Cenisio (Milan Metro): Difference between revisions
Appearance
Content deleted Content added
m Removing from Category:2015 establishments in Italy using Cat-a-lot |
m fixed/removed deprecated parameters from Template:Infobox station (via WP:JWB) |
||
(One intermediate revision by one other user not shown) | |||
Line 22: | Line 22: | ||
| rebuilt = |
| rebuilt = |
||
| electrified = |
| electrified = |
||
| |
| accessible = yes |
||
| code = |
| code = |
||
| owned = [[Azienda Trasporti Milanesi]] |
| owned = [[Azienda Trasporti Milanesi]] |
||
| zone = [[Sistema Tariffario Integrato del Bacino di Mobilità|STIBM]]: Mi1<ref>{{cite web |title=Rete metropolitana di Milano |url=https://giromilano.atm.it/images/schema_rete_metro.jpg |publisher=[[Azienda Trasporti Milanesi]] |access-date=13 January 2022}}</ref> |
| zone = [[Sistema Tariffario Integrato del Bacino di Mobilità|STIBM]]: Mi1<ref>{{cite web |title=Rete metropolitana di Milano |url=https://giromilano.atm.it/images/schema_rete_metro.jpg |publisher=[[Azienda Trasporti Milanesi]] |access-date=13 January 2022 |archive-date=9 July 2021 |archive-url=https://web.archive.org/web/20210709183803/https://giromilano.atm.it/images/schema_rete_metro.jpg |url-status=dead }}</ref> |
||
| smartcardname = |
| smartcardname = |
||
| smartcardstatus = |
| smartcardstatus = |
Latest revision as of 00:27, 29 July 2024
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Coordinates | 45°17′29″N 9°06′08″E / 45.291409°N 9.102231°E | ||||||||||
Owned by | Azienda Trasporti Milanesi | ||||||||||
Platforms | 1 | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | STIBM: Mi1[1] | ||||||||||
History | |||||||||||
Opened | 20 June 2015 | ||||||||||
Services | |||||||||||
|
Cenisio is a station on Line 5 of the Milan Metro.
History
[edit]The works for the construction of the station began in July 2011,[2] as part of the second section of the line, from Garibaldi FS to San Siro Stadio. It was opened to the public on 20 June 2015, nearly two months after the opening of this section of the line, and five months earlier than scheduled.[3]
Station structure
[edit]Cenisio is an underground station with two tracks served by one island platform and, like all the other stations on Line 5, is wheelchair accessible.
Interchanges
[edit]Near this station are located:
- Tram stops (lines 12 and 14)
References
[edit]- ^ "Rete metropolitana di Milano". Azienda Trasporti Milanesi. Archived from the original on 9 July 2021. Retrieved 13 January 2022.
- ^ [1] Sito Comune di Milano
- ^ MilanoToday