New Melones Dam: Difference between revisions
Citation bot (talk | contribs) Add: newspaper, agency, authors 1-1. Removed parameters. Some additions/deletions were parameter name changes. | Use this bot. Report bugs. | Suggested by BrownHairedGirl | #UCB_webform 985/1459 |
|||
(10 intermediate revisions by 7 users not shown) | |||
Line 23: | Line 23: | ||
| owner = [[U.S. Bureau of Reclamation]] |
| owner = [[U.S. Bureau of Reclamation]] |
||
| dam_type = Earth and rock embankment |
| dam_type = Earth and rock embankment |
||
| dam_height = {{convert|625|ft|m|abbr=on}}<ref name="dimensions">{{cite web|url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=Dimensions|title=New Melones Dam Dimensions|publisher=U.S. Bureau of Reclamation|work=New Melones Unit Project|date=2008-11-05|access-date=2012-04-06}}</ref> |
| dam_height = {{convert|625|ft|m|abbr=on}}<ref name="dimensions">{{cite web|url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=Dimensions|title=New Melones Dam Dimensions|publisher=U.S. Bureau of Reclamation|work=New Melones Unit Project|date=2008-11-05|access-date=2012-04-06|archive-date=June 15, 2011|archive-url=https://web.archive.org/web/20110615004238/http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=Dimensions|url-status=dead}}</ref> |
||
| dam_height_thalweg = |
| dam_height_thalweg = |
||
| dam_height_foundation= |
| dam_height_foundation= |
||
Line 34: | Line 34: | ||
| spillway_count = |
| spillway_count = |
||
| spillway_type = Ungated overflow |
| spillway_type = Ungated overflow |
||
| spillway_capacity = {{convert|112600|cuft/s|m3/s|abbr=on}}<ref name="hydrology">{{cite web|url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=Hydraulics+%26+Hydrology|title=New Melones Dam Hydraulics & Hydrology|publisher=U.S. Bureau of Reclamation|work=New Melones Unit Project|date=2008-11-05|access-date=2012-04-06}}</ref> |
| spillway_capacity = {{convert|112600|cuft/s|m3/s|abbr=on}}<ref name="hydrology">{{cite web|url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=Hydraulics+%26+Hydrology|title=New Melones Dam Hydraulics & Hydrology|publisher=U.S. Bureau of Reclamation|work=New Melones Unit Project|date=2008-11-05|access-date=2012-04-06|archive-date=September 25, 2012|archive-url=https://web.archive.org/web/20120925113044/http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=Hydraulics+%26+Hydrology|url-status=dead}}</ref> |
||
| res_name = [[New Melones Lake]] |
| res_name = [[New Melones Lake]] |
||
| res_capacity_total = {{convert|2400000|acre feet|ML|lk=on}}<ref name="CDEC"/> |
| res_capacity_total = {{convert|2400000|acre feet|ML|lk=on}}<ref name="CDEC"/> |
||
Line 53: | Line 53: | ||
| plant_turbines = 2 × 150 MW [[Francis turbine|Francis]]<ref name="power">{{cite web|url=http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New%20Melones%20Powerplant|title=New Melones Powerplant|publisher=U.S. Bureau of Reclamation|work=New Melones Unit Project|date=2009-05-13|access-date=2012-04-06|url-status=dead|archive-url=https://web.archive.org/web/20110613140008/http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New%20Melones%20Powerplant|archive-date=2011-06-13}}</ref> |
| plant_turbines = 2 × 150 MW [[Francis turbine|Francis]]<ref name="power">{{cite web|url=http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New%20Melones%20Powerplant|title=New Melones Powerplant|publisher=U.S. Bureau of Reclamation|work=New Melones Unit Project|date=2009-05-13|access-date=2012-04-06|url-status=dead|archive-url=https://web.archive.org/web/20110613140008/http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New%20Melones%20Powerplant|archive-date=2011-06-13}}</ref> |
||
| plant_capacity = 300 MW<ref name="power"/> |
| plant_capacity = 300 MW<ref name="power"/> |
||
| plant_annual_gen = 417,880,000 KWh (2001-2015)<ref name="CEC">{{cite web|url=http://www.energy.ca.gov/almanac/renewables_data/hydro/index.php|title=California Hydroelectric Statistics & Data|publisher=California Energy Commission|access-date=2017-02-24}}</ref> |
| plant_annual_gen = 417,880,000 KWh (2001-2015)<ref name="CEC">{{cite web|url=http://www.energy.ca.gov/almanac/renewables_data/hydro/index.php|title=California Hydroelectric Statistics & Data|publisher=California Energy Commission|access-date=2017-02-24|archive-date=February 26, 2018|archive-url=https://web.archive.org/web/20180226135225/http://www.energy.ca.gov/almanac/renewables_data/hydro/index.php|url-status=dead}}</ref> |
||
| website = |
| website = |
||
| extra = |
| extra = |
||
Line 62: | Line 62: | ||
The dam was authorized in 1944 as a unit of the federal [[Central Valley Project]], a system designed to provide irrigation water to the fertile agricultural region of the [[Central Valley (California)|Central Valley]]. It would be built by the [[U.S. Army Corps of Engineers]] (Corps), and transferred to the [[U.S. Bureau of Reclamation]] (Reclamation) upon completion. In 1966, work began to clear the foundations for a high dam that would replace an earlier, much smaller structure built by two irrigation districts. Construction of the main embankment began in 1976, and was topped out in late 1978. The filling of New Melones Lake began in 1978, and the dam's hydroelectric station produced its first power in mid-1979. |
The dam was authorized in 1944 as a unit of the federal [[Central Valley Project]], a system designed to provide irrigation water to the fertile agricultural region of the [[Central Valley (California)|Central Valley]]. It would be built by the [[U.S. Army Corps of Engineers]] (Corps), and transferred to the [[U.S. Bureau of Reclamation]] (Reclamation) upon completion. In 1966, work began to clear the foundations for a high dam that would replace an earlier, much smaller structure built by two irrigation districts. Construction of the main embankment began in 1976, and was topped out in late 1978. The filling of New Melones Lake began in 1978, and the dam's hydroelectric station produced its first power in mid-1979. |
||
New Melones was the focus of a long environmental battle during the 1970s and early 1980s;<ref>http://www.stanislausriver.org</ref> critics protested the flooding of a long scenic stretch of the Stanislaus River, which flowed over whitewater rapids through the deepest limestone canyon in the western United States. The protestors employed a variety of methods, some extreme, to prevent the filling of New Melones Lake until 1983, when record-setting floods filled the reservoir and nearly breached the dam's emergency [[spillway]]. The fight over New Melones galvanized the river conservation movement in California and influenced major water policy changes on the state and federal levels; since its completion, no other dams of its size or importance have been built in the United States.{{sfn|Lowry|2003|p=41}} |
New Melones was the focus of a long environmental battle during the 1970s and early 1980s;<ref>{{cite web|url=http://www.stanislausriver.org|title=The Stanislaus River, Alive Again|access-date=7 February 2023 |website=stanislausriver.org|publisher=GreenInfo Network}}</ref> critics protested the flooding of a long scenic stretch of the Stanislaus River, which flowed over whitewater rapids through the deepest limestone canyon in the western United States. The protestors employed a variety of methods, some extreme, to prevent the filling of New Melones Lake until 1983, when record-setting floods filled the reservoir and nearly breached the dam's emergency [[spillway]]. The fight over New Melones galvanized the river conservation movement in California and influenced major water policy changes on the state and federal levels; since its completion, no other dams of its size or importance have been built in the United States.{{sfn|Lowry|2003|p=41}} |
||
The New Melones project has continued to generate controversy, due to the water yield from the project being lower than expected, and the use of New Melones water to meet federal environmental standards at the expense of farming. The reservoir is considered "over-allocated"; in an average year, it is unable to meet all the demands placed on it. The debate over water rights continues today, with environmentalists seeking to further increase fishery flows, and the Stanislaus [[irrigation district]]s asserting their [[Prior-appropriation water rights|senior rights]] to the river. |
The New Melones project has continued to generate controversy, due to the water yield from the project being lower than expected, and the use of New Melones water to meet federal environmental standards at the expense of farming. The reservoir is considered "over-allocated"; in an average year, it is unable to meet all the demands placed on it. The debate over water rights continues today, with environmentalists seeking to further increase fishery flows, and the Stanislaus [[irrigation district]]s asserting their [[Prior-appropriation water rights|senior rights]] to the river. |
||
Line 70: | Line 70: | ||
[[Image:New_Melones_Dam_and_Reservoir_(14116131214).jpg|thumb|left|New Melones Dam and Lake, looking north]] |
[[Image:New_Melones_Dam_and_Reservoir_(14116131214).jpg|thumb|left|New Melones Dam and Lake, looking north]] |
||
The impounded water behind the dam forms New Melones Lake, which at full pool of {{convert|1088|ft|abbr=on}} above sea level encompasses {{convert|12500|acre|ha}} of surface water<ref name="CDEC"/> and a volume of {{convert|2400000|acre feet|km3}}.<ref name="project"/> About {{convert|450000|acre feet|km3}}, 19 percent of the reservoir's capacity, is reserved for flood control.<ref name="CVflood">{{cite web |url=http://www.auburndamcouncil.org/pages/pdf-files/3-cv_floodmgmt_system.pdf |title=Chapter 3: Central Valley Flood Management Systems |publisher=Auburn Dam Council |work=Post–Flood Assessment for 1983, 1986, 1995, and 1997 |access-date=2012-04-20 |url-status=dead |archive-url=https://web.archive.org/web/20160311201335/http://www.auburndamcouncil.org/pages/pdf-files/3-cv_floodmgmt_system.pdf |archive-date=2016-03-11 }}</ref> During flooding events, the dam is operated to keep flows on the Stanislaus River below {{convert|8000|cuft/s|m3/s|abbr=on}}, although this figure may be lowered depending on flow conditions in the San Joaquin River.<ref name="CVflood"/> Between 1978 and 2010 the dam prevented a total of $505 million in flooding damages (adjusted for inflation), including $231 million during the New Year's flood of 1997 alone.<ref name="flooding damages">{{cite web|url=https://www.usbr.gov/mp/cvp/cvp-cas/docs/Draft_Findings/130815_new_melones_final_damages_prevented_revised_2010.pdf|title=New Melones Dam: Flood Damages Prevented|publisher=U.S. Bureau of Reclamation|year=2010|access-date=2017-02-17}}</ref> However, the ''[[Manteca Bulletin]]'' noted that the dam was operated carelessly during the 1997 flood – almost {{convert|45000|acre|ha}} of farmland was flooded near the confluence of the Stanislaus and San Joaquin Rivers<ref>{{cite news|url=http://www.mantecabulletin.com/section/38/article/141638/|title=188,000 Flee Dam – Emergency spillway could fail|agency=Associated Press|work=Manteca Bulletin|date=2017-02-13|access-date=2017-03-06}}</ref> – and a further $80 million of damage could have been prevented had the reservoir been kept at a safe level.<ref name="Wyatt"/> |
The impounded water behind the dam forms New Melones Lake, which at full pool of {{convert|1088|ft|abbr=on}} above sea level encompasses {{convert|12500|acre|ha}} of surface water<ref name="CDEC"/> and a volume of {{convert|2400000|acre feet|km3}}.<ref name="project"/> About {{convert|450000|acre feet|km3}}, 19 percent of the reservoir's capacity, is reserved for flood control.<ref name="CVflood">{{cite web |url=http://www.auburndamcouncil.org/pages/pdf-files/3-cv_floodmgmt_system.pdf |title=Chapter 3: Central Valley Flood Management Systems |publisher=Auburn Dam Council |work=Post–Flood Assessment for 1983, 1986, 1995, and 1997 |access-date=2012-04-20 |url-status=dead |archive-url=https://web.archive.org/web/20160311201335/http://www.auburndamcouncil.org/pages/pdf-files/3-cv_floodmgmt_system.pdf |archive-date=2016-03-11 }}</ref> During flooding events, the dam is operated to keep flows on the Stanislaus River below {{convert|8000|cuft/s|m3/s|abbr=on}}, although this figure may be lowered depending on flow conditions in the San Joaquin River.<ref name="CVflood"/> Between 1978 and 2010 the dam prevented a total of $505 million in flooding damages (adjusted for inflation), including $231 million during the New Year's flood of 1997 alone.<ref name="flooding damages">{{cite web|url=https://www.usbr.gov/mp/cvp/cvp-cas/docs/Draft_Findings/130815_new_melones_final_damages_prevented_revised_2010.pdf|title=New Melones Dam: Flood Damages Prevented|publisher=U.S. Bureau of Reclamation|year=2010|access-date=2017-02-17|archive-date=February 12, 2017|archive-url=https://web.archive.org/web/20170212072404/https://www.usbr.gov/mp//cvp/cvp-cas/docs/Draft_Findings/130815_new_melones_final_damages_prevented_revised_2010.pdf|url-status=dead}}</ref> However, the ''[[Manteca Bulletin]]'' noted that the dam was operated carelessly during the 1997 flood – almost {{convert|45000|acre|ha}} of farmland was flooded near the confluence of the Stanislaus and San Joaquin Rivers<ref>{{cite news|url=http://www.mantecabulletin.com/section/38/article/141638/|title=188,000 Flee Dam – Emergency spillway could fail|agency=Associated Press|work=Manteca Bulletin|date=2017-02-13|access-date=2017-03-06|archive-date=March 12, 2017|archive-url=https://web.archive.org/web/20170312061920/http://www.mantecabulletin.com/section/38/article/141638/|url-status=dead}}</ref> – and a further $80 million of damage could have been prevented had the reservoir been kept at a safe level.<ref name="Wyatt"/> |
||
The dam's hydroelectric power plant is located at its base on the north side of the river, and has a rated [[hydraulic head]] of {{convert|480|ft|abbr=on}}.<ref name="power"/> The plant houses two 150.0 [[Megawatt|MW]] [[Francis turbine]]s for a total capacity of 300 MW. Daily releases are made on a [[peaking power|peaking]] basis; seasonal totals are dictated by irrigation (in summer) and flood control (in winter) requirements below the dam.<ref name="power"/><ref name="project"/> The release from New Melones is re-regulated by the smaller downstream reservoir of [[Tulloch Dam]], ensuring a stable flow in the Stanislaus River.<ref name="bay delta water resources">{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/bay_delta_plan/water_quality_control_planning/2016_sed/docs/ch_02_water.pdf|title=Chapter 2: Water Resources|publisher=California State Water Resources Control Board|work=Draft Revised Substitute Environmental Document in Support of Potential Changes to the Water Quality Control Plan for the Bay-Delta: San Joaquin River flows and Southern Delta water quality|date=Sep 2016|access-date=2017-03-06}}</ref> For the period 2001 to 2015, the plant produced an average of 418 million [[kilowatt hour]]s (KWh) annually.<ref name="CEC"/> This ranged from a high of 910 million KWh in fiscal year 2006, to a low of 130 million KWh in 2015.<ref name="CEC"/> The plant replaced the old 22 MW power station at the original Melones Dam; on average it generates about four times as much electricity as the original did.{{sfn|Palmer|1984|p=70}} |
The dam's hydroelectric power plant is located at its base on the north side of the river, and has a rated [[hydraulic head]] of {{convert|480|ft|abbr=on}}.<ref name="power"/> The plant houses two 150.0 [[Megawatt|MW]] [[Francis turbine]]s for a total capacity of 300 MW. Daily releases are made on a [[peaking power|peaking]] basis; seasonal totals are dictated by irrigation (in summer) and flood control (in winter) requirements below the dam.<ref name="power"/><ref name="project"/> The release from New Melones is re-regulated by the smaller downstream reservoir of [[Tulloch Dam]], ensuring a stable flow in the Stanislaus River.<ref name="bay delta water resources">{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/bay_delta_plan/water_quality_control_planning/2016_sed/docs/ch_02_water.pdf|title=Chapter 2: Water Resources|publisher=California State Water Resources Control Board|work=Draft Revised Substitute Environmental Document in Support of Potential Changes to the Water Quality Control Plan for the Bay-Delta: San Joaquin River flows and Southern Delta water quality|date=Sep 2016|access-date=2017-03-06}}</ref> For the period 2001 to 2015, the plant produced an average of 418 million [[kilowatt hour]]s (KWh) annually.<ref name="CEC"/> This ranged from a high of 910 million KWh in fiscal year 2006, to a low of 130 million KWh in 2015.<ref name="CEC"/> The plant replaced the old 22 MW power station at the original Melones Dam; on average it generates about four times as much electricity as the original did.{{sfn|Palmer|1984|p=70}} |
||
