Kerang train accident: Difference between revisions
Finishing background |
Nightmares26 (talk | contribs) added {{Railway accidents and incidents in Australia}} navbox |
||
(37 intermediate revisions by 27 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|2007 collision in Victoria, Australia}} |
|||
{{EngvarB|date=August 2014}} |
|||
{{Use |
{{Use Australian English|date=May 2024}} |
||
{{Update|date=September 2009}} |
|||
{{Use dmy dates|date=January 2018}} |
|||
{{Infobox |
{{Infobox public transit accident |
||
|image = Kerang Location Map.png |
|||
| |
| name = Kerang train accident |
||
<!-- Image --> |
|||
| |
| image = Kerang Location Map.png |
||
⚫ | |||
⚫ | |||
| image_alt = |
|||
|location-dist = 257.2 |
|||
| caption = |
|||
|location-dir = NNW |
|||
<!-- Maps --> |
|||
⚫ | |||
| |
| image_map = |
||
| |
| image_map_alt = |
||
| image_map_caption = |
|||
⚫ | |||
| |
| pushpin_map = |
||
| alternative_map = |
|||
⚫ | |||
| |
| pushpin_map_alt = |
||
| pushpin_map_caption = |
|||
⚫ | |||
| |
| mapframe = |
||
| |
| qid = |
||
| mapframe_zoom = |
|||
| coordinates = |
|||
<!-- Details --> |
|||
| date = 5 June 2007 |
|||
| time = 13:40 |
|||
⚫ | |||
| location_dir = NNW |
|||
⚫ | |||
| location_dist_km = 257.2 |
|||
| location_dist_mi = |
|||
| country = Australia |
|||
| line = [[Piangil railway line]] |
|||
⚫ | |||
| owner = |
|||
| service = |
|||
| type = Level crossing collision |
|||
⚫ | |||
<!-- Statistics --> |
|||
| bus = |
|||
| trains = 1 |
|||
| vehicles = |
|||
| passengers = 36 |
|||
| crew = |
|||
| pedestrians = |
|||
| deaths = 11 |
|||
| injuries = 23 |
|||
| damage = |
|||
| property = |
|||
<!-- Route map --> |
|||
| route_map = |
|||
| route_map_state = |
|||
| route_map_name = |
|||
<!-- Footnotes --> |
|||
| footnotes = |
|||
}} |
}} |
||
The '''Kerang train accident''' occurred on 5 June 2007 at about 13:40 [[Time in Australia|AEST]] in the Australian state of [[Victoria (Australia)|Victoria]], approximately {{convert|6|km|mi|1}} north of the town of [[Kerang, Victoria|Kerang]] in the state's northwest, and {{convert|257|km|mi|0}} north-northwest of the city of [[Melbourne]]. |
The '''Kerang train accident''' occurred on 5 June 2007 at about 13:40 [[Time in Australia|AEST]] in the Australian state of [[Victoria (Australia)|Victoria]], approximately {{convert|6|km|mi|1}} north of the town of [[Kerang, Victoria|Kerang]] in the state's northwest, and {{convert|257|km|mi|0}} north-northwest of the city of [[Melbourne]]. |
||
[[Victoria Police]] confirmed that 11 people were killed and 23 injured in the crash,<ref>{{cite news|first=Dan|last=Oakes|author2=Doherty, Ben, Webb, Carolyn, Guerrera, Orietta|title=11 die in train crash|url=http://www.theage.com.au/news/national/six-dead-in-train-crash/2007/06/05/1180809490082.html?page=fullpage#contentSwap1|work=[[The Age]]|date=5 June 2007|accessdate=6 June 2007}}</ref><ref>{{cite news|title=No boom gates at level crossing crash scene|url=http://www.abc.net.au/news/newsitems/200706/s1943147.htm|work=[[ABC News (Australia)|ABC News]]|date=5 June 2007|accessdate=6 June 2007}}</ref> making this to date the deadliest Australian rail disaster since 1977. As of 11:00 am on 6 June, two passengers remained unaccounted for.<ref>[http://www.theage.com.au/news/national/train-crash-truckie-sorry/2007/06/06/1181084316656.html "Train crash truckie 'sorry'", ''The Age'', 6 June 2007] (Retrieved 6 June 2007)</ref> The site was visited on the evening of 5 June by the [[Premier of Victoria]], [[Steve Bracks]], who called it a "horrific scene".<ref name="abc1">{{cite news|title=Three still missing after Vic train smash|url=http://www.abc.net.au/news/2007-06-06/three-still-missing-after-vic-train-smash/59834|accessdate=5 January 2018|work=ABC News|date=6 June 2007|language=en-AU}}</ref> |
[[Victoria Police]] confirmed that 11 people were killed and 23 injured in the crash,<ref>{{cite news|first=Dan|last=Oakes|author2=Doherty, Ben, Webb, Carolyn, Guerrera, Orietta|title=11 die in train crash|url=http://www.theage.com.au/news/national/six-dead-in-train-crash/2007/06/05/1180809490082.html?page=fullpage#contentSwap1|work=[[The Age]]|date=5 June 2007|accessdate=6 June 2007|archive-date=14 August 2009|archive-url=https://web.archive.org/web/20090814170654/http://www.theage.com.au/news/national/six-dead-in-train-crash/2007/06/05/1180809490082.html?page=fullpage#contentSwap1|url-status=live}}</ref><ref>{{cite news|title=No boom gates at level crossing crash scene|url=http://www.abc.net.au/news/newsitems/200706/s1943147.htm|work=[[ABC News (Australia)|ABC News]]|date=5 June 2007|accessdate=6 June 2007|archive-date=23 August 2010|archive-url=https://web.archive.org/web/20100823223630/http://www.abc.net.au/news/newsitems/200706/s1943147.htm|url-status=live}}</ref> making this to date the deadliest Australian rail disaster since 1977. As of 11:00 am on 6 June, two passengers remained unaccounted for.<ref>[http://www.theage.com.au/news/national/train-crash-truckie-sorry/2007/06/06/1181084316656.html "Train crash truckie 'sorry'", ''The Age'', 6 June 2007] {{Webarchive|url=https://web.archive.org/web/20071225074457/http://www.theage.com.au/news/national/train-crash-truckie-sorry/2007/06/06/1181084316656.html |date=25 December 2007 }} (Retrieved 6 June 2007)</ref> The site was visited on the evening of 5 June by the [[Premier of Victoria]], [[Steve Bracks]], who called it a "horrific scene".<ref name="abc1">{{cite news|title=Three still missing after Vic train smash|url=http://www.abc.net.au/news/2007-06-06/three-still-missing-after-vic-train-smash/59834|accessdate=5 January 2018|work=ABC News|date=6 June 2007|language=en-AU|archive-date=29 October 2016|archive-url=https://web.archive.org/web/20161029003108/http://www.abc.net.au/news/2007-06-06/three-still-missing-after-vic-train-smash/59834|url-status=live}}</ref> |
||
== Background == |
== Background == |
||
Line 30: | Line 64: | ||
