New Taipei Metro: Difference between revisions
Bailmoney27 (talk | contribs) →Phases 2 and 3 of the Circular line: Ref improve |
No edit summary |
||
(26 intermediate revisions by 4 users not shown) | |||
Line 3: | Line 3: | ||
{{Infobox public transit |
{{Infobox public transit |
||
| box_width = |
| box_width = |
||
| image = File:New Taipei Metro logo |
| image = File:New Taipei Metro logo new logo.svg |
||
| imagesize = 100px |
| imagesize = 100px |
||
| name = |
| name = |
||
Line 49: | Line 49: | ||
'''New Taipei Metro''' ({{Lang-zh|t=新北捷運|p=Xīnběi Jiéyùn|zhu=ㄒㄧㄣ ㄅㄟˇ ㄐㄧㄝˊ ㄩㄣˋ}}) is a transit system serving [[New Taipei City|New Taipei]], Taiwan, operated by {{ill|New Taipei Metro Corporation|zh|新北捷運公司}}. The [[Danhai light rail]], [[Ankeng light rail]], and [[Circular line (New Taipei Metro)|Circular line]] are currently in operation, while the [[Sanying line]] is under construction. There are many other lines in various planning stages, such as the [[Shenkeng light rail]].<ref>{{cite web |title=公司簡介-新北大眾捷運股份有限公司 |url=http://www.ntmetro.com.tw/content/?parent_id=10412&type_id=10412 |website=www.ntmetro.com.tw |access-date=23 March 2019 |language=zh-tw}}</ref> Concurrently, these services are connected to [[Taipei Metro]] but operate independently. |
'''New Taipei Metro''' ({{Lang-zh|t=新北捷運|p=Xīnběi Jiéyùn|zhu=ㄒㄧㄣ ㄅㄟˇ ㄐㄧㄝˊ ㄩㄣˋ}}) is a transit system serving [[New Taipei City|New Taipei]], Taiwan, operated by {{ill|New Taipei Metro Corporation|zh|新北捷運公司}}. The [[Danhai light rail]], [[Ankeng light rail]], and [[Circular line (New Taipei Metro)|Circular line]] are currently in operation, while the [[Sanying line]] is under construction. There are many other lines in various planning stages, such as the [[Shenkeng light rail]].<ref>{{cite web |title=公司簡介-新北大眾捷運股份有限公司 |url=http://www.ntmetro.com.tw/content/?parent_id=10412&type_id=10412 |website=www.ntmetro.com.tw |access-date=23 March 2019 |language=zh-tw}}</ref> Concurrently, these services are connected to [[Taipei Metro]] but operate independently. |
||
==Timeline of services== |
|||
{| class="wikitable" |
|||
!Date started |
|||
!Date amended |
|||
!Terminus |
|||
!Route |
|||
!Terminus |
|||
|- |
|||
|2018-12 |
|||
|'''Current''' |
|||
|[[Kanding light rail station|Kanding]] |
|||
|{{rint|newtaipei|v}} |
|||
|[[Hongshulin station|Hongshulin]] |
|||
|- |
|||
|2020-01 |
|||
|'''Current''' |
|||
|[[Dapinglin metro station|Dapinglin]] |
|||
|{{rint|newtaipei|y}} |
|||
|[[New Taipei Industrial Park metro station|New Taipei Industrial Park]] |
|||
|- |
|||
|2020-11 |
|||
|'''Current''' |
|||
|[[Tamsui Fisherman's Wharf light rail station|Tamsui Fisherman's Wharf]] |
|||
|{{rint|newtaipei|v}} |
|||
|[[Binhai Shalun light rail station|Binhai Shalun]] |
|||
|- |
|||
|2023-02 |
|||
|'''Current''' |
|||
|[[Shuangcheng light rail station|Shuangcheng]] |
|||
|{{rint|newtaipei|k}} |
|||
|[[Shisizhang station|Shisizhang]] |
|||
|} |
|||
== Lines == |
== Lines == |
||
Line 59: | Line 92: | ||