⚫ | By controlling the flows of the Stanislaus River, the dam and reservoir make available {{convert|200000|to|280000|acre feet|dam3|abbr=on}} of additional water each year.<ref name="general">{{cite web |url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=General |title=New Melones Dam – General Information |publisher=U.S. Bureau of Reclamation |work=New Melones Unit Project |date=2008-11-05 |access-date=2012-08-22 |archive-date=September 25, 2012 |archive-url=https://web.archive.org/web/20120925113037/http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=General |url-status=dead }}</ref> About {{convert|213000|acre|ha}} of land along the Stanislaus River are irrigated using water from New Melones.<ref name="bay delta water resources"/><ref>{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/bay_delta_plan/water_quality_control_planning/2016_sed/docs/ch_02_water.pdf|title=Chapter 2: Water Resources|publisher=California State Water Resources Control Board|work=Evaluation of San Joaquin River Flow and Southern Delta Water Quality Objectives and Implementation|date=Sep 2016|access-date=2017-03-10}}</ref> According to the Bureau of Reclamation, the increase in water supply from New Melones Dam has "translated into prosperity for the region, allowing the growth of cities including [[Tracy, California|Tracy]] and [[Manteca, California|Manteca]], and irrigating high-value crops including almonds, walnuts and grapes."<ref>{{cite news |author=Nichols, Dana M. |title=Mixed legacy mars Melones milestone: Free celebration coincides with event lamenting loss of rafting |work=Recordnet |date=2009-04-23 }}</ref> In addition, New Melones Lake is one of the major tourist draws of the region, providing activities such as boating, fishing and shoreline camping. An estimated 800,000 people visit the lake each year;<ref>{{cite web|url=https://www.usbr.gov/mp/ccao/newmelones/|title=New Melones|publisher=U.S. Bureau of Reclamation|date=2016-03-10|access-date=2017-02-24}}</ref> however, droughts can cause the closure of lake facilities due to low water levels.<ref>{{cite news|url=http://www.recordnet.com/article/20140209/a_news/402090315|title=New Melones Lake Marina to close by Oct. 1|work=Recordnet|date=2014-02-09|access-date=2017-02-24}}</ref> |
||
By controlling the flows of the Stanislaus River, the dam and reservoir make available {{convert|200000|to|280000|acre feet|dam3|abbr=on}} of additional water each year.<ref name="general">{{cite web |url=http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam&groupName=General |title=New Melones Dam – General Information |publisher=U.S. Bureau of Reclamation |
|||
⚫ | |work=New Melones Unit Project |date=2008-11-05 |access-date=2012-08-22}}</ref> About {{convert|213000|acre|ha}} of land along the Stanislaus River are irrigated using water from New Melones.<ref name="bay delta water resources"/><ref>{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/bay_delta_plan/water_quality_control_planning/2016_sed/docs/ch_02_water.pdf|title=Chapter 2: Water Resources|publisher=California State Water Resources Control Board|work=Evaluation of San Joaquin River Flow and Southern Delta Water Quality Objectives and Implementation|date=Sep 2016|access-date=2017-03-10}}</ref> According to the Bureau of Reclamation, the increase in water supply from New Melones Dam has "translated into prosperity for the region, allowing the growth of cities including [[Tracy, California|Tracy]] and [[Manteca, California|Manteca]], and irrigating high-value crops including almonds, walnuts and grapes."<ref>{{cite news |author=Nichols, Dana M. |title=Mixed legacy mars Melones milestone: Free celebration coincides with event lamenting loss of rafting |work=Recordnet |date=2009-04-23 }}</ref> In addition, New Melones Lake is one of the major tourist draws of the region, providing activities such as boating, fishing and shoreline camping. An estimated 800,000 people visit the lake each year;<ref>{{cite web|url=https://www.usbr.gov/mp/ccao/newmelones/|title=New Melones|publisher=U.S. Bureau of Reclamation|date=2016-03-10|access-date=2017-02-24}}</ref> however, droughts can cause the closure of lake facilities due to low water levels.<ref>{{cite news|url=http://www.recordnet.com/article/20140209/a_news/402090315|title=New Melones Lake Marina to close by Oct. 1|work=Recordnet|date=2014-02-09|access-date=2017-02-24}}</ref> |
||
==History== |
==History== |
||
===Background=== |
===Background=== |
||
[[Image:Old_melones_dam1.jpg|thumb|right|The original Melones Dam]] |
[[Image:Old_melones_dam1.jpg|thumb|right|The original Melones Dam]] |
||
The modern development of the Stanislaus River began with the Oakdale and South San Joaquin Irrigation Districts, which were created in 1909 under the [[Wright Act of 1887|Wright Act]] to serve farmers in the area. Early irrigation along the Stanislaus River was dependent on the natural flow of the river, which was never enough to water crops during the late summer and fall.<ref name="OID"/> In 1926 the two irrigation districts jointly completed the original Melones Dam, a {{convert|211|ft|m|adj=on}} high concrete arch dam with a storage capacity of {{convert|112500|acre feet|m3}}.<ref>{{cite web |url=http://www.usbr.gov/mp/ccao/newmelones/history.html |title=History |publisher=U.S. Bureau of Reclamation |work=Central California Area Office, New Melones |date=2011-07-25 |access-date=2012-08-22}}</ref> This reservoir was still not big enough for all the demands placed on it, especially during the long droughts of the 1930s.<ref name="OID">{{cite web|url=http://www.oakdaleirrigation.com/sections/about/history|title=History|publisher=Oakdale Irrigation District|access-date=2017-02-15|url-status=dead|archive-url=https://web.archive.org/web/20160513054914/http://www.oakdaleirrigation.com/sections/about/history|archive-date=2016-05-13}}</ref><ref name="SSJID">{{cite web|url=http://www.ssjid.com/about-ssjid/history.htm|title=History of South San Joaquin Irrigation District|publisher=South San Joaquin Irrigation District|access-date=2017-02-15|archive-url=https://web.archive.org/web/20160504084921/http://www.ssjid.com/about-ssjid/history.htm|archive-date=2016-05-04|url-status=dead}}</ref> |
The modern development of the Stanislaus River began with the Oakdale and South San Joaquin Irrigation Districts, which were created in 1909 under the [[Wright Act of 1887|Wright Act]] to serve farmers in the area. Early irrigation along the Stanislaus River was dependent on the natural flow of the river, which was never enough to water crops during the late summer and fall.<ref name="OID"/> In 1926 the two irrigation districts jointly completed the original Melones Dam, a {{convert|211|ft|m|adj=on}} high concrete arch dam with a storage capacity of {{convert|112500|acre feet|m3}}.<ref>{{cite web |url=http://www.usbr.gov/mp/ccao/newmelones/history.html |title=History |publisher=U.S. Bureau of Reclamation |work=Central California Area Office, New Melones |date=2011-07-25 |access-date=2012-08-22 |archive-date=September 16, 2012 |archive-url=https://web.archive.org/web/20120916065343/http://www.usbr.gov/mp/ccao/newmelones/history.html |url-status=dead }}</ref> This reservoir was still not big enough for all the demands placed on it, especially during the long droughts of the 1930s.<ref name="OID">{{cite web|url=http://www.oakdaleirrigation.com/sections/about/history|title=History|publisher=Oakdale Irrigation District|access-date=2017-02-15|url-status=dead|archive-url=https://web.archive.org/web/20160513054914/http://www.oakdaleirrigation.com/sections/about/history|archive-date=2016-05-13}}</ref><ref name="SSJID">{{cite web|url=http://www.ssjid.com/about-ssjid/history.htm|title=History of South San Joaquin Irrigation District|publisher=South San Joaquin Irrigation District|access-date=2017-02-15|archive-url=https://web.archive.org/web/20160504084921/http://www.ssjid.com/about-ssjid/history.htm|archive-date=2016-05-04|url-status=dead}}</ref> |
||
The storage capacity of these early reservoirs was limited and the irrigation districts sought to increase the size of the Melones Reservoir. The federal Flood Control Act of 1944 authorized the [[U.S. Army Corps of Engineers]] to build a {{convert|355|ft|m|adj=on}} arch dam with a capacity of {{convert|450000|acre feet|dam3|abbr=on}}.<ref name="Dunning"/> As a primary flood control structure, it would protect {{convert|35000|acre|ha}} of farmland as well as the towns of [[Oakdale, California|Oakdale]], [[Riverbank, California|Riverbank]] and [[Ripon, California|Ripon]] from flooding. It would generate electricity using the original 22 megawatt Melones hydroelectric plant.<ref name="project"/> However, the [[cost-benefit analysis]] conducted for the project, then known as "New Melones I", did not justify the construction of the dam for flood control alone. If other benefits such as irrigation, fishery conservation and recreation were included, the cost-benefit ratio became positive.<ref name="Dunning"/> The Corps downplayed these additional benefits, intending to keep it primarily as a flood-control structure, because an irrigation project would then fall under the authority of the [[U.S. Bureau of Reclamation]].<ref name="Dunning"/> |
The storage capacity of these early reservoirs was limited and the irrigation districts sought to increase the size of the Melones Reservoir. The federal Flood Control Act of 1944 authorized the [[U.S. Army Corps of Engineers]] to build a {{convert|355|ft|m|adj=on}} arch dam with a capacity of {{convert|450000|acre feet|dam3|abbr=on}}.<ref name="Dunning"/> As a primary flood control structure, it would protect {{convert|35000|acre|ha}} of farmland as well as the towns of [[Oakdale, California|Oakdale]], [[Riverbank, California|Riverbank]] and [[Ripon, California|Ripon]] from flooding. It would generate electricity using the original 22 megawatt Melones hydroelectric plant.<ref name="project"/> However, the [[cost-benefit analysis]] conducted for the project, then known as "New Melones I", did not justify the construction of the dam for flood control alone. If other benefits such as irrigation, fishery conservation and recreation were included, the cost-benefit ratio became positive.<ref name="Dunning"/> The Corps downplayed these additional benefits, intending to keep it primarily as a flood-control structure, because an irrigation project would then fall under the authority of the [[U.S. Bureau of Reclamation]].<ref name="Dunning"/> |
||
Line 94: | Line 93: | ||
===Initial construction and controversy=== |
===Initial construction and controversy=== |
||
Actual construction began in July 1966 with clearing of the dam and reservoir site, construction of access roads, foundation preparations and excavations for the future outlet works. A diversion tunnel to allow the river to bypass the dam site was excavated between 1966 and December 1973.<ref name="project"/> The Corps opened bids for construction of the main dam on October 10, 1972. Melones Contractors (a consortium formed by Guy F. Atckinson Company, Gordon H. Ball, and Arundel Corp.) won the primary construction contract for $109.7 million, while [[Allis-Chalmers]] and [[General Electric]] took an $11.5 million contract to provide turbines and hydroelectric generating equipment.<ref name="history"/> During reservoir clearing operations, the USACE spent about $28 million relocating roads and bridges in the future reservoir space.<ref name="history"/> Foundation work for the dam itself began on March 6, 1974 with the first embankment material placed in January 1976.<ref name="history"/> Much of the embankment fill came from an excavation shortly northwest of the dam, which would later serve as the dam's spillway. During the height of construction in the summer, the total workforce reached about 800, while averaging between 500–600 in the winter months.<ref name="PML">{{cite news|title=New Melones Dam Rolls Ahead|date=February 1978|work=Pine Mountain Lake News|url=http://www.pinemountainlake.com/New-Melones-Dam-rolls-ahead~335622~21389.htm|url-status=bot: unknown|archive-url=https://archive.today/20121210173527/www.pinemountainlake.com/New-Melones-Dam-rolls-ahead~335622~21389.htm|archive-date=2012-12-10}}</ref> |
Actual construction began in July 1966 with clearing of the dam and reservoir site, construction of access roads, foundation preparations and excavations for the future outlet works. A diversion tunnel to allow the river to bypass the dam site was excavated between 1966 and December 1973.<ref name="project"/> The Corps opened bids for construction of the main dam on October 10, 1972. Melones Contractors (a consortium formed by Guy F. Atckinson Company, Gordon H. Ball, and Arundel Corp.) won the primary construction contract for $109.7 million, while [[Allis-Chalmers]] and [[General Electric]] took an $11.5 million contract to provide turbines and hydroelectric generating equipment.<ref name="history"/> During reservoir clearing operations, the USACE spent about $28 million relocating roads and bridges in the future reservoir space.<ref name="history"/> Foundation work for the dam itself began on March 6, 1974 with the first embankment material placed in January 1976.<ref name="history"/> Much of the embankment fill came from an excavation shortly northwest of the dam, which would later serve as the dam's spillway. During the height of construction in the summer, the total workforce reached about 800, while averaging between 500–600 in the winter months.<ref name="PML">{{cite news|title=New Melones Dam Rolls Ahead|date=February 1978|work=Pine Mountain Lake News|url=http://www.pinemountainlake.com/New-Melones-Dam-rolls-ahead~335622~21389.htm|url-status=bot: unknown|archive-url=https://archive.today/20121210173527/http://www.pinemountainlake.com/New-Melones-Dam-rolls-ahead~335622~21389.htm|archive-date=2012-12-10}}</ref> |
||
{{multiple image |
{{multiple image |
||
Line 108: | Line 107: | ||
}} |
}} |
||
Although the 1964 floods had initially generated support for New Melones, a spirited opposition to the dam arose from both the river recreation industry and environmentalists who saw the Stanislaus River canyon as having greater value than a reservoir.<ref name="history"/> River runners protested the threat to the Stanislaus River, which was becoming one of the most popular [[whitewater]] runs in the United States, with the first commercial rafting company established in 1962 ([http://www.stanislausriver.org/explore/#sort=uploaded&keywords=51%2C50%2C32 see images of the river, rafting, and the canyon at the Stanislaus River Archive]).<ref name="watereducation">{{cite web|url=http://www.watereducation.org/aquapedia/new-melones-dam|title=New Melones Dam|publisher=Water Education Foundation|work=Aquapedia|access-date=2017-02-16}}</ref> The river flowed through the deepest limestone canyon in the US, with cliffs rising {{convert|1000|ft|m}} above the water in places.<ref>{{cite news|author=Roderick, Kevin|title=Ghost River : Stretch of the Stanislaus Prized by Rafters Has Reappeared at Bottom of Shrinking Reservoir|work=Los Angeles Times|date=1989-09-21|url= |
Although the 1964 floods had initially generated support for New Melones, a spirited opposition to the dam arose from both the river recreation industry and environmentalists who saw the Stanislaus River canyon as having greater value than a reservoir.<ref name="history"/> River runners protested the threat to the Stanislaus River, which was becoming one of the most popular [[whitewater]] runs in the United States, with the first commercial rafting company established in 1962 ([http://www.stanislausriver.org/explore/#sort=uploaded&keywords=51%2C50%2C32 see images of the river, rafting, and the canyon at the Stanislaus River Archive]).<ref name="watereducation">{{cite web|url=http://www.watereducation.org/aquapedia/new-melones-dam|title=New Melones Dam|publisher=Water Education Foundation|work=Aquapedia|access-date=2017-02-16}}</ref> The river flowed through the deepest limestone canyon in the US, with cliffs rising {{convert|1000|ft|m}} above the water in places.<ref>{{cite news|author=Roderick, Kevin|title=Ghost River : Stretch of the Stanislaus Prized by Rafters Has Reappeared at Bottom of Shrinking Reservoir|work=Los Angeles Times|date=1989-09-21|url=https://www.latimes.com/archives/la-xpm-1989-09-21-mn-892-story.html}}</ref> Other natural features of the area included extensive limestone caves, and endemic species such as ''[[Banksula melones]]'', the Melones cave [[harvestman]].<ref>{{cite web|title=''Banksula melones'' (Melones cave harvestman)|publisher=California Department of Fish and Wildlife|format=pdf|url=https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=107196|access-date=2017-02-16}}</ref> In addition, more than one hundred archaeological and historical sites, left over from Native American inhabitation and the [[California Gold Rush|Gold Rush]] period, were all situated in the reservoir flood zone.<ref>{{cite web|url=http://digitalassets.lib.berkeley.edu/anthpubs/ucb/text/arf060-004.pdf|title=Culture History of the New Melones Reservoir Area, Calaveras and Tuolumne County, California|author=Moratto, Michael J.|publisher=University of California, Berkeley|access-date=2017-02-16|archive-date=September 21, 2015|archive-url=https://web.archive.org/web/20150921015703/http://digitalassets.lib.berkeley.edu/anthpubs/ucb/text/arf060-004.pdf|url-status=dead}}</ref><ref name="Larson">{{cite web|url=https://pubs.usgs.gov/dds/dds-43/VOL_II/VII_C08.PDF|title=Historical Water-Use Priorities and Public Policies|author=Larson, David J.|publisher=U.S. Geological Survey|work=Sierra Nevada Ecosystem Project: Final report to Congress, vol. II, Assessments and scientific basis for management options|year=1996|access-date=2017-02-16}}</ref> |
||
While the US Army Corps of Engineers was constructing New Melones Dam, the dam operators, the US Bureau of Reclamation, applied to the California State Water Resources Control Board (SWRCB) for water rights for the project. During extensive hearings, the Environmental Defense Fund and the Sierra Club recommended that the SWRCB deny the Bureau’s applications for water rights because of the adverse effects of the project and the failure of the Bureau to show that the water sought to be stored will be put to beneficial use within a reasonable time. The Bureau took the position that the SWRCB was limited in its jurisdiction to determining if unappropriated water was available. |
|||
⚫ | |||
