Ibarbengoa (Bilbao metro): Difference between revisions
m Typo/general fixes, replaced: steets → streets - this title is a translation. |
m sorry for the typo :/ |
||
(44 intermediate revisions by 18 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Rapid transit station in Getxo, Basque Country, Spain}} |
|||
{{Infobox station |
{{Infobox station |
||
| name = |
| name = Ibarbengoa |
||
| type = |
| type = |
||
| style = Metro Bilbao |
| style = Metro Bilbao |
||
| image = |
| image = Estación de Ibarbengoa2.jpg |
||
| image_caption = |
| image_caption = View of the station |
||
| address = Mariturri St.<br>48993 [[Getxo]] |
| address = Mariturri St.<br>48993 [[Getxo]]<ref name="MB">{{cite web |title=Estaciones - Ibarbengoa |url=https://www.metrobilbao.eus/es/estaciones?stn=IBB |website=Metro Bilbao |access-date=26 June 2022 |language=es}}</ref> |
||
| country = [[Spain]] |
| country = [[Spain]] |
||
| coordinates = {{Coord|43|21|49|N|3|00|24|W|type:railwaystation_region:ES-BI|display=inline,title}} |
| coordinates = {{Coord|43|21|49|N|3|00|24|W|type:railwaystation_region:ES-BI|display=inline,title}} |
||
| line = |
| line = [[File:Metro de Bilbao L1.svg|20px|link=Line 1 (Bilbao metro)]] [[Line 1 (Bilbao metro)|Line 1]] |
||
| other = |
| other = |
||
| structure = At-grade |
| structure = At-grade |
||
| platform = 2 |
| platform = 2 island platforms |
||
| depth = |
| depth = |
||
| levels = 1 |
| levels = 1 |
||
Line 18: | Line 19: | ||
| bicycle = |
| bicycle = |
||
| baggage_check = |
| baggage_check = |
||
| opened = |
| opened = 15 June 2020 |
||
| closed = |
| closed = |
||
| rebuilt = |
| rebuilt = |
||
| electrified = |
| electrified = |
||
| |
| accessible = Yes |
||
| code = |
| code = |
||
| owned = |
| owned = {{unbulleted list|{{ill|Biscay Transport Consortium|es|Consorcio de Transportes de Vizcaya}}|[[Euskal Trenbide Sarea]]}} |
||
| zone = {{CTB|2}} |
| zone = {{CTB|2}} |
||
| former = |
| former = |
||
| passengers = 63,016<ref>{{cite web |title=Metro en cifras |url=https://www.metrobilbao.eus/es/metro-en-cifras |website=Metro Bilbao |access-date=26 June 2022 |language=es}}</ref> |
|||
| passengers = |
|||
| pass_year = |
| pass_year = 2021 |
||
| pass_percent = |
| pass_percent = |
||
| pass_system = |
| pass_system = |
||
| mpassengers = |
| mpassengers = |
||
| services = |
| services = {{Adjacent stations |
||
⚫ | |||
|line=L1|left=Berango|right=Bidezabal |
|||
}} |
|||
| map_locator = |
| map_locator = |
||
| web = |
| web = |
||
}} |
}} |
||
'''Ibarbengoa'''<ref>{{cite |
'''Ibarbengoa''' is a station on [[Line 1 (Bilbao metro)|line 1]] of the [[Bilbao metro]].<ref>{{cite news |url=https://www.elcorreo.com/bizkaia/mames-santimami-metro-20171216214525-nt.html |title= San Mamés será Santimami en el metro |last=García |first=Josu |date=16 December 2017 |website= |work=El Correo |access-date=25 January 2020|language=es }}</ref> It is located in the neighbourhood of Andra Mari, in the municipality of [[Getxo]]. The station was constructed to serve the northernmost part of Getxo and to become the northern terminus of services terminating in Getxo. The station currently serves as the northern terminus for select metro services. The station opened on 15 June 2020. |
||
The station will open to service in March, 2020.<ref name="opening">{{cite web |url=https://www.deia.eus/actualidad/sociedad/2020/01/25/estacion-metro-ibarbengoa-getxo-abrira/1013845.html |title=The Ibarbengoa station will open next March |last=Alonso |first=Alberto G. |date=25 January 2020 |website=Deia.eus |publisher=Deia |access-date=25 January 2020 |quote=}}</ref> |
|||
== History == |
== History == |
||