Ankeng LRT serves the [[Xindian District]] (Ankeng) of New Taipei City by connecting the [[Circular line (New Taipei Metro)|Circular line]]'s [[Shisizhang metro station]] with [[Shuangcheng light rail station]]. Construction started around April 2016 and is well away on the road level part between station K1 and K5, with the first tracks having been laid in November 2018. As of October 2021 the project was 83.69% complete. From station K6 to K9 the tracks are elevated, as well as K2. As of June 2018, the entire section from station K1 to K6 is clearly visible on [[Google Maps]] running down the middle of Anyi Rd and then turning right onto Anjie Rd, passing through a cemetery and going across Ankang Road. As of September 2018, work has started on the bridge across the [[Xindian River]] to Shisizhang station. On February 10, 2023, the Ankeng LRT officially started operations and passengers can ride for free during the first month.<ref>{{cite web |title=Ankeng LRT begins trial operations with free rides until March 12 |url=https://focustaiwan.tw/society/202302100016 |website=Focus Taiwan |publisher=Central News Agency (CNA) |access-date=10 February 2023}}</ref> |
Ankeng LRT serves the [[Xindian District]] (Ankeng) of New Taipei City by connecting the [[Circular line (New Taipei Metro)|Circular line]]'s [[Shisizhang metro station]] with [[Shuangcheng light rail station]]. Construction started around April 2016 and is well away on the road level part between station K1 and K5, with the first tracks having been laid in November 2018. As of October 2021 the project was 83.69% complete. From station K6 to K9 the tracks are elevated, as well as K2. As of June 2018, the entire section from station K1 to K6 is clearly visible on [[Google Maps]] running down the middle of Anyi Rd and then turning right onto Anjie Rd, passing through a cemetery and going across Ankang Road. As of September 2018, work has started on the bridge across the [[Xindian River]] to Shisizhang station. On February 10, 2023, the Ankeng LRT officially started operations and passengers can ride for free during the first month.<ref>{{cite web |title=Ankeng LRT begins trial operations with free rides until March 12 |url=https://focustaiwan.tw/society/202302100016 |website=Focus Taiwan |publisher=Central News Agency (CNA) |access-date=10 February 2023}}</ref> |
||
=== |
===Circular line=== |
||
{{Main|Circular line (New Taipei Metro)}} |
{{Main|Circular line (New Taipei Metro)}} |
||
On 31 January 2020, the Circular line opened.<ref name=":01">{{Cite web |date=21 January 2020 |title=捷運環狀線 1月31日通車 |url=https://www.cna.com.tw/news/firstnews/202001215003.aspx}}</ref> Stage I construction consists of 14 stations running from {{stl|Taipei Metro|New Taipei Industrial Park}} on {{lnl|Taoyuan Metro|A}} to {{stl|Taipei Metro|Dapinglin}} on {{lnl|Taipei Metro|G}} and is about {{convert|15.4|km|mi|abbr=on}} long.<ref>{{Cite web|date=19 January 2020 |title=Network and Systems|url=http://english.metro.taipei/ct.asp?xItem=1315555&ctNode=70214&mp=122036|access-date=22 January 2020|publisher=Taipei Rapid Transit Corporation}}</ref> Electromechanical equipment for the line is supplied by [[Hitachi Rail STS]], including driverless technology and CBTC Radio signalling.<ref name="Y Line Train"/> In February 2020, free rides were offered to passengers in order to raise awareness and test the route's popularity.<ref>{{Cite web |title=Free rides on MRT Circular Line to end Saturday – Focus Taiwan |url=https://focustaiwan.tw/society/202002250014 |url-status=dead |archive-url=https://web.archive.org/web/20200303022214/https://focustaiwan.tw/society/202002250014 |archive-date=3 March 2020 |access-date=3 March 2020 |website=focustaiwan.tw |language=zh-Hant-TW}}</ref><ref>{{Cite web |title=Map of new Taipei MRT Circular Line now up |url=https://www.taiwannews.com.tw/en/news/3861119 |access-date=3 March 2020 |website=Taiwan News|date=20 January 2020 }}</ref> On 5 May 2023, the Circular line was transferred from the Taipei Metro to the New Taipei Metro.