, 1871|title=To the honorable The Governor and Legislature of the State of New Hampshire|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=z9w_AAAAIBAJ&pg=PA2|access-date=October 13, 2021}}</ref> }}
{{Block quote|text=...from some convenient point on the State line between the towns of Nashua, in this state, and Dunstable, in the State of Massachusetts, and running to the City of Nashua to connect with the Worcester & Nashua railroad, the Nashua & Lowell railroad, the Wilton railroad, the Concord railroad, and the proposed Nashua & Rochester railroad, at said Nashua.<ref>{{Cite news|last=Spalding|first=E. H.|date=May 8, 1871|title=To the honorable The Governor and Legislature of the State of New Hampshire|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=z9w_AAAAIBAJ&pg=PA2|access-date=October 13, 2021}}</ref> }}


New Hampshire granted Spalding a charter the next year, allowing construction to commence.<ref name=":0" /> The railroad's construction was supported by the Concord Railroad, which wanted an alternate route from its southern terminus in Nashua to Boston.<ref name=":0" /> At the time of the Nashua, Acton and Boston Railroad's construction, the only route between Nashua and Boston was via the Nashua and Lowell Railroad.
New Hampshire granted Spalding a charter the next year, allowing construction to commence.<ref name=":0">{{Cite book|last=Karr|first=Ronald Dale|url=https://www.worldcat.org/oclc/32604470|title=The rail lines of southern New England : a handbook of railroad history|date=1995|publisher=Branch Line Press|isbn=0-942147-02-2|location=Pepperell, Mass.|pages=215–217, 220–222|oclc=32604470}}</ref> The railroad's construction was supported by the Concord Railroad, which wanted an alternate route from its southern terminus in Nashua to Boston.<ref name=":0" /> At the time of the Nashua, Acton and Boston Railroad's construction, the only route between Nashua and Boston was via the Nashua and Lowell Railroad.<ref name=":0" />


Construction of the 20 mile long line took place between 1872 and 1873, with the railroad's first passenger train arriving in Nashua on July 1, 1873.<ref name=":0" /><ref>{{Cite news|date=July 2, 1873|title=The Acton Open|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=Md4_AAAAIBAJ&pg=PA2|access-date=October 13, 2021}}</ref> Even before opening, the railroad advertised it would charge a lower fare to passengers than its competitor; the Nashua, Acton and Boston pledged a fare of $1 for travel between Nashua and Boston, compared to the $1.20 offered by its competitor. The [[Nashua Daily Telegraph]] commented that "while we welcome this reduction, we hope that it will lead to no ruinous competition between the Lowell and the Acton."<ref>{{Cite news|date=May 17, 1873|title=First Fruits of the Acton|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=Ct4_AAAAIBAJ&pg=PA1|access-date=October 13, 2021}}</ref>
Construction of the {{Convert|20|mi|km|adj=mid|-long}} line took place between 1872 and 1873. Spalding built the railroad "as straight as a gun barrel" after construction made it out of the Nashua city limits.<ref name=":1" /> This required the demolition of a ledge approximately {{Convert|4|mi|spell=in}} miles away from Nashua, which involved the first use of [[dynamite]] in New Hampshire's history.<ref name=":1" /> Construction was completed in June 1873, with the railroad's first passenger train arriving in Nashua on July 1, 1873.<ref name=":0" /><ref>{{Cite news|date=July 2, 1873|title=The Acton Open|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=Md4_AAAAIBAJ&pg=PA2|access-date=October 13, 2021}}</ref> Prior to opening, the railroad advertised it would charge a lower fare to passengers than its competitor; the Nashua, Acton and Boston pledged a fare of $1 for travel between Nashua and Boston, compared to the $1.20 offered by the Nashua and Lowell. The ''[[Nashua Daily Telegraph]]'' commented, "While we welcome this reduction, we hope that it will lead to no ruinous competition between the Lowell and the Acton."<ref>{{Cite news|date=May 17, 1873|title=First Fruits of the Acton|page=1|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=Ct4_AAAAIBAJ&pg=PA1|access-date=October 13, 2021}}</ref>


