{{Infobox Bridge |
{{Infobox bridge
|bridge_name=Pearl Harbor Memorial Bridge
|bridge_name=Pearl Harbor Memorial Bridge
|image = Q Bridge, August 2015.jpg
|image = Q Bridge in New Haven Illuminated Red, White, and Blue (27460771747).jpg
|image_size=300px
|caption = The nearly-complete bridge in August 2015
|caption = The Pearl Harbor Memorial Bridge, locally known as the '''Q Bridge''', crosses over the [[Quinnipiac River]].
|locale=[[New Haven, Connecticut]], [[United States|U.S.]]
|locale=[[New Haven, Connecticut]], [[United States|U.S.]]
|carries=Ten lanes of {{Jct|state=CT|I|95|CTTP}}
|carries=10 lanes of {{Jct|state=CT|I|95}}
|crosses=[[Quinnipiac River]]
|crosses=[[Quinnipiac River]]
|maint=[[Connecticut Department of Transportation]]
|maint=[[Connecticut Department of Transportation]]
|opened=1958 (original span) reconstructed 2005-2015
|opened=1958 (original span) reconstructed 2005-2015
|mainspan={{convert|157.0|m|ft}}
|mainspan=515 ft (157.0 m)
|height={{convert|45.7|m|ft}}
|height=150 ft (45.7 m)
|below={{convert|18.3|m|ft}}
|below=60 ft (18.3 m)
|design=[[Extradosed bridge]]
|design=[[Extradosed bridge]]
|length={{convert|1443.2|m|ft}}
|length=4,735 ft (1,443.2 m)
|width={{convert|55.4|m|ft}}
|width=182 ft (55.4 m)
|extra=
}}
}}


The '''Pearl Harbor Memorial Bridge''', more commonly referred to as the '''Q Bridge''' by locals, is an [[extradosed bridge]] that carries [[Interstate 95 in Connecticut|Interstate 95]] ([[Connecticut Turnpike]]) over the mouth of the [[Quinnipiac River]] in [[New Haven, Connecticut|New Haven]], in the [[U.S. state]] of [[Connecticut]].<ref>{{cite web |url=http://www.i95newhaven.com/pdfs/fact_sheet_extradosedbridge020510.pdf |title=Pearl Harbor Memorial Bridge Factsheet, Accessed March 10, 2010 |format=PDF |date= |accessdate=August 22, 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20110723140704/http://www.i95newhaven.com/pdfs/fact_sheet_extradosedbridge020510.pdf |archivedate=July 23, 2011 |df=mdy-all }}</ref> The original 1,300 m (0.8&nbsp;mi) span&nbsp;– which opened on January 2, 1958&nbsp;– was a [[girder bridge|girder and floorbeam]] design where steel beams support the concrete bridge deck. The bridge carried three lanes of traffic in each direction with no inside or outside shoulders. The bridge was officially dedicated as the Pearl Harbor Memorial Bridge in 1995 to commemorate the [[attack on Pearl Harbor]].<ref>{{cite web|url=http://www.cga.ct.gov/ps95/Act/pa/1995PA-00325-R00SB-01041-PA.htm |title=Connecticut General Assembly Public Act No. 95-325 |publisher=Cga.ct.gov |date= |accessdate=August 22, 2011}}</ref>
The '''Pearl Harbor Memorial Bridge''', commonly referred to as the '''Q Bridge''' by locals, is an [[extradosed bridge]] that carries [[Interstate 95 in Connecticut|Interstate 95]] ([[Connecticut Turnpike]]) over the mouth of the [[Quinnipiac River]] in [[New Haven, Connecticut|New Haven]], in the [[U.S. state]] of [[Connecticut]].<ref>{{cite web |url=http://www.i95newhaven.com/pdfs/fact_sheet_extradosedbridge020510.pdf |title=Pearl Harbor Memorial Bridge Factsheet, Accessed March 10, 2010 |access-date=August 22, 2011 |url-status=dead |archive-url=https://web.archive.org/web/20110723140704/http://www.i95newhaven.com/pdfs/fact_sheet_extradosedbridge020510.pdf |archive-date=July 23, 2011 |df=mdy-all }}</ref> This bridge replaced the original 1,300 m (0.8&nbsp;mi) span which opened on January 2, 1958. The old bridge had a [[girder bridge|girder and floorbeam]] design where steel beams supported a concrete bridge deck that carried three lanes of traffic in each direction with no inside or outside shoulders. The bridge was officially dedicated as the Pearl Harbor Memorial Bridge in 1995 to commemorate the [[attack on Pearl Harbor]].<ref>{{cite web|url=http://www.cga.ct.gov/ps95/Act/pa/1995PA-00325-R00SB-01041-PA.htm |title=Connecticut General Assembly Public Act No. 95-325 |publisher=Cga.ct.gov |access-date=August 22, 2011}}</ref>