<ref>{{Cite web |last=賴 |first=筱桐 |date=4 September 2023 |title=環狀線遭質疑「假移交」 新北捷:5/23已完成權責移轉 - 生活 - 自由時報電子報 |url=https://news.ltn.com.tw/news/life/breakingnews/4417849 |access-date=28 April 2024 |website=news.ltn.com.tw |language=zh-TW}}</ref> It is the first [[Automated guideway transit|automated metro]] entirely within [[New Taipei City]],<ref>{{Cite web |last=Central News Agency |date=2019-10-25 |title=1st section of Taipei MRT Circular Line set to operate by year-end {{!}} Taiwan News {{!}} 2019-10-25 23:20:00 |url=https://www.taiwannews.com.tw/en/news/3803575 |access-date=2023-09-07 |website=Taiwan News}}</ref> with the only other driverless line being the [[Wenhu line]]. The western section of the line officially opened on 31 January 2020. The line is currently {{convert|15.4|km|mi|abbr=on}} long, with 14 stations.<ref>{{Cite web |date=2019-12-28 |title=Taipei MRT Circular Line to Face Inspection Jan. 5 |url=https://news.immigration.gov.tw/PH/NewsTopic.aspx?NEWSGUID=3bc1c6cf-2f23-4f21-9454-feae386fb28e |access-date=11 January 2020 |website=Global News for New Immigrants |publisher=Ministry of Interior, National Immigration Agency |language=en |archive-date=2020-01-11 |archive-url=https://web.archive.org/web/20200111093738/https://news.immigration.gov.tw/PH/NewsTopic.aspx%3FNEWSGUID%3D3bc1c6cf-2f23-4f21-9454-feae386fb28e |url-status=dead }}</ref> It uses CBTC Radio signalling from [[Ansaldo STS]].<ref>{{Cite web |date=17 March 2009 |title=Taipei Circular Line Kicks Off |url=http://www.railwaygazette.com/news/single-view/view//taipei-circular-line-kicks-off.html |url-status=dead |archive-url=https://web.archive.org/web/20100310081408/http://www.railwaygazette.com/news/single-view/view/taipei-circular-line-kicks-off.html |archive-date=10 March 2010 |access-date=10 November 2019 |website=Railway Gazette |language=en}}</ref> |
|||
==Rolling stock== |
|||
===Light rail trains=== |
|||
The [[Danhai light rail]] uses {{ill|Danhai LRV|zh|新北捷運淡海輕軌電聯車|lt=its own rolling stock}}, which entered service in December 2018 with the opening of the first section. The [[Ankeng light rail]] uses {{ill|Ankeng LRV|zh|新北捷運安坑輕軌電聯車|lt=its own rolling stock}}, similar to those used on the Danhai light rail, which entered service in February 2023 with the opening of the line. Both types of trains run on {{track gauge|sg|allk=on}}. |
|||
===Rapid transit trains=== |
|||
The [[Hitachi Rail Italy Driverless Metro]] is used on the {{lnl|New Taipei Metro|Y}}, which entered service in January 2020 with the opening of the first section. Each train consists of a 4-car EMU set and with open-gangway connection between cars. The trains run on {{track gauge|sg|allk=on}} without onboard operators.<ref name="Y Line Train">{{Cite web |last=<!--Not stated--> |title=Metro Taipei Circular Line Driverless |url=http://italy.hitachirail.com/en/taipei_437.html |access-date=22 January 2020 |website=Hitachi Rail |language=en |archive-date=26 June 2017 |archive-url=https://archive.today/20170626155032/http://italy.hitachirail.com/en/taipei_437.html |url-status=dead }}</ref> |
|||
===Fleet roster=== |
|||
====Light rail fleet==== |
|||
