Kirti Nagar metro station: Difference between revisions
IznoRepeat (talk | contribs) m →External links: rm non-bidirectional navboxes (that have no business being on a specific station's page) |
m 1. Corrected unnecessary capitalization. 2. Changed ’ to ' |
||
(24 intermediate revisions by 10 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Metro station in Delhi, India}} |
|||
{{Use Indian English|date=July 2015}} |
{{Use Indian English|date=July 2015}} |
||
{{Use dmy dates|date=July 2015}} |
{{Use dmy dates|date=July 2015}} |
||
{{Infobox station |
{{Infobox station |
||
| name = [[File:Delhi Metro logo.svg|50px]]<br>Kirti Nagar |
| name = [[File:Delhi Metro logo.svg|50px]]<br>Kirti Nagar |
||
| type = |
| type = {{Delhi Metro Infobox station line|line=Blue|line2=Green}} |
||
| style = Delhi Metro |
| style = Delhi Metro |
||
| image = KIRTI_NAGAR.jpg |
| image = KIRTI_NAGAR.jpg |
||
| image_caption = Kirti Nagar metro station |
| image_caption = Kirti Nagar metro station |
||
| address = |
| address = |
||
| coordinates = {{ |
| coordinates = {{WikidataCoord|display=inline,title}} |
||
| line |
| line = {{rcb|Delhi Metro|Blue|croute}} {{rcb|Delhi Metro|Green|croute}} |
||
| other = |
| other = |
||
| structure = Elevated (Blue line)<br> At Grade (Green line) |
| structure = Elevated (Blue line)<br> At Grade (Green line) |
||
| platform = [[Side platform]] |
| platform = {{ubl|[[Side platform]]|Platform-1 → {{ltl|Delhi Metro|Blue|R|type=main}} / {{ltl|Delhi Metro|Blue|R|type=branch}}|Platform-2 → {{ltl|Delhi Metro|Blue|L}}|Platform-3 → {{ltl|Delhi Metro|Green|L}}|Platform-4 → Train Terminates}} |
||
| depth = |
| depth = |
||
| levels = 2 |
| levels = 2 |
||
| tracks = 4 |
| tracks = 4 |
||
| parking = {{Parking symbol}} Available |
| parking = {{Parking symbol}} Available |
||
| bicycle = Yes |
| bicycle = Yes |
||
| opened = {{start date|2005| |
| opened = {{ubl|{{start date|2005|12|31|df=yes}} (Blue Line)|{{start date|2011|8|27|df=yes}} (Green Line)}} |
||
| closed = |
| closed = |
||
| rebuilt = |
| rebuilt = |
||
| electrified = 25 kV 50 Hz |
| electrified = {{25 kV 50 Hz}} through [[overhead catenary]] |
||
| |
| accessible = Yes {{access icon}} |
||
| code = |
| code = {{#property:P296}} |
||
| owned = [[Delhi Metro]] |
| owned = [[Delhi Metro]] |
||
| zone = |
| zone = |
||
| smartcardname = |
| smartcardname = |
||
| smartcardstatus = |
| smartcardstatus = |
||
| former = |
| former = |
||
| passengers = |
| passengers = |
||
| pass_year = |
| pass_year = |
||
| pass_percent = |
| pass_percent = |
||
| pass_system = |
| pass_system = |
||
| mpassengers = |
| mpassengers = |
||
{{Infobox |
|||
| services ={{Adjacent stations |system=Delhi Metro |line1=Blue |left1=Shadipur |right1=Moti Nagar |
|||
| data1 = {{Rail pass box |
|||
|line2=Green |left2= |right2=Satguru Ram Singh Marg}} |
|||
| passengers = 53,885<ref name = "New Interchange Stations - Taking Load off DM Hubs">{{cite news |last=Agarwal |first=Priyangi |date=1 December 2023 |title=How new interchange stations are taking load off Delhi Metro hubs |url=https://timesofindia.indiatimes.com/city/delhi/how-new-interchange-stations-are-taking-load-off-delhi-metro-hubs/articleshow/105640678.cms |work=Times of India |location=New Delhi |access-date=6 December 2023}}</ref> |
|||
| map_type = India Delhi |
|||
| pass_year = October 2019 |
|||
| map_dot_label = Kirti Nagar |