=== Operating history ===
=== Operating history ===
Soon after opening, the company obtained a charter for a four mile long extension southward from Acton to Concord, where it connected with the [[Fitchburg Railroad]]. This new connection allowed the Nashua, Acton and Boston to offer an alternative route from New Hampshire to Boston and compete with the combined Nashua and Lowell and [[Boston and Lowell Railroad]] system that was previously the only railroad along this route.<ref name=":0" /> Three passenger trains per day operated along the railroad in each direction per day, powered by the company's two steam locomotives.<ref name=":2" />
Soon after opening, the company obtained a charter for a {{Convert|4|mi|km|adj=mid|-long|spell=in}} extension southward from Acton to Concord, where it connected with the [[Fitchburg Railroad]]. This new connection allowed the Nashua, Acton and Boston to offer an alternative route from New Hampshire to Boston and compete with the combined Nashua and Lowell and [[Boston and Lowell Railroad]] system that was previously the only railroad along this route.<ref name=":0" /> Three passenger trains per day operated along the railroad in each direction, powered by the company's two steam locomotives.<ref name=":2" />


Despite offering a route six miles shorter than that of the Nashua and Lowell, the company struggled to turn a profit due to long layover times at Concord, where passengers transferred to the Fitchburg Railroad to reach Boston.<ref name=":1">{{Cite news|date=January 13, 1905|title=Acton Road Foreclosure|work=[[The Telegraph (Nashua, New Hampshire)|The Telegraph]]|url=https://books.google.com/books?id=Bw5AAAAAIBAJ&pg=PA5|access-date=October 13, 2021}}</ref> The competing Nashua and Lowell/Boston and Lowell system was integrated and allowed seamless travel between Nashua and Boston, giving it a major competitive advantage.<ref name=":0" />
The Nashua, Acton and Boston managed to run its trains in comparable time to the Nashua and Lowell, despite its route being {{Convert|6|mi|spell=in}} longer than that of its competitor.<ref name=":0" /> Ultimately, the company struggled to turn a profit due to long layover times at Concord, where passengers transferred to the Fitchburg Railroad to reach Boston.<ref name=":1">{{Cite news|date=January 13, 1905|title=Acton Road Foreclosure|work=[[The Telegraph (Nashua, New Hampshire)|The Telegraph]]|url=https://books.google.com/books?id=Bw5AAAAAIBAJ&pg=PA5|access-date=October 13, 2021}}</ref> The railroad was locally nicknamed the "Red Line" due to its operating losses ("red" symbolizing the color used in finance to depict losses).<ref name=":0" /> The competing Nashua and Lowell/Boston and Lowell system was integrated and allowed seamless travel between Nashua and Boston, giving it a major competitive advantage.<ref name=":0" />


=== Takeover by the Concord Railroad ===
=== Takeover by the Concord Railroad ===
{{Quotebox
{{Quotebox
| quote = [Residents] wondered that any railroad should be so absurdly managed as to have complaint made by one or two hundred people on this line of road to the state authorities, representing their grievances. They could not believe that any manager of a railroad could, in his sober senses, be so blind to the interest of his employers and so regardless of his own credit, as a business man, as to run a road so incommodiously and obviously hostile to the reasonable convenience of of the legitimate patrons of his line of road...
| quote = [Residents] wondered that any railroad should be so absurdly managed as to have complaint made by one or two hundred people on this line of road to the state authorities, representing their grievances. They could not believe that any manager of a railroad could, in his sober senses, be so blind to the interest of his employers and so regardless of his own credit, as a business man, as to run a road so incommodiously and obviously hostile to the reasonable convenience of the legitimate patrons of his line of road...
-An article in the [[Nashua Daily Telegraph]], published February 19, 1879
-An article in the [[Nashua Daily Telegraph]], published February 19, 1879
| align = left
| align = right
| width = 300px
| width = 300px
}}The Nashua, Acton and Boston only survived as an independent company until 1876, when it was leased in its entirety by the Concord Railroad, which had been heavily involved in the NA&B from the beginning. Service rapidly declined along the line following the Concord's takeover, generating complaints from residents in the area. While as an independent company, the Nashua, Acton and Boston operated three passenger trains a day in each direction, the new owners operated only one train daily, which left Nashua at 6:30 in the morning for Boston and returned in the afternoon.<ref name=":2">{{Cite news|date=February 19, 1879|title=Strange Railroad Management|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=WOk_AAAAIBAJ&pg=PA1|access-date=October 13, 2021}}</ref>
}}The Nashua, Acton and Boston survived as an independent company only until 1876, when it was leased in its entirety by the Concord Railroad, which had been heavily involved in the NA&B from the beginning. Service rapidly declined along the line following the Concord's takeover, generating complaints from residents in the area. While as an independent company, the Nashua, Acton and Boston operated three passenger trains a day in each direction, the new owners operated only one train daily, which left Nashua at 6:30 in the morning for Boston and returned in the afternoon.<ref name=":2">{{Cite news|date=February 19, 1879|title=Strange Railroad Management|work=[[Nashua Daily Telegraph]]|url=https://books.google.com/books?id=WOk_AAAAIBAJ&pg=PA1|access-date=October 13, 2021}}</ref>


