Line D (Buenos Aires Underground): Difference between revisions
No edit summary |
|||
(126 intermediate revisions by 67 users not shown) | |||
Line 1: | Line 1: | ||
{{short description|Rapid transit line of Buenos Aires}} |
|||
[[Image:Estacion subte.jpg|thumb|right|Facultad de Medicina station]] |
|||
{{Infobox rail line |
|||
| name = [[File:Línea D (SBASE) bullet.svg|50px]] <br /> Line D |
|||
| image = File:Callao Station, Line D.jpg |
|||
| image_width = 275 |
|||
| caption =Entrance to [[Callao (Line D Buenos Aires Underground)|Callao]] station. |
|||
| type = [[Rapid transit]] |
|||
| system = [[Buenos Aires Underground]] |
|||
| status = |
|||
| locale = |
|||
| start = [[Catedral (Buenos Aires Underground)|Catedral]] |
|||
| end = [[Congreso de Tucumán (Buenos Aires Underground)|Congreso de Tucumán]] |
|||
| stations = 16 |
|||
| daily_ridership = 328,000 (2018)<ref name="Clarin">{{cite web |url=https://www.clarin.com/ciudades/subte-record-pasajeros-siguen-quejas-servicio-busca-mejorar-obras_0_S1jcmz0Sm.html |title=Subte: con récord de pasajeros, siguen las quejas por el servicio y busca mejorar con más obras |date=13 August 2018 |access-date=2019-03-21}} </ref> [[Image:Increase.svg|10px]] 1.04% <ref name="Enelsubte">{{cite web |url=https://www.clarin.com/ciudades/subte-record-pasajeros-siguen-quejas-servicio-busca-mejorar-obras_0_S1jcmz0Sm.html |title=En 2018 el Subte transportó la mayor cantidad de pasajeros en 25 años |date=20 February 2019 |access-date=2019-04-05}} </ref> |
|||
| open = 1937 |
|||
| close = |
|||
| owner = |
|||
| operator = [[Metrovías]] |
|||
| character = Underground |
|||
| stock = [[Buenos Aires Underground 100 Series|100 Series]]<br/>[[Buenos Aires Underground 300 Series|300 Series]] |
|||
| linelength = 11 km (6.84 mi) |
|||
| tracklength = |
|||
| gauge = {{RailGauge|sg}} |
|||
| electrification = [[Overhead lines|Catenary]] 1500 V DC |
|||
| speed = |
|||
| elevation = |
|||
| map = {{Line D (BA)}} |
|||
| map_state = |
|||
}}{{Update|date=October 2022}} |
|||
'''Line D''' of the [[Buenos Aires Underground]] runs from [[Catedral (Buenos Aires Underground)|Catedral]] to [[Congreso de Tucumán (Buenos Aires Underground)|Congreso de Tucumán]]. The line opened on 3 June 1937 and has been expanded to the north several times. The line is currently 11 km long and has 16 stations, while running approximately parallel to the city's coastline. |
|||
[[File:Línea D del Subte de Buenos Aires.svg|thumb|Line D map|300px]] |
|||
===<font color="#0B6C39">Línea D</font>=== |
|||
Opened on [[3 June]] [[1937]], 10.41 km. From '''Catedral''' to '''Congreso de Tucumán'''. [[As of 2005]] the ending station is '''Congreso de Tucumán'''. |
|||
* Catedral ('''<font color="3399CC">Peru (A)</font>, <font color="663399">Bolivar (E)</font>''') |
|||
* 9 de Julio ('''<font color="D21F19">Carlos Pellegrini (B)</font>, <font color="13429D">Diagonal Norte (C)</font>''') |
|||
* Tribunales |
|||
* Callao |
|||
* Facultad de Medicina |
|||
* Pueyrredón |
|||
* Agüero |
|||
* Bulnes |
|||
* Scalabrini Ortiz |
|||
* Plaza Italia |
|||
* Palermo |
|||
* Ministro Carranza |
|||
* Olleros |
|||
* José Hernández |
|||
* Juramento |
|||
* Congreso de Tucumán |
|||
==History== |
|||
[[Image:ParadaJhernandez.JPG|thumb|right|J. Hernandez station on Avenida Cabildo in Belgrano]] |
|||
[[File:CHADOPyF-mapa.jpg|thumbnail|left|The original plans for Line D were similar to those of [[Line G (Buenos Aires Underground)|Line G]]]] |
|||
Line D was the second line to be built by the Compañía Hispano Argentina de Obras Públicas y Finanzas (CHADOPyF, Hispanic-Argentine Company for Public Works and Finances), following the construction of [[Line C (Buenos Aires Underground)|Line C]] in 1934. Construction began in 1935 and the first part of the line was inaugurated in 1937 and ran 1.7 km from [[Catedral (Buenos Aires Underground)|Catedral]] (still the current terminus) to [[Tribunales (Buenos Aires Underground)|Tribunales]]. Three years later, the section which brought the line to [[Plaza Italia (Buenos Aires Underground)|Plaza Italia]] in [[Palermo, Buenos Aires|Palermo]] was completed, bringing the length of the line to 6.5 km. |
|||