|||
| |
| pass_percent = |
||
| route_map = {{Delhi Metro Blue Line Route}}{{Delhi Metro Green Line Route}} |
|||
| map_state = collapsed |
|||
}} |
}} |
||
| data2 = {{Rail pass box |
|||
The '''Kirti Nagar''' Metro Station is located on the [[Blue Line (Delhi Metro)|Blue Line]] of the [[Delhi Metro]].<ref>{{cite web|url=http://www.delhimetrorail.com/commuters/station_information.html |title=Station Information |access-date=2010-06-26 |url-status=dead |archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html |archive-date=19 June 2010 }}</ref> |
|||
| passengers = 50,215<ref name = "New Interchange Stations - Taking Load off DM Hubs" /> |
|||
| pass_year = October 2023 |
|||
| pass_percent = -6.8 |
|||
}} |
|||
}} |
|||
| services = {{Adjacent stations|system=Delhi Metro|line1=Blue|left1=Moti Nagar|right1=Shadipur |
|||
|line2=Green|left2=Satguru Ram Singh Marg}} |
|||
| route_map = {{Delhi Metro Blue Line Route}}{{Delhi Metro Green Line Route}} |
|||
| map_state = collapsed |
|||
| mapframe = yes |
|||
| mapframe-marker = rail |
|||
| mapframe-zoom = 14 |
|||
}} |
|||
The '''Kirti Nagar''' metro station is an interchange station between the [[Blue Line (Delhi Metro)|Blue Line]] and [[Green Line (Delhi Metro)|Green Line]] of [[Delhi Metro]].<ref>{{Cite web|url= https://www.delhimetrorail.com/station/KNR |title= Kirti Nagar |website=delhimetrorail.com |publisher= Delhi Metro Rail Corporation| access-date= 7 December 2023}}</ref><ref>{{cite web|url=http://www.delhimetrorail.com/commuters/station_information.html |title=Station Information |access-date=2010-06-26 |url-status=dead |archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html |archive-date=19 June 2010}}</ref> It is one of the eastward terminal stations of the Green Line, the other being [[Inderlok metro station|Inderlok]], and was opened as a part of a small {{convert|3.41|km|abbr=on}} branch from this station to [[Ashok Park Main metro station|Ashok Park Main station]] on 27 August 2011.<ref>{{cite web |url=https://themetrorailguy.com/delhi-metro-phase-2-information-map/ |title=Delhi Metro Phase 2 – Information, Route Maps & Updates |website=themetrorailguy.com |publisher=The Metro Rail Guy |access-date=7 December 2023}}</ref> This allowed passengers to easily transfer between the [[Red Line (Delhi Metro)|Red Line]] and Blue Line of the network. |
|||
The station serves the localities of [[Kirti Nagar]], [[Moti Nagar Assembly constituency|Moti Nagar]], [[Shadipur Depot|Shadipur]], [[Naraina Vihar|Naraina]], and Karampura. Some recreational places near it include Moments mall, Furniture market, Sunday market, and BTW Kirti Nagar. |
|||
== Station layout == |
|||
'''Station Layout''' {{Rail color box|Delhi Metro|Blue|croute}} |
|||
{| border=0 cellspacing=0 cellpadding=3 |
|||
|style="border-top:solid 1px grey;border-bottom:solid 1px grey;" width=50 rowspan=4 valign=top|'''P''' |
|||
|style="border-top:solid 1px grey;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
|||
|- |
|||
|style="border-bottom:solid 1px grey;" width=100|<span style=color:#{{rcr|Delhi Metro|Blue}}>'''Platform 1'''<br/>'''Eastbound'''</span> |
|||
|style="border-bottom:solid 1px grey;" width=500|Towards → {{ltl|Delhi Metro|Blue|R}}<br><small>'''Next Station:''' {{stl|Delhi Metro|Shadipur}}</small> |
|||
|- |
|||
|<span style=color:#{{rcr|Delhi Metro|Blue}}>'''Platform 2'''<br/>'''Westbound'''</span> |