=== Boston and Maine purchase and abandonment ===
=== Boston and Maine purchase and abandonment ===
[[File:North_Acton_station_postcard.jpg|thumb|North Acton station, circa 1907–1915|left|alt=A postcard photo of a small railroad station]]
The [[Boston and Maine Corporation]] took over the Concord, by then known as the [[Concord and Montreal Railroad]], in 1895, thereby gaining control of the Nashua, Acton and Boston as well.<ref name=":0" /> The Concord Railroad continued to lease the Nashua, Acton and Boston, while the Boston and Maine in turn leased the Concord. Traffic continued to decline, with the last through train operating in June 1921.<ref name=":0" /> After this point, the only train service along the line was a single freight train out of Nashua, mostly carrying lumber for customers in [[Groton, Massachusetts|Groton]]. The Boston and Maine filed to abandon nearly all of the line in 1924, with the [[Interstate Commerce Commission]] approving abandonment in April of the following year. Despite objections from remaining shippers, the final trains ran in May 1925, with the entire line being abandoned apart from the first two miles out of Nashua. This spur line continued to be used for freight traffic until 1980, when it too was abandoned.<ref name=":0" />
The [[Boston and Maine Railroad]] (B&M) took over the Concord, by then known as the [[Concord and Montreal Railroad]], in 1895, thereby gaining control of the Nashua, Acton and Boston as well.<ref name=":0" /> On paper the Concord Railroad continued to lease the Nashua, Acton and Boston, while the Boston and Maine in turn leased the Concord, so B&M effectively controlled the Nashua, Acton and Boston. In 1905, the Concord and Montreal foreclosed on the Nashua, Acton and Boston's mortgage bonds following approval by the New Hampshire legislature.<ref name=":1" /><ref>{{Cite news|date=January 18, 1905|title=New Hampshire Forestry|work=[[The Telegraph (Nashua, New Hampshire)|The Telegraph]]|url=https://books.google.com/books?id=Cw5AAAAAIBAJ&pg=PA5|access-date=October 13, 2021}}</ref> A further corporate reorganization occurred in 1909, when a new company known as the Nashua and Acton Railroad Company purchased the assets of the Nashua, Acton and Boston from the Concord and Montreal, though still under the lease of the Boston and Maine.<ref>{{Cite news|date=January 14, 1907|title=To Acquire Railroad|work=[[Boston Evening Transcript]]|url=https://books.google.com/books?id=inE-AAAAIBAJ&pg=PA2|access-date=October 13, 2021}}</ref> In March 1921, the New Hampshire legislature authorized the Boston and Maine to purchase outright the Nashua and Acton, formally ending the company's existence.<ref>{{Cite news|date=March 3, 1921|title=Legislative Hopper Busy|work=[[The Telegraph (Nashua, New Hampshire)|The Telegraph]]|url=https://books.google.com/books?id=mIBAAAAAIBAJ&pg=PA9}}</ref>


Regardless of the changes to the company on paper, traffic continued to decline, with the last through passenger train operating in June 1921.<ref name=":0" /> After this point, the only train service along the line was a single daily freight train out of Nashua, mostly carrying lumber for customers in [[Groton, Massachusetts|Groton]]. The Boston and Maine filed to abandon nearly all of the line in August 1924, with the [[Interstate Commerce Commission]] approving abandonment in April of the following year.<ref name=":0" /><ref>{{Cite news|date=August 25, 1924|title=Washington, Aug. 25|work=[[Lewiston Evening Journal]]|url=https://books.google.com/books?id=oIkgAAAAIBAJ&pg=PA1|access-date=October 13, 2021}}</ref> Despite objections from remaining shippers, the final trains ran in May 1925, with the entire line being abandoned apart from the first {{Convert|2|mi|spell=in}} out of Nashua. This spur line continued to be used for freight traffic until 1980, when it too was abandoned.<ref name=":0" />
==Accident==