{| class="wikitable sortable" style="font-size: 85%;" | |
|||
|- |
|||
! Car type |
|||
! Photo |
|||
! Year built |
|||
! Builder(s) |
|||
! Train length (m) |
|||
! Capacity (seated/standing) |
|||
! Max. speed{{efn|Design/Service}} (km/h) |
|||
! Fleet total |
|||
! Car set numbers |
|||
! Line(s) |
|||
! Depot(s) |
|||
! Notes |
|||
|- |
|||
| {{ill|Danhai LRV|zh|新北捷運淡海輕軌電聯車|lt=Danhai LRV}} |
|||
| [[File:New Taipei Metro Danhai Light Rail Train 2018-12-29.jpg|110px]] |
|||
| 2016-2017 |
|||
| rowspan="2" | [[Taiwan Rolling Stock Company|TRSC]] |
|||
| rowspan="2" | 34.5 |
|||
| rowspan="2" | 62/265 |
|||
| rowspan="2" | 70 ([[overhead line]])/50 (no overhead line) |
|||
| rowspan="2" | 15 |
|||
| 1011–1155 |
|||
| [[File:New Taipei Metro Line V.svg|30px|link=Danhai light rail]] |
|||
| Danhai |
|||
| rowspan="2" | [[Gangway connection#Open gangways in urban transit|Open gangway]] connection |
|||
|- |
|||
| {{ill|Ankeng LRV|zh|新北捷運安坑輕軌電聯車|lt=Ankeng LRV}} |
|||
| [[File:Shuangcheng Station of the Ankeng Line.jpg|110px]] |
|||
| 2016-2023 |
|||
| 2011–2155 |
|||
| [[File:New Taipei Metro Line K.svg|30px|link=Ankeng light rail]] |
|||
| Ankeng |
|||
|} |
|||
====Rapid transit fleet==== |
|||
{| class="wikitable sortable" style="font-size: 85%;" | |
|||
|- |
|||
! Car type |
|||
! Photo |
|||
! Year built |
|||
! Builder(s) |
|||
! Train length (m) |
|||
! Capacity (seated/standing) |
|||
! Max. speed{{efn|Design/Service}} (km/h) |
|||
! Fleet total |
|||
! Car set numbers |
|||
! Line(s) |
|||
! Depot(s) |
|||
! Notes |
|||
|- |
|||
| [[New Taipei Metro Circular Line EMU|EMU101]] ([[Hitachi Rail Italy Driverless Metro|Driverless Metro]]) |
|||
| [[File:TRTC Circular Line EMU train by ntpcdorts.jpg|110px]] |
|||
| 2016 |
|||
| [[Hitachi Rail Italy]], TRSC |
|||
| 68.43 |
|||
| 24/650 |
|||
| 90/80 |
|||
| 68 |
|||
| 101–117 |
|||
| [[File:New Taipei Metro Line Y.svg|30px|link=Circular line (New Taipei Metro)]] |
|||
| North, South |
|||
| Open gangway connection |
|||
|} |
|||
===Engineering trains=== |
|||
New Taipei Metro also uses a fleet of specialised trains for [[maintenance of way]] purposes on the Circular line: |
|||
{| class="wikitable sortable" style="font-size: 95%;" | |
|||
|- |
|||
! Car Type |
|||
! Purpose |
|||
! Builder |
|||
! Max. speed (km/h) |
|||
! Length (m) |
|||
! Lines used on |
|||
|- |
|||
| Rescue locomotive |
|||
| Rescue of passenger [[electric multiple unit|EMU]] or engineering trains |
|||
| rowspan="2" | Bemo Rail |
|||
| 50 |
|||
| 9.45 |
|||
| rowspan="4" | [[File:New Taipei Metro Line Y.svg|20px|link=Circular line (New Taipei Metro)]] |
|||
|- |
|||
| Track maintenance vehicle |
|||
| rowspan="2" | Track maintenance |
|||
| 25 |
|||
| 5.86 |
|||
|- |
|||
| [[Road–rail vehicle]] |
|||
| [[Mercedes-Benz]] |
|||
| 50 (rail), 80 (road) |
|||
| 5.2 |
|||
|- |
|||
| [[Flatcar]] |
|||
| Carrying maintenance equipment |
|||
| Bemo Rail |
|||
| {{n/a}} |
|||
| 18 |
|||
|} |
|||
===Depots=== |
|||
The system currently has three depots, with more under construction.<ref>{{Cite press release |title=Circular Line Phase I Soon to Be Added to Taipei MRT Route Network to Provide the Public with More Comfortable and Convenient Transportation Services |date=22 January 2020 |publisher=Taipei City Government, Department of Rapid Transit Systems |location=Taipei |url=https://english.dorts.gov.taipei/News_Content.aspx?n=A5F92B0ABCE15B09&sms=DFFA119D1FD5602C&s=096A8D1016A219EB |access-date=22 January 2020 |author=<!--Staff writer(s); no by-line.-->}}</ref> |