On April 4, 1973, the SWRCB issued Decision 1422 which held that the public interest requires the use of the Stanislaus River for whitewater boating, stream fishing and wildlife habitat be protected to the extent that water is not needed for other beneficial purposes.<ref>{{Cite book |last=California State Water Resources Control Board |title=New Melones Project: Water Rights Decision 1422. |date=April 1973 |publisher=State of California |year=1973 |location=Sacramento, CA |publication-date=1973}}</ref> The SWRCB limited impoundment behind New Melones Dam to water needed for fish and wildlife releases, water quality releases, flood control and that needed to satisfy prior water rights at the existing Melones Reservoir. The Board reserved jurisdiction to consider allowing more storage behind New Melones Dam if the Bureau could show that the benefits from the storage outweigh the damage in the watershed above the dam and that the Bureau had firm commitments to deliver the water. |
|||
⚫ | |||
The federal government sued the SWRCB over the storage restrictions contained in Decision 1422. The federal government won at the district and appeals court level, but the US Supreme reversed the lower court decision. In 1978, the US Supreme Court held in California v. United States that under the 1902 Reclamation Act a State may impose any condition on control, appropriation, use or distribution of water in a federal reclamation project that is not inconsistent with clear congressional directives respecting the project.<ref>{{Cite web |title=California v. United States, 438 U.S. 645 (1978) |url=https://supreme.justia.com/cases/federal/us/438/645/ |access-date=2024-06-24 |website=Justia Law |language=en}}</ref> The Court remanded the case to the lower courts to consider the conditions imposed in Decision 1422. |
|||
⚫ | While the administrative and legal battles were occurring, the environmental group [[Friends of the River]] (FOR) was formed in the early 1970s to push a statewide ballot measure, [http://www.stanislausriver.org/explore/#sort=uploaded&keywords=48 Proposition 17], which would have designated {{convert|9|mi|km}} of the Stanislaus River between Stanislaus Powerhouse and Parrott's Ferry as a [[National Wild and Scenic Rivers System|National Wild and Scenic River]] and stopped the construction of New Melones Dam. Development-related interests such as [[Pacific Gas and Electric Company|PG&E]], the [[California Chamber of Commerce]] and the contractors working on the dam spent millions of dollars lobbying against Prop 17 ([http://www.stanislausriver.org/explore/#sort=uploaded&keywords=172 see images on the Stanislaus River Archive]).<ref>{{cite news|title=From the depths of New Melones comes the gateway of controversy|author=Jardine, Jeff|work=Modesto Bee|date=2015-06-29|url=http://www.modbee.com/news/local/news-columns-blogs/jeff-jardine/article25795189.html}}</ref> One of their slogans, "Stop the 'Wild River' Hoax!" argued that this part of the Stanislaus River was not untouched wilderness (as dams already existed both upstream and downstream of the 9-mile segment) and therefore was ineligible for Wild and Scenic designation. This statement was misleading, since the language of the Wild and Scenic Rivers Act does not disqualify rivers with dams – only the portions already inundated by reservoirs.{{sfn|Hundley|2001|p=368}}{{#tag:ref|The Wild and Scenic Rivers Act <!-- includes provisions for "Wild", "Scenic" and "Recreational" river designations. "Wild" and "Scenic" designations require that the river in question be "free of impoundments" while "Recreational" designation allows rivers that "may have undergone some impoundment or diversion in the past". The act-->''"prohibits federal support for actions such as the construction of dams or other instream activities that would harm the river's free-flowing condition, water quality, or outstanding resource values. However, designation does not affect existing water rights or the existing jurisdiction of states and the federal government over waters as determined by established principles of law"'' and seeks to "''balance dam and other construction at appropriate sections of rivers''". Thus, rivers subject to existing water rights and damming on other stretches can still qualify for designation.<ref>{{cite web|url=https://www.rivers.gov/wsr-act.php|title=About the Wild and Scenic Rivers Act|publisher=National Wild and Scenic Rivers System|access-date=2017-03-06}}</ref>|group=n}} Dam supporters also argued that the Stanislaus River in its natural state was only accessible to a small group of people; that the rafting companies held a "monopoly" on river recreation and a reservoir would open up the area for far more tourists than would have visited otherwise, bringing more economic benefits to the area.<ref>{{cite news|title=Stop the Wild Rivers Hoax: Help Us Save the Stanislaus|work=The Bakersfield Californian|date=1974-11-04|access-date=2017-02-24|url=https://www.newspapers.com/newspage/4189217/}}</ref> Proposition 17 lost by a voter margin of 52.5%-47.5%. |
||
⚫ | Construction on the dam continued to progress. On April 1, 1978 the gates of the diversion tunnel were closed, and New Melones Lake began to fill, soon inundating the old Melones Dam.{{sfn|Palmer|1984|p=161}} As the reservoir filled, work moved ahead on the power plant and generating units, which were all completed by the end of 1978. The main embankment of the dam was topped out on October 28, 1978.<ref name="history" /> |
||
===Protests and filling of the lake=== |
===Protests and filling of the lake=== |
||
Line 120: | Line 125: | ||
In the meantime, environmental groups lobbied for a compromise to stay the lake level at [http://www.stanislausriver.org/explore/#sort=uploaded&locations=144 the old Parrott's Ferry Bridge], {{convert|844|ft|abbr=on}} above sea level, corresponding to a storage capacity of {{convert|438000|acre feet|dam3|abbr=on}}: "We can have a working dam and a wild river."<ref name="history"/>{{sfn|Palmer|1984|p=139}} The irrigation districts, Reclamation officials, and local representatives including [[John Garamendi]] and [[Norman S. Waters]], argued that to complete the dam only to not fill it was absurd.{{sfn|Palmer|1984|p=139}} The state of California initially sided with the opposition. On November 20, 1980 the State Water Resources Control Board set the temporary upper limit for lake level at the old Parrott's Ferry Bridge.<ref name="history"/> With that limit in place, operations of the dam and reservoir were handed to Reclamation.<ref name="history"/> |
In the meantime, environmental groups lobbied for a compromise to stay the lake level at [http://www.stanislausriver.org/explore/#sort=uploaded&locations=144 the old Parrott's Ferry Bridge], {{convert|844|ft|abbr=on}} above sea level, corresponding to a storage capacity of {{convert|438000|acre feet|dam3|abbr=on}}: "We can have a working dam and a wild river."<ref name="history"/>{{sfn|Palmer|1984|p=139}} The irrigation districts, Reclamation officials, and local representatives including [[John Garamendi]] and [[Norman S. Waters]], argued that to complete the dam only to not fill it was absurd.{{sfn|Palmer|1984|p=139}} The state of California initially sided with the opposition. On November 20, 1980 the State Water Resources Control Board set the temporary upper limit for lake level at the old Parrott's Ferry Bridge.<ref name="history"/> With that limit in place, operations of the dam and reservoir were handed to Reclamation.<ref name="history"/> |
||
Over the next two years the state continued to delay allowing the reservoir to fill because the Bureau of Reclamation had not convincingly demonstrated that "the irrigation need will outweigh any damage that results to fish, wildlife and recreation in the watershed above New Melones Dam."{{sfn|Hundley|2001|p=370}}<ref>{{cite news|author=Morris, Mike|title=Still active years after Melones stunt|work=Union Democrat|date=2006-02-03|url=http://www.uniondemocrat.com/localnews/3714662-151/still-active-years-after-melones-stunt}}</ref> Further studies by the [[California Department of Fish and Wildlife]] and the Bureau of Reclamation itself showed that completely filling New Melones Lake would, in fact, offset some of the benefits of the project. For example, if additional water were provided for farms, even more water would have to be released into the Stanislaus River to wash out polluted [[return flow]]s from new irrigation.{{sfn|Palmer|1984|p=140}} A larger reservoir would also halt the Stanislaus' spring flooding to such an extent that it would harm the salmon populations that the dam was intended to benefit. Also, a higher reservoir would allow for less flood control space in emergencies.{{sfn|Palmer|1984|p=141}} The state determined that the optimal reservoir volume was {{convert|623000|acre feet|km3}}, which would provide enough water to fulfill existing rights and fishery flows as well as provide a hedge against droughts and floods; although it would inundate about {{convert|2|mi|km}} of the river above Parrott's Ferry, FOR agreed to this compromise.<ref>{{cite news|title=Both Sides Satisfied With New Melones Decision|work=Santa Cruz Sentinel|date=1979-11-01|access-date=2017-02-24|url=https://www.newspapers.com/newspage/62710322/}}</ref> |
Over the next two years the state continued to delay allowing the reservoir to fill because the Bureau of Reclamation had not convincingly demonstrated that "the irrigation need will outweigh any damage that results to fish, wildlife and recreation in the watershed above New Melones Dam."{{sfn|Hundley|2001|p=370}}<ref>{{cite news|author=Morris, Mike|title=Still active years after Melones stunt|work=Union Democrat|date=2006-02-03|url=http://www.uniondemocrat.com/localnews/3714662-151/still-active-years-after-melones-stunt|access-date=March 11, 2017|archive-date=March 12, 2017|archive-url=https://web.archive.org/web/20170312060923/http://www.uniondemocrat.com/localnews/3714662-151/still-active-years-after-melones-stunt|url-status=dead}}</ref> Further studies by the [[California Department of Fish and Wildlife]] and the Bureau of Reclamation itself showed that completely filling New Melones Lake would, in fact, offset some of the benefits of the project. For example, if additional water were provided for farms, even more water would have to be released into the Stanislaus River to wash out polluted [[return flow]]s from new irrigation.{{sfn|Palmer|1984|p=140}} A larger reservoir would also halt the Stanislaus' spring flooding to such an extent that it would harm the salmon populations that the dam was intended to benefit. Also, a higher reservoir would allow for less flood control space in emergencies.{{sfn|Palmer|1984|p=141}} The state determined that the optimal reservoir volume was {{convert|623000|acre feet|km3}}, which would provide enough water to fulfill existing rights and fishery flows as well as provide a hedge against droughts and floods; although it would inundate about {{convert|2|mi|km}} of the river above Parrott's Ferry, FOR agreed to this compromise.<ref>{{cite news|title=Both Sides Satisfied With New Melones Decision|work=Santa Cruz Sentinel|date=1979-11-01|access-date=2017-02-24|url=https://www.newspapers.com/newspage/62710322/}}</ref> |
||
Ultimately, it was nature, not political maneuvering, that led to [http://www.stanislausriver.org/explore/#sort=uploaded&keywords=30 the filling of New Melones Lake]. The winter and spring rainy season of 1982 was one of the wettest recorded in the 20th century. The Stanislaus River swelled to such high levels that it exceeded what could be safely released through the dam's outlets, and the reservoir rapidly surpassed the temporary limit. The winter of 1983 was even wetter and pushed water so high that it reached the lip of the emergency spillway (but did not flow over it), a level that has not been surpassed since.<ref name="watereducation"/><ref>{{cite news|author=Cowan, Jason|title=New Melones water levels rising: Historic sites once again submerged after recent storms|date=2016-03-17|work=Union Democrat|url=http://www.uniondemocrat.com/localnews/4127959-151/new-melones-water-levels-rising}}</ref><ref>{{cite web|url=http://cdec.water.ca.gov/cgi-progs/profile?s=NML&type=res|title=New Melones Reservoir (NML) Reservoir Information and Monthly Averages|publisher=California Department of Water Resources|work=California Data Exchange Center|access-date=2012-04-06}}</ref> With the lake full, the state of California lifted the temporary limit in March, 1983.<ref name="history"/> A deciding factor in the rescinding of the water-level limit was the prevention of $50 million in damages<ref name="flooding damages"/> by New Melones Dam in 1982 and 1983, which demonstrated the dam's value for flood control.<ref>{{cite web|url=http://www.ssjid.com/assets/pdf/Michelaina_Johnson-Taming_the_Rapids.pdf|title=Taming the Rapids: A Brief History of Development on the Stanislaus River|author=Johnson, Michelaina|year=2015|publisher=South San Joaquin Irrigation District|access-date=2017-02-24}}</ref> |
Ultimately, it was nature, not political maneuvering, that led to [http://www.stanislausriver.org/explore/#sort=uploaded&keywords=30 the filling of New Melones Lake]. The winter and spring rainy season of 1982 was one of the wettest recorded in the 20th century. The Stanislaus River swelled to such high levels that it exceeded what could be safely released through the dam's outlets, and the reservoir rapidly surpassed the temporary limit. The winter of 1983 was even wetter and pushed water so high that it reached the lip of the emergency spillway (but did not flow over it), a level that has not been surpassed since.<ref name="watereducation"/><ref>{{cite news|author=Cowan, Jason|title=New Melones water levels rising: Historic sites once again submerged after recent storms|date=2016-03-17|work=Union Democrat|url=http://www.uniondemocrat.com/localnews/4127959-151/new-melones-water-levels-rising|access-date=March 11, 2017|archive-date=April 2, 2019|archive-url=https://web.archive.org/web/20190402233436/https://www.uniondemocrat.com/localnews/4127959-151/new-melones-water-levels-rising|url-status=dead}}</ref><ref>{{cite web|url=http://cdec.water.ca.gov/cgi-progs/profile?s=NML&type=res|title=New Melones Reservoir (NML) Reservoir Information and Monthly Averages|publisher=California Department of Water Resources|work=California Data Exchange Center|access-date=2012-04-06}}</ref> With the lake full, the state of California lifted the temporary limit in March, 1983.<ref name="history"/> A deciding factor in the rescinding of the water-level limit was the prevention of $50 million in damages<ref name="flooding damages"/> by New Melones Dam in 1982 and 1983, which demonstrated the dam's value for flood control.<ref>{{cite web|url=http://www.ssjid.com/assets/pdf/Michelaina_Johnson-Taming_the_Rapids.pdf|title=Taming the Rapids: A Brief History of Development on the Stanislaus River|author=Johnson, Michelaina|year=2015|publisher=South San Joaquin Irrigation District|access-date=2017-02-24|archive-date=March 15, 2016|archive-url=https://web.archive.org/web/20160315120340/http://www.ssjid.com/assets/pdf/Michelaina_Johnson-Taming_the_Rapids.pdf|url-status=dead}}</ref> |
||
==Water rights disputes== |
==Water rights disputes== |
||
[[Image:New Melones Lake, near Columbia, California LCCN2013634022.tif|thumb|right|Low water levels at New Melones, 2012]] |
[[Image:New Melones Lake, near Columbia, California LCCN2013634022.tif|thumb|right|Low water levels at New Melones, 2012]] |
||
New Melones Dam has a very large storage capacity relative to the watershed that feeds it, as compared to other major reservoirs in California. The potential water yield, and thus the supply contracts, of the Melones Project were calculated based on stream flow data between 1922 and 1978; however, this period may have been somewhat wetter than the long-term average.<ref name="history"/> The Bureau of Reclamation estimated the additional water yield per year as {{convert|335000|acre feet|km3}} but the actual yield has been closer to {{convert|200000|acre feet|km3}}. As a result, the reservoir is often at a low water level because in most years demand is greater than supply. In the 38 years between 1978 and 2016, New Melones has only reached capacity five times, and only once (in 1983) has it reached the level of the spillway. Between 1987 and 1992 Reclamation was forced to purchase water from other agencies to fulfill New Melones' water obligations.<ref>{{cite web|url=https://undark.org/article/storage-dams-water-groundwater-canada-drought-site-c/|title=The Big Dam Era Is Not Over|author=Lawton, Rebecca|publisher=UnDark|date=2016-07-27|access-date=2017-02-15}}</ref> Even so, the reservoir fell to a record low level of {{convert|83631|acre feet|m3}}, 3.5% of capacity, on October 1, 1992.<ref>{{cite web|url=http://cdec.water.ca.gov/cgi-progs/queryDaily?NML&d=18-Oct-1992+14:44&span=30days|title=New Melones Reservoir (Query for Daily Water Levels between 9/19/1992 and 10/18/1992)|publisher=California Department of Water Resources|work=California Data Exchange Center|access-date=2017-02-15}}</ref> Conversely, the great storage capacity also means that New Melones can capture more flood runoff while other major California reservoirs must release it to maintain flood control space.<ref name="Cowan">{{cite news|url=http://www.uniondemocrat.com/csp/mediapool/sites/UnionDemocrat/LocalNews/story.csp?cid=3890606&sid=753&fid=151|title=New Melones Reservoir at 13 percent capacity, but filling|author=Cowan, Jason|work=Union Democrat|date=2016-01-08|access-date=2017-02-15}}</ref> |