On December 1, 1899, the back half of a train uncoupled between Otterson Street station in Nashua and Sandy pond. After the front of the train made a stop, the back of the train caught up. The brakeman was thrown onto the tracks, and then run over by the flatcar, which had broken loose.<ref>{{cite web
==Station and junction listing==
|url=http://nashuacitystation.org/railroad/boston-and-maine-worcester-nashua-and-portland-div-acton-branch/|title=Boston & Maine: Worcester, Nashua & Portland Div., Acton Branch|author=Nashua City Station|date=|work=|publisher=|accessdate=}}</ref>
{| class="wikitable"
!Miles (km)<ref name=1917timetable>{{cite book |title-link=:commons:File:Boston and Maine Railroad 1917 timetable.pdf |title=Local Train Service |date=September 30, 1917 |publisher=Boston and Maine Railroad |pages=65 |via=Wikimedia Commons}}</ref>
!City
!Station
!Connections and notes
|-
|{{convert|0.0|mi|km|abbr=values}}
|[[Concord, Massachusetts|Concord]]
|[[West Concord station|Concord Junction]]
| Junction with [[Fitchburg Railroad]]
|-
|{{convert|1.9|mi|km|abbr=values}}
|rowspan=2|[[Acton, Massachusetts|Acton]]
|Acton
|
|-
|{{convert|4.2|mi|km|abbr=values}}
|North Acton
|Junction with Framingham and Lowell Railroad
|-
|{{convert|8.2|mi|km|abbr=values}}
|rowspan="4"|[[Westford, Massachusetts|Westford]]
|[[East Littleton station|East Littleton]]
|
|-
|{{convert|10.2|mi|km|abbr=values}}
|[[Pine Ridge station (Massachusetts)|Pine Ridge]] (Westford)
|
|-
|{{convert|11.0|mi|km|abbr=values}}
|colspan=2|Bridge over [[Stony Brook Railroad]] and [[Lowell and Fitchburg Street Railway]] (no station or track connections)
|-
|{{convert|11.1|mi|km|abbr=values}}
|West Graniteville (Graniteville)
|
|-
|{{convert|15.2|mi|km|abbr=values}}
|[[Groton, Massachusetts|Groton]]
|East Groton
|
|-
|{{convert|17.9|mi|km|abbr=values}}
|[[Dunstable, Massachusetts|Dunstable, MA]]
|Dunstable
|
|-
|{{convert|23.0|mi|km|abbr=values}}
|rowspan=3|[[Nashua, New Hampshire|Nashua, NH]]
|Sandy Pond
|
|-
|{{convert|23.5|mi|km|abbr=values}}
|Otterson Street
|
|-
|{{convert|24.3|mi|km|abbr=values}}
|[[Union Station (Nashua, New Hampshire)|Nashua Union Station]]
|Junction with [[Worcester, Nashua and Rochester Railroad]], [[Concord and Montreal Railroad|Concord Railroad]], [[Nashua and Lowell Railroad]]
|-
|}


==References==
==References==
Line 48: Line 113:


==External links==
==External links==
{{Attached KML}}
{{commons category inline}}
{{commons category inline}}


{{Authority control}}
{{Authority control}}


[[Category:Massachusetts railroads]]
[[Category:Defunct Massachusetts railroads]]
[[Category:Railway companies established in 1871]]
[[Category:Defunct New Hampshire railroads]]
[[Category:Railway companies disestablished in 1921]]

Latest revision as of 18:44, 26 July 2024

Nashua, Acton and Boston Railroad
Map
A stone arch bridge crossing a small river, within a forested area.
The former arch bridge in Westford, Massachusetts
Overview
LocaleMassachusetts and New Hampshire
Dates of operation1873–1876 (independent operations)
1876–1921 (as a corporate entity)
SuccessorBoston and Maine Railroad
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Length24.3 miles (39.1 km)
No. of tracks1

The Nashua, Acton and Boston Railroad (NA&B) was a railroad formed in 1871 to build a line between Nashua, New Hampshire, and Acton, Massachusetts. After opening in 1873, the railroad expanded to Concord, Massachusetts, and offered a commuter connection to Boston. It was leased by the Concord Railroad in 1876, with the lease later passing to the Boston and Maine Railroad in 1895. Most of the railroad line was abandoned in the 1920s, though a short portion in Nashua continued to be operated until 1980.