The [[Murray Valley Highway]] crosses the [[Piangil railway line]] about {{cvt|6|km|mi}} north-west of the town of Kerang. The [[level crossing]] at this location, numbered Y2943, was protected prior to the accident by warning signs, road markings, flashing lights and warning bells, all of which were later found to be operational at the time of the crash.{{sfn|CITMSI|2008|p=45}} |
The [[Murray Valley Highway]] crosses the [[Piangil railway line]] about {{cvt|6|km|mi}} north-west of the town of Kerang. The [[level crossing]] at this location, numbered Y2943, was protected prior to the accident by warning signs, road markings, flashing lights and warning bells, all of which were later found to be operational at the time of the crash.{{sfn|CITMSI|2008|p=45}} |
||
The highway is a single-carriageway, two-lane [[Paved road|bitumen road]], with a gentle curve about {{cvt|300|m|ft}} prior to the level crossing when |
The highway is a single-carriageway, two-lane [[Paved road|bitumen road]], with a gentle curve about {{cvt|300|m|ft}} prior to the level crossing when approaching from the south. At the level crossing, the [[speed limit]] was {{cvt|100|km/h|mph}}.{{sfn|CITMSI|2008|p=50}} The railway is a single line with a speed limit of {{cvt|90|km/h|mph}} for passenger trains.{{sfn|CITMSI|2008|p=44}} |
||
One fatal crash had previously occurred at the crossing, in 1995, but a database maintained by [[Transport Safety Victoria]] had recorded a number of [[Near miss (safety)|near misses]] between rail and road vehicles in the months leading up to the 2007 accident.{{sfn|CITMSI|2008|p=49}} |
|||
=== Train === |
=== Train === |
||
[[File:N460NewLivery.JPG|thumb|N460 pictured some months after the accident, in 2008.]] |
|||
Southbound [[V/Line]] passenger train 8042 was a regularly scheduled passenger service from [[Swan Hill railway station|Swan Hill]] to [[Southern Cross railway station|Southern Cross, Melbourne]]. The train consisted of [[V/Line N class|N class]] locomotive N460 and three carriages, designated set N7: ACN21, a [[First class travel|first class]] carriage; BRN20, an [[economy class]] carriage with |
Southbound [[V/Line]] passenger train 8042 was a regularly scheduled passenger service from [[Swan Hill railway station|Swan Hill]] to [[Southern Cross railway station|Southern Cross, Melbourne]]. The train consisted of [[V/Line N class|N class]] locomotive N460 and three carriages, designated set N7: ACN21, a [[First class travel|first class]] carriage; BRN20, an [[economy class]] carriage with [[Buffet car|buffet facilities]]; and BN19, a second economy carriage.{{sfn|CITMSI|2008|p=17}} It departed Swan Hill at 1.00{{nbsp}}pm with a scheduled arrival time in Kerang of 1.39{{nbsp}}p.m. |
||
The train was crewed by a fully qualified V/Line [[Train driver|driver]] from Melbourne, and two conductors, one from [[Bendigo]] and the other from Melbourne, who were jointly responsible for passenger services and operating the buffet.{{sfn|CITMSI|2008|p=15}} |
The train was crewed by a fully qualified V/Line [[Train driver|driver]] from Melbourne, and two conductors, one from [[Bendigo]] and the other from Melbourne, who were jointly responsible for passenger services and operating the buffet.{{sfn|CITMSI|2008|p=15}} |
||
Thirty-four passengers were on board at the time of the accident: 6 in the leading carriage, ACN21, 21 in BRN20, and seven at the rear of the train in BN19.{{sfn|CITMSI|2008|p=16}} |
|||
=== Truck === |
=== Truck === |
||
[[File:New Zealand Trucks - Flickr - 111 Emergency (192).jpg|thumb|A Kenworth K104 similar to the prime mover involved in the accident.]] |
|||
The [[semi-trailer truck]] involved in the accident consisted of a [[Refrigerator truck|refrigerated]][[Curtain sided lorry|curtain sided]] trailer hauled by a [[Kenworth]] K104B [[prime mover]].{{sfn|CITMSI|2008|pp=20–21}} Its driver, |
The [[semi-trailer truck]] involved in the accident consisted of a [[Refrigerator truck|refrigerated]] [[Curtain sided lorry|curtain sided]] trailer hauled by a [[Kenworth]] K104B [[tractor unit|prime mover]].{{sfn|CITMSI|2008|pp=20–21}} Its driver, Christiaan Scholl, was transporting a load of timber and pipe fittings from Victoria to South Australia on behalf of Canny Carrying Company.{{sfn|Coroner|2013|p=15}} |
||
On 5 June, Scholl departed [[Wangaratta]] about 90 minutes later than was usual for his cross-border trip. It was usual for him to cross the railway line at Kerang around noon.{{sfn|Coroner|2013|p=16}} |
On 5 June, Scholl departed [[Wangaratta]] about 90 minutes later than was usual for his cross-border trip. It was usual for him to cross the railway line at Kerang around noon.{{sfn|Coroner|2013|p=16}} |
||
== Incident == |
== Incident == |
||
The train involved in the accident was a locomotive-hauled service from [[Swan Hill railway station|Swan Hill]] that departed for [[Melbourne]] at 13:00,<ref name=vline>{{cite web|title=V/Line to support full scale inquiry |
The train involved in the accident was a locomotive-hauled service from [[Swan Hill railway station|Swan Hill]] that departed for [[Melbourne]] at 13:00,<ref name=vline>{{cite web|title=V/Line to support full scale inquiry|url=http://www.vline.com.au/home/news/en/20/894/article.aspx|publisher=V/Line Passenger Pty. Ltd|date=5 June 2007|accessdate=6 June 2007|url-status=dead|archiveurl=https://web.archive.org/web/20110706113452/http://www.vline.com.au/home/news/en/20/894/article.aspx|archivedate=6 July 2011|df=dmy}}</ref> operated by an [[V/Line N class (diesel)|N class locomotive]] and three car [[N type carriage|N type carriage set]]. The collision caused the closure of nearby sections of the [[Murray Valley Highway]].<ref name="abc1"/> |
||
Southbound V/Line passenger train service 8042, which consisted of locomotive N460 and carriage set N7, was run into by a northbound [[semi-trailer truck]], at a [[level crossing]] where the [[Piangil railway line]] crosses the [[Murray Valley Highway]]. The locomotive and first carriage escaped impact as the truck swerved left. However, the second carriage and third carriages were both struck, causing severe damage to the carriages and fatal injury to 11 passengers. |