The old Pearl Harbor Memorial Bridge was replaced by a $554 million 10-lane [[extradosed bridge]]; the northbound span of which opened to traffic on June 22, 2012. Southbound traffic was shifted onto the new bridge, sharing the northbound span with northbound traffic until the new southbound span was completed in late 2015. Since the [[Gibbs Street Pedestrian Bridge|Gibbs Street Bridge]] in [[Portland, Oregon]] was redesigned from an extradosed span to a box girder bridge, the Pearl Harbor Memorial Bridge was the first extradosed bridge completed in the United States when it fully opened in September 2015.<ref>{{cite web
The old Pearl Harbor Memorial Bridge was replaced by a $554 million 10-lane [[extradosed bridge]]; the northbound span of which opened to traffic on June 22, 2012. Southbound traffic was shifted onto the new bridge, sharing the northbound span with northbound traffic until the new southbound span was completed in late 2015. Since the [[Gibbs Street Pedestrian Bridge|Gibbs Street Bridge]] in [[Portland, Oregon]] was redesigned from an extradosed span to a box girder bridge, the Pearl Harbor Memorial Bridge was the first extradosed bridge completed in the United States when it fully opened in September 2015.<ref>{{cite web
Line 23: Line 23:
|title = Welcome to the Gibbs Street Pedestrian Bridge Website!
|title = Welcome to the Gibbs Street Pedestrian Bridge Website!
|publisher = Gibbs Street Bridge
|publisher = Gibbs Street Bridge
|accessdate = December 8, 2008
|access-date = December 8, 2008
|deadurl = yes
|url-status = dead
|archiveurl = https://web.archive.org/web/20081205012602/http://www.gibbsbridge.org/
|archive-url = https://web.archive.org/web/20081205012602/http://www.gibbsbridge.org/
|archivedate = December 5, 2008
|archive-date = December 5, 2008
|df = mdy-all
|df = mdy-all
}}</ref> The new bridge is the centerpiece of a $2 billion [[megaproject]] called the [[New Haven Harbor Crossing Improvement Program]].
}}</ref> The new bridge is the centerpiece of a $2 billion [[megaproject]] called the [[New Haven Harbor Crossing Improvement Program]].


==History==
==History==
{{Infobox Bridge |
{{Infobox bridge
|bridge_name=(Old) Pearl Harbor Memorial Bridge
|bridge_name=(Old) Pearl Harbor Memorial Bridge
|image = Pearl Harbor Memorial Bridge (Connecticut).jpg
|image = Pearl Harbor Memorial Bridge (Connecticut).jpg
Line 41: Line 41:
|open=January 2, 1958 (Reconstructed 2005-2015)
|open=January 2, 1958 (Reconstructed 2005-2015)
|closed=July 26, 2013
|closed=July 26, 2013
|below={{convert|18.3|m|ft}}
|below=60 ft (18.3 m)
|design=[[Girder bridge|Girder]] and floorbeam
|design=[[Girder bridge|Girder]] and floorbeam
|length={{convert|1443.2|m|ft}}
|length=4,735 ft (1,443.2 m)
|width={{convert|25.6|m|ft}}
|width=84 ft (25.6 m)
|coordinates={{Coord|41|17|55|N|72|54|14|W|type:landmark_region:US-CT|display=inline,title}}
|coordinates={{Coord|41|17|55|N|72|54|14|W|type:landmark_region:US-CT|display=inline,title}}
|extra={{Location map | USA Connecticut
|label =
|label_size =
|alt =
|position = right
|background =
|lon_dir=W
|lat_dir=N
|lat_deg = 41
|lat_min = 17
|lat_sec = 55
|lon_deg = 72
|lon_min = 54
|lon_sec = 14
|lat =
|long =
|mark =
|marksize =
|border = none
|float =
|width = 250
|caption = <!-- blank -->
}}
}}{{Expand section|date=March 2008}}
}}{{Expand section|date=March 2008}}