History

[edit]

Construction and opening

[edit]

The Nashua, Acton and Boston Railroad was formed in 1871 by an act passed by the Massachusetts General Court, with Nashua resident Edward H. Spalding as its first president. The founders of the new railroad were upset with the management of the Nashua and Lowell Railroad, and it was later alleged by a local newspaper that Spalding incorporated the company because the Nashua and Lowell's president refused to renew his annual pass to ride the railroad.[1] In June 1871, Spalding petitioned the governor and New Hampshire General Court for a charter:

...from some convenient point on the State line between the towns of Nashua, in this state, and Dunstable, in the State of Massachusetts, and running to the City of Nashua to connect with the Worcester & Nashua railroad, the Nashua & Lowell railroad, the Wilton railroad, the Concord railroad, and the proposed Nashua & Rochester railroad, at said Nashua.[2]

New Hampshire granted Spalding a charter the next year, allowing construction to commence.[3] The railroad's construction was supported by the Concord Railroad, which wanted an alternate route from its southern terminus in Nashua to Boston.[3] At the time of the Nashua, Acton and Boston Railroad's construction, the only route between Nashua and Boston was via the Nashua and Lowell Railroad.[3]

Construction of the 20-mile-long (32 km) line took place between 1872 and 1873. Spalding built the railroad "as straight as a gun barrel" after construction made it out of the Nashua city limits.[1] This required the demolition of a ledge approximately four miles (6.4 km) miles away from Nashua, which involved the first use of dynamite in New Hampshire's history.[1] Construction was completed in June 1873, with the railroad's first passenger train arriving in Nashua on July 1, 1873.[3][4] Prior to opening, the railroad advertised it would charge a lower fare to passengers than its competitor; the Nashua, Acton and Boston pledged a fare of $1 for travel between Nashua and Boston, compared to the $1.20 offered by the Nashua and Lowell. The Nashua Daily Telegraph commented, "While we welcome this reduction, we hope that it will lead to no ruinous competition between the Lowell and the Acton."[5]

Operating history

[edit]

Soon after opening, the company obtained a charter for a four-mile-long (6.4 km) extension southward from Acton to Concord, where it connected with the Fitchburg Railroad. This new connection allowed the Nashua, Acton and Boston to offer an alternative route from New Hampshire to Boston and compete with the combined Nashua and Lowell and Boston and Lowell Railroad system that was previously the only railroad along this route.[3] Three passenger trains per day operated along the railroad in each direction, powered by the company's two steam locomotives.[6]

The Nashua, Acton and Boston managed to run its trains in comparable time to the Nashua and Lowell, despite its route being six miles (9.7 km) longer than that of its competitor.[3] Ultimately, the company struggled to turn a profit due to long layover times at Concord, where passengers transferred to the Fitchburg Railroad to reach Boston.[1] The railroad was locally nicknamed the "Red Line" due to its operating losses ("red" symbolizing the color used in finance to depict losses).[3] The competing Nashua and Lowell/Boston and Lowell system was integrated and allowed seamless travel between Nashua and Boston, giving it a major competitive advantage.[3]

Takeover by the Concord Railroad

[edit]

[Residents] wondered that any railroad should be so absurdly managed as to have complaint made by one or two hundred people on this line of road to the state authorities, representing their grievances. They could not believe that any manager of a railroad could, in his sober senses, be so blind to the interest of his employers and so regardless of his own credit, as a business man, as to run a road so incommodiously and obviously hostile to the reasonable convenience of the legitimate patrons of his line of road... -An article in the Nashua Daily Telegraph, published February 19, 1879

The Nashua, Acton and Boston survived as an independent company only until 1876, when it was leased in its entirety by the Concord Railroad, which had been heavily involved in the NA&B from the beginning. Service rapidly declined along the line following the Concord's takeover, generating complaints from residents in the area. While as an independent company, the Nashua, Acton and Boston operated three passenger trains a day in each direction, the new owners operated only one train daily, which left Nashua at 6:30 in the morning for Boston and returned in the afternoon.[6]