Southbound V/Line passenger train service 8042, which consisted of locomotive N460 and carriage set N7, was run into by a northbound [[semi-trailer truck]], at a [[level crossing]] where the [[Piangil railway line]] crosses the [[Murray Valley Highway]]. The locomotive and first carriage escaped impact as the truck swerved left. However, the second carriage and third carriages were both struck, causing severe damage to the carriages and fatal injury to 11 passengers. |
||
Given that the truck had a mass of about 40 tonnes, and had been travelling at 100 km/h,<ref>{{cite news|title=Truckie 'speed error' behind 11 Kerang deaths |
Given that the truck had a mass of about 40 tonnes, and had been travelling at 100 km/h,<ref>{{cite news|title=Truckie 'speed error' behind 11 Kerang deaths|url=http://www.news.com.au/breaking-news/truckie-speed-error-behind-11-kerang-deaths/story-e6frfku0-1225716471538|work=news.com.au|date=26 May 2009|accessdate=21 January 2011|archive-date=12 August 2014|archive-url=https://web.archive.org/web/20140812210207/http://www.news.com.au/breaking-news/truckie-speed-error-behind-11-kerang-deaths/story-e6frfku0-1225716471538|url-status=dead}}</ref> its impact was devastating. The truck, owned by the Canny Carrying Company of [[Wangaratta, Victoria|Wangaratta]] and driven by Christiaan Scholl, was extensively damaged on impact with the carriages, although Scholl only sustained shoulder and head injuries. |
||
{{ |
{{wikinews|Ten killed in train crash in northern Victoria, Australia}} |
||
One survivor recalled, "A lady sitting across from me saw the truck and closed her eyes. You just wonder how anybody got out."<ref name="smh1">{{cite news|title=Eight killed in train crash|url=http://www.smh.com.au/news/national/eight-killed-in-train-crash/2007/06/05/1180809491964.html|work=[[The Sydney Morning Herald]]|date=5 June 2007|accessdate=6 June 2007}}</ref> |
One survivor recalled, "A lady sitting across from me saw the truck and closed her eyes. You just wonder how anybody got out."<ref name="smh1">{{cite news|title=Eight killed in train crash|url=http://www.smh.com.au/news/national/eight-killed-in-train-crash/2007/06/05/1180809491964.html|work=[[The Sydney Morning Herald]]|date=5 June 2007|accessdate=6 June 2007|archive-date=7 June 2007|archive-url=https://web.archive.org/web/20070607213022/http://www.smh.com.au/news/national/eight-killed-in-train-crash/2007/06/05/1180809491964.html|url-status=live}}</ref> |
||
Ursula McGuinnes, general manager of Stakeholder Relations for V/Line, noted that the level crossing was protected with lights and bells, which were still sounding and flashing when emergency services arrived, but did not have [[Boom barrier|boom gates]].<ref name="abc1"/> |
Ursula McGuinnes, general manager of Stakeholder Relations for V/Line, noted that the level crossing was protected with lights and bells, which were still sounding and flashing when emergency services arrived, but did not have [[Boom barrier|boom gates]].<ref name="abc1"/> |
||
Line 58: | Line 96: | ||
According to Kerang resident and [[Shire of Gannawarra]] councillor Lui Basile, there had been a recent timetable change on the line.<ref name="smh1"/> |
According to Kerang resident and [[Shire of Gannawarra]] councillor Lui Basile, there had been a recent timetable change on the line.<ref name="smh1"/> |
||
On 15 February 2008, the Office of the Chief Investigator, [[Government of Victoria#Department of Infrastructure|Department of Infrastructure]], released Rail Safety Report 2007/09, detailing the findings of the investigation into the collision. The report noted that the train, truck, and level crossing warning signals were all serviceable prior to the incident, and both the train and truck driver were familiar with their respective routes. The report noted that the truck driver did not agree to be interviewed by investigators, and concluded that: "For reasons not determined the truck driver did not respond in an adequate time and manner to the level crossing warning devices."<ref name=doireport>{{cite web |
On 15 February 2008, the Office of the Chief Investigator, [[Government of Victoria#Department of Infrastructure|Department of Infrastructure]], released Rail Safety Report 2007/09, detailing the findings of the investigation into the collision. The report noted that the train, truck, and level crossing warning signals were all serviceable prior to the incident, and both the train and truck driver were familiar with their respective routes. The report noted that the truck driver did not agree to be interviewed by investigators, and concluded that: "For reasons not determined the truck driver did not respond in an adequate time and manner to the level crossing warning devices."<ref name=doireport>{{cite web|url=http://www.transport.vic.gov.au/__data/assets/pdf_file/0008/30995/OCI-Report2007-09-Kerang.pdf|title=Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007|work=Chief Investigator, Transport and Marine Safety Investigations|publisher=Department of Infrastructure, Victoria|date=15 February 2008|accessdate=16 May 2008|archive-date=24 March 2012|archive-url=https://web.archive.org/web/20120324105308/http://www.transport.vic.gov.au/__data/assets/pdf_file/0008/30995/OCI-Report2007-09-Kerang.pdf|url-status=dead}}</ref> |
||
|url=http://www.transport.vic.gov.au/__data/assets/pdf_file/0008/30995/OCI-Report2007-09-Kerang.pdf |
|||
|format=PDF|title=Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007 |work=Chief Investigator, Transport and Marine Safety Investigations |publisher=Department of Infrastructure, Victoria |date=15 February 2008 |accessdate=16 May 2008 }}</ref> |
|||
== Response == |
== Response == |