New Melones Dam has a very large storage capacity relative to the watershed that feeds it, as compared to other major reservoirs in California. The potential water yield, and thus the supply contracts, of the Melones Project were calculated based on stream flow data between 1922 and 1978; however, this period may have been somewhat wetter than the long-term average.<ref name="history"/> The Bureau of Reclamation estimated the additional water yield per year as {{convert|335000|acre feet|km3}} but the actual yield has been closer to {{convert|200000|acre feet|km3}}. As a result, the reservoir is often at a low water level because in most years demand is greater than supply. In the 38 years between 1978 and 2016, New Melones has only reached capacity five times, and only once (in 1983) has it reached the level of the spillway. Between 1987 and 1992 Reclamation was forced to purchase water from other agencies to fulfill New Melones' water obligations.<ref>{{cite web|url=https://undark.org/article/storage-dams-water-groundwater-canada-drought-site-c/|title=The Big Dam Era Is Not Over|author=Lawton, Rebecca|publisher=UnDark|date=2016-07-27|access-date=2017-02-15}}</ref> Even so, the reservoir fell to a record low level of {{convert|83631|acre feet|m3}}, 3.5% of capacity, on October 1, 1992.<ref>{{cite web|url=http://cdec.water.ca.gov/cgi-progs/queryDaily?NML&d=18-Oct-1992+14:44&span=30days|title=New Melones Reservoir (Query for Daily Water Levels between 9/19/1992 and 10/18/1992)|publisher=California Department of Water Resources|work=California Data Exchange Center|access-date=2017-02-15|archive-date=March 12, 2017|archive-url=https://web.archive.org/web/20170312071108/http://cdec.water.ca.gov/cgi-progs/queryDaily?NML&d=18-Oct-1992+14:44&span=30days|url-status=dead}}</ref> Conversely, the great storage capacity also means that New Melones can capture more flood runoff while other major California reservoirs must release it to maintain flood control space.<ref name="Cowan">{{cite news|url=http://www.uniondemocrat.com/csp/mediapool/sites/UnionDemocrat/LocalNews/story.csp?cid=3890606&sid=753&fid=151|title=New Melones Reservoir at 13 percent capacity, but filling|author=Cowan, Jason|work=Union Democrat|date=2016-01-08|access-date=2017-02-15|archive-date=March 12, 2017|archive-url=https://web.archive.org/web/20170312060353/http://www.uniondemocrat.com/csp/mediapool/sites/UnionDemocrat/LocalNews/story.csp?cid=3890606&sid=753&fid=151|url-status=dead}}</ref> |
||
The original contracted water supply from New Melones Dam was {{convert|1067000|acre feet|km3}}, of which {{convert|600000|acre feet|km3}} was allocated to the Oakdale and South San Joaquin Irrigation Districts (who owned the original Melones Dam and have the oldest water rights); {{convert|422000|acre feet|km3}} for Stanislaus River water quality and fishery conservation; and {{convert|45000|acre feet|km3}} for the Stockton East Water District. Originally, Reclamation had planned to extend the water supply to other users, but even from the start, the Melones Project was barely able to meet these existing targets.<ref name="Wyatt">{{cite web|url=http://www.mantecabulletin.com/archives/140121/|title=What if OID and SSJID had built New Melones?|publisher=Manteca Bulletin|author=Wyatt, Dennis|date=2016-12-15|access-date=2017-02-15}}</ref> New Melones releases are important for regional [[groundwater recharge]], a vital water source for farmers when surface water supplies are cut off due to drought,<ref name="Fujii">{{cite news|author=Fujii, Reed|work=Recordnet|url=http://www.recordnet.com/news/20160401/no-new-melones-water-for-stockton|title=No New Melones Water for Stockton|date=2016-01-01|access-date=2017-02-15}}</ref> and to protect water quality in the Stanislaus and San Joaquin Rivers by diluting pollutants during the late summer and fall dry season.<ref>{{cite news|url=http://www.calaverasenterprise.com/news/article_5bc806a6-fd18-11e5-84e8-a7b12fc23a7b.html|author=Nichols, Dana M.|title= |
The original contracted water supply from New Melones Dam was {{convert|1067000|acre feet|km3}}, of which {{convert|600000|acre feet|km3}} was allocated to the Oakdale and South San Joaquin Irrigation Districts (who owned the original Melones Dam and have the oldest water rights); {{convert|422000|acre feet|km3}} for Stanislaus River water quality and fishery conservation; and {{convert|45000|acre feet|km3}} for the Stockton East Water District. Originally, Reclamation had planned to extend the water supply to other users, but even from the start, the Melones Project was barely able to meet these existing targets.<ref name="Wyatt">{{cite web|url=http://www.mantecabulletin.com/archives/140121/|title=What if OID and SSJID had built New Melones?|publisher=Manteca Bulletin|author=Wyatt, Dennis|date=2016-12-15|access-date=2017-02-15|archive-date=March 12, 2017|archive-url=https://web.archive.org/web/20170312062125/http://www.mantecabulletin.com/archives/140121/|url-status=dead}}</ref> New Melones releases are important for regional [[groundwater recharge]], a vital water source for farmers when surface water supplies are cut off due to drought,<ref name="Fujii">{{cite news|author=Fujii, Reed|work=Recordnet|url=http://www.recordnet.com/news/20160401/no-new-melones-water-for-stockton|title=No New Melones Water for Stockton|date=2016-01-01|access-date=2017-02-15}}</ref> and to protect water quality in the Stanislaus and San Joaquin Rivers by diluting pollutants during the late summer and fall dry season.<ref>{{cite news|url=http://www.calaverasenterprise.com/news/article_5bc806a6-fd18-11e5-84e8-a7b12fc23a7b.html|author=Nichols, Dana M.|title=New Melones Reservoir operators ask to reduce environmental releases: Critics say mandated fish releases undermine local economy|work=Calaveras Enterprise|date=2016-01-07|access-date=2017-02-15|archive-date=April 13, 2016|archive-url=https://web.archive.org/web/20160413051857/http://www.calaverasenterprise.com/news/article_5bc806a6-fd18-11e5-84e8-a7b12fc23a7b.html|url-status=dead}}</ref> |
||
===Fishery flows=== |
===Fishery flows=== |
||
Line 134: | Line 139: | ||
[[Image:Pair_of_Chinook_salmon.jpg|thumb|left|A pair of [[Chinook salmon]] in the Stanislaus River]] |
[[Image:Pair_of_Chinook_salmon.jpg|thumb|left|A pair of [[Chinook salmon]] in the Stanislaus River]] |
||
A further constraint is that water released in autumn must be cold enough for anadromous fish to survive, and thus must be made from the lower level outlets at New Melones Dam. However, the old Melones Dam was not demolished during the construction of the new dam (the original dam remains submerged far below the reservoir surface, only rarely re-emerging when the water level is low). The old dam partially blocks the movement of cold water from the deepest parts of the reservoir, causing warmer surface water to be drawn out instead.<ref>{{cite news|url=http://www.calaverasenterprise.com/news/article_04de8ab2-3fb9-11e5-a761-fbf590f192b2.html|title=Will drought reveal old Melones Dam?|author=Nichols, Dana|work=Calaveras Enterprise|date=2015-08-11|access-date=2017-02-21}}</ref> As a result, in certain years the amount of irrigation water has been reduced in order to maintain enough depth in New Melones Lake in the fall to preserve the cold water pool.<ref>{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/drought/docs/tucp/2015/knell_omsediment_04062015.pdf|publisher=California State Water Resources Control Board|title=Oakdale Irrigation District Memorandum: New Melones/Old Melones Analysis|date=2015-04-06|access-date=2017-02-21}}</ref><ref>{{cite book|title=Ecosystem Restoration Program Plan|volume=2|date=Mar 1998|publisher=CALFED Bay-Delta Program|page=400|url=https://books.google.com/books?id=TAAzAQAAMAAJ&pg=PA400}}</ref> |
A further constraint is that water released in autumn must be cold enough for anadromous fish to survive, and thus must be made from the lower level outlets at New Melones Dam. However, the old Melones Dam was not demolished during the construction of the new dam (the original dam remains submerged far below the reservoir surface, only rarely re-emerging when the water level is low). The old dam partially blocks the movement of cold water from the deepest parts of the reservoir, causing warmer surface water to be drawn out instead.<ref>{{cite news|url=http://www.calaverasenterprise.com/news/article_04de8ab2-3fb9-11e5-a761-fbf590f192b2.html|title=Will drought reveal old Melones Dam?|author=Nichols, Dana|work=Calaveras Enterprise|date=2015-08-11|access-date=2017-02-21|archive-date=March 6, 2017|archive-url=https://web.archive.org/web/20170306041633/http://www.calaverasenterprise.com/news/article_04de8ab2-3fb9-11e5-a761-fbf590f192b2.html|url-status=dead}}</ref> As a result, in certain years the amount of irrigation water has been reduced in order to maintain enough depth in New Melones Lake in the fall to preserve the cold water pool.<ref>{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/drought/docs/tucp/2015/knell_omsediment_04062015.pdf|publisher=California State Water Resources Control Board|title=Oakdale Irrigation District Memorandum: New Melones/Old Melones Analysis|date=2015-04-06|access-date=2017-02-21}}</ref><ref>{{cite book|title=Ecosystem Restoration Program Plan|volume=2|date=Mar 1998|publisher=CALFED Bay-Delta Program|page=400|url=https://books.google.com/books?id=TAAzAQAAMAAJ&pg=PA400}}</ref> |
||
A 2016 study by independent environmental consulting group FishBio showed that the artificial spring pulse flows from New Melones Dam do fairly little to support salmon and steelhead out-migration in the Stanislaus River. Rather, the fish take their cues from increased water flow due to rainfall, as they naturally would have before the many dams on the Stanislaus River were built.<ref name="Dunbar">{{cite news|url=http://www.modbee.com/opinion/opn-columns-blogs/mike-dunbar/article96747287.html|title=After releasing water for steelhead, not enough left for trout|author=Dunbar, Mike|date=2016-08-20|work=Modesto Bee|access-date=2017-03-06}}</ref> In the spring of 2016 about 12,500 juvenile salmon migrated downriver to the sea during April and May, but less than 1 percent migrated during the pulse flow. In years of drought when the lake level is low, releasing water during the spring creates consequences later in the year – because there is not enough cold water left for the autumn spawning run.<ref name="Dunbar"/> |
A 2016 study by independent environmental consulting group FishBio showed that the artificial spring pulse flows from New Melones Dam do fairly little to support salmon and steelhead out-migration in the Stanislaus River. Rather, the fish take their cues from increased water flow due to rainfall, as they naturally would have before the many dams on the Stanislaus River were built.<ref name="Dunbar">{{cite news|url=http://www.modbee.com/opinion/opn-columns-blogs/mike-dunbar/article96747287.html|title=After releasing water for steelhead, not enough left for trout|author=Dunbar, Mike|date=2016-08-20|work=Modesto Bee|access-date=2017-03-06}}</ref> In the spring of 2016 about 12,500 juvenile salmon migrated downriver to the sea during April and May, but less than 1 percent migrated during the pulse flow. In years of drought when the lake level is low, releasing water during the spring creates consequences later in the year – because there is not enough cold water left for the autumn spawning run.<ref name="Dunbar"/> |
||
The state of California has further proposed that between 20 and 60 percent of the unimpaired, or natural flow of the Stanislaus River be allowed to run downstream during the spring to support ailing fish populations.<ref>{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/bay_delta_plan/water_quality_control_planning/2016_sed/docs/ch_01_intro.pdf|title=Introduction|work=Draft Revised Substitute Environmental Document in Support of Potential Changes to the Water Quality Control Plan for the Bay-Delta: San Joaquin River flows and Southern Delta water quality|date=Sep 2016|publisher=California State Water Resources Control Board|access-date=2017-03-06}}</ref> In addition, the minimum level of New Melones Lake would be set at {{convert|700000|acre feet|km3}} (29 percent capacity) at all times in order to preserve the cold water pool. This would essentially limit the usable storage in the reservoir to the {{convert|1250000|acre feet|km3}} between the cold water pool and the flood-control pool, further handicapping the ability of the reservoir to manage water.<ref name="deal"/> This plan has been met with outcry from local cities and irrigation districts, which contend that it would heavily damage the farming economy and cause thousands of seasonal jobs to disappear.<ref name="deal">{{cite news|url=http://www.mantecabulletin.com/section/38/article/140890|title=Is better river deal possible? Brown wants to see if there is better plan for fish, farms & cities|author=Wyatt, Dennis|work=Manteca Bulletin|date=2017-01-16|access-date=2017-03-06|archive-url=https://web.archive.org/web/20170307020034/http://www.mantecabulletin.com/section/38/article/140890/|archive-date=2017-03-07}}</ref> Furthermore, it does not address other major problems including introduced [[striped bass]] in the San Joaquin River, which eat many if not most of the juvenile salmon and steelhead before they even reach the sea.<ref>{{cite news|url=http://www.modbee.com/opinion/opn-columns-blogs/mike-dunbar/article56177060.html|title=Soon, state will explain why it wants our water|work=Modesto Bee|author=Dunbar, Mike|date=2016-01-22|access-date=2017-03-06}}</ref><ref>{{cite news|url=http://www.mantecabulletin.com/archives/15401/|title=A plan to kill the Stanislaus River: Move would destroy fishing, cause severe SSJID water shortages|author=Wyatt, Dennis|work=Manteca Bulletin|date=2010-06-20|access-date=2017-03-06}}</ref><ref>{{cite news|title=Debate swirls over striped bass role in rivers' salmon population|author=Holland, John|work=Modesto Bee|date=2016-04-09|access-date=2017-03-06|url=http://www.modbee.com/news/article70975652.html}}</ref> |
The state of California has further proposed that between 20 and 60 percent of the unimpaired, or natural flow of the Stanislaus River be allowed to run downstream during the spring to support ailing fish populations.<ref>{{cite web|url=http://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/bay_delta_plan/water_quality_control_planning/2016_sed/docs/ch_01_intro.pdf|title=Introduction|work=Draft Revised Substitute Environmental Document in Support of Potential Changes to the Water Quality Control Plan for the Bay-Delta: San Joaquin River flows and Southern Delta water quality|date=Sep 2016|publisher=California State Water Resources Control Board|access-date=2017-03-06}}</ref> In addition, the minimum level of New Melones Lake would be set at {{convert|700000|acre feet|km3}} (29 percent capacity) at all times in order to preserve the cold water pool. This would essentially limit the usable storage in the reservoir to the {{convert|1250000|acre feet|km3}} between the cold water pool and the flood-control pool, further handicapping the ability of the reservoir to manage water.<ref name="deal"/> This plan has been met with outcry from local cities and irrigation districts, which contend that it would heavily damage the farming economy and cause thousands of seasonal jobs to disappear.<ref name="deal">{{cite news|url=http://www.mantecabulletin.com/section/38/article/140890|title=Is better river deal possible? Brown wants to see if there is better plan for fish, farms & cities|author=Wyatt, Dennis|work=Manteca Bulletin|date=2017-01-16|access-date=2017-03-06|archive-url=https://web.archive.org/web/20170307020034/http://www.mantecabulletin.com/section/38/article/140890/|archive-date=2017-03-07}}</ref> Furthermore, it does not address other major problems including introduced [[striped bass]] in the San Joaquin River, which eat many if not most of the juvenile salmon and steelhead before they even reach the sea.<ref>{{cite news|url=http://www.modbee.com/opinion/opn-columns-blogs/mike-dunbar/article56177060.html|title=Soon, state will explain why it wants our water|work=Modesto Bee|author=Dunbar, Mike|date=2016-01-22|access-date=2017-03-06}}</ref><ref>{{cite news|url=http://www.mantecabulletin.com/archives/15401/|title=A plan to kill the Stanislaus River: Move would destroy fishing, cause severe SSJID water shortages|author=Wyatt, Dennis|work=Manteca Bulletin|date=2010-06-20|access-date=2017-03-06|archive-date=March 12, 2017|archive-url=https://web.archive.org/web/20170312061503/http://www.mantecabulletin.com/archives/15401/|url-status=dead}}</ref><ref>{{cite news|title=Debate swirls over striped bass role in rivers' salmon population|author=Holland, John|work=Modesto Bee|date=2016-04-09|access-date=2017-03-06|url=http://www.modbee.com/news/article70975652.html}}</ref> |
||
===Conflict and compromise=== |
===Conflict and compromise=== |
||
In 2015, Congressman [[Tom McClintock]] introduced HR 1668, the "Save Our Water Act", which "amends the Endangered Species Act of 1973 (ESA) to suspend during droughts the application of the ESA to water releases from water storage facilities by federal and state agencies in a navigable river basin."<ref name="HR1668">{{cite web|url=https://www.congress.gov/bill/114th-congress/house-bill/1668|title=H.R.1668 - Save Our Water Act|publisher=United States Congress|date=2015-04-22|access-date=2017-02-21}}</ref> McClintock specifically cited the release of {{convert|30000|acre feet|m3}} from New Melones Lake over several weeks in spring 2015, when New Melones Lake was approaching its lowest level on record since the 1992 drought. That year, very few fish had returned to the Stanislaus to spawn; in an editorial for ''MyMotherLode'', Mark Truppner wrote: "Biologists estimate that it will affect the offspring of about 29 steelhead trout in the Stanislaus River – a few hundred [[Juvenile fish|smolt]]s [sic] almost all of which will be eaten by predators long before they reach the ocean. And that assumes they won't swim toward the ocean on their own – as they have been doing without our helpful assistance since time immemorial."<ref>{{cite news|title=McClintock: Billions Of Gallons Being Released From Melones|author=Truppner, Mark|work=MyMotherLode|date=2015-04-23|url=http://www.mymotherlode.com/news/local/238566/mcclintock-10-billion-gallons-water-released-melones.html}}</ref> However the bill did not pass.<ref name="HR1668"/> |