Boston and Maine purchase and abandonment

[edit]
A postcard photo of a small railroad station
North Acton station, circa 1907–1915

The Boston and Maine Railroad (B&M) took over the Concord, by then known as the Concord and Montreal Railroad, in 1895, thereby gaining control of the Nashua, Acton and Boston as well.[3] On paper the Concord Railroad continued to lease the Nashua, Acton and Boston, while the Boston and Maine in turn leased the Concord, so B&M effectively controlled the Nashua, Acton and Boston. In 1905, the Concord and Montreal foreclosed on the Nashua, Acton and Boston's mortgage bonds following approval by the New Hampshire legislature.[1][7] A further corporate reorganization occurred in 1909, when a new company known as the Nashua and Acton Railroad Company purchased the assets of the Nashua, Acton and Boston from the Concord and Montreal, though still under the lease of the Boston and Maine.[8] In March 1921, the New Hampshire legislature authorized the Boston and Maine to purchase outright the Nashua and Acton, formally ending the company's existence.[9]

Regardless of the changes to the company on paper, traffic continued to decline, with the last through passenger train operating in June 1921.[3] After this point, the only train service along the line was a single daily freight train out of Nashua, mostly carrying lumber for customers in Groton. The Boston and Maine filed to abandon nearly all of the line in August 1924, with the Interstate Commerce Commission approving abandonment in April of the following year.[3][10] Despite objections from remaining shippers, the final trains ran in May 1925, with the entire line being abandoned apart from the first two miles (3.2 km) out of Nashua. This spur line continued to be used for freight traffic until 1980, when it too was abandoned.[3]

Station and junction listing

[edit]
Miles (km)[11] City Station Connections and notes
0.0 (0) Concord Concord Junction Junction with Fitchburg Railroad
1.9 (3.1) Acton Acton
4.2 (6.8) North Acton Junction with Framingham and Lowell Railroad
8.2 (13.2) Westford East Littleton
10.2 (16.4) Pine Ridge (Westford)
11.0 (17.7) Bridge over Stony Brook Railroad and Lowell and Fitchburg Street Railway (no station or track connections)
11.1 (17.9) West Graniteville (Graniteville)
15.2 (24.5) Groton East Groton
17.9 (28.8) Dunstable, MA Dunstable
23.0 (37.0) Nashua, NH Sandy Pond
23.5 (37.8) Otterson Street
24.3 (39.1) Nashua Union Station Junction with Worcester, Nashua and Rochester Railroad, Concord Railroad, Nashua and Lowell Railroad

References

[edit]
  1. ^ a b c d e "Acton Road Foreclosure". The Telegraph. January 13, 1905. Retrieved October 13, 2021.
  2. ^ Spalding, E. H. (May 8, 1871). "To the honorable The Governor and Legislature of the State of New Hampshire". Nashua Daily Telegraph. Retrieved October 13, 2021.
  3. ^ a b c d e f g h i j k l Karr, Ronald Dale (1995). The rail lines of southern New England : a handbook of railroad history. Pepperell, Mass.: Branch Line Press. pp. 215–217, 220–222. ISBN 0-942147-02-2. OCLC 32604470.
  4. ^ "The Acton Open". Nashua Daily Telegraph. July 2, 1873. Retrieved October 13, 2021.
  5. ^ "First Fruits of the Acton". Nashua Daily Telegraph. May 17, 1873. p. 1. Retrieved October 13, 2021.
  6. ^ a b "Strange Railroad Management". Nashua Daily Telegraph. February 19, 1879. Retrieved October 13, 2021.
  7. ^ "New Hampshire Forestry". The Telegraph. January 18, 1905. Retrieved October 13, 2021.
  8. ^ "To Acquire Railroad". Boston Evening Transcript. January 14, 1907. Retrieved October 13, 2021.
  9. ^ "Legislative Hopper Busy". The Telegraph. March 3, 1921.
  10. ^ "Washington, Aug. 25". Lewiston Evening Journal. August 25, 1924. Retrieved October 13, 2021.
  11. ^ Local Train Service. Boston and Maine Railroad. September 30, 1917. p. 65 – via Wikimedia Commons.
[edit]
KML is not from Wikidata

Media related to Nashua, Acton and Boston Railroad at Wikimedia Commons