|||
{| class="wikitable" style="text-align:center" |
|||
! Depot Name |
|||
! Year Opened |
|||
! Location |
|||
! Rolling Stock Housed |
|||
! Line(s) Served |
|||
|- |
|||
| {{ill|Danhai Depot|zh|淡海機廠|lt=Danhai}} |
|||
| 2018 |
|||
| [[Tamsui District|Tamsui]], north of {{stl|New Taipei Metro|Kanding}} |
|||
| {{ill|Danhai LRV|zh|新北捷運淡海輕軌電聯車|lt=Danhai LRV}} |
|||
| [[File:New Taipei Metro Line V.svg|20px|link=Danhai light rail]] |
|||
|- |
|||
| {{ill|South Depot|zh|南機廠 (台北)|lt=South}} |
|||
| 2020 |
|||
| [[Xindian District|Xindian]], north of {{stl|New Taipei Metro|Shisizhang}} |
|||
| [[New Taipei Metro Circular Line EMU|EMU101]] |
|||
| [[File:New Taipei Metro Line Y.svg|20px|link=Circular line (New Taipei Metro)]] |
|||
|- |
|||
| {{ill|Ankeng Depot|zh|安坑機廠|lt=Ankeng}} |
|||
| 2023 |
|||
| [[Xindian District|Xindian]], south of {{stl|New Taipei Metro|Shuangcheng}} |
|||
| {{ill|Ankeng LRV|zh|新北捷運安坑輕軌電聯車|lt=Ankeng LRV}} |
|||
| [[File:New Taipei Metro Line K.svg|20px|link=Ankeng light rail]] |
|||
|} |
|||
<gallery> |
|||
File:淡海輕軌藍海線履勘委員勘察機廠整備狀況.jpg|An LRV at Danhai Depot |
|||
File:Trains on the Taipei Metro Circular Line 20180810(1).jpg|The workshop area of South Depot |
|||
File:Ankeng Depot aerial photographs.jpg|Aerial view of Ankeng Depot |
|||
</gallery> |
|||
== Future expansions == |
== Future expansions == |
||
Line 96: | Line 273: | ||
== See also == |
== See also == |
||
* [[Department of Rapid Transit Systems, New Taipei City Government]] |
* [[Department of Rapid Transit Systems, New Taipei City Government]] |
||
== Notes == |
|||
{{notelist}} |
|||
== References == |
== References == |
||
Line 106: | Line 286: | ||
|title=Lines and services of New Taipei Metro |
|title=Lines and services of New Taipei Metro |
||
|list= |
|list= |
||
{{Circular line navbox}} |
|||
{{Danhai Light Rail Transit}} |
{{Danhai Light Rail Transit}} |
||
{{Ankeng Light Rail Transit}} |
|||
{{Circular line navbox}} |
|||
}} |
}} |
||
{{Taiwan Rail Transport}} |
{{Taiwan Rail Transport}} |
Latest revision as of 19:10, 8 September 2024
New Taipei Metro | |||
---|---|---|---|
Overview | |||
Native name | 新北捷運 | ||
Owner | Department of Rapid Transit Systems, New Taipei City Government | ||
Area served | New Taipei City, Taipei | ||
Locale | New Taipei City | ||
Transit type | |||
Number of lines | 3 | ||
Number of stations | 37 | ||
Chief executive | Lin Youxian (林祐賢) | ||
Headquarters | New Taipei City | ||
Website | www | ||
Operation | |||
Began operation | December 12, 2018 January 31, 2020 (rapid transit) | (light rail)||
Operator(s) | New Taipei Metro Corporation | ||
Character | Elevated, underground, at-grade | ||
Technical | |||
System length | 9.55 km (5.93 mi) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | 750 V DC | ||
|
New Taipei Metro (Chinese: 新北捷運; pinyin: Xīnběi Jiéyùn; Zhuyin Fuhao: ㄒㄧㄣ ㄅㄟˇ ㄐㄧㄝˊ ㄩㄣˋ) is a transit system serving New Taipei, Taiwan, operated by New Taipei Metro Corporation . The Danhai light rail, Ankeng light rail, and Circular line are currently in operation, while the Sanying line is under construction. There are many other lines in various planning stages, such as the Shenkeng light rail.[1] Concurrently, these services are connected to Taipei Metro but operate independently.