In 2015, Congressman [[Tom McClintock]] introduced HR 1668, the "Save Our Water Act", which "amends the Endangered Species Act of 1973 (ESA) to suspend during droughts the application of the ESA to water releases from water storage facilities by federal and state agencies in a navigable river basin."<ref name="HR1668">{{cite web|url=https://www.congress.gov/bill/114th-congress/house-bill/1668|title=H.R.1668 - Save Our Water Act|publisher=United States Congress|date=2015-04-22|access-date=2017-02-21}}</ref> McClintock specifically cited the release of {{convert|30000|acre feet|m3}} from New Melones Lake over several weeks in spring 2015, when New Melones Lake was approaching its lowest level on record since the 1992 drought. That year, very few fish had returned to the Stanislaus to spawn; in an editorial for ''MyMotherLode'', Mark Truppner wrote: "Biologists estimate that it will affect the offspring of about 29 steelhead trout in the Stanislaus River – a few hundred [[Juvenile fish|smolt]]s [sic] almost all of which will be eaten by predators long before they reach the ocean. And that assumes they won't swim toward the ocean on their own – as they have been doing without our helpful assistance since time immemorial."<ref>{{cite news|title=McClintock: Billions Of Gallons Being Released From Melones|author=Truppner, Mark|work=MyMotherLode|date=2015-04-23|url=http://www.mymotherlode.com/news/local/238566/mcclintock-10-billion-gallons-water-released-melones.html}}</ref> However the bill did not pass.<ref name="HR1668"/> |
||
One potential solution has been outlined in a 2016 agreement between the Bureau of Reclamation, the local water districts and a number of other state and federal agencies. The local water districts would provide {{convert|75000|acre feet|m3}} of water for fishery flows during the spring; this water would be sold to the San Luis & Delta-Mendota Water Authority. Instead of draining into the ocean, it would be captured by the large Central Valley Project and [[California State Water Project|State Water Project]] pumping stations in the Delta for eventual re-use on Authority lands.<ref>{{cite web|url=http://www.acwa.com/news/water-supply-challenges/multi-agency-new-melones-plan-benefits-farmers-fish|title=Multi-Agency New Melones Plan Benefits Farmers, Fish|author=Martineau, Pamela|publisher=Association of California Water Agencies|date=2016-04-14|access-date=2017-02-15|url-status=dead|archive-url=https://web.archive.org/web/20170312055115/http://www.acwa.com/news/water-supply-challenges/multi-agency-new-melones-plan-benefits-farmers-fish|archive-date=2017-03-12}}</ref> Previously, Reclamation had been taking the Stanislaus irrigation districts' water without paying for it. Essentially, the agreement allows for the water to be re-used for agriculture while still maintaining fishery flows in the Stanislaus River.<ref>{{cite news|title=Deal avoids water war: Farms, fish & cities taken care of for year|work=Manteca Bulletin|date=2016-06-14|author=Wyatt, Dennis}}</ref> |
One potential solution has been outlined in a 2016 agreement between the Bureau of Reclamation, the local water districts and a number of other state and federal agencies. The local water districts would provide {{convert|75000|acre feet|m3}} of water for fishery flows during the spring; this water would be sold to the San Luis & Delta-Mendota Water Authority. Instead of draining into the ocean, it would be captured by the large Central Valley Project and [[California State Water Project|State Water Project]] pumping stations in the Delta for eventual re-use on Authority lands.<ref>{{cite web|url=http://www.acwa.com/news/water-supply-challenges/multi-agency-new-melones-plan-benefits-farmers-fish|title=Multi-Agency New Melones Plan Benefits Farmers, Fish|author=Martineau, Pamela|publisher=Association of California Water Agencies|date=2016-04-14|access-date=2017-02-15|url-status=dead|archive-url=https://web.archive.org/web/20170312055115/http://www.acwa.com/news/water-supply-challenges/multi-agency-new-melones-plan-benefits-farmers-fish|archive-date=2017-03-12}}</ref> Previously, Reclamation had been taking the Stanislaus irrigation districts' water without paying for it. Essentially, the agreement allows for the water to be re-used for agriculture while still maintaining fishery flows in the Stanislaus River.<ref>{{cite news|title=Deal avoids water war: Farms, fish & cities taken care of for year|work=Manteca Bulletin|date=2016-06-14|author=Wyatt, Dennis}}</ref><blockquote> |
||
==Legacy== |
==Legacy== |
||
The controversy over New Melones Dam was one of the most heated environmental disputes in the U.S. at the time.<ref name="Larson"/> The dam was constructed at a time of growing public support for environmental preservation, as compared to development or [[Conservation in the United States#Early American conservation movement|utilitarian conservation]] of natural resources.<ref name="Larson"/> Friends of the River describes the campaign against the dam as "probably the biggest citizen effort to save a river and stop a dam in American history."<ref name="FOR">{{cite web|url=http://www.friendsoftheriver.org/site/PageServer?pagename=SpiritoftheStan|title=The Campaign to Save the Stanislaus River – 1969 to 1982 and its Historic Importance|publisher=Friends of the River |
</blockquote>The controversy over New Melones Dam was one of the most heated environmental disputes in the U.S. at the time.<ref name="Larson"/> The dam was constructed at a time of growing public support for environmental preservation, as compared to development or [[Conservation in the United States#Early American conservation movement|utilitarian conservation]] of natural resources.<ref name="Larson"/> Friends of the River describes the campaign against the dam as "probably the biggest citizen effort to save a river and stop a dam in American history."<ref name="FOR">{{cite web|url=http://www.friendsoftheriver.org/site/PageServer?pagename=SpiritoftheStan|title=The Campaign to Save the Stanislaus River – 1969 to 1982 and its Historic Importance|publisher=Friends of the River |
||
|author=Gaguine, Alexander|access-date=2017-02-16|archive-url=https://web.archive.org/web/20120304182404/http://www.friendsoftheriver.org/site/PageServer?pagename=SpiritoftheStan|archive-date=2012-03-04}}</ref> The Bureau of Reclamation itself has called New Melones "a case study of all that can go wrong with a project."<ref name="history">{{cite web |archive-url=https://web.archive.org/web/20140324032321/http://www.usbr.gov/projects/Project.jsp?proj_Name=New%20Melones%20Unit%20Project&pageType=ProjectHistoryPage|archive-date=2014-03-24|url=http://www.usbr.gov/projects/Project.jsp?proj_Name=New%20Melones%20Unit%20Project&pageType=ProjectHistoryPage |title=Project History |publisher=U.S. Bureau of Reclamation |work=New Melones Unit Project |date=2009-04-07 |access-date=2012-04-20}}</ref> Although opponents of the dam were ultimately unsuccessful, the campaign greatly strengthened the political power of the river conservation movement in California and the rest of the United States; in California, a number of later dam projects were defeated by citizen opposition,<ref name="Dunning">{{cite web|url=http://scholar.law.colorado.edu/cgi/viewcontent.cgi?article=1019&context=innovation-in-western-water-law-and-management|title=Dam Fights and Water Policy in California: 1969-1989|publisher=University of Colorado Law School|author=Dunning, Harrison C.|date=1991-06-07|access-date=2017-02-21}}</ref><ref>{{cite web|url=http://www.friendsoftheriver.org/our-work/past-work/|title=40+ Years of Friends Saving Rivers|publisher=Friends of the River|access-date=2017-02-21}}</ref> including a hydroelectric project on the nearby [[Tuolumne River]] which was canceled less than two years after New Melones Dam was completed.{{sfn|Palmer|2004|p=43}} |
|author=Gaguine, Alexander|access-date=2017-02-16|archive-url=https://web.archive.org/web/20120304182404/http://www.friendsoftheriver.org/site/PageServer?pagename=SpiritoftheStan|archive-date=2012-03-04}}</ref> The Bureau of Reclamation itself has called New Melones "a case study of all that can go wrong with a project."<ref name="history">{{cite web |archive-url=https://web.archive.org/web/20140324032321/http://www.usbr.gov/projects/Project.jsp?proj_Name=New%20Melones%20Unit%20Project&pageType=ProjectHistoryPage|archive-date=2014-03-24|url=http://www.usbr.gov/projects/Project.jsp?proj_Name=New%20Melones%20Unit%20Project&pageType=ProjectHistoryPage |title=Project History |publisher=U.S. Bureau of Reclamation |work=New Melones Unit Project |date=2009-04-07 |access-date=2012-04-20}}</ref> Although opponents of the dam were ultimately unsuccessful, the campaign greatly strengthened the political power of the river conservation movement in California and the rest of the United States; in California, a number of later dam projects were defeated by citizen opposition,<ref name="Dunning">{{cite web|url=http://scholar.law.colorado.edu/cgi/viewcontent.cgi?article=1019&context=innovation-in-western-water-law-and-management|title=Dam Fights and Water Policy in California: 1969-1989|publisher=University of Colorado Law School|author=Dunning, Harrison C.|date=1991-06-07|access-date=2017-02-21}}</ref><ref>{{cite web|url=http://www.friendsoftheriver.org/our-work/past-work/|title=40+ Years of Friends Saving Rivers|publisher=Friends of the River|access-date=2017-02-21}}</ref> including a hydroelectric project on the nearby [[Tuolumne River]] which was canceled less than two years after New Melones Dam was completed.{{sfn|Palmer|2004|p=43}} |
||
Line 152: | Line 156: | ||
In ''Dam Politics: Restoring America's Rivers'', William R. Lowry writes: |
In ''Dam Politics: Restoring America's Rivers'', William R. Lowry writes: |
||
{{ |
{{blockquote|The New Melones Dam was one of the last of its kind. Although proclamations that dam building no longer occurs in the United States are not completely true, it is true that no structure as large or as significant has since been built on an American river. And since this date, virtually no structural modification to a river in this country has gone unopposed.{{sfn|Lowry|2003|p=41}}}} |
||
The New Melones debate influenced the eventual protection of a number of other northern California rivers (the [[Eel River (California)|Eel]], [[Klamath River|Klamath]] and others) under the [[National Wild and Scenic Rivers System]] starting in 1980.{{sfn|Palmer|1993|p=37}}{{sfn|Mooney|Zavaleta|2016|p=41}} It considerably changed the California state government's approach to water resources development, switching focus from massive dam projects to conservation and policy improvements. In 1982, the same year that New Melones Lake filled, the Reclamation Reform Act set more stringent standards for vetting federal Reclamation projects, essentially "distancing federal policy from the 'dams-everywhere' approach of the past."{{sfn|Palmer|2004|p=42-43}} However, the relative lack of new storage has severely strained California's water system, which now serves 15 million more people than it did when New Melones Dam was completed in 1979.<ref>{{cite web|url=https://www.usbr.gov/mp/ccao/newmelones/planning-visit/visitor.html|title=The New Melones Lake Visitor Center and Museum|publisher=U.S. Bureau of Reclamation|date=2016-02-05|access-date=2017-02-21}}</ref><ref>{{cite news|author=Rogers, Paul|title=California drought: Why doesn't California build big dams any more?|work=Mercury News|date=2014-08-31|url=http://www.mercurynews.com/2014/08/31/california-drought-why-doesnt-california-build-big-dams-any-more/}}</ref> |
The New Melones debate influenced the eventual protection of a number of other northern California rivers (the [[Eel River (California)|Eel]], [[Klamath River|Klamath]] and others) under the [[National Wild and Scenic Rivers System]] starting in 1980.{{sfn|Palmer|1993|p=37}}{{sfn|Mooney|Zavaleta|2016|p=41}} It considerably changed the California state government's approach to water resources development, switching focus from massive dam projects to conservation and policy improvements. In 1982, the same year that New Melones Lake filled, the Reclamation Reform Act set more stringent standards for vetting federal Reclamation projects, essentially "distancing federal policy from the 'dams-everywhere' approach of the past."{{sfn|Palmer|2004|p=42-43}} However, the relative lack of new storage has severely strained California's water system, which now serves 15 million more people than it did when New Melones Dam was completed in 1979.<ref>{{cite web|url=https://www.usbr.gov/mp/ccao/newmelones/planning-visit/visitor.html|title=The New Melones Lake Visitor Center and Museum|publisher=U.S. Bureau of Reclamation|date=2016-02-05|access-date=2017-02-21}}</ref><ref>{{cite news|author=Rogers, Paul|title=California drought: Why doesn't California build big dams any more?|work=Mercury News|date=2014-08-31|url=http://www.mercurynews.com/2014/08/31/california-drought-why-doesnt-california-build-big-dams-any-more/}}</ref> |
||
<!--include or not? |
<!--include or not? |
||
In 1992 Congress passed the [[Central Valley Project Improvement Act]], which dedicated {{convert|800000|acre|ha}} of CVP waters to fish and wildlife conservation. During the drought in 1992 New Melones Lake was at a very low level; Friends of the River lobbied Congress to reinstate the original limit for lake level at the Parrott's Ferry Bridge. Larger releases would be made from New Melones Dam during spring flooding, helping to flush out salinity and pollutants in the river system and the Bay-Delta region. The loss of irrigation water would be mitigated with new conservation measures. Keeping the lake at a lower level would allow the restoration of {{convert|9|mi|km}} of the Stanislaus River Canyon, once one of the most popular whitewater runs in the state, although the limited release capacity of the dam would still result in occasional flooding above Parrott's Ferry.{{sfn|Palmer|2004|p=59}}--> |
In 1992 Congress passed the [[Central Valley Project Improvement Act]], which dedicated {{convert|800000|acre|ha}} of CVP waters to fish and wildlife conservation. During the drought in 1992 New Melones Lake was at a very low level; Friends of the River lobbied Congress to reinstate the original limit for lake level at the Parrott's Ferry Bridge. Larger releases would be made from New Melones Dam during spring flooding, helping to flush out salinity and pollutants in the river system and the Bay-Delta region. The loss of irrigation water would be mitigated with new conservation measures. Keeping the lake at a lower level would allow the restoration of {{convert|9|mi|km}} of the Stanislaus River Canyon, once one of the most popular whitewater runs in the state, although the limited release capacity of the dam would still result in occasional flooding above Parrott's Ferry.{{sfn|Palmer|2004|p=59}}-->In a history of the dam written in 1994 as part of the Bureau of Reclamation History Program, Joe Simonds came to this conclusion:<blockquote>The New Melones Dam stands as a reminder of the conflicts surrounding growth, the environment, and water in the West. The Corps built it at the end of the era of large dam construction. Even without the environmental controversy that surrounds the project, the operational and water yield problems will certainly cause continued difficulties well into the future. With the enormity of the problems facing New Melones, it seems unlikely that the project will ever realize its full potential as a multi use unit. Indeed, new Melones may become a case study of all that can go wrong with a project.<ref>Simonds, Wm. Joe. [https://www.waterboards.ca.gov/waterrights/water_issues/programs/bay_delta/california_waterfix/exhibits/docs/RestoretheDelta/RTD_110.pdf ''The New Melones Unit Project,''] 1994.</ref></blockquote> |
||
==See also== |
==See also== |
||
Line 178: | Line 182: | ||
*{{cite book|last=Hundley|first=Norris|title=The Great Thirst: Californians and Water—A History|publisher=University of California Press|year=2001|isbn=0-52092-529-7|url=https://books.google.com/books?id=7CDVZL_AOBUC}} |
*{{cite book|last=Hundley|first=Norris|title=The Great Thirst: Californians and Water—A History|publisher=University of California Press|year=2001|isbn=0-52092-529-7|url=https://books.google.com/books?id=7CDVZL_AOBUC}} |
||
*{{cite book|last=Lowry|first=William Robert|title=Dam Politics: Restoring America's Rivers|publisher=Georgetown University Press|year=2003|isbn=0-87840-390-6}} |
*{{cite book|last=Lowry|first=William Robert|title=Dam Politics: Restoring America's Rivers|publisher=Georgetown University Press|year=2003|isbn=0-87840-390-6}} |
||
*{{cite book|last1=Mooney|first1=Harold|last2=Zavaleta|first2=Erika|title=Ecosystems of California|publisher=University of California Press|year=2016|url=https://books.google.com/books?id=HkT_CgAAQBAJ&pg=PA734}} |
*{{cite book|last1=Mooney|first1=Harold|last2=Zavaleta|first2=Erika|title=Ecosystems of California|publisher=University of California Press|year=2016|isbn=9780520962170 |url=https://books.google.com/books?id=HkT_CgAAQBAJ&pg=PA734}} |