The construction of a new station in the northern, and mostly rural, neighborhood of Andra Mari in [[Getxo]] had been planned for some time, being first announced in 2010 as part of a new urban plan for the area.<ref>{{cite news |url=https://www.elcorreo.com/vizcaya/v/20101217/margen-derecha/vecinos-andra-mari-echan-20101217.html |title= Vecinos de Andra Mari se echan a la calle contra el plan territorial parcial |last=Izagirre |first=Txema |date=17 December 2010 |work=El Correo |publisher= |access-date=25 January 2020|language=es }}</ref> The plan included the construction of around 8,000 homes, a new metro station and a [[park and ride]] facility. The plan was met with strong opposition from the inhabitants of Andra Mari, who claimed the plan benefited residential speculation and the urbanization of an until then mostly rural area.<ref>{{cite news |url=https://www.elcorreo.com/vizcaya/v/20101219/vizcaya/protestas-vecinales-contra-plan-20101219.html |title= Protestas vecinales contra el Plan Territorial de Getxo |last=Izagirre |first=Txema |date=19 December 2010 |work=El Correo |publisher= |access-date=25 January 2020 |language=es }}</ref> |
|||
The |
The construction of the new station finished in 2014, but further protests delayed the construction of the parking facility, as a result the station remained closed.<ref>{{cite news |url=https://www.elcorreo.com/vizcaya/v/20130926/margen-derecha/estacion-fantasma-ibarbengoa-20130926.html |title= La estación 'fantasma' de Ibarbengoa |last=Izagirre |first=Txema |date=26 September 2013 |work=El Correo |publisher= |access-date=16 February 2020|language=es }}</ref> The parking facility was finally finished on late 2019,<ref>{{cite news |url=https://www.elcorreo.com/bizkaia/margen-derecha/obras-parking-metro-20181211163525-nt.html |title= Las obras del parking del metro en Ibarbengoa acabarán en verano |last=Izagirre |first=Txema |date=11 December 2018 |work=El Correo |publisher= |access-date=16 February 2020 |language=es }}</ref> but its opening was delayed due to problems related the [[park and ride]] facility next to the station.<ref>{{cite news |url=https://www.elcorreo.com/bizkaia/margen-derecha/fecha-puesta-marcha-20191010201330-nt.html |title=La fecha de puesta en marcha de la estación fantasma de Ibarbengoa sigue en el aire |last=Izagirre |first=Txema |date=9 October 2019 |language=es |work=El Correo |access-date=25 January 2020 |quote=}}</ref> The station opened on 15 June 2020.<ref>{{cite news |last1=García |first1=Josu |title=El metro abre hoy la estación fantasma de Ibarbengoa, que llevaba 8 años terminada |url=https://www.elcorreo.com/bizkaia/metro-abre-estacion-20200615214803-nt.html |access-date=22 June 2022 |work=El Correo |date=15 June 2020 |language=es}}</ref> |
||
The construction of the new station finished in 2014, but further protests delayed the construction of the parking facility, as a result the station remained closed.<ref>{{cite web |url=https://www.elcorreo.com/vizcaya/v/20130926/margen-derecha/estacion-fantasma-ibarbengoa-20130926.html |title=The 'ghost' station of Ibarbengoa |last=Izagirre |first=Txema |date=26 September 2013 |website=El Correo |publisher= |access-date=16 February 2020|quote=}}</ref> The parking facility was finally finished on late 2019.<ref>{{cite web |url=https://www.elcorreo.com/bizkaia/margen-derecha/obras-parking-metro-20181211163525-nt.html |title=The Ibarbengoa parking construction will finish next summer |last=Izagirre |first=Txema |date=11 December 2018 |website=El Correo |publisher= |access-date=16 February 2020 |quote=}}</ref> |
|||
The station will open in March, 2020.<ref name="opening" /> |
|||
== Station layout == |
== Station layout == |
||
It is an overground station with two island platforms. |
It is an overground station with two island platforms. |
||
Line 59: | Line 57: | ||
== Services == |
== Services == |
||
The station is served by [[Line 1 (Bilbao metro)|line 1]] from [[Etxebarri (Bilbao metro)|Etxebarri]] to [[Plentzia (Bilbao metro)|Plentzia]]. The station is also served by regional [[Bizkaibus]] bus services. |
|||
== References == |
|||
⚫ | |||
==External links== |
|||
The station will act as northern terminus for the limited services of [[Line 1 (Metro Bilbao)|Line 1]] from [[Etxebarri (Metro Bilbao)|Etxebarri]], while also being served by the services continuing on to [[Plentzia]]. There will be trains to Etxebarri every five to ten minutes and services to Plentzia every twenty minutes.<ref name="Schedules">[http://www.metrobilbao.net/img/promocion/Lunesajuevesvia1.pdf Official Schedules] at Metro Bilbao website</ref> |