This bridge was created as part of a project to build the [[Connecticut Turnpike]], a toll road stretching from Greenwich to Killingly in the 1950s. By 1993 the Quinnipiac River bridge was considered outdated, and traffic bottlenecks had been a chronic problem over the Q bridge.<ref>{{cite news
The original span at this site was created as part of a project to build the [[Connecticut Turnpike]], a toll road stretching from Greenwich to Killingly. This steel girder bridge was completed January 2, 1958. It was designed for a capacity of 90,000 vehicles per day.<ref>{{cite web |url=https://structurae.net/en/structures/pearl-harbor-memorial-bridge |title=Pearl Harbor Memorial Bridge |publisher=Structurae: International Database and Gallery of Structures |accessdate=2021-10-31 }}</ref> By 1993, the Quinnipiac River bridge was considered outdated, and traffic bottlenecks had been a chronic problem.<ref>{{cite news
| title = State Seeks to Open a Bottleneck
| title = State Seeks to Open a Bottleneck
| first = JULIE
| first = JULIE
| last = MILLER
| last = MILLER
| authorlink =
| url = https://www.nytimes.com/1993/09/05/nyregion/state-seeks-to-open-a-bottleneck.html
| url = https://www.nytimes.com/1993/09/05/nyregion/state-seeks-to-open-a-bottleneck.html
| agency =
| newspaper = [[The New York Times]]
| newspaper = [[The New York Times]]
| publisher = The New York Times Company
| location = New York, New York
| location = New York, New York
| isbn =
| issn =
| oclc =
| pmid =
| pmd =
| bibcode =
| doi =
| id =
| date = September 5, 1993
| date = September 5, 1993
| page =
| access-date = February 13, 2011
| pages =
| at =
| accessdate = February 13, 2011
| language =
|trans-title=| quote =
| ref =
}}</ref>
}}</ref>


Line 105: Line 66:
In response to the controversy over the design of the new bridge, CONNDOT organized the Intermodal Concept Development Committee (ICDC), which included representatives from New Haven, East Haven, and Branford, environmental groups, local business associations, the FHWA, the Army Corps of Engineers, and the Coast Guard.
In response to the controversy over the design of the new bridge, CONNDOT organized the Intermodal Concept Development Committee (ICDC), which included representatives from New Haven, East Haven, and Branford, environmental groups, local business associations, the FHWA, the Army Corps of Engineers, and the Coast Guard.


The ICDC examined over 100 alternatives before narrowing the list to seven in the Supplemental DEIS, presented in April 1997. The final EIS was issued in March 1999, which called for a 10-lane Q-Bridge; eight lanes to East Haven and six lanes to Branford, and a new [[Metro-North]]/[[Shore Line East]] train station at State Street in New Haven. The FHWA issued a Record of Decision, approving the FEIS in August 1999.<ref>[http://www.i95newhaven.com/poverview/history.asp I-95 New Haven Harbor Crossing Improvement Program History] {{webarchive|url=https://web.archive.org/web/20070814012831/http://www.i95newhaven.com/poverview/history.asp |date=August 14, 2007 }}</ref> CONNDOT is preparing two separate studies to reconstruct the remainder of the corridor through the Long Wharf section of New Haven and West Haven.
The ICDC examined over 100 alternatives before narrowing the list to seven in the Supplemental DEIS, presented in April 1997. The final EIS was issued in March 1999, which called for a 10-lane Q Bridge; eight lanes to East Haven and six lanes to Branford, and a new [[Metro-North]]/[[Shore Line East]] train station at State Street in New Haven. The FHWA issued a Record of Decision, approving the FEIS in August 1999.<ref>[http://www.i95newhaven.com/poverview/history.asp I-95 New Haven Harbor Crossing Improvement Program History] {{webarchive|url=https://web.archive.org/web/20070814012831/http://www.i95newhaven.com/poverview/history.asp |date=August 14, 2007 }}</ref> CONNDOT is preparing two separate studies to reconstruct the remainder of the corridor through the Long Wharf section of New Haven and West Haven.