||
*{{cite book|last=Palmer|first=Tim|title=Stanislaus: The Struggle for a River|publisher=University of California Press|year=1984|isbn=0-52005-225-0}} |
*{{cite book|last=Palmer|first=Tim|title=Stanislaus: The Struggle for a River|publisher=University of California Press|year=1984|isbn=0-52005-225-0}} |
||
*{{cite book|last=Palmer|first=Tim|title=Wild and Scenic Rivers of America|publisher=Island Press|year=1993|isbn=1-55963-145-7|url=https://archive.org/details/wildscenicrivers00palm|url-access=registration|page=[https://archive.org/details/wildscenicrivers00palm/page/37 37]}} |
*{{cite book|last=Palmer|first=Tim|title=Wild and Scenic Rivers of America|publisher=Island Press|year=1993|isbn=1-55963-145-7|url=https://archive.org/details/wildscenicrivers00palm|url-access=registration|page=[https://archive.org/details/wildscenicrivers00palm/page/37 37]}} |
||
Line 184: | Line 188: | ||
==External links== |
==External links== |
||
{{ |
{{Commons category|New Melones Dam}} |
||
*[http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam New Melones Dam] |
*[http://www.usbr.gov/projects/Facility.jsp?fac_Name=New+Melones+Dam New Melones Dam] |
||
*[http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New+Melones+Powerplant New Melones Power Plant] |
*[http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New+Melones+Powerplant New Melones Power Plant] {{Webarchive|url=https://web.archive.org/web/20110614222012/http://www.usbr.gov/projects/Powerplant.jsp?fac_Name=New+Melones+Powerplant |date=June 14, 2011 }} |
||
*[https://web.archive.org/web/20110716003604/http://kimra.sankmcafee.com/NMDpa.pdf Post-Audit of New Melones Dam, by Kimra Dawn McAfee (Master's Thesis, May 2000)] |
*[https://web.archive.org/web/20110716003604/http://kimra.sankmcafee.com/NMDpa.pdf Post-Audit of New Melones Dam, by Kimra Dawn McAfee (Master's Thesis, May 2000)] |
||
*[http://repository.uchastings.edu/ca_ballot_props/803/ Proposition 17] |
*[http://repository.uchastings.edu/ca_ballot_props/803/ Proposition 17] |
||
Line 201: | Line 205: | ||
[[Category:Energy infrastructure completed in 1979]] |
[[Category:Energy infrastructure completed in 1979]] |
||
[[Category:1979 establishments in California]] |
[[Category:1979 establishments in California]] |
||
[[Category:1979 controversies in the United States]] |
|||
[[Category:1979 protests]] |
|||
[[Category:Buildings and structures in Calaveras County, California]] |
[[Category:Buildings and structures in Calaveras County, California]] |
||
[[Category:Dams in California]] |
[[Category:Dams in California]] |
Latest revision as of 03:43, 27 August 2024
New Melones Dam | |
---|---|
Country | United States |
Location | Near Jamestown, California |
Coordinates | 37°56′50″N 120°31′41″W / 37.94722°N 120.52806°W |
Construction began | 1966 |
Opening date | 1979 |
Owner(s) | U.S. Bureau of Reclamation |
Dam and spillways | |
Type of dam | Earth and rock embankment |
Impounds | Stanislaus River |
Height | 625 ft (191 m)[1] |
Length | 1,560 ft (480 m)[1] |
Spillway type | Ungated overflow |
Spillway capacity | 112,600 cu ft/s (3,190 m3/s)[2] |
Reservoir | |
Creates | New Melones Lake |
Total capacity | 2,400,000 acre-feet (3,000,000 ML)[3] |
Catchment area | 904 sq mi (2,340 km2)[2] |
Surface area | 12,500 acres (5,100 ha)[3] |
Normal elevation | 1,088 ft (332 m)[2] |
Power Station | |
Commission date | 1979[4] |
Hydraulic head | 480 ft (150 m)[4] |
Turbines | 2 × 150 MW Francis[4] |
Installed capacity | 300 MW[4] |
Annual generation | 417,880,000 KWh (2001-2015)[5] |
New Melones Dam is an earth and rock filled embankment dam on the Stanislaus River, about 5 miles (8.0 km) west of Jamestown, California, United States, on the border of Calaveras County and Tuolumne County. The water impounded by the 625-foot-tall (191 m) dam forms New Melones Lake, California's fourth-largest reservoir,[6] in the foothills of the Sierra Nevada east of the San Joaquin Valley. The dam serves mainly for irrigation water supply, and also provides hydropower generation, flood control, and recreation benefits.
The dam was authorized in 1944 as a unit of the federal Central Valley Project, a system designed to provide irrigation water to the fertile agricultural region of the Central Valley. It would be built by the U.S. Army Corps of Engineers (Corps), and transferred to the U.S. Bureau of Reclamation (Reclamation) upon completion. In 1966, work began to clear the foundations for a high dam that would replace an earlier, much smaller structure built by two irrigation districts. Construction of the main embankment began in 1976, and was topped out in late 1978. The filling of New Melones Lake began in 1978, and the dam's hydroelectric station produced its first power in mid-1979.
New Melones was the focus of a long environmental battle during the 1970s and early 1980s;[7] critics protested the flooding of a long scenic stretch of the Stanislaus River, which flowed over whitewater rapids through the deepest limestone canyon in the western United States. The protestors employed a variety of methods, some extreme, to prevent the filling of New Melones Lake until 1983, when record-setting floods filled the reservoir and nearly breached the dam's emergency spillway. The fight over New Melones galvanized the river conservation movement in California and influenced major water policy changes on the state and federal levels; since its completion, no other dams of its size or importance have been built in the United States.[8]
The New Melones project has continued to generate controversy, due to the water yield from the project being lower than expected, and the use of New Melones water to meet federal environmental standards at the expense of farming. The reservoir is considered "over-allocated"; in an average year, it is unable to meet all the demands placed on it. The debate over water rights continues today, with environmentalists seeking to further increase fishery flows, and the Stanislaus irrigation districts asserting their senior rights to the river.
Specifications
[edit]New Melones Dam and its reservoir comprise the independent New Melones Unit of the Central Valley Project. The dam's primary purpose is to control the runoff from 904 square miles (2,340 km2),[2] or about 92 percent, of the watershed of the Stanislaus River, a major tributary of the San Joaquin River.[9] At 625 feet (191 m) high from the foundations and 1,560 feet (480 m) long, and containing 15,700,000 cu yd (12,000,000 m3) of material, New Melones is the second tallest earthfill dam in the United States, after Oroville Dam, and the sixth tallest dam overall.[9] With a crest elevation of 1,135 feet (346 m), the dam rises for 541 feet (165 m) above the streambed.[1] Flood waters are released through an unlined spillway about a mile (1.6 km) northwest of the dam, with a capacity of 112,600 cubic feet per second (3,190 m3/s).[2] The dam also has an outlet works which can release up to 8,300 cubic feet per second (240 m3/s).[2]
The impounded water behind the dam forms New Melones Lake, which at full pool of 1,088 ft (332 m) above sea level encompasses 12,500 acres (5,100 ha) of surface water[3] and a volume of 2,400,000 acre-feet (3.0 km3).[9] About 450,000 acre-feet (0.56 km3), 19 percent of the reservoir's capacity, is reserved for flood control.[10] During flooding events, the dam is operated to keep flows on the Stanislaus River below 8,000 cu ft/s (230 m3/s), although this figure may be lowered depending on flow conditions in the San Joaquin River.[10] Between 1978 and 2010 the dam prevented a total of $505 million in flooding damages (adjusted for inflation), including $231 million during the New Year's flood of 1997 alone.[11] However, the Manteca Bulletin noted that the dam was operated carelessly during the 1997 flood – almost 45,000 acres (18,000 ha) of farmland was flooded near the confluence of the Stanislaus and San Joaquin Rivers[12] – and a further $80 million of damage could have been prevented had the reservoir been kept at a safe level.[13]
The dam's hydroelectric power plant is located at its base on the north side of the river, and has a rated hydraulic head of 480 ft (150 m).[4] The plant houses two 150.0 MW Francis turbines for a total capacity of 300 MW. Daily releases are made on a peaking basis; seasonal totals are dictated by irrigation (in summer) and flood control (in winter) requirements below the dam.[4][9] The release from New Melones is re-regulated by the smaller downstream reservoir of Tulloch Dam, ensuring a stable flow in the Stanislaus River.[14] For the period 2001 to 2015, the plant produced an average of 418 million kilowatt hours (KWh) annually.[5] This ranged from a high of 910 million KWh in fiscal year 2006, to a low of 130 million KWh in 2015.[5] The plant replaced the old 22 MW power station at the original Melones Dam; on average it generates about four times as much electricity as the original did.[15]
By controlling the flows of the Stanislaus River, the dam and reservoir make available 200,000 to 280,000 acre⋅ft (250,000 to 350,000 dam3) of additional water each year.[16] About 213,000 acres (86,000 ha) of land along the Stanislaus River are irrigated using water from New Melones.[14][17] According to the Bureau of Reclamation, the increase in water supply from New Melones Dam has "translated into prosperity for the region, allowing the growth of cities including Tracy and Manteca, and irrigating high-value crops including almonds, walnuts and grapes."[18] In addition, New Melones Lake is one of the major tourist draws of the region, providing activities such as boating, fishing and shoreline camping. An estimated 800,000 people visit the lake each year;[19] however, droughts can cause the closure of lake facilities due to low water levels.[20]
History
[edit]Background
[edit]The modern development of the Stanislaus River began with the Oakdale and South San Joaquin Irrigation Districts, which were created in 1909 under the Wright Act to serve farmers in the area. Early irrigation along the Stanislaus River was dependent on the natural flow of the river, which was never enough to water crops during the late summer and fall.[21] In 1926 the two irrigation districts jointly completed the original Melones Dam, a 211-foot (64 m) high concrete arch dam with a storage capacity of 112,500 acre-feet (138,800,000 m3).[22] This reservoir was still not big enough for all the demands placed on it, especially during the long droughts of the 1930s.[21][23]
The storage capacity of these early reservoirs was limited and the irrigation districts sought to increase the size of the Melones Reservoir. The federal Flood Control Act of 1944 authorized the U.S. Army Corps of Engineers to build a 355-foot (108 m) arch dam with a capacity of 450,000 acre⋅ft (560,000 dam3).[24] As a primary flood control structure, it would protect 35,000 acres (14,000 ha) of farmland as well as the towns of Oakdale, Riverbank and Ripon from flooding. It would generate electricity using the original 22 megawatt Melones hydroelectric plant.[9] However, the cost-benefit analysis conducted for the project, then known as "New Melones I", did not justify the construction of the dam for flood control alone. If other benefits such as irrigation, fishery conservation and recreation were included, the cost-benefit ratio became positive.[24] The Corps downplayed these additional benefits, intending to keep it primarily as a flood-control structure, because an irrigation project would then fall under the authority of the U.S. Bureau of Reclamation.[24]
During the 1950s the irrigation districts built two more dams, Donnells and Beardsley, along the upper Stanislaus River, forming (along with Tulloch Dam below Melones Dam) the Tri-Dam Project.[21][23] The Corps objected to the Tri-Dam Project because the additional storage provided by these smaller dams further decreased the potential flood control benefit of New Melones.[25] With the Corps unable to provide a sound economic justification, New Melones I was ultimately shelved in 1954.[24] Meanwhile, the Oakdale and South San Joaquin irrigation districts had conducted their own study in the late 1940s and proposed a bigger dam, 460 feet (140 m) tall with a capacity of 1.1 million acre feet (1.4 km3), or approximately one year's worth of Stanislaus River runoff.[13][26]
The Bureau of Reclamation first surveyed the Melones dam site in the 1950s, and initially supported the proposed 1.1 million acre foot reservoir[27] but soon increased the size of the project (to be known as "New Melones II") twofold, as part of the Central Valley Project.[26] The Bureau cited numerous benefits to a larger reservoir, which it estimated would capture 335,000 acre-feet (0.413 km3)[n 1] of extra water per year to increase irrigation, supply other units of the Central Valley Project, and maintain a minimum flow in the Stanislaus River to protect fish (before New Melones was built, diversions often dried the river completely in summer). This water would be provided above and beyond fulfilling previously existing water rights to the irrigation districts.[28]
Although the 1944 version of the project had been abandoned, the Bureau and the Corps continued to argue over who would construct the dam.[24] The Flood Control Act of 1962 authorized the final design of the dam – changing it from an arch to an embankment dam, increasing the size of the projected reservoir to 2,400,000 acre⋅ft (3,000,000 dam3) and requiring the construction of a new power plant.[9][26] It also settled the interagency dispute by authorizing the Corps to construct the dam and direct flood control operations, and the Bureau to operate the dam for its other intended purposes such as irrigation and hydroelectricity.[24]
In the early 1960s, there was some local opposition to the project on the grounds that it was too big – with a reservoir more than twice as large as the annual flow of the Stanislaus River, it might never fill and would be a waste of federal Central Valley Project funds.[29] There was also concern that water from New Melones II might be exported outside the Stanislaus River basin and sold elsewhere; therefore, a rider attached to the 1962 act "reserved water for use within the basin with export of excess water only".[30] Two years later, the Christmas flood of 1964 caused considerable damage along the Stanislaus River that a large dam could have prevented; Congressman John J. McFall "seized the political leverage that only [the floods] could provide, and urged the drenched farmers to support New Melones Dam."[31] With opposition having largely turned to support, Congress approved funding in 1965, with construction starting the following year.[24]
Initial construction and controversy
[edit]Actual construction began in July 1966 with clearing of the dam and reservoir site, construction of access roads, foundation preparations and excavations for the future outlet works. A diversion tunnel to allow the river to bypass the dam site was excavated between 1966 and December 1973.[9] The Corps opened bids for construction of the main dam on October 10, 1972. Melones Contractors (a consortium formed by Guy F. Atckinson Company, Gordon H. Ball, and Arundel Corp.) won the primary construction contract for $109.7 million, while Allis-Chalmers and General Electric took an $11.5 million contract to provide turbines and hydroelectric generating equipment.[32] During reservoir clearing operations, the USACE spent about $28 million relocating roads and bridges in the future reservoir space.[32] Foundation work for the dam itself began on March 6, 1974 with the first embankment material placed in January 1976.[32] Much of the embankment fill came from an excavation shortly northwest of the dam, which would later serve as the dam's spillway. During the height of construction in the summer, the total workforce reached about 800, while averaging between 500–600 in the winter months.[33]
Although the 1964 floods had initially generated support for New Melones, a spirited opposition to the dam arose from both the river recreation industry and environmentalists who saw the Stanislaus River canyon as having greater value than a reservoir.[32] River runners protested the threat to the Stanislaus River, which was becoming one of the most popular whitewater runs in the United States, with the first commercial rafting company established in 1962 (see images of the river, rafting, and the canyon at the Stanislaus River Archive).[34] The river flowed through the deepest limestone canyon in the US, with cliffs rising 1,000 feet (300 m) above the water in places.[35] Other natural features of the area included extensive limestone caves, and endemic species such as Banksula melones, the Melones cave harvestman.[36] In addition, more than one hundred archaeological and historical sites, left over from Native American inhabitation and the Gold Rush period, were all situated in the reservoir flood zone.[37][38]
While the US Army Corps of Engineers was constructing New Melones Dam, the dam operators, the US Bureau of Reclamation, applied to the California State Water Resources Control Board (SWRCB) for water rights for the project. During extensive hearings, the Environmental Defense Fund and the Sierra Club recommended that the SWRCB deny the Bureau’s applications for water rights because of the adverse effects of the project and the failure of the Bureau to show that the water sought to be stored will be put to beneficial use within a reasonable time. The Bureau took the position that the SWRCB was limited in its jurisdiction to determining if unappropriated water was available.