Timeline of services
[edit]Date started | Date amended | Terminus | Route | Terminus |
---|---|---|---|---|
2018-12 | Current | Kanding | Hongshulin | |
2020-01 | Current | Dapinglin | New Taipei Industrial Park | |
2020-11 | Current | Tamsui Fisherman's Wharf | Binhai Shalun | |
2023-02 | Current | Shuangcheng | Shisizhang |
Lines
[edit]Danhai light rail
[edit]The Danhai light rail is a light rail transit (LRT) network located in Tamsui District, New Taipei, Taiwan. It opened on 24 December 2018. The network connects to the Taipei Metro at Hongshulin.[2]
Ankeng light rail
[edit]Ankeng LRT serves the Xindian District (Ankeng) of New Taipei City by connecting the Circular line's Shisizhang metro station with Shuangcheng light rail station. Construction started around April 2016 and is well away on the road level part between station K1 and K5, with the first tracks having been laid in November 2018. As of October 2021 the project was 83.69% complete. From station K6 to K9 the tracks are elevated, as well as K2. As of June 2018, the entire section from station K1 to K6 is clearly visible on Google Maps running down the middle of Anyi Rd and then turning right onto Anjie Rd, passing through a cemetery and going across Ankang Road. As of September 2018, work has started on the bridge across the Xindian River to Shisizhang station. On February 10, 2023, the Ankeng LRT officially started operations and passengers can ride for free during the first month.[3]
Circular line
[edit]On 31 January 2020, the Circular line opened.[4] Stage I construction consists of 14 stations running from New Taipei Industrial Park on Taoyuan Airport MRT to Dapinglin on Songshan–Xindian line and is about 15.4 km (9.6 mi) long.[5] Electromechanical equipment for the line is supplied by Hitachi Rail STS, including driverless technology and CBTC Radio signalling.[6] In February 2020, free rides were offered to passengers in order to raise awareness and test the route's popularity.[7][8] On 5 May 2023, the Circular line was transferred from the Taipei Metro to the New Taipei Metro.[9] It is the first automated metro entirely within New Taipei City,[10] with the only other driverless line being the Wenhu line. The western section of the line officially opened on 31 January 2020. The line is currently 15.4 km (9.6 mi) long, with 14 stations.[11] It uses CBTC Radio signalling from Ansaldo STS.[12]
Rolling stock
[edit]Light rail trains
[edit]The Danhai light rail uses its own rolling stock , which entered service in December 2018 with the opening of the first section. The Ankeng light rail uses its own rolling stock , similar to those used on the Danhai light rail, which entered service in February 2023 with the opening of the line. Both types of trains run on 1,435 mm (4 ft 8+1⁄2 in) standard gauge.
