Seri Andalas LRT station: Difference between revisions
Asiayazhou (talk | contribs) No edit summary |
m fixed/removed deprecated parameters from Template:Infobox station (via WP:JWB) |
||
(13 intermediate revisions by 10 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Railway station in Klang, Malaysia}} |
|||
{{more citations needed|date=May 2019}} |
{{more citations needed|date=May 2019}} |
||
{{Infobox station |
{{Infobox station |
||
| style = Rapid KL |
|||
⚫ | |||
| style2 = Shah Alam |
|||
⚫ | |||
| type = [[File:Rapid KL Logo.svg|Rapid_KL_Logo|60px]] {{!}} ''Future'' [[Light rapid transit|LRT]] station |
|||
| native_name = |
| native_name = |
||
| type = [[rapid transit|LRT station]] |
|||
| logo = |
| logo = |
||
| logo_size = |
| logo_size = |
||
| image = |
| image = File:LRT Sri Andalas.png |
||
| image_size = |
| image_size = |
||
| image_caption = |
| image_caption = |
||
| address = [[Sri Andalas]], [[Klang (city)|Klang]], [[Selangor]] |
| address = [[Taman Sri Andalas|Sri Andalas]], [[Klang (city)|Klang]], [[Selangor]] |
||
| country = [[Malaysia]] |
| country = [[Malaysia]] |
||
| coordinates = |
| coordinates = |
||
| line = {{rint|my|rapidkl}} {{rint|my|11}} |
| line = {{rint|my|rapidkl}} {{rint|my|11}} {{rcb|KLRT|11|xroute}} |
||
| other = |
| other = |
||
| platform = 2 [[side platform]]s |
| platform = 2 [[side platform]]s |
||
| structure = Elevated |
|||
| tracks = 2 |
| tracks = 2 |
||
| parking = Available |
| parking = Available |
||
Line 26: | Line 30: | ||
| rebuilt = |
| rebuilt = |
||
| electrified = |
| electrified = |
||
| |
| accessible = |
||
| code = |
| code = {{KLRT code|SA|22}} |
||
| owned = ''[[Prasarana Malaysia]]'' |
| owned = ''[[Prasarana Malaysia]]'' |
||
| operator = [[Rapid Rail]] |
|||
| zone = |
| zone = |
||
| services = {{ |
| services = {{Adjacent stations|system=Rapid KL|line=Shah Alam|left=Taman Selatan|right=Klang Jaya}} |
||
| mpassengers = |
| mpassengers = |
||
}} |
}} |
||
The ''' |
The '''Seri Andalas LRT station''' is a [[light rapid transit]] (LRT) station that serves the suburb of [[Klang (city)|Klang]] in [[Selangor]], [[Malaysia]]. The station is an elevated [[metro station|rapid transit station]] in [[Taman Sri Andalas]], [[Klang (city)|Klang]], [[Selangor]], [[Malaysia]], forming part of the [[Klang Valley Integrated Transit System]]<ref>{{cite web |url=http://lrt3.com.my/v14/index.php/2015-02-13-03-29-33/pelan-setiap-stesen |title=Pelan Setiap Stesen |publisher=Prasarana Malaysia |access-date=2015-05-17 |archive-url=https://web.archive.org/web/20150522013509/http://lrt3.com.my/v14/index.php/2015-02-13-03-29-33/pelan-setiap-stesen |archive-date=2015-05-22 |url-status=dead }}</ref> and serves as one of the stations on the [[Shah Alam line]] |
||
The station is marked as Station No. 22 along the |
The station is marked as Station No. 22 along the RM9 billion line project with the line's maintenance [[train station|depot]] located in Johan Setia, [[Klang (city)|Klang]].<ref>{{cite web |url=http://www.mrt.com.my/lrt3/Bukit_Tinggi_Station.htm |title= Bukit Tinggi LRT Station |publisher=MRT Corp Malaysia}}</ref> The '''Sri Andalas LRT station''' was expected to be operational in February 2024, but Transport Minister [[Anthony Loke]] mentioned that the overall line would be expected to be operational by '''1st March 2025''' adding more delays to the opening of the [[Shah Alam Line]].<ref>{{Cite web |date=2023-04-07 |title=LRT3 TO START OPERATION IN MARCH 2025 - ANTHONY LOKE |url=https://www.bernama.com/en/general/news.php?id=2203444 |access-date=2023-07-05 |website=BERNAMA |language=en}}</ref> It will have facilities such as Park and Ride, kiosks, restrooms, elevators, taxi stand and feeder bus among others.<ref>{{cite web |url=http://lrt3.com.my/v14/index.php/mengenai-lrt3/jangka-masa-projek |title=Jangka Masa Projek LRT3 |publisher=Prasarana Malaysia |access-date=2015-05-17 |archive-url=https://web.archive.org/web/20150527001609/http://lrt3.com.my/v14/index.php/mengenai-lrt3/jangka-masa-projek |archive-date=2015-05-27 |url-status=dead }}</ref> |
||
==Locality landmarks== |
==Locality landmarks== |
||
* Hospital Tengku Ampuan Rahimah Klang |
* [[Tengku Ampuan Rahimah Hospital|Hospital Tengku Ampuan Rahimah Klang]] (HTAR) |
||
* Hospital Bersalin Razif |
|||
* Taman Sri Andalas |
* Taman Sri Andalas |
||
* Batu Unjur |
* Batu Unjur |
||
Line 54: | Line 60: | ||
{{Klang Valley train stations|state=collapsed}} |
{{Klang Valley train stations|state=collapsed}} |
||
{{coord missing|Malaysia}} |
{{coord missing|Malaysia}} |
||
[[Category:Railway stations in Selangor]] |
|||
[[Category:Rapid transit stations in Selangor]] |
[[Category:Rapid transit stations in Selangor]] |
||
[[Category: |
[[Category:Shah Alam Line]] |
||
{{Malaysia- |
{{Malaysia-metro-stub}} |
||
{{Asia-metro-stub}} |
Latest revision as of 02:40, 30 July 2024
This article needs additional citations for verification. (May 2019) |
SA22 Seri Andalas | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
| Future LRT station | |||||||||||
General information | |||||||||||
Location | Sri Andalas, Klang, Selangor Malaysia | ||||||||||
Owned by | Prasarana Malaysia | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 11 Shah Alam | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Station code | SA22 | ||||||||||
Services | |||||||||||
|
The Seri Andalas LRT station is a light rapid transit (LRT) station that serves the suburb of Klang in Selangor, Malaysia. The station is an elevated rapid transit station in Taman Sri Andalas, Klang, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System[1] and serves as one of the stations on the Shah Alam line
The station is marked as Station No. 22 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang.[2] The Sri Andalas LRT station was expected to be operational in February 2024, but Transport Minister Anthony Loke mentioned that the overall line would be expected to be operational by 1st March 2025 adding more delays to the opening of the Shah Alam Line.[3] It will have facilities such as Park and Ride, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[4]
Locality landmarks
[edit]- Hospital Tengku Ampuan Rahimah Klang (HTAR)
- Hospital Bersalin Razif
- Taman Sri Andalas
- Batu Unjur
- Taman Bayu Tinggi
- Taman Bayu Perdana
- Taman Chi Liung
- Pandamaran
- Taman Rakyat
References
[edit]- ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
- ^ "Bukit Tinggi LRT Station". MRT Corp Malaysia.
- ^ "LRT3 TO START OPERATION IN MARCH 2025 - ANTHONY LOKE". BERNAMA. 2023-04-07. Retrieved 2023-07-05.
- ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
External links
[edit]