On April 4, 1973, the SWRCB issued Decision 1422 which held that the public interest requires the use of the Stanislaus River for whitewater boating, stream fishing and wildlife habitat be protected to the extent that water is not needed for other beneficial purposes.[39] The SWRCB limited impoundment behind New Melones Dam to water needed for fish and wildlife releases, water quality releases, flood control and that needed to satisfy prior water rights at the existing Melones Reservoir. The Board reserved jurisdiction to consider allowing more storage behind New Melones Dam if the Bureau could show that the benefits from the storage outweigh the damage in the watershed above the dam and that the Bureau had firm commitments to deliver the water.
The federal government sued the SWRCB over the storage restrictions contained in Decision 1422. The federal government won at the district and appeals court level, but the US Supreme reversed the lower court decision. In 1978, the US Supreme Court held in California v. United States that under the 1902 Reclamation Act a State may impose any condition on control, appropriation, use or distribution of water in a federal reclamation project that is not inconsistent with clear congressional directives respecting the project.[40] The Court remanded the case to the lower courts to consider the conditions imposed in Decision 1422.
While the administrative and legal battles were occurring, the environmental group Friends of the River (FOR) was formed in the early 1970s to push a statewide ballot measure, Proposition 17, which would have designated 9 miles (14 km) of the Stanislaus River between Stanislaus Powerhouse and Parrott's Ferry as a National Wild and Scenic River and stopped the construction of New Melones Dam. Development-related interests such as PG&E, the California Chamber of Commerce and the contractors working on the dam spent millions of dollars lobbying against Prop 17 (see images on the Stanislaus River Archive).[41] One of their slogans, "Stop the 'Wild River' Hoax!" argued that this part of the Stanislaus River was not untouched wilderness (as dams already existed both upstream and downstream of the 9-mile segment) and therefore was ineligible for Wild and Scenic designation. This statement was misleading, since the language of the Wild and Scenic Rivers Act does not disqualify rivers with dams – only the portions already inundated by reservoirs.[42][n 2] Dam supporters also argued that the Stanislaus River in its natural state was only accessible to a small group of people; that the rafting companies held a "monopoly" on river recreation and a reservoir would open up the area for far more tourists than would have visited otherwise, bringing more economic benefits to the area.[44] Proposition 17 lost by a voter margin of 52.5%-47.5%.
Construction on the dam continued to progress. On April 1, 1978 the gates of the diversion tunnel were closed, and New Melones Lake began to fill, soon inundating the old Melones Dam.[45] As the reservoir filled, work moved ahead on the power plant and generating units, which were all completed by the end of 1978. The main embankment of the dam was topped out on October 28, 1978.[32]
Protests and filling of the lake
[edit]On May 22, 1979, Mark Dubois, one of the founders of FOR, hiked into the Stanislaus River Canyon and chained himself to a boulder, forcing the Corps to stop filling the lake or risk drowning him. Dubois hid in the canyon for five days while local authorities tried unsuccessfully to find him; he had written letters to the Corps and Governor Jerry Brown telling them of his plans in advance (see documents and images of this event on the Stanislaus River Archive). Ultimately, dam operators opened the gates, halting the rising reservoir at an elevation of 808 feet (246 m), or about 280 feet (85 m) below its maximum design level.[46] The Corps was delayed in handing the project over to the Bureau of Reclamation, as testing could not be completed on the hydroelectric turbines until the water level increased further.[47] On May 29, Governor Brown vetoed Assembly Bill 2164, which would have allowed filling New Melones Lake to its full capacity.[32]
In the meantime, environmental groups lobbied for a compromise to stay the lake level at the old Parrott's Ferry Bridge, 844 ft (257 m) above sea level, corresponding to a storage capacity of 438,000 acre⋅ft (540,000 dam3): "We can have a working dam and a wild river."[32][48] The irrigation districts, Reclamation officials, and local representatives including John Garamendi and Norman S. Waters, argued that to complete the dam only to not fill it was absurd.[48] The state of California initially sided with the opposition. On November 20, 1980 the State Water Resources Control Board set the temporary upper limit for lake level at the old Parrott's Ferry Bridge.[32] With that limit in place, operations of the dam and reservoir were handed to Reclamation.[32]
Over the next two years the state continued to delay allowing the reservoir to fill because the Bureau of Reclamation had not convincingly demonstrated that "the irrigation need will outweigh any damage that results to fish, wildlife and recreation in the watershed above New Melones Dam."[49][50] Further studies by the California Department of Fish and Wildlife and the Bureau of Reclamation itself showed that completely filling New Melones Lake would, in fact, offset some of the benefits of the project. For example, if additional water were provided for farms, even more water would have to be released into the Stanislaus River to wash out polluted return flows from new irrigation.[51] A larger reservoir would also halt the Stanislaus' spring flooding to such an extent that it would harm the salmon populations that the dam was intended to benefit. Also, a higher reservoir would allow for less flood control space in emergencies.[52] The state determined that the optimal reservoir volume was 623,000 acre-feet (0.768 km3), which would provide enough water to fulfill existing rights and fishery flows as well as provide a hedge against droughts and floods; although it would inundate about 2 miles (3.2 km) of the river above Parrott's Ferry, FOR agreed to this compromise.[53]
Ultimately, it was nature, not political maneuvering, that led to the filling of New Melones Lake. The winter and spring rainy season of 1982 was one of the wettest recorded in the 20th century. The Stanislaus River swelled to such high levels that it exceeded what could be safely released through the dam's outlets, and the reservoir rapidly surpassed the temporary limit. The winter of 1983 was even wetter and pushed water so high that it reached the lip of the emergency spillway (but did not flow over it), a level that has not been surpassed since.[34][54][55] With the lake full, the state of California lifted the temporary limit in March, 1983.[32] A deciding factor in the rescinding of the water-level limit was the prevention of $50 million in damages[11] by New Melones Dam in 1982 and 1983, which demonstrated the dam's value for flood control.[56]
Water rights disputes
[edit]New Melones Dam has a very large storage capacity relative to the watershed that feeds it, as compared to other major reservoirs in California. The potential water yield, and thus the supply contracts, of the Melones Project were calculated based on stream flow data between 1922 and 1978; however, this period may have been somewhat wetter than the long-term average.[32] The Bureau of Reclamation estimated the additional water yield per year as 335,000 acre-feet (0.413 km3) but the actual yield has been closer to 200,000 acre-feet (0.25 km3). As a result, the reservoir is often at a low water level because in most years demand is greater than supply. In the 38 years between 1978 and 2016, New Melones has only reached capacity five times, and only once (in 1983) has it reached the level of the spillway. Between 1987 and 1992 Reclamation was forced to purchase water from other agencies to fulfill New Melones' water obligations.[57] Even so, the reservoir fell to a record low level of 83,631 acre-feet (103,157,000 m3), 3.5% of capacity, on October 1, 1992.[58] Conversely, the great storage capacity also means that New Melones can capture more flood runoff while other major California reservoirs must release it to maintain flood control space.[59]
The original contracted water supply from New Melones Dam was 1,067,000 acre-feet (1.316 km3), of which 600,000 acre-feet (0.74 km3) was allocated to the Oakdale and South San Joaquin Irrigation Districts (who owned the original Melones Dam and have the oldest water rights); 422,000 acre-feet (0.521 km3) for Stanislaus River water quality and fishery conservation; and 45,000 acre-feet (0.056 km3) for the Stockton East Water District. Originally, Reclamation had planned to extend the water supply to other users, but even from the start, the Melones Project was barely able to meet these existing targets.[13] New Melones releases are important for regional groundwater recharge, a vital water source for farmers when surface water supplies are cut off due to drought,[60] and to protect water quality in the Stanislaus and San Joaquin Rivers by diluting pollutants during the late summer and fall dry season.[61]
Fishery flows
[edit]After the Central Valley Project Improvement Act in 1991 and the Bay-Delta Water Quality Control Plan in 1995, much more water was required to meet target environmental flows in the Stanislaus and San Joaquin Rivers and the Delta, which conflicts with the original language of the 1962 act authorizing the dam, which stated that only "excess water" could be appropriated for these uses.[30][60] One of the new requirements was for spring and autumn "pulse flows" intended to help migration of anadromous fish (Chinook salmon and steelhead trout in particular). This policy has been criticized by local irrigation districts as a waste of water during dry years, as fish populations have continued to struggle despite the additional flows. Reclamation officials argue that the flows are needed to meet state and federal requirements, as well as the earlier Endangered Species Act of 1972.[62] As a result, the Melones Project is now only able to meet all its contracts in above average water years. Local water users have coined the somewhat derisive nickname of "green dam" because the policy has shifted to favor fish rather than farmers.[63]
A further constraint is that water released in autumn must be cold enough for anadromous fish to survive, and thus must be made from the lower level outlets at New Melones Dam. However, the old Melones Dam was not demolished during the construction of the new dam (the original dam remains submerged far below the reservoir surface, only rarely re-emerging when the water level is low). The old dam partially blocks the movement of cold water from the deepest parts of the reservoir, causing warmer surface water to be drawn out instead.[64] As a result, in certain years the amount of irrigation water has been reduced in order to maintain enough depth in New Melones Lake in the fall to preserve the cold water pool.[65][66]
A 2016 study by independent environmental consulting group FishBio showed that the artificial spring pulse flows from New Melones Dam do fairly little to support salmon and steelhead out-migration in the Stanislaus River. Rather, the fish take their cues from increased water flow due to rainfall, as they naturally would have before the many dams on the Stanislaus River were built.[67] In the spring of 2016 about 12,500 juvenile salmon migrated downriver to the sea during April and May, but less than 1 percent migrated during the pulse flow. In years of drought when the lake level is low, releasing water during the spring creates consequences later in the year – because there is not enough cold water left for the autumn spawning run.[67]
The state of California has further proposed that between 20 and 60 percent of the unimpaired, or natural flow of the Stanislaus River be allowed to run downstream during the spring to support ailing fish populations.[68] In addition, the minimum level of New Melones Lake would be set at 700,000 acre-feet (0.86 km3) (29 percent capacity) at all times in order to preserve the cold water pool. This would essentially limit the usable storage in the reservoir to the 1,250,000 acre-feet (1.54 km3) between the cold water pool and the flood-control pool, further handicapping the ability of the reservoir to manage water.[69] This plan has been met with outcry from local cities and irrigation districts, which contend that it would heavily damage the farming economy and cause thousands of seasonal jobs to disappear.[69] Furthermore, it does not address other major problems including introduced striped bass in the San Joaquin River, which eat many if not most of the juvenile salmon and steelhead before they even reach the sea.[70][71][72]
Conflict and compromise
[edit]In 2015, Congressman Tom McClintock introduced HR 1668, the "Save Our Water Act", which "amends the Endangered Species Act of 1973 (ESA) to suspend during droughts the application of the ESA to water releases from water storage facilities by federal and state agencies in a navigable river basin."[73] McClintock specifically cited the release of 30,000 acre-feet (37,000,000 m3) from New Melones Lake over several weeks in spring 2015, when New Melones Lake was approaching its lowest level on record since the 1992 drought. That year, very few fish had returned to the Stanislaus to spawn; in an editorial for MyMotherLode, Mark Truppner wrote: "Biologists estimate that it will affect the offspring of about 29 steelhead trout in the Stanislaus River – a few hundred smolts [sic] almost all of which will be eaten by predators long before they reach the ocean. And that assumes they won't swim toward the ocean on their own – as they have been doing without our helpful assistance since time immemorial."[74] However the bill did not pass.[73]
One potential solution has been outlined in a 2016 agreement between the Bureau of Reclamation, the local water districts and a number of other state and federal agencies. The local water districts would provide 75,000 acre-feet (93,000,000 m3) of water for fishery flows during the spring; this water would be sold to the San Luis & Delta-Mendota Water Authority. Instead of draining into the ocean, it would be captured by the large Central Valley Project and State Water Project pumping stations in the Delta for eventual re-use on Authority lands.[75] Previously, Reclamation had been taking the Stanislaus irrigation districts' water without paying for it. Essentially, the agreement allows for the water to be re-used for agriculture while still maintaining fishery flows in the Stanislaus River.[76]
Legacy
[edit]
The controversy over New Melones Dam was one of the most heated environmental disputes in the U.S. at the time.[38] The dam was constructed at a time of growing public support for environmental preservation, as compared to development or utilitarian conservation of natural resources.[38] Friends of the River describes the campaign against the dam as "probably the biggest citizen effort to save a river and stop a dam in American history."[77] The Bureau of Reclamation itself has called New Melones "a case study of all that can go wrong with a project."[32] Although opponents of the dam were ultimately unsuccessful, the campaign greatly strengthened the political power of the river conservation movement in California and the rest of the United States; in California, a number of later dam projects were defeated by citizen opposition,[24][78] including a hydroelectric project on the nearby Tuolumne River which was canceled less than two years after New Melones Dam was completed.[79]
In Dam Politics: Restoring America's Rivers, William R. Lowry writes:
The New Melones Dam was one of the last of its kind. Although proclamations that dam building no longer occurs in the United States are not completely true, it is true that no structure as large or as significant has since been built on an American river. And since this date, virtually no structural modification to a river in this country has gone unopposed.[8]
The New Melones debate influenced the eventual protection of a number of other northern California rivers (the Eel, Klamath and others) under the National Wild and Scenic Rivers System starting in 1980.[80][81] It considerably changed the California state government's approach to water resources development, switching focus from massive dam projects to conservation and policy improvements. In 1982, the same year that New Melones Lake filled, the Reclamation Reform Act set more stringent standards for vetting federal Reclamation projects, essentially "distancing federal policy from the 'dams-everywhere' approach of the past."[82] However, the relative lack of new storage has severely strained California's water system, which now serves 15 million more people than it did when New Melones Dam was completed in 1979.[83][84]
In a history of the dam written in 1994 as part of the Bureau of Reclamation History Program, Joe Simonds came to this conclusion:
The New Melones Dam stands as a reminder of the conflicts surrounding growth, the environment, and water in the West. The Corps built it at the end of the era of large dam construction. Even without the environmental controversy that surrounds the project, the operational and water yield problems will certainly cause continued difficulties well into the future. With the enormity of the problems facing New Melones, it seems unlikely that the project will ever realize its full potential as a multi use unit. Indeed, new Melones may become a case study of all that can go wrong with a project.[85]
See also
[edit]- California State Water Project
- List of United States Bureau of Reclamation dams
- List of dams and reservoirs in California
- List of largest reservoirs of California
- List of power stations in California
- List of the tallest dams in the United States
- Tulloch Dam
Notes
[edit]- ^ The 335,000 acre foot figure refers to the increase in the amount of usable water in the Stanislaus River Basin that would be made possible by a high dam. The water would be captured from storm flows that the existing, smaller reservoirs in the basin did not have the ability to hold.