The line was not properly extended until 1993 when it was extended to [[Ministro Carranza (Buenos Aires Underground)|Ministro Caranza]], a station named after the [[Radical Civic Union|Radical]] politician. Further extensions occurred in the 1990s, beginning in 1997 with the opening of [[Olleros (Buenos Aires Underground)|Olleros]] and [[José Hernández (Buenos Aires Underground)|José Hernández]], then [[Juramento (Buenos Aires Underground)|Juramento]] in 1999, and finally [[Congreso de Tucumán (Buenos Aires Underground)|Congreso de Tucumán]] in 2000, where it currently terminates.<ref>[http://www.buenosaires.gob.ar/subte/nuestra-historia/linea-d Linea D] – Ciudad de Buenos Aires</ref> |
|||
=== Miscellaneous === |
|||
Over the decades it has been discussed numerous times whether to extend the line out to the limits of the city proper. The last of these proposals came forward in 2002 which would have seen an additional two stations added to the line. However, this was later abandoned since the line was already at full capacity after the opening of [[Congreso de Tucumán (Buenos Aires Underground)|Congreso de Tucumán]] station.<ref>[http://enelsubte.com/noticias/la-linea-d-no-llega-puente-saavedra-2693/ ¿Por qué la línea D no llega hasta Puente Saavedra?] – EnElSubte, 25 June 2013.</ref> In June 2015 the [[Metrobus Cabildo]] line opened, connecting Line D from its terminus at Congreso de Tucumán to [[Vicente López, Buenos Aires|Vicente López]] district in [[Greater Buenos Aires]], some kilometres away from the city limits, overlapping any theoretical extension of Line D.<ref>[http://enelsubte.com/noticias/inauguraria-en-junio-el-metrobus-cabildo/ Inaugurarían en junio el Metrobús Cabildo] – EnElSubte, 6 May 2015.</ref> Line D is the only line in the network which will not be extended as part of the most recent expansion plan. |
|||
Until the privatization of the metro in the 1990s, the ''D'' line was identified by the red color; whilst the ''B'' line used green. The switch was perceived to be an annoying re-branding effort. |
|||
The line was closed for two months during the summer of 2024 to upgrade the signal system. However, after the update, the frequency was actually worse and the waiting time ceased to be shown on the stations.<ref>{{Cite web|url=https://www.lanacion.com.ar/buenos-aires/modernizadas-y-con-problemas-por-que-el-tren-mitre-y-la-linea-d-tienen-problemas-en-el-servicio-a-nid08052024/|trans-title=Modernized and with problems: why the Mitre train and Subte Line D have service shortcomings despite the recent works|title=Modernizadas y con problemas: por qué el tren Mitre y la línea D de subtes tienen falencias en el servicio a pesar de las obras recientes|accessdate=2024-06-14|date=2024-05-08|website=LA NACION|language=es}}</ref> |
|||
The ''D'' line and the ''E'' line share their car stock. |
|||
Until the privatisation of the underground in the 1990s, Line D was identified by the red colour; whilst [[Line B (Buenos Aires Underground)|Line B]] used green. |
|||
The ''D'' line runs from the downtown district to the elegant northern neighborhoods of [[Palermo, Buenos Aires|Palermo]] and [[Belgrano, Buenos Aires|Belgrano]]. The expansion works of the 1990s (''Olleros'' to ''Congreso'') feature an increased distance between stations (approx 900 m, as opposed to 500 m in the earlier works). |
|||
==Museum Stations== |
|||
''Catedral'' station is a good starting point for tourists wishing to explore the [[Plaza de Mayo]], [[San Telmo]] and [[Florida Street]]. |
|||
[[File:Estación Olleros - Línea D - Subte de Buenos Aires.jpg|thumb|left|Olleros station platforms.]] |
|||
Cultural activities occur at the Line D Juramento, Congreso de Tucumán and Olleros stations. These stations can be visited to see the exhibitions provided by the city's and national museums, education institutions and other civil society organisations. |
|||
While ''Callao'' station was noted for its sketchy murals (widely reputed as ugly), many other stations feature ''mayólicas'' (traditional tile art) describing scenes of Argentine history and rural life. |
|||