||
Emergency response was swift, with a number of seriously injured people airlifted to Melbourne, while others were taken by road or air ambulance to nearby Kerang Hospital.<ref name="abc1"/> The State Premier Steve Bracks flew to the crash scene on the evening of 5 June with the Victoria Police Assistant Commissioner Noel Ashby and the Opposition transport spokesman Terry Mulder, calling it a "horrific scene".<ref name="abc1"/><ref name="age2">{{cite news|title=Bracks to fly to train crash scene|url=http://www.theage.com.au/news/National/Bracks-to-fly-to-train-crash-scene/2007/06/05/1180809504520.html|work=[[The Age]]|date=5 June 2007|accessdate=5 June 2007}}</ref> |
Emergency response was swift, with a number of seriously injured people airlifted to Melbourne, while others were taken by road or air ambulance to nearby Kerang Hospital.<ref name="abc1"/> The State Premier Steve Bracks flew to the crash scene on the evening of 5 June with the Victoria Police Assistant Commissioner Noel Ashby and the Opposition transport spokesman Terry Mulder, calling it a "horrific scene".<ref name="abc1"/><ref name="age2">{{cite news|title=Bracks to fly to train crash scene|url=http://www.theage.com.au/news/National/Bracks-to-fly-to-train-crash-scene/2007/06/05/1180809504520.html|work=[[The Age]]|date=5 June 2007|accessdate=5 June 2007|archive-date=8 June 2007|archive-url=https://web.archive.org/web/20070608102403/http://www.theage.com.au/news/National/Bracks-to-fly-to-train-crash-scene/2007/06/05/1180809504520.html|url-status=live}}</ref> |
||
Both the Federal Minister for Transport and Regional Services [[Mark Vaile]] and the Prime Minister [[John Howard]] spoke to the media, offering Federal government aid to families as well as the investigative assistance of the [[Australian Transport Safety Bureau]].<ref name="abc1"/><ref name="smh1"/> [[Opposition (Australia)|Leader of the Opposition]] [[Kevin Rudd]] said that he was "saddened and shocked" by the incident and went on to say that his "thoughts and prayers tonight are with those still fighting for their life in hospitals throughout Victoria."<ref>{{cite news|title=PM offers train crash help|url=http://www.theaustralian.news.com.au/story/0,20867,21854188-1702,00.html|work=[[The Australian]]|date=5 June 2007|accessdate=5 June 2007}}</ref> |
Both the Federal Minister for Transport and Regional Services [[Mark Vaile]] and the Prime Minister [[John Howard]] spoke to the media, offering Federal government aid to families as well as the investigative assistance of the [[Australian Transport Safety Bureau]].<ref name="abc1"/><ref name="smh1"/> [[Opposition (Australia)|Leader of the Opposition]] [[Kevin Rudd]] said that he was "saddened and shocked" by the incident and went on to say that his "thoughts and prayers tonight are with those still fighting for their life in hospitals throughout Victoria."<ref>{{cite news|title=PM offers train crash help|url=http://www.theaustralian.news.com.au/story/0,20867,21854188-1702,00.html|work=[[The Australian]]|date=5 June 2007|accessdate=5 June 2007|archive-date=11 June 2007|archive-url=https://web.archive.org/web/20070611061808/http://www.theaustralian.news.com.au/story/0,20867,21854188-1702,00.html|url-status=live}}</ref> |
||
V/Line announced it would support a full inquiry and had arranged counselling for the passengers and their families. Chief executive Rob Barnett said the incident would raise questions about the safety of level crossings, but asked everyone to resist jumping to conclusions.<ref name=vline/> Buses replaced trains between Bendigo and Swan Hill until the crash site was cleared and the site released by accident investigators.<ref>{{cite news|title=Victoria train crash toll now eight dead|url=http://www.theage.com.au/news/National/Victoria-train-crash-toll-now-eight-dead/2007/06/05/1180809490335.html|work=[[The Age]]|date=5 June 2007|accessdate=5 June 2007}}</ref><ref>{{cite web|title=Bendigo Line ~ Service disruptions ~ Tue 5 June |
V/Line announced it would support a full inquiry and had arranged counselling for the passengers and their families. Chief executive Rob Barnett said the incident would raise questions about the safety of level crossings, but asked everyone to resist jumping to conclusions.<ref name=vline/> Buses replaced trains between Bendigo and Swan Hill until the crash site was cleared and the site released by accident investigators.<ref>{{cite news|title=Victoria train crash toll now eight dead|url=http://www.theage.com.au/news/National/Victoria-train-crash-toll-now-eight-dead/2007/06/05/1180809490335.html|work=[[The Age]]|date=5 June 2007|accessdate=5 June 2007|archive-date=7 June 2007|archive-url=https://web.archive.org/web/20070607214219/http://www.theage.com.au/news/National/Victoria-train-crash-toll-now-eight-dead/2007/06/05/1180809490335.html|url-status=live}}</ref><ref>{{cite web|title=Bendigo Line ~ Service disruptions ~ Tue 5 June|url=http://www.vline.com.au/home/news/en/21/892/article.aspx|publisher=[[V/Line]] Passenger Pty. Ltd|date=5 June 2007|accessdate=6 June 2007|url-status=dead|archiveurl=https://web.archive.org/web/20110706113438/http://www.vline.com.au/home/news/en/21/892/article.aspx|archivedate=6 July 2011|df=dmy}}</ref> |
||
Due to the nature of land surrounding the accident site, some earthworks were required to provide a solid footing for the heavy lifting equipment needed to remove the rolling stock damaged in the accident.<ref name="vline3">{{cite web|title=V/Line prepares for rail recovery program |