Rapid transit trains
[edit]The Hitachi Rail Italy Driverless Metro is used on the Circular line, which entered service in January 2020 with the opening of the first section. Each train consists of a 4-car EMU set and with open-gangway connection between cars. The trains run on 1,435 mm (4 ft 8+1⁄2 in) standard gauge without onboard operators.[6]
Fleet roster
[edit]Light rail fleet
[edit]Car type | Photo | Year built | Builder(s) | Train length (m) | Capacity (seated/standing) | Max. speed[a] (km/h) | Fleet total | Car set numbers | Line(s) | Depot(s) | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
Danhai LRV | 2016-2017 | TRSC | 34.5 | 62/265 | 70 (overhead line)/50 (no overhead line) | 15 | 1011–1155 | Danhai | Open gangway connection | ||
Ankeng LRV | 2016-2023 | 2011–2155 | Ankeng |
Rapid transit fleet
[edit]Car type | Photo | Year built | Builder(s) | Train length (m) | Capacity (seated/standing) | Max. speed[b] (km/h) | Fleet total | Car set numbers | Line(s) | Depot(s) | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
EMU101 (Driverless Metro) | 2016 | Hitachi Rail Italy, TRSC | 68.43 | 24/650 | 90/80 | 68 | 101–117 | North, South | Open gangway connection |
Engineering trains
[edit]New Taipei Metro also uses a fleet of specialised trains for maintenance of way purposes on the Circular line:
Car Type | Purpose | Builder | Max. speed (km/h) | Length (m) | Lines used on |
---|---|---|---|---|---|
Rescue locomotive | Rescue of passenger EMU or engineering trains | Bemo Rail | 50 | 9.45 | |
Track maintenance vehicle | Track maintenance | 25 | 5.86 | ||
Road–rail vehicle | Mercedes-Benz | 50 (rail), 80 (road) | 5.2 | ||
Flatcar | Carrying maintenance equipment | Bemo Rail | — | 18 |
Depots
[edit]The system currently has three depots, with more under construction.[13]
Depot Name | Year Opened | Location | Rolling Stock Housed | Line(s) Served |
---|---|---|---|---|
Danhai | 2018 | Tamsui, north of Kanding | Danhai LRV | |
South | 2020 | Xindian, north of Shisizhang | EMU101 | |
Ankeng | 2023 | Xindian, south of Shuangcheng | Ankeng LRV |
-
An LRV at Danhai Depot
-
The workshop area of South Depot
-
Aerial view of Ankeng Depot
Future expansions
[edit]Phases 2 and 3 of the Circular line
[edit]Phase 2 of the Circular line is under construction and planned to be completed in 2029.[14] Phase 2 consists of a northern and southern section. The northern section will continue from New Taipei Industrial Park to Jiannan Road. This section will service Wugu, Luzhou, Shilin and Neihu. The southern section will continue from Dapinglin to Taipei Zoo and will mainly service Wenshan.
Phase 3 is planned to start construction in 2025 and finish in 2033.[15] Phase 3 consists of the eastern section, which is planned to connect Jiannan Road and Taipei Zoo in Phase 2, making the line a complete loop.
Sanying line
[edit]The Sanying line is a metro line under construction, serving Sanxia and Yingge districts. The first section is 14.29 km (8.88 mi) long, has twelve stations and runs through Tucheng, Sanxia and Yingge districts, and should be completed by 2025. The line shares the same terminus with Bannan line's terminal station, Dingpu.[16] This line is also planned to be extended to Bade, Taoyuan with 2 stations and 3.88 km (2.41 mi), terminating at Danan station on the Taoyuan Metro Green line.[17]
Shenkeng light rail
[edit]The Shenkeng light rail is a planned light rail system in Shenkeng and Shiding districts. The route extends eastwards from Taipei City Zoo through Shenkeng District, terminating at National Freeway No 5's Shiding service area.[18][19]
Wugu–Taishan light rail
[edit]The Wugu–Taishan light rail is a planned light rail system in the Sanchong, Luzhou, Wugu and Taishan districts. The route begins from Jixian Environmental Park, passing through Luzhou, Wugu, and Taishan, terminating at the location between Taishan metro station (A5) and Taishan Guihe metro station (A6) on the Taoyuan Airport MRT. A new station (tentative name: Wenzizun, station code: A5a) is also planned to be set up on Taoyuan Airport MRT to allow transfers between the light rail system.[20]
An extension to Banqiao District is also being planned, known as the Taishan–Banqiao light rail.[21]
Network map
[edit]See also
[edit]Notes
[edit]References
[edit]- ^ "公司簡介-新北大眾捷運股份有限公司". www.ntmetro.com.tw (in Chinese (Taiwan)). Retrieved 23 March 2019.