“The objective of the museum-stations is to get the population acquainted with the huge cultural and historical patrimony that the City owns, thus turning the subway network, a massive transport medium, into an ideal diffusion agent. The lending of the facilities is absolutely free for the museum and institutions that wish to exhibit their activities or part of the historical or cultural patrimony they treasure”.<ref>''Quote > ''[http://www.sbase.com.ar/en/home.htm Subterráneos de Buenos Aires] {{Webarchive|url=https://web.archive.org/web/20080302060242/http://www.sbase.com.ar/en/home.htm |date=2008-03-02 }} (English)</ref> |
|||
''Bulnes'' station is connected to the ''Alto Palermo'' shopping mall. |
|||
==Rolling stock== |
|||
''Plaza Italia'' station is a starting point for many Sunday trips to the Zoo, the Botanic park, and the parks of Palermo. |
|||
{{Main|Buenos Aires Underground rolling stock}} |
|||
[[File:Alstom-B-3.jpg|thumbnail|[[Buenos Aires Underground 100 Series]] rolling stock]] |
|||
Line D was originally served by [[Siemens-Schuckert Orenstein & Koppel]] rail rolling stock, and then by [[Construcciones y Auxiliar de Ferrocarriles|CAF]] cars. In 1999, cars from the [[Nagoya Municipal Subway]] were purchased second hand from [[Japan]] and used on the line. In 2001, numerous [[Alstom Metropolis]] [[Buenos Aires Underground 100 Series|100 Series cars]] were purchased and built in Brazil and Argentina with the intention of incorporating them into [[Line A (Buenos Aires Underground)|Line A]], however they were ultimately put into service on Line D. More 100 Series cars were purchased up until 2009, making a total of 96 cars.<ref>[http://enelsubte.com/noticias/finalizo-la-entrega-los-alstom-metropolis-143/ Finalizó la entrega de los Alstom Metrópolis] – EnElSubte, 9 March 2009.</ref> Since 2019, much of the fleet was transferred to [[Line E (Buenos Aires Underground)|Line E]] to serve alongside the Fiat Materfer cars on that line. The Alstom 100 fleet has been suspended on Line D since the 2024 January-March shutdown, as they do not yet have the capability to operate under [[Communications-based_train_control|CBTC]] signalling. |
|||
''Palermo'' and ''Ministro Carranza'' stations can be used for combination with suburban train lines. Access to the train station is not smooth, as it requires going out to the street and re-entering. No combination tickets are sold. |
|||
The remaining Nagoya cars were moved to [[Line C (Buenos Aires Underground)|Line C]] in 2007 and replaced with the 100 Series cars and with [[Fiat-Materfer (Buenos Aires Underground)|Fiat-Materfer]] cars. To make the rolling stock more uniform, 24 more modern [[Buenos Aires Underground 300 Series|300 Series]] Alstom Metropolis cars were ordered in 2013 to replace the Materfer cars on the line, which meant that the line was entirely composed of 120 [[Alstom]] cars.<ref>[http://enelsubte.com/noticias/sbase-anuncia-nuevos-coches-foto-del-metro-san-pablo-3028/ SBASE anuncia nuevos coches con foto del Metro de San Pablo] – EnElSubte, 21 January 2014.</ref> In September 2015, at a conference in Brazil, the head of SBASE gave a presentation in which the number of new cars to be purchased for the line was 84 instead of 30.<ref name=plan>[https://www.scribd.com/fullscreen/280786246?access_key=key-QjMpWeIgIaIPKz8sIyZ8&allow_share=true&escape=false&view_mode=scroll Plan de modernización del Subterráneo de Buenos Aires] – Buenos Aires Ciudad, September 2015.</ref> By 2016, the final figure had been fixed at 60 new cars, which meant that the line had 156 Alstom Metropolis cars by 2017.<ref>{{cite news|title=La Ciudad coloca deuda para comprar 60 coches Alstom para la línea D|url=http://enelsubte.com/noticias/la-ciudad-coloca-deuda-para-comprar-coches-alstom-para-la-linea-d/|access-date=7 July 2016|work=EnElSubte|date=28 January 2016|language=es-ES}}</ref> The 300 Series cars now make up the entirety of Line D's fleet. |
|||
The name ''Ministro Carranza'', after a [[Radical Civic Union]] politician, is used in lieu of ''Dorrego'', to avoid name duplication with the ''B'' line. There were two ''Agüero'' stations (lines ''B'' and ''D'') until the ''B'' line changed its station name to [[Carlos Gardel]] in the 1980s. The ''Callao'' and ''Pueyrredón'' names are still shared with the ''B'' line. |
|||
== Gallery == |
|||