|||
|<span style=color:white></span>Towards ← {{ltl|Delhi Metro|Blue|L}}<br><small>'''Next Station:''' {{stl|Delhi Metro|Moti Nagar}}</small> |
|||
|- |
|||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px grey;" colspan=2 align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
|||
|- |
|||
|valign=top|'''C''' |
|||
|valign=top|Concourse |
|||
|valign=top|Fare control, station agent, metro card vending machines, crossover |
|||
|- |
|||
|style="border-bottom:solid 1px grey;border-top:solid 1px grey;" width=50 valign=top|'''G''' |
|||
|style="border-top:solid 1px grey;border-bottom:solid 1px grey;" width=100 valign=top|Street Level |
|||
|style="border-top:solid 1px grey;border-bottom:solid 1px grey;" width=500 valign=top|Gates |
|||
|} |
|||
'''Station Layout''' {{Rail color box|Delhi Metro|Green|croute}} |
|||
{| border=0 cellspacing=0 cellpadding=3 |
|||
|style="border-top:solid 1px grey;border-bottom:solid 1px grey;" width=50 rowspan=4 valign=top|'''P''' |
|||
|style="border-top:solid 1px grey;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 2px black;text-align:center;" colspan=2|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
|||
|- |
|||
|style="border-bottom:solid 1px grey;" width=100|<span style=color:#{{rcr|Delhi Metro|Green}}>'''Platform 4'''<br/>'''Eastbound'''</span> |
|||
|style="border-bottom:solid 1px grey;" width=500|Towards → Train Terminates Here |
|||
|- |
|||
|<span style=color:#{{rcr|Delhi Metro|Green}}>'''Platform 3'''<br/>'''Westbound'''</span> |
|||
|<span style=color:white></span>Towards ← {{ltl|Delhi Metro|Green|L}}<br><small>'''Next Station:''' {{stl|Delhi Metro|Satguru Ram Singh Marg}}</small> |
|||
|- |
|||
|style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px grey;" colspan=2 align=center|<small>[[Side platform]] | Doors will open on the left {{access icon}}</small> |
|||
|- |
|||
|valign=top|'''C''' |
|||
|valign=top|Concourse |
|||
|valign=top|Fare control, station agent, metro card vending machines, crossover |
|||
|- |
|||
|style="border-bottom:solid 1px grey;border-top:solid 1px grey;" width=50 valign=top|'''G''' |
|||
|style="border-top:solid 1px grey;border-bottom:solid 1px grey;" width=100 valign=top|Street Level |
|||
|style="border-top:solid 1px grey;border-bottom:solid 1px grey;" width=500 valign=top|Gates |
|||
|} |
|||
== Facilities == |
|||
The station has the following facilities:<ref>{{Cite web|url= https://www.delhimetrorail.com/station/KNR#station-facilities |title= Kirti Nagar |website=delhimetrorail.com |publisher= Delhi Metro Rail Corporation |access-date= 10 December 2023}}</ref> |
|||
*'''Currency chest:''' A [[Yes Bank]] currency chest in the outer area |
|||
*'''Food & beverages:''' Multiple establishments on the paid concourse and in the station's outer area |
|||
*'''Token vending and automatic vending machines:''' Multiple machines on the unpaid concourse |
|||
*'''Toilets:''' 2 toilets – both on the paid concourse |
|||
*'''Other services:''' An [[Mahanagar Telephone Nigam Limited|MTNL exchange]] in the outer area |
|||
== Entry/Exits == |
|||
{|class="wikitable" style="text-align: center;" width="50%" |
|||
It is one of the terminus stations of the Green Line, the other being Inderlok. |
|||
|- |
|||