|||
* {{Commons category-inline|2=Ibarbengoa (Bilbao metro)}} |
|||
{{ |
{{Metro Bilbao line|line1=yes}} |
||
{{s-rail|title=Metro Bilbao}} |
|||
{{s-line|system=Metro Bilbao|line=1|next=Bidezabal|previous=Berango}} |
|||
{{s-end}} |
|||
==See also== |
|||
*[[Line 1 (Metro Bilbao)|Line 1]] |
|||
⚫ | |||
⚫ | |||
== References == |
|||
⚫ | |||
[[Category: |
[[Category:Line 1 (Bilbao metro) stations]] |
||
[[Category:Railway stations opened in 2020]] |
[[Category:Railway stations in Spain opened in 2020]] |
||
[[Category:2020 establishments in the Basque Country (autonomous community)]] |
|||
⚫ |
Latest revision as of 05:20, 30 July 2024
Ibarbengoa | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Mariturri St. 48993 Getxo[1] Spain | ||||||||||
Coordinates | 43°21′49″N 3°00′24″W / 43.36361°N 3.00667°W | ||||||||||
Owned by | |||||||||||
Line(s) | Line 1 | ||||||||||
Platforms | 2 island platforms | ||||||||||
Tracks | 3 | ||||||||||
Construction | |||||||||||
Structure type | At-grade | ||||||||||
Platform levels | 1 | ||||||||||
Parking | Yes | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Fare zone | Zone 2 | ||||||||||
History | |||||||||||
Opened | 15 June 2020 | ||||||||||
Passengers | |||||||||||
2021 | 63,016[2] | ||||||||||
Services | |||||||||||
|
Ibarbengoa is a station on line 1 of the Bilbao metro.[3] It is located in the neighbourhood of Andra Mari, in the municipality of Getxo. The station was constructed to serve the northernmost part of Getxo and to become the northern terminus of services terminating in Getxo. The station currently serves as the northern terminus for select metro services. The station opened on 15 June 2020.
History
[edit]The construction of a new station in the northern, and mostly rural, neighborhood of Andra Mari in Getxo had been planned for some time, being first announced in 2010 as part of a new urban plan for the area.[4] The plan included the construction of around 8,000 homes, a new metro station and a park and ride facility. The plan was met with strong opposition from the inhabitants of Andra Mari, who claimed the plan benefited residential speculation and the urbanization of an until then mostly rural area.[5]
The construction of the new station finished in 2014, but further protests delayed the construction of the parking facility, as a result the station remained closed.[6] The parking facility was finally finished on late 2019,[7] but its opening was delayed due to problems related the park and ride facility next to the station.[8] The station opened on 15 June 2020.[9]
Station layout
[edit]It is an overground station with two island platforms.
Access
[edit]Services
[edit]The station is served by line 1 from Etxebarri to Plentzia. The station is also served by regional Bizkaibus bus services.
References
[edit]- ^ "Estaciones - Ibarbengoa". Metro Bilbao (in Spanish). Retrieved 26 June 2022.
- ^ "Metro en cifras". Metro Bilbao (in Spanish). Retrieved 26 June 2022.
- ^ García, Josu (16 December 2017). "San Mamés será Santimami en el metro". El Correo (in Spanish). Retrieved 25 January 2020.
- ^ Izagirre, Txema (17 December 2010). "Vecinos de Andra Mari se echan a la calle contra el plan territorial parcial". El Correo (in Spanish). Retrieved 25 January 2020.
- ^ Izagirre, Txema (19 December 2010). "Protestas vecinales contra el Plan Territorial de Getxo". El Correo (in Spanish). Retrieved 25 January 2020.
- ^ Izagirre, Txema (26 September 2013). "La estación 'fantasma' de Ibarbengoa". El Correo (in Spanish). Retrieved 16 February 2020.
- ^ Izagirre, Txema (11 December 2018). "Las obras del parking del metro en Ibarbengoa acabarán en verano". El Correo (in Spanish). Retrieved 16 February 2020.
- ^ Izagirre, Txema (9 October 2019). "La fecha de puesta en marcha de la estación fantasma de Ibarbengoa sigue en el aire". El Correo (in Spanish). Retrieved 25 January 2020.
- ^ García, Josu (15 June 2020). "El metro abre hoy la estación fantasma de Ibarbengoa, que llevaba 8 años terminada". El Correo (in Spanish). Retrieved 22 June 2022.
External links
[edit]- Media related to Ibarbengoa (Bilbao metro) at Wikimedia Commons