Due to the nature of land surrounding the accident site, some earthworks were required to provide a solid footing for the heavy lifting equipment needed to remove the rolling stock damaged in the accident.<ref name="vline3">{{cite web|title=V/Line prepares for rail recovery program|url=http://www.vline.com.au/home/news/en/20/900/article.aspx|publisher=[[V/Line]] Passenger Pty. Ltd|date=6 June 2007|accessdate=7 June 2007|url-status=dead|archiveurl=https://web.archive.org/web/20120217064838/http://www.vline.com.au/home/news/en/20/900/article.aspx|archivedate=17 February 2012|df=dmy}}</ref> Once removed from the line, the damaged rolling stock was transported to Melbourne for further investigation,<ref name="vline3"/> with some of the carriages still in storage in 2008.<ref>{{cite web|url=https://www.flickr.com/photos/24447011@N02/3011386573/|title=Kerang collision carriage BRN20 stored at Newport workshops|date=4 October 2008|publisher=www.flickr.com|accessdate=23 March 2009|archive-date=11 May 2021|archive-url=https://web.archive.org/web/20210511185041/https://www.flickr.com/photos/24447011@N02/3011386573/|url-status=live}}</ref> |
||
|url=https://www.flickr.com/photos/24447011@N02/3011386573/ |
|||
|title=Kerang collision carriage BRN20 stored at Newport workshops |
|||
|publisher=www.flickr.com |
|||
|accessdate=23 March 2009 |
|||
}}</ref> |
|||
The driver of the semi-trailer, Christiaan Scholl, was charged with one count of culpable driving and on 7 June was bailed to appear before Bendigo Magistrates Court on 19 December. A police spokesman stated that more charges were expected to be laid in due course.<ref name="vicpol1">{{cite web|title=Man charged over Kerang collision|url=http://www.police.vic.gov.au/content.asp?Document_ID=11281|publisher=[[Victoria Police]]|date=7 June 2007|accessdate=8 June 2007}}</ref><ref>{{cite news|title=Kerang crash driver charged |
The driver of the semi-trailer, Christiaan Scholl, was charged with one count of culpable driving and on 7 June was bailed to appear before Bendigo Magistrates Court on 19 December. A police spokesman stated that more charges were expected to be laid in due course.<ref name="vicpol1">{{cite web|title=Man charged over Kerang collision|url=http://www.police.vic.gov.au/content.asp?Document_ID=11281|publisher=[[Victoria Police]]|date=7 June 2007|accessdate=8 June 2007|archive-date=28 September 2007|archive-url=https://web.archive.org/web/20070928173130/http://www.police.vic.gov.au/content.asp?Document_ID=11281|url-status=live}}</ref><ref>{{cite news|title=Kerang crash driver charged|url=http://www.news.com.au/story/0,23599,21865847-2,00.html|work=news.com.au|date=7 June 2007|accessdate=7 June 2007|url-status=dead|archiveurl=https://web.archive.org/web/20070609161006/http://www.news.com.au/story/0%2C23599%2C21865847-2%2C00.html|archivedate=9 June 2007|df=dmy}}</ref> On 18 August 2008, Scholl was committed for trial on 11 charges of causing death by culpable driving and 8 charges of causing injury by negligent driving. His trial began in Bendigo on 26 May 2009. On 13 June 2009, he was found not guilty on all charges.<ref name="Age Jun 2009">{{cite news|last1=Hagan|first1=Kate|title=Kerang driver not guilty|url=http://www.theage.com.au/national/kerang-driver-not-guilty-20090613-c6j6.html|accessdate=5 January 2018|work=The Age|date=13 June 2009|archive-date=5 January 2018|archive-url=https://web.archive.org/web/20180105184953/http://www.theage.com.au/national/kerang-driver-not-guilty-20090613-c6j6.html|url-status=live}}</ref> A group of crash victims indicated they would pursue a civil action against Scholl.<ref name="Australian Jun 2009">{{cite news|last1=Best|first1=Catherine|last2=Turnbull|first2=Jeff|title=Anger at Kerang train crash verdict|url=http://www.theaustralian.com.au/news/latest-news/anger-at-kerang-train-crash-verdict/news-story/9498dbd6b5be847544f7727f9b58a17d|accessdate=5 January 2018|work=The Australian|date=14 June 2009|archive-date=12 October 2017|archive-url=https://web.archive.org/web/20171012164717/http://www.theaustralian.com.au/news/latest-news/anger-at-kerang-train-crash-verdict/news-story/9498dbd6b5be847544f7727f9b58a17d|url-status=live}}</ref> One of the train's conductors [[Settlement (litigation)|settled]] his claim against Scholl out of court in 2011 for an undisclosed sum of money.<ref name="Age Jul 2011">{{cite news|last1=Petrie|first1=Andrea|title=Conductor settles action|url=http://www.theage.com.au/victoria/conductor-settles-action-20110724-1hvg2.html|accessdate=5 January 2018|work=The Age|date=25 July 2011|archive-date=5 January 2018|archive-url=https://web.archive.org/web/20180105184949/http://www.theage.com.au/victoria/conductor-settles-action-20110724-1hvg2.html|url-status=live}}</ref> |
||
==Inquest== |
==Inquest== |
||
An inquiry into the Kerang rail disaster was due to begin on 18 January 2011, but was delayed by a day due to [[2011 Victorian floods|flooding in the region]].<ref name="ABC Jan 2011">{{cite news|title=Kerang rail disaster inquest begins|url=http://www.abc.net.au/news/stories/2011/01/19/3116184.htm|accessdate=5 January 2018|work=ABC News|date=19 January 2011|language=en-AU}}</ref> The inquest began on 19 January at the Coroner's Court in Bendigo. After a [[Moment of silence|minute's silence]], coroner Dr Jane Hendtlass heard evidence from the driver of the train. The inquest was scheduled to run over 58 days.<ref name="Age Jan 2011">{{cite news|last1=Lowe|first1=Adrian|title=Kerang train crash inquest starts with minute's silence|url=http://www.theage.com.au/victoria/kerang-train-crash-inquest-starts-with-minutes-silence-20110119-19w0u.html|accessdate=5 January 2018|work=The Age|date=19 January 2011}}</ref> |