! align="center" colspan="2" style="background:#{{rcr|Delhi Metro|Blue}};"| <span style="color:WHITE;">Kirti Nagar Station: Entry/Exits<ref>{{Cite web|url= https://www.delhimetrorail.com/station/KNR#gates |title= Kirti Nagar |website=delhimetrorail.com |publisher= Delhi Metro Rail Corporation |access-date= 7 December 2023}}</ref></span> |
|||
|- |
|||
! style="width:50%;"|Gate No-1 {{access icon}} |
|||
|- |
|||
| Furniture market & Moments mall |
|||
|} |
|||
== Connections == |
|||
An extension of the [[Green Line (Delhi Metro)|Green Line]], commuters travelling on the Green Line are able to transfer to [[Blue Line (Delhi Metro)|Blue Line]] from this station as well as the [[Red Line (Delhi Metro)|Red Line]] at [[Inderlok metro station|Inderlok]] via [[Ashok Park Main metro station|Ashok Park Main]], saving time and money, rather than going all the way to longer routes of [[Rajiv Chowk metro station|Rajiv Chowk]] and [[Kashmere Gate metro station|Kashmere Gate]]. This branch opened on 27 August 2011. |
|||
=== Bus === |
|||
A new [[Delhi Metrolite|Metrolite Line]] is under construction and will be completed by 2025. It will run from Kirti Nagar to Bamnoli Village, with 22 stations. The stations for the line will be built in a mix of elevated, and at-grade stations.<ref>{{cite web|title=Construction for Delhi Metro's Metrolite Project Commences|url=https://www.urbantransportnews.com/news/work-on-delhis-kirti-nagar-bamnoli-village-metrolite-project-commenced|website=www.urbantransportnews.com|access-date=25 November 2020}}</ref> |
|||
*'''[[Delhi Transport Corporation|DTC]] buses''': DTC bus routes numbers 72, 78, 78A, 78ASTL, 78STL, 83, 83A, 85, 85BEXT, 85EXT, 108, 114, 116B, 159, 159E, 160, 168, 187, 208, 316, 316A, 318, 408, 408CL, 408EXTCL, 408LSTL, 410, 410ACL, 410CL, 521, 725LSTL, 725STL, 752, 778, 807, 810, 810LSTL, 820, 842, 857, 859, 859A, 871, 871A, 892, 894, 894A, 894CL, 910, 910A, 930, 930A, 940, 940A, 940STL, 943, 944, 953, 953STL, 962, 962B, 970, 970A, 970B, 970C, 975, 980, 985, 990, 990A, 990B, 990CL, 990EXT, 991, and 997 serve the station from nearby [[Moti Nagar Assembly constituency|Moti Nagar Industrial Area]] bus stop.<ref>{{cite web |url=https://www.google.com/maps/place/Moti+Nagar+Industrial+Area/@28.6573138,77.1478989,17.9z/data=!4m6!3m5!1s0x390d0301fdb88ecd:0x507203ddd9af2e64!8m2!3d28.65732!4d77.1485!16s%2Fg%2F1hc3ygt5x?entry=ttu |title=Moti Nagar Industrial Area |website=google.com |publisher=businfo.dimts.in |access-date=7 December 2023}}</ref> |
|||
=== Metrolite === |
|||
Some recreational places include Moments Mall, BTW Kirti Nagar, Furniture Market, Sunday Market, and other popular eatery shops spread throughout the area. |
|||
The [[Delhi Metrolite]] is a planned {{cvt|19|km|abbr=on}} [[Metrolite]] system with 20 stations that will connect Kirti Nagar to [[Yashobhoomi Dwarka Sector - 25 metro station|Dwarka ECC]] via [[Mayapuri]], [[Hari Nagar Assembly constituency|Hari Nagar]], [[Tihar Jail]], and [[Dwarka, Delhi|Dwarka]] Sector 2, Sector 7, Sector 6, Sector 20, and Sector 23.