''Congreso de Tucumán'' was named after the gatherings in [[Tucumán]] where both Argentine independence ([[1816]]) and first constitution ([[1819]]) where formulated. |
|||
<gallery class="center" mode="packed"> |
|||
File:Subterráneo Buenos Aires-Línea D-Tribunales.jpg|Tribunales station entrance |
|||
File:Magazine stand in Plaza Italia station.jpg|A magazine stand at Plaza Italia station |
|||
File:Estación 9 de Julio de la línea D de subtes por D2000.JPG|9 de Julio station |
|||
File:Coche 3 - Linea D.jpg|Interior of [[Buenos Aires Underground 100 Series|100 Series]] rolling stock |
|||
File:Coche 2 Linea D Subte.jpg|Alstom train |
|||
</gallery> |
|||
== References == |
|||
[[Category:Buenos Aires metro]] |
|||
{{reflist}} |
|||
== External links == |
|||
{{Commons category|Línea D (Subterráneo Buenos Aires)|Line D}} |
|||
* [https://web.archive.org/web/20101225113304/http://www.sbase.com.ar/en/ Subterráneos de Buenos Aires (Official Page)] |
|||
* [https://web.archive.org/web/20101020080935/http://www.metrovias.com.ar/v2/Home-En.asp?lang=EN Metrovías S.A. Subte Operator (Official Page)] |
|||
* [https://web.archive.org/web/20090303050842/http://www.sbase.com.ar/en/index.php/the-network/line-d Subterráneos de Buenos Aires, D Line] |
|||
* [http://www.subte.com.ar/mapas/subte.asp System map] |
|||
{{Buenos Aires Underground Stations}} |
|||
{{Buenos Aires Transit}} |
|||
[[Category:Buenos Aires Underground]] |
|||
[[Category:Railway lines opened in 1937]] |
|||
[[Category:Railway lines in Argentina|Buenos Aires – Line D]] |
|||
[[Category:1937 establishments in Argentina]] |
Latest revision as of 18:03, 31 July 2024
Line D | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 16 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Buenos Aires Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Metrovías | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | 100 Series 300 Series | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 328,000 (2018)[1] 1.04% [2] | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 1937 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 11 km (6.84 mi) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Underground | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | Catenary 1500 V DC | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
This article needs to be updated.(October 2022) |
Line D of the Buenos Aires Underground runs from Catedral to Congreso de Tucumán. The line opened on 3 June 1937 and has been expanded to the north several times. The line is currently 11 km long and has 16 stations, while running approximately parallel to the city's coastline.
History
[edit]Line D was the second line to be built by the Compañía Hispano Argentina de Obras Públicas y Finanzas (CHADOPyF, Hispanic-Argentine Company for Public Works and Finances), following the construction of Line C in 1934. Construction began in 1935 and the first part of the line was inaugurated in 1937 and ran 1.7 km from Catedral (still the current terminus) to Tribunales. Three years later, the section which brought the line to Plaza Italia in Palermo was completed, bringing the length of the line to 6.5 km.
The line was not properly extended until 1993 when it was extended to Ministro Caranza, a station named after the Radical politician. Further extensions occurred in the 1990s, beginning in 1997 with the opening of Olleros and José Hernández, then Juramento in 1999, and finally Congreso de Tucumán in 2000, where it currently terminates.[3]
Over the decades it has been discussed numerous times whether to extend the line out to the limits of the city proper. The last of these proposals came forward in 2002 which would have seen an additional two stations added to the line. However, this was later abandoned since the line was already at full capacity after the opening of Congreso de Tucumán station.[4] In June 2015 the Metrobus Cabildo line opened, connecting Line D from its terminus at Congreso de Tucumán to Vicente López district in Greater Buenos Aires, some kilometres away from the city limits, overlapping any theoretical extension of Line D.[5] Line D is the only line in the network which will not be extended as part of the most recent expansion plan.