An inquiry into the Kerang rail disaster was due to begin on 18 January 2011, but was delayed by a day due to [[2011 Victorian floods|flooding in the region]].<ref name="ABC Jan 2011">{{cite news|title=Kerang rail disaster inquest begins|url=http://www.abc.net.au/news/stories/2011/01/19/3116184.htm|accessdate=5 January 2018|work=ABC News|date=19 January 2011|language=en-AU|archive-date=26 March 2011|archive-url=https://web.archive.org/web/20110326183419/http://www.abc.net.au/news/stories/2011/01/19/3116184.htm|url-status=live}}</ref> The inquest began on 19 January at the Coroner's Court in Bendigo. After a [[Moment of silence|minute's silence]], coroner Dr Jane Hendtlass heard evidence from the driver of the train. The inquest was scheduled to run over 58 days.<ref name="Age Jan 2011">{{cite news|last1=Lowe|first1=Adrian|title=Kerang train crash inquest starts with minute's silence|url=http://www.theage.com.au/victoria/kerang-train-crash-inquest-starts-with-minutes-silence-20110119-19w0u.html|accessdate=5 January 2018|work=The Age|date=19 January 2011|archive-date=5 January 2018|archive-url=https://web.archive.org/web/20180105181920/http://www.theage.com.au/victoria/kerang-train-crash-inquest-starts-with-minutes-silence-20110119-19w0u.html|url-status=live}}</ref> |
||
The inquest ultimately investigated 15 other deaths at Victorian level crossings. Its findings were released on 21 October 2013, and included recommendations that V/Line's emergency procedure and training be improved, that level crossing design be revisited to examine the best ways to alert drivers to approaching trains, and that better records be kept of level crossing incidents.<ref name="Age Oct 2013">{{cite news|last1=Cooper|first1=Adam|title=Coroner's findings leave families of Kerang train crash victims unsatisfied|url=http://www.theage.com.au/victoria/coroners-findings-leave-families-of-kerang-train-crash-victims-unsatisfied-20131020-2vvsk.html|accessdate=5 January 2018|work=The Age|date=21 October 2013}}</ref> |
The inquest ultimately investigated 15 other deaths at Victorian level crossings. Its findings were released on 21 October 2013, and included recommendations that V/Line's emergency procedure and training be improved, that level crossing design be revisited to examine the best ways to alert drivers to approaching trains, and that better records be kept of level crossing incidents.<ref name="Age Oct 2013">{{cite news|last1=Cooper|first1=Adam|title=Coroner's findings leave families of Kerang train crash victims unsatisfied|url=http://www.theage.com.au/victoria/coroners-findings-leave-families-of-kerang-train-crash-victims-unsatisfied-20131020-2vvsk.html|accessdate=5 January 2018|work=The Age|date=21 October 2013|archive-date=5 January 2018|archive-url=https://web.archive.org/web/20180105181926/http://www.theage.com.au/victoria/coroners-findings-leave-families-of-kerang-train-crash-victims-unsatisfied-20131020-2vvsk.html|url-status=live}}</ref> |
||
== See also == |
== See also == |
||
* [[Railway accidents in Victoria]] |
* [[Railway accidents in Victoria]] |
||
* [[List of disasters in Australia by death toll]] |
* [[List of disasters in Australia by death toll]] |
||
* [[List of rail accidents (2000–10)]] – includes [[level crossing]] accidents. |
|||
* [[List of level crossing accidents]] |
* [[List of level crossing accidents]] |
||
Line 93: | Line 123: | ||
== Bibliography == |
== Bibliography == |
||
*{{cite book|url=https://economicdevelopment.vic.gov.au/__data/assets/pdf_file/0003/1326432/2007-06-05-Level-Crossing-Collision-VLine-Passenger-Train-8042-and-a-Truck-near-Kerang.pdf|title=Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007 |
*{{cite book|url=https://economicdevelopment.vic.gov.au/__data/assets/pdf_file/0003/1326432/2007-06-05-Level-Crossing-Collision-VLine-Passenger-Train-8042-and-a-Truck-near-Kerang.pdf|title=Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007|publisher=Chief Investigator, Transport and Marine Safety Investigations|date=15 February 2008|accessdate=5 January 2018|ref={{sfnref|CITMSI|2008}}}} |
||
*{{cite book|title=Coronial Investigation of Twenty-six Rail Crossing Deaths in Victoria, Australia|date=October 2013|publisher=Coroners Court of Victoria|url=http://www.coronerscourt.vic.gov.au/resources/0887b4fa-a1bd-476e-84f8-f1ebec5d9157/attachment+a.pdf|accessdate=5 January 2018|ref={{sfnref|Coroner|2013}}}} |
*{{cite book|title=Coronial Investigation of Twenty-six Rail Crossing Deaths in Victoria, Australia|date=October 2013|publisher=Coroners Court of Victoria|url=http://www.coronerscourt.vic.gov.au/resources/0887b4fa-a1bd-476e-84f8-f1ebec5d9157/attachment+a.pdf|accessdate=5 January 2018|ref={{sfnref|Coroner|2013}}|archive-url=https://web.archive.org/web/20131021223335/http://www.coronerscourt.vic.gov.au/resources/0887b4fa-a1bd-476e-84f8-f1ebec5d9157/attachment+a.pdf|archive-date=21 October 2013|url-status=dead}} |
||
{{Coord|35|42|05|S|143|52|47|E|display=title|region:AU-VIC_type:event}} |
{{Coord|35|42|05|S|143|52|47|E|display=title|region:AU-VIC_type:event}} |
||
{{2007 railway accidents}} |
{{2007 railway accidents}} |
||
{{Railway accidents and incidents in Australia}} |
|||
{{DEFAULTSORT:Kerang Train Crash}} |
{{DEFAULTSORT:Kerang Train Crash}} |
||
[[Category:2007 in Australia]] |
[[Category:2007 disasters in Australia]] |
||
[[Category:2007 road incidents]] |
[[Category:2007 road incidents]] |
||
[[Category:Level crossing incidents in Australia]] |
[[Category:Level crossing incidents in Australia]] |
||
[[Category:Railway accidents in 2007]] |
[[Category:Railway accidents in 2007]] |
||
[[Category:Railway accidents in Victoria ( |
[[Category:Railway accidents and incidents in Victoria (state)]] |
||
[[Category: |
[[Category:2000s in Victoria (state)]] |
||
[[Category: |
[[Category:June 2007 events in Australia]] |
||
[[Category: |
[[Category:Kerang, Victoria]] |
Latest revision as of 09:08, 1 September 2024
Kerang train accident | |
---|---|
Details | |
Date | 5 June 2007 13:40 |
Location | Kerang, Victoria 257.2 km (159.8 mi) NNW from Melbourne |
Country | Australia |
Line | Piangil railway line |
Operator | V/Line |
Incident type | Level crossing collision |
Cause | Truck driver error |
Statistics | |
Trains | 1 |
Passengers | 36 |
Deaths | 11 |
Injured | 23 |
The Kerang train accident occurred on 5 June 2007 at about 13:40 AEST in the Australian state of Victoria, approximately 6 kilometres (3.7 mi) north of the town of Kerang in the state's northwest, and 257 kilometres (160 mi) north-northwest of the city of Melbourne.