<ref>{{cite news |last=Roy |first=Sidharatha |date=4 November 2021 |title=Delhi: Metrolite runs into rough weather before ride starts |url=https://timesofindia.indiatimes.com/city/delhi/metrolite-runs-into-rough-weather-before-ride-starts/articleshow/87516625.cms |work=Times of India |location=New Delhi |access-date=7 December 2023}}</ref> It will be designed as per [[Ministry of Housing and Urban Affairs|MoHUA's]] Metrolite specifications,<ref>{{cite web |url=https://mohua.gov.in/upload/whatsnew/5d2c1268929e3standard%20specification%20LURTS-Metrolite.pdf |title=Standard Specifications - Light Urban Rail Transit System: 'Metrolite' |website=mohua.gov.in |publisher=Ministry of Housing & Urban Affairs |access-date=7 December 2023}}</ref> and will be much cheaper to construct because of its lower speeds and carrying capacities compared to regular metros. The detailed project report (DPR) for this line was approved by [[Delhi Metro Rail Corporation|DMRC's]] board in October 2019, and is currently awaiting the [[Government of Delhi|Delhi Government's]] approval.<ref>{{cite web |url=https://delhiplanning.delhi.gov.in/sites/default/files/Planning/e12_transport.pdf |title=Chapter 12, Transport - Economic Survey of Delhi, 2021-22 |date=20 March 2023 |website=delhiplanning.delhi.gov.in |publisher=Delhi Government |access-date=14 December 2023 |page=8 |quote=DMRC has submitted DPR for next 3-corridors of Delhi Metro Phase-IV with the corridor between Rithala and Narela (METRO LITE) and Lajpat Nagar to Saket G-Block and Inderlok to Indraprastha being metro corridors.}}</ref> |
|||
==See also== |
==See also== |
||
Line 61: | Line 142: | ||
==External links== |
==External links== |
||
{{Commons|Delhi Metro}} |
{{Commons|Delhi Metro}} |
||
* [http://www.delhimetrorail.com/ Delhi Metro Rail Corporation Ltd. (Official site)] |
* [http://www.delhimetrorail.com/ Delhi Metro Rail Corporation Ltd. (Official site)] |
||
* [http://www.delhimetrorail.com/annual_report.aspx/ Delhi Metro Annual Reports] |
* [http://www.delhimetrorail.com/annual_report.aspx/ Delhi Metro Annual Reports] |
||
* {{cite web|title=Station Information |work=Delhi Metro Rail Corporation Ltd. (DMRC) |url=http://www.delhimetrorail.com/commuters/station_information.html |url-status=dead |archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html |archive-date=19 June 2010 }} |
* {{cite web|title=Station Information |work=Delhi Metro Rail Corporation Ltd. (DMRC) |url=http://www.delhimetrorail.com/commuters/station_information.html |url-status=dead |archive-url=https://web.archive.org/web/20100619035828/http://delhimetrorail.com/commuters/station_information.html |archive-date=19 June 2010 }} |
||
{{Delhi Metro}} |
{{Delhi Metro}} |
||
{{Delhi & NCR Metro stations}} |
{{Delhi & NCR Metro stations|green line=yes|blue line=yes}} |
||
[[Category:Railway stations in India opened in 2005]] |
|||
[[Category:Delhi Metro stations]] |
[[Category:Delhi Metro stations]] |
||
[[Category:Railway stations opened in 2005]] |
|||
[[Category:Railway stations in West Delhi district]] |
[[Category:Railway stations in West Delhi district]] |
||
Latest revision as of 18:15, 31 August 2024
The Kirti Nagar metro station is an interchange station between the Blue Line and Green Line of Delhi Metro.[2][3] It is one of the eastward terminal stations of the Green Line, the other being Inderlok, and was opened as a part of a small 3.41 km (2.12 mi) branch from this station to Ashok Park Main station on 27 August 2011.[4] This allowed passengers to easily transfer between the Red Line and Blue Line of the network.
The station serves the localities of Kirti Nagar, Moti Nagar, Shadipur, Naraina, and Karampura. Some recreational places near it include Moments mall, Furniture market, Sunday market, and BTW Kirti Nagar.