- ^ "Newly opened the first section of the Danhai LRT Lanhai Line - [WTM] Railway & Travel News". en.wtmnews.net. Retrieved 2023-09-07.
- ^ "Ankeng LRT begins trial operations with free rides until March 12". Focus Taiwan. Central News Agency (CNA). Retrieved 10 February 2023.
- ^ "捷運環狀線 1月31日通車". 21 January 2020.
- ^ "Network and Systems". Taipei Rapid Transit Corporation. 19 January 2020. Retrieved 22 January 2020.
- ^ a b "Metro Taipei Circular Line Driverless". Hitachi Rail. Archived from the original on 26 June 2017. Retrieved 22 January 2020.
- ^ "Free rides on MRT Circular Line to end Saturday – Focus Taiwan". focustaiwan.tw (in Chinese). Archived from the original on 3 March 2020. Retrieved 3 March 2020.
- ^ "Map of new Taipei MRT Circular Line now up". Taiwan News. 20 January 2020. Retrieved 3 March 2020.
- ^ 賴, 筱桐 (4 September 2023). "環狀線遭質疑「假移交」 新北捷:5/23已完成權責移轉 - 生活 - 自由時報電子報". news.ltn.com.tw (in Chinese (Taiwan)). Retrieved 28 April 2024.
- ^ Central News Agency (2019-10-25). "1st section of Taipei MRT Circular Line set to operate by year-end | Taiwan News | 2019-10-25 23:20:00". Taiwan News. Retrieved 2023-09-07.
- ^ "Taipei MRT Circular Line to Face Inspection Jan. 5". Global News for New Immigrants. Ministry of Interior, National Immigration Agency. 2019-12-28. Archived from the original on 2020-01-11. Retrieved 11 January 2020.
- ^ "Taipei Circular Line Kicks Off". Railway Gazette. 17 March 2009. Archived from the original on 10 March 2010. Retrieved 10 November 2019.
- ^ "Circular Line Phase I Soon to Be Added to Taipei MRT Route Network to Provide the Public with More Comfortable and Convenient Transportation Services" (Press release). Taipei: Taipei City Government, Department of Rapid Transit Systems. 22 January 2020. Retrieved 22 January 2020.
- ^ Artymiuk, Simon (2023-04-05). "Work starts on north section of Taipei MRT Circular Line". International Railway Journal. Retrieved 2024-08-19.
- ^ Wong, Brendan (2023-04-28). "Taipei MRT Circular Line's new east section expected to begin construction within two years". Radio Taiwan International. Retrieved 2024-08-19.
- ^ "路線說明" [Description of Line]. Department of Rapid Transit Systems, New Taipei City (in Chinese). 2020-01-10. Retrieved 2020-01-25.
- ^ "路線說明" [Description of Line]. Department of Rapid Transit Systems, New Taipei City (in Chinese). 2018-09-14. Retrieved 2020-01-25.
- ^ "捷運路線清楚又便利!學問就在顏色上!" (in Chinese (Taiwan)). New Taipei City Government. 2018-04-18.
- ^ "Department of Rapid Transit Systems-Network-Approved MRT Routes". New Taipei City Government. 2019-01-23.
- ^ "五股泰山輕軌 - 新北市政府捷運工程局" (in Chinese (Taiwan)). Department of Rapid Transit Systems, New Taipei City Government. 2022-10-26.
- ^ "泰山板橋輕軌 - 新北市政府捷運工程局" (in Chinese (Taiwan)). Department of Rapid Transit Systems, New Taipei City Government. 2022-10-26.