Victoria Police confirmed that 11 people were killed and 23 injured in the crash,[1][2] making this to date the deadliest Australian rail disaster since 1977. As of 11:00 am on 6 June, two passengers remained unaccounted for.[3] The site was visited on the evening of 5 June by the Premier of Victoria, Steve Bracks, who called it a "horrific scene".[4]
Background
[edit]Level crossing
[edit]The Murray Valley Highway crosses the Piangil railway line about 6 km (3.7 mi) north-west of the town of Kerang. The level crossing at this location, numbered Y2943, was protected prior to the accident by warning signs, road markings, flashing lights and warning bells, all of which were later found to be operational at the time of the crash.[5]
The highway is a single-carriageway, two-lane bitumen road, with a gentle curve about 300 m (980 ft) prior to the level crossing when approaching from the south. At the level crossing, the speed limit was 100 km/h (62 mph).[6] The railway is a single line with a speed limit of 90 km/h (56 mph) for passenger trains.[7]
One fatal crash had previously occurred at the crossing, in 1995, but a database maintained by Transport Safety Victoria had recorded a number of near misses between rail and road vehicles in the months leading up to the 2007 accident.[8]
Train
[edit]Southbound V/Line passenger train 8042 was a regularly scheduled passenger service from Swan Hill to Southern Cross, Melbourne. The train consisted of N class locomotive N460 and three carriages, designated set N7: ACN21, a first class carriage; BRN20, an economy class carriage with buffet facilities; and BN19, a second economy carriage.[9] It departed Swan Hill at 1.00 pm with a scheduled arrival time in Kerang of 1.39 p.m.
The train was crewed by a fully qualified V/Line driver from Melbourne, and two conductors, one from Bendigo and the other from Melbourne, who were jointly responsible for passenger services and operating the buffet.[10]
Thirty-four passengers were on board at the time of the accident: 6 in the leading carriage, ACN21, 21 in BRN20, and seven at the rear of the train in BN19.[11]
Truck
[edit]The semi-trailer truck involved in the accident consisted of a refrigerated curtain sided trailer hauled by a Kenworth K104B prime mover.[12] Its driver, Christiaan Scholl, was transporting a load of timber and pipe fittings from Victoria to South Australia on behalf of Canny Carrying Company.[13]
On 5 June, Scholl departed Wangaratta about 90 minutes later than was usual for his cross-border trip. It was usual for him to cross the railway line at Kerang around noon.[14]
Incident
[edit]The train involved in the accident was a locomotive-hauled service from Swan Hill that departed for Melbourne at 13:00,[15] operated by an N class locomotive and three car N type carriage set. The collision caused the closure of nearby sections of the Murray Valley Highway.[4]
Southbound V/Line passenger train service 8042, which consisted of locomotive N460 and carriage set N7, was run into by a northbound semi-trailer truck, at a level crossing where the Piangil railway line crosses the Murray Valley Highway. The locomotive and first carriage escaped impact as the truck swerved left. However, the second carriage and third carriages were both struck, causing severe damage to the carriages and fatal injury to 11 passengers.
Given that the truck had a mass of about 40 tonnes, and had been travelling at 100 km/h,[16] its impact was devastating. The truck, owned by the Canny Carrying Company of Wangaratta and driven by Christiaan Scholl, was extensively damaged on impact with the carriages, although Scholl only sustained shoulder and head injuries.
One survivor recalled, "A lady sitting across from me saw the truck and closed her eyes. You just wonder how anybody got out."[17]
Ursula McGuinnes, general manager of Stakeholder Relations for V/Line, noted that the level crossing was protected with lights and bells, which were still sounding and flashing when emergency services arrived, but did not have boom gates.[4]
According to Kerang resident and Shire of Gannawarra councillor Lui Basile, there had been a recent timetable change on the line.[17]
On 15 February 2008, the Office of the Chief Investigator, Department of Infrastructure, released Rail Safety Report 2007/09, detailing the findings of the investigation into the collision. The report noted that the train, truck, and level crossing warning signals were all serviceable prior to the incident, and both the train and truck driver were familiar with their respective routes. The report noted that the truck driver did not agree to be interviewed by investigators, and concluded that: "For reasons not determined the truck driver did not respond in an adequate time and manner to the level crossing warning devices."[18]
Response
[edit]Emergency response was swift, with a number of seriously injured people airlifted to Melbourne, while others were taken by road or air ambulance to nearby Kerang Hospital.[4] The State Premier Steve Bracks flew to the crash scene on the evening of 5 June with the Victoria Police Assistant Commissioner Noel Ashby and the Opposition transport spokesman Terry Mulder, calling it a "horrific scene".[4][19]
Both the Federal Minister for Transport and Regional Services Mark Vaile and the Prime Minister John Howard spoke to the media, offering Federal government aid to families as well as the investigative assistance of the Australian Transport Safety Bureau.[4][17] Leader of the Opposition Kevin Rudd said that he was "saddened and shocked" by the incident and went on to say that his "thoughts and prayers tonight are with those still fighting for their life in hospitals throughout Victoria."[20]
V/Line announced it would support a full inquiry and had arranged counselling for the passengers and their families. Chief executive Rob Barnett said the incident would raise questions about the safety of level crossings, but asked everyone to resist jumping to conclusions.[15] Buses replaced trains between Bendigo and Swan Hill until the crash site was cleared and the site released by accident investigators.[21][22]
Due to the nature of land surrounding the accident site, some earthworks were required to provide a solid footing for the heavy lifting equipment needed to remove the rolling stock damaged in the accident.[23] Once removed from the line, the damaged rolling stock was transported to Melbourne for further investigation,[23] with some of the carriages still in storage in 2008.[24]
The driver of the semi-trailer, Christiaan Scholl, was charged with one count of culpable driving and on 7 June was bailed to appear before Bendigo Magistrates Court on 19 December. A police spokesman stated that more charges were expected to be laid in due course.[25][26] On 18 August 2008, Scholl was committed for trial on 11 charges of causing death by culpable driving and 8 charges of causing injury by negligent driving. His trial began in Bendigo on 26 May 2009. On 13 June 2009, he was found not guilty on all charges.[27] A group of crash victims indicated they would pursue a civil action against Scholl.[28] One of the train's conductors settled his claim against Scholl out of court in 2011 for an undisclosed sum of money.[29]
Inquest
[edit]An inquiry into the Kerang rail disaster was due to begin on 18 January 2011, but was delayed by a day due to flooding in the region.[30] The inquest began on 19 January at the Coroner's Court in Bendigo. After a minute's silence, coroner Dr Jane Hendtlass heard evidence from the driver of the train. The inquest was scheduled to run over 58 days.[31]
The inquest ultimately investigated 15 other deaths at Victorian level crossings. Its findings were released on 21 October 2013, and included recommendations that V/Line's emergency procedure and training be improved, that level crossing design be revisited to examine the best ways to alert drivers to approaching trains, and that better records be kept of level crossing incidents.[32]
See also
[edit]- Railway accidents in Victoria
- List of disasters in Australia by death toll
- List of level crossing accidents
References
[edit]- ^ Oakes, Dan; Doherty, Ben, Webb, Carolyn, Guerrera, Orietta (5 June 2007). "11 die in train crash". The Age. Archived from the original on 14 August 2009. Retrieved 6 June 2007.