- ^ The Wild and Scenic Rivers Act "prohibits federal support for actions such as the construction of dams or other instream activities that would harm the river's free-flowing condition, water quality, or outstanding resource values. However, designation does not affect existing water rights or the existing jurisdiction of states and the federal government over waters as determined by established principles of law" and seeks to "balance dam and other construction at appropriate sections of rivers". Thus, rivers subject to existing water rights and damming on other stretches can still qualify for designation.[43]
References
[edit]- ^ a b c "New Melones Dam Dimensions". New Melones Unit Project. U.S. Bureau of Reclamation. November 5, 2008. Archived from the original on June 15, 2011. Retrieved April 6, 2012.
- ^ a b c d e f "New Melones Dam Hydraulics & Hydrology". New Melones Unit Project. U.S. Bureau of Reclamation. November 5, 2008. Archived from the original on September 25, 2012. Retrieved April 6, 2012.
- ^ a b c "New Melones Reservoir (NML) Dam Information". California Data Exchange Center. California Department of Water Resources. Retrieved April 6, 2012.
- ^ a b c d e f "New Melones Powerplant". New Melones Unit Project. U.S. Bureau of Reclamation. May 13, 2009. Archived from the original on June 13, 2011. Retrieved April 6, 2012.
- ^ a b c "California Hydroelectric Statistics & Data". California Energy Commission. Archived from the original on February 26, 2018. Retrieved February 24, 2017.
- ^ "Alphabetical List of California Dams (Over 40,000 acre feet)". Civil and Environmental Engineering. University of California Davis. Archived from the original on February 5, 2012. Retrieved April 7, 2012.
- ^ "The Stanislaus River, Alive Again". stanislausriver.org. GreenInfo Network. Retrieved February 7, 2023.
- ^ a b Lowry 2003, p. 41.
- ^ a b c d e f g "New Melones Unit Project". U.S. Bureau of Reclamation. Archived from the original on March 3, 2016. Retrieved July 31, 2011.
- ^ a b "Chapter 3: Central Valley Flood Management Systems" (PDF). Post–Flood Assessment for 1983, 1986, 1995, and 1997. Auburn Dam Council. Archived from the original (PDF) on March 11, 2016. Retrieved April 20, 2012.
- ^ a b "New Melones Dam: Flood Damages Prevented" (PDF). U.S. Bureau of Reclamation. 2010. Archived from the original (PDF) on February 12, 2017. Retrieved February 17, 2017.
- ^ "188,000 Flee Dam – Emergency spillway could fail". Manteca Bulletin. Associated Press. February 13, 2017. Archived from the original on March 12, 2017. Retrieved March 6, 2017.
- ^ a b c Wyatt, Dennis (December 15, 2016). "What if OID and SSJID had built New Melones?". Manteca Bulletin. Archived from the original on March 12, 2017. Retrieved February 15, 2017.
- ^ a b "Chapter 2: Water Resources" (PDF). Draft Revised Substitute Environmental Document in Support of Potential Changes to the Water Quality Control Plan for the Bay-Delta: San Joaquin River flows and Southern Delta water quality. California State Water Resources Control Board. September 2016. Retrieved March 6, 2017.
- ^ Palmer 1984, p. 70.
- ^ "New Melones Dam – General Information". New Melones Unit Project. U.S. Bureau of Reclamation. November 5, 2008. Archived from the original on September 25, 2012. Retrieved August 22, 2012.
- ^ "Chapter 2: Water Resources" (PDF). Evaluation of San Joaquin River Flow and Southern Delta Water Quality Objectives and Implementation. California State Water Resources Control Board. September 2016. Retrieved March 10, 2017.
- ^ Nichols, Dana M. (April 23, 2009). "Mixed legacy mars Melones milestone: Free celebration coincides with event lamenting loss of rafting". Recordnet.
- ^ "New Melones". U.S. Bureau of Reclamation. March 10, 2016. Retrieved February 24, 2017.
- ^ "New Melones Lake Marina to close by Oct. 1". Recordnet. February 9, 2014. Retrieved February 24, 2017.
- ^ a b c "History". Oakdale Irrigation District. Archived from the original on May 13, 2016. Retrieved February 15, 2017.
- ^ "History". Central California Area Office, New Melones. U.S. Bureau of Reclamation. July 25, 2011. Archived from the original on September 16, 2012. Retrieved August 22, 2012.
- ^ a b "History of South San Joaquin Irrigation District". South San Joaquin Irrigation District. Archived from the original on May 4, 2016. Retrieved February 15, 2017.
- ^ a b c d e f g h Dunning, Harrison C. (June 7, 1991). "Dam Fights and Water Policy in California: 1969-1989". University of Colorado Law School. Retrieved February 21, 2017.
- ^ Palmer 1984, p. 48.
- ^ a b c McAfee, Kimra Dawn (May 2000). "Post-Audit of New Melones Dam, Central Valley Project, Stanislaus River, California". San Francisco State University.
- ^ Palmer 1984, p. 52.
- ^ "New Melones Project Water Rights Decision" (PDF). California State Water Resources Control Board. 1972. Retrieved February 16, 2017.
- ^ Palmer 1984, p. 55.
- ^ a b Palmer 1984, p. 54.
- ^ Palmer 1984, p. 56.
- ^ a b c d e f g h i j k l "Project History". New Melones Unit Project. U.S. Bureau of Reclamation. April 7, 2009. Archived from the original on March 24, 2014. Retrieved April 20, 2012.
- ^ "New Melones Dam Rolls Ahead". Pine Mountain Lake News. February 1978. Archived from the original on December 10, 2012.
{{cite news}}
: CS1 maint: bot: original URL status unknown (link) - ^ a b "New Melones Dam". Aquapedia. Water Education Foundation. Retrieved February 16, 2017.
- ^ Roderick, Kevin (September 21, 1989). "Ghost River : Stretch of the Stanislaus Prized by Rafters Has Reappeared at Bottom of Shrinking Reservoir". Los Angeles Times.
- ^ "Banksula melones (Melones cave harvestman)" (pdf). California Department of Fish and Wildlife. Retrieved February 16, 2017.
- ^ Moratto, Michael J. "Culture History of the New Melones Reservoir Area, Calaveras and Tuolumne County, California" (PDF). University of California, Berkeley. Archived from the original (PDF) on September 21, 2015. Retrieved February 16, 2017.
- ^ a b c Larson, David J. (1996). "Historical Water-Use Priorities and Public Policies" (PDF). Sierra Nevada Ecosystem Project: Final report to Congress, vol. II, Assessments and scientific basis for management options. U.S. Geological Survey. Retrieved February 16, 2017.
- ^ California State Water Resources Control Board (April 1973). New Melones Project: Water Rights Decision 1422. Sacramento, CA: State of California (published 1973).
{{cite book}}
: CS1 maint: date and year (link) - ^ "California v. United States, 438 U.S. 645 (1978)". Justia Law. Retrieved June 24, 2024.
- ^ Jardine, Jeff (June 29, 2015). "From the depths of New Melones comes the gateway of controversy". Modesto Bee.
- ^ Hundley 2001, p. 368.
- ^ "About the Wild and Scenic Rivers Act". National Wild and Scenic Rivers System. Retrieved March 6, 2017.
- ^ "Stop the Wild Rivers Hoax: Help Us Save the Stanislaus". The Bakersfield Californian. November 4, 1974. Retrieved February 24, 2017.
- ^ Palmer 1984, p. 161.
- ^ "I'm Here to Speak for Life: River Guardian Mark Dubois". International Rivers. June 30, 2015. Retrieved February 17, 2017.
- ^ Sinclair, Ward; Berthelson, John (May 23, 1979). "Engineers Halt Flooding to Search for Chained-Up Protester". Washington Post.
- ^ a b Palmer 1984, p. 139.
- ^ Hundley 2001, p. 370.
- ^ Morris, Mike (February 3, 2006). "Still active years after Melones stunt". Union Democrat. Archived from the original on March 12, 2017. Retrieved March 11, 2017.
- ^ Palmer 1984, p. 140.
- ^ Palmer 1984, p. 141.
- ^ "Both Sides Satisfied With New Melones Decision". Santa Cruz Sentinel. November 1, 1979. Retrieved February 24, 2017.
- ^ Cowan, Jason (March 17, 2016). "New Melones water levels rising: Historic sites once again submerged after recent storms". Union Democrat. Archived from the original on April 2, 2019. Retrieved March 11, 2017.
- ^ "New Melones Reservoir (NML) Reservoir Information and Monthly Averages". California Data Exchange Center. California Department of Water Resources. Retrieved April 6, 2012.
- ^ Johnson, Michelaina (2015). "Taming the Rapids: A Brief History of Development on the Stanislaus River" (PDF). South San Joaquin Irrigation District. Archived from the original (PDF) on March 15, 2016. Retrieved February 24, 2017.
- ^ Lawton, Rebecca (July 27, 2016). "The Big Dam Era Is Not Over". UnDark. Retrieved February 15, 2017.
- ^ "New Melones Reservoir (Query for Daily Water Levels between 9/19/1992 and 10/18/1992)". California Data Exchange Center. California Department of Water Resources. Archived from the original on March 12, 2017. Retrieved February 15, 2017.
- ^ Cowan, Jason (January 8, 2016). "New Melones Reservoir at 13 percent capacity, but filling". Union Democrat. Archived from the original on March 12, 2017. Retrieved February 15, 2017.
- ^ a b Fujii, Reed (January 1, 2016). "No New Melones Water for Stockton". Recordnet. Retrieved February 15, 2017.
- ^ Nichols, Dana M. (January 7, 2016). "New Melones Reservoir operators ask to reduce environmental releases: Critics say mandated fish releases undermine local economy". Calaveras Enterprise. Archived from the original on April 13, 2016. Retrieved February 15, 2017.
- ^ Mumma, Linda (April 8, 2015). "Water districts halt fish flow at New Melones". KCRA. Retrieved February 15, 2017.
- ^ Lusvardi, Wayne (July 24, 2013). "Rep. Denham trumps Sen. Feinstein's call for more water storage". CalWatchdog. Retrieved March 6, 2017.
- ^ Nichols, Dana (August 11, 2015). "Will drought reveal old Melones Dam?". Calaveras Enterprise. Archived from the original on March 6, 2017. Retrieved February 21, 2017.
- ^ "Oakdale Irrigation District Memorandum: New Melones/Old Melones Analysis" (PDF). California State Water Resources Control Board. April 6, 2015. Retrieved February 21, 2017.
- ^ Ecosystem Restoration Program Plan. Vol. 2. CALFED Bay-Delta Program. March 1998. p. 400.
- ^ a b Dunbar, Mike (August 20, 2016). "After releasing water for steelhead, not enough left for trout". Modesto Bee. Retrieved March 6, 2017.
- ^ "Introduction" (PDF). Draft Revised Substitute Environmental Document in Support of Potential Changes to the Water Quality Control Plan for the Bay-Delta: San Joaquin River flows and Southern Delta water quality. California State Water Resources Control Board. September 2016. Retrieved March 6, 2017.
- ^ a b Wyatt, Dennis (January 16, 2017). "Is better river deal possible? Brown wants to see if there is better plan for fish, farms & cities". Manteca Bulletin. Archived from the original on March 7, 2017. Retrieved March 6, 2017.
- ^ Dunbar, Mike (January 22, 2016). "Soon, state will explain why it wants our water". Modesto Bee. Retrieved March 6, 2017.
- ^ Wyatt, Dennis (June 20, 2010). "A plan to kill the Stanislaus River: Move would destroy fishing, cause severe SSJID water shortages". Manteca Bulletin. Archived from the original on March 12, 2017. Retrieved March 6, 2017.
- ^ Holland, John (April 9, 2016). "Debate swirls over striped bass role in rivers' salmon population". Modesto Bee. Retrieved March 6, 2017.
- ^ a b "H.R.1668 - Save Our Water Act". United States Congress. April 22, 2015. Retrieved February 21, 2017.
- ^ Truppner, Mark (April 23, 2015). "McClintock: Billions Of Gallons Being Released From Melones". MyMotherLode.
- ^ Martineau, Pamela (April 14, 2016). "Multi-Agency New Melones Plan Benefits Farmers, Fish". Association of California Water Agencies. Archived from the original on March 12, 2017. Retrieved February 15, 2017.
- ^ Wyatt, Dennis (June 14, 2016). "Deal avoids water war: Farms, fish & cities taken care of for year". Manteca Bulletin.
- ^ Gaguine, Alexander. "The Campaign to Save the Stanislaus River – 1969 to 1982 and its Historic Importance". Friends of the River. Archived from the original on March 4, 2012. Retrieved February 16, 2017.
- ^ "40+ Years of Friends Saving Rivers". Friends of the River. Retrieved February 21, 2017.
- ^ Palmer 2004, p. 43.
- ^ Palmer 1993, p. 37.
- ^ Mooney & Zavaleta 2016, p. 41.
- ^ Palmer 2004, p. 42-43.
- ^ "The New Melones Lake Visitor Center and Museum". U.S. Bureau of Reclamation. February 5, 2016. Retrieved February 21, 2017.
- ^ Rogers, Paul (August 31, 2014). "California drought: Why doesn't California build big dams any more?". Mercury News.
- ^ Simonds, Wm. Joe. The New Melones Unit Project, 1994.
Works cited
[edit]- Hundley, Norris (2001). The Great Thirst: Californians and Water—A History. University of California Press. ISBN 0-52092-529-7.
- Lowry, William Robert (2003). Dam Politics: Restoring America's Rivers. Georgetown University Press. ISBN 0-87840-390-6.
- Mooney, Harold; Zavaleta, Erika (2016). Ecosystems of California. University of California Press. ISBN 9780520962170.
- Palmer, Tim (1984). Stanislaus: The Struggle for a River. University of California Press. ISBN 0-52005-225-0.
- Palmer, Tim (1993). Wild and Scenic Rivers of America. Island Press. p. 37. ISBN 1-55963-145-7.
- Palmer, Tim (2004). Lifelines: The Case for River Conservation. Rowman & Littlefield. ISBN 0-74253-139-2.
External links
[edit]- New Melones Dam
- New Melones Power Plant Archived June 14, 2011, at the Wayback Machine
- Post-Audit of New Melones Dam, by Kimra Dawn McAfee (Master's Thesis, May 2000)
- Proposition 17
- Stanislaus River Before New Melones Dam (1975 footage)
- Station Meta Data: New Melones Dam (NML)
- U.S. Geological Survey Geographic Names Information System: (Tuolumne County)
- U.S. Geological Survey Geographic Names Information System: (Calaveras County)
- Stanislaus River Archive
- Dams completed in 1979
- Energy infrastructure completed in 1979
- 1979 establishments in California
- 1979 controversies in the United States
- 1979 protests
- Buildings and structures in Calaveras County, California
- Dams in California
- Buildings and structures in Tuolumne County, California
- Hydroelectric power plants in California
- United States Bureau of Reclamation dams
- Embankment dams
- Dams on the Stanislaus River
- Central Valley Project