Station layout
[edit]Station Layout Blue Line
P | Side platform | Doors will open on the left | |
Platform 1 Eastbound |
Towards → Noida Electronic City or Vaishali Next Station: Shadipur | |
Platform 2 Westbound |
Towards ← Dwarka Sector 21 Next Station: Moti Nagar | |
Side platform | Doors will open on the left | ||
C | Concourse | Fare control, station agent, metro card vending machines, crossover |
G | Street Level | Gates |
Station Layout Green Line
P | Side platform | Doors will open on the left | |
Platform 4 Eastbound |
Towards → Train Terminates Here | |
Platform 3 Westbound |
Towards ← Brigadier Hoshiyar Singh Next Station: Satguru Ram Singh Marg | |
Side platform | Doors will open on the left | ||
C | Concourse | Fare control, station agent, metro card vending machines, crossover |
G | Street Level | Gates |
Facilities
[edit]The station has the following facilities:[5]
- Currency chest: A Yes Bank currency chest in the outer area
- Food & beverages: Multiple establishments on the paid concourse and in the station's outer area
- Token vending and automatic vending machines: Multiple machines on the unpaid concourse
- Toilets: 2 toilets – both on the paid concourse
- Other services: An MTNL exchange in the outer area
Entry/Exits
[edit]Kirti Nagar Station: Entry/Exits[6] | |
---|---|
Gate No-1 | |
Furniture market & Moments mall |
Connections
[edit]Bus
[edit]- DTC buses: DTC bus routes numbers 72, 78, 78A, 78ASTL, 78STL, 83, 83A, 85, 85BEXT, 85EXT, 108, 114, 116B, 159, 159E, 160, 168, 187, 208, 316, 316A, 318, 408, 408CL, 408EXTCL, 408LSTL, 410, 410ACL, 410CL, 521, 725LSTL, 725STL, 752, 778, 807, 810, 810LSTL, 820, 842, 857, 859, 859A, 871, 871A, 892, 894, 894A, 894CL, 910, 910A, 930, 930A, 940, 940A, 940STL, 943, 944, 953, 953STL, 962, 962B, 970, 970A, 970B, 970C, 975, 980, 985, 990, 990A, 990B, 990CL, 990EXT, 991, and 997 serve the station from nearby Moti Nagar Industrial Area bus stop.[7]
Metrolite
[edit]The Delhi Metrolite is a planned 19 km (12 mi) Metrolite system with 20 stations that will connect Kirti Nagar to Dwarka ECC via Mayapuri, Hari Nagar, Tihar Jail, and Dwarka Sector 2, Sector 7, Sector 6, Sector 20, and Sector 23.[8] It will be designed as per MoHUA's Metrolite specifications,[9] and will be much cheaper to construct because of its lower speeds and carrying capacities compared to regular metros. The detailed project report (DPR) for this line was approved by DMRC's board in October 2019, and is currently awaiting the Delhi Government's approval.[10]
See also
[edit]References
[edit]- ^ a b Agarwal, Priyangi (1 December 2023). "How new interchange stations are taking load off Delhi Metro hubs". Times of India. New Delhi. Retrieved 6 December 2023.
- ^ "Kirti Nagar". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 7 December 2023.
- ^ "Station Information". Archived from the original on 19 June 2010. Retrieved 26 June 2010.
- ^ "Delhi Metro Phase 2 – Information, Route Maps & Updates". themetrorailguy.com. The Metro Rail Guy. Retrieved 7 December 2023.
- ^ "Kirti Nagar". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 10 December 2023.
- ^ "Kirti Nagar". delhimetrorail.com. Delhi Metro Rail Corporation. Retrieved 7 December 2023.
- ^ "Moti Nagar Industrial Area". google.com. businfo.dimts.in. Retrieved 7 December 2023.
- ^ Roy, Sidharatha (4 November 2021). "Delhi: Metrolite runs into rough weather before ride starts". Times of India. New Delhi. Retrieved 7 December 2023.
- ^ "Standard Specifications - Light Urban Rail Transit System: 'Metrolite'" (PDF). mohua.gov.in. Ministry of Housing & Urban Affairs. Retrieved 7 December 2023.
- ^ "Chapter 12, Transport - Economic Survey of Delhi, 2021-22" (PDF). delhiplanning.delhi.gov.in. Delhi Government. 20 March 2023. p. 8. Retrieved 14 December 2023.
DMRC has submitted DPR for next 3-corridors of Delhi Metro Phase-IV with the corridor between Rithala and Narela (METRO LITE) and Lajpat Nagar to Saket G-Block and Inderlok to Indraprastha being metro corridors.
External links
[edit]- Delhi Metro Rail Corporation Ltd. (Official site)
- Delhi Metro Annual Reports
- "Station Information". Delhi Metro Rail Corporation Ltd. (DMRC). Archived from the original on 19 June 2010.