{{cite news}}
: CS1 maint: multiple names: authors list (link) - ^ "No boom gates at level crossing crash scene". ABC News. 5 June 2007. Archived from the original on 23 August 2010. Retrieved 6 June 2007.
- ^ "Train crash truckie 'sorry'", The Age, 6 June 2007 Archived 25 December 2007 at the Wayback Machine (Retrieved 6 June 2007)
- ^ a b c d e f "Three still missing after Vic train smash". ABC News. 6 June 2007. Archived from the original on 29 October 2016. Retrieved 5 January 2018.
- ^ CITMSI 2008, p. 45.
- ^ CITMSI 2008, p. 50.
- ^ CITMSI 2008, p. 44.
- ^ CITMSI 2008, p. 49.
- ^ CITMSI 2008, p. 17.
- ^ CITMSI 2008, p. 15.
- ^ CITMSI 2008, p. 16.
- ^ CITMSI 2008, pp. 20–21.
- ^ Coroner 2013, p. 15.
- ^ Coroner 2013, p. 16.
- ^ a b "V/Line to support full scale inquiry". V/Line Passenger Pty. Ltd. 5 June 2007. Archived from the original on 6 July 2011. Retrieved 6 June 2007.
- ^ "Truckie 'speed error' behind 11 Kerang deaths". news.com.au. 26 May 2009. Archived from the original on 12 August 2014. Retrieved 21 January 2011.
- ^ a b c "Eight killed in train crash". The Sydney Morning Herald. 5 June 2007. Archived from the original on 7 June 2007. Retrieved 6 June 2007.
- ^ "Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007" (PDF). Chief Investigator, Transport and Marine Safety Investigations. Department of Infrastructure, Victoria. 15 February 2008. Archived from the original (PDF) on 24 March 2012. Retrieved 16 May 2008.
- ^ "Bracks to fly to train crash scene". The Age. 5 June 2007. Archived from the original on 8 June 2007. Retrieved 5 June 2007.
- ^ "PM offers train crash help". The Australian. 5 June 2007. Archived from the original on 11 June 2007. Retrieved 5 June 2007.
- ^ "Victoria train crash toll now eight dead". The Age. 5 June 2007. Archived from the original on 7 June 2007. Retrieved 5 June 2007.
- ^ "Bendigo Line ~ Service disruptions ~ Tue 5 June". V/Line Passenger Pty. Ltd. 5 June 2007. Archived from the original on 6 July 2011. Retrieved 6 June 2007.
- ^ a b "V/Line prepares for rail recovery program". V/Line Passenger Pty. Ltd. 6 June 2007. Archived from the original on 17 February 2012. Retrieved 7 June 2007.
- ^ "Kerang collision carriage BRN20 stored at Newport workshops". www.flickr.com. 4 October 2008. Archived from the original on 11 May 2021. Retrieved 23 March 2009.
- ^ "Man charged over Kerang collision". Victoria Police. 7 June 2007. Archived from the original on 28 September 2007. Retrieved 8 June 2007.
- ^ "Kerang crash driver charged". news.com.au. 7 June 2007. Archived from the original on 9 June 2007. Retrieved 7 June 2007.
- ^ Hagan, Kate (13 June 2009). "Kerang driver not guilty". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
- ^ Best, Catherine; Turnbull, Jeff (14 June 2009). "Anger at Kerang train crash verdict". The Australian. Archived from the original on 12 October 2017. Retrieved 5 January 2018.
- ^ Petrie, Andrea (25 July 2011). "Conductor settles action". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
- ^ "Kerang rail disaster inquest begins". ABC News. 19 January 2011. Archived from the original on 26 March 2011. Retrieved 5 January 2018.
- ^ Lowe, Adrian (19 January 2011). "Kerang train crash inquest starts with minute's silence". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
- ^ Cooper, Adam (21 October 2013). "Coroner's findings leave families of Kerang train crash victims unsatisfied". The Age. Archived from the original on 5 January 2018. Retrieved 5 January 2018.
Bibliography
[edit]- Level Crossing Collision V/Line Passenger Train 8042 and a Truck Near Kerang, Victoria 5 June 2007 (PDF). Chief Investigator, Transport and Marine Safety Investigations. 15 February 2008. Retrieved 5 January 2018.
- Coronial Investigation of Twenty-six Rail Crossing Deaths in Victoria, Australia (PDF). Coroners Court of Victoria. October 2013. Archived from the original (PDF) on 21 October 2013. Retrieved 5 January 2018.