The line was closed for two months during the summer of 2024 to upgrade the signal system. However, after the update, the frequency was actually worse and the waiting time ceased to be shown on the stations.[6]
Until the privatisation of the underground in the 1990s, Line D was identified by the red colour; whilst Line B used green.
Museum Stations
[edit]Cultural activities occur at the Line D Juramento, Congreso de Tucumán and Olleros stations. These stations can be visited to see the exhibitions provided by the city's and national museums, education institutions and other civil society organisations.
“The objective of the museum-stations is to get the population acquainted with the huge cultural and historical patrimony that the City owns, thus turning the subway network, a massive transport medium, into an ideal diffusion agent. The lending of the facilities is absolutely free for the museum and institutions that wish to exhibit their activities or part of the historical or cultural patrimony they treasure”.[7]
Rolling stock
[edit]Line D was originally served by Siemens-Schuckert Orenstein & Koppel rail rolling stock, and then by CAF cars. In 1999, cars from the Nagoya Municipal Subway were purchased second hand from Japan and used on the line. In 2001, numerous Alstom Metropolis 100 Series cars were purchased and built in Brazil and Argentina with the intention of incorporating them into Line A, however they were ultimately put into service on Line D. More 100 Series cars were purchased up until 2009, making a total of 96 cars.[8] Since 2019, much of the fleet was transferred to Line E to serve alongside the Fiat Materfer cars on that line. The Alstom 100 fleet has been suspended on Line D since the 2024 January-March shutdown, as they do not yet have the capability to operate under CBTC signalling.
The remaining Nagoya cars were moved to Line C in 2007 and replaced with the 100 Series cars and with Fiat-Materfer cars. To make the rolling stock more uniform, 24 more modern 300 Series Alstom Metropolis cars were ordered in 2013 to replace the Materfer cars on the line, which meant that the line was entirely composed of 120 Alstom cars.[9] In September 2015, at a conference in Brazil, the head of SBASE gave a presentation in which the number of new cars to be purchased for the line was 84 instead of 30.[10] By 2016, the final figure had been fixed at 60 new cars, which meant that the line had 156 Alstom Metropolis cars by 2017.[11] The 300 Series cars now make up the entirety of Line D's fleet.
Gallery
[edit]-
Tribunales station entrance
-
A magazine stand at Plaza Italia station
-
9 de Julio station
-
Interior of 100 Series rolling stock
-
Alstom train
References
[edit]- ^ "Subte: con récord de pasajeros, siguen las quejas por el servicio y busca mejorar con más obras". 13 August 2018. Retrieved 2019-03-21.
- ^ "En 2018 el Subte transportó la mayor cantidad de pasajeros en 25 años". 20 February 2019. Retrieved 2019-04-05.
- ^ Linea D – Ciudad de Buenos Aires
- ^ ¿Por qué la línea D no llega hasta Puente Saavedra? – EnElSubte, 25 June 2013.
- ^ Inaugurarían en junio el Metrobús Cabildo – EnElSubte, 6 May 2015.
- ^ "Modernizadas y con problemas: por qué el tren Mitre y la línea D de subtes tienen falencias en el servicio a pesar de las obras recientes" [Modernized and with problems: why the Mitre train and Subte Line D have service shortcomings despite the recent works]. LA NACION (in Spanish). 2024-05-08. Retrieved 2024-06-14.
- ^ Quote > Subterráneos de Buenos Aires Archived 2008-03-02 at the Wayback Machine (English)
- ^ Finalizó la entrega de los Alstom Metrópolis – EnElSubte, 9 March 2009.
- ^ SBASE anuncia nuevos coches con foto del Metro de San Pablo – EnElSubte, 21 January 2014.
- ^ Plan de modernización del Subterráneo de Buenos Aires – Buenos Aires Ciudad, September 2015.
- ^ "La Ciudad coloca deuda para comprar 60 coches Alstom para la línea D". EnElSubte (in European Spanish). 28 January 2016. Retrieved 7 July 2016.