In 2001, New Haven Mayor [[John DeStefano, Jr.]] pressed CONNDOT and the FHWA to design the new Q-Bridge as a [[signature span]]. A [[cable-stayed bridge|cable-stayed]] design was originally considered, but the [[Federal Aviation Administration]] raised concerns over the height of the towers interfering with the approach into [[Tweed-New Haven Airport]] compelled CONNDOT to consider an [[extradosed bridge]], which retains the aesthetic qualities of a cable-stayed structure, with shorter towers.
In 2001, New Haven Mayor [[John DeStefano, Jr.]] pressed CONNDOT and the FHWA to design the new Q Bridge as a signature span. A [[cable-stayed bridge|cable-stayed]] design was originally considered, but the [[Federal Aviation Administration]] raised concerns over the height of the towers interfering with the approach into [[Tweed-New Haven Airport]], which compelled CONNDOT to consider an [[extradosed bridge]], which retains the aesthetic qualities of a cable-stayed structure but can be built with shorter towers due to the roadway also being supported by girders (in this case prestressed concrete box girders).


Construction on the eastern approach to the bridge in Branford and East Haven began in 2001; while work began in 2004 on the earthworks for the western approach around the I-91/Route 34 interchange. The [[United Illuminating]] Company erected new [[Electricity pylon|pylons]] and rerouted its 115 kilovolt [[transmission line]]s away from the bridge in 2003, to make way for the larger bridge to be built.
Construction on the eastern approach to the bridge in Branford and East Haven began in 2001; while work began in 2004 on the earthworks for the western approach around the I-91/Route 34 interchange. The [[United Illuminating]] Company erected new [[Electricity pylon|pylons]] and rerouted its 115 kilovolt [[transmission line]]s away from the bridge in 2003, to make way for the larger bridge to be built.


===More construction delays===
===More construction delays===
Construction on the bridge itself was originally set to begin in 2005 and be completed in 2012. However, two historically significant structures—the former [[Yale Boathouse]] and the Fitch Foundry—sat directly in the path of the new bridge. The City of New Haven demanded that these two structures be preserved.<ref>[http://www.wtnh.com/Global/story.asp?s=2564977 Future of Yale Boathouse, bridge development in question, WTNH TV Channel 8, November 15, 2004]</ref> Mayor DeStefano further argued that CONNDOT should include the expansion of I-95 through Long Wharf and West Haven into the overall plan instead of pursuing these projects separately. Given the impasse between CONNDOT and the City of New Haven over these two issues, the FHWA threatened to pull funding for the project unless the city and state could come to a consensus on how to proceed while keeping the project's costs under control.<ref>[http://www.wtnh.com/Global/story.asp?s=4098314 New Haven trying to get agreement on Q-Bridge project, WTNH TV Channel 8, November 9, 2005]</ref><ref>[https://web.archive.org/web/20070928003402/http://www.nhregister.com/site/index.cfm?newsid=15461369&BRD=1281&PAG=461&dept_id=517515&rfi=8 Feds may halt Q-bridge rehab Highway administration unhappy with cost overruns, New Haven Register, October 27, 2005]</ref> Realizing that such a move would effectively void the already-approved EIS and require a new one to be developed, CONNDOT and the city of New Haven made a compromise in late 2005 that called for CONNDOT to provide $30 million in funding for a new Yale Boathouse on Long Wharf that would incorporate historical similarities (and actual structures) from the old boathouse. In exchange, the City of New Haven agreed to allow CONNDOT to continue the environmental and design studies on the Long Wharf and West Haven sections apart from the I-91/Route 34 to Branford segment of I-95 that includes the Q-Bridge.<ref>[https://web.archive.org/web/20070930184716/http://www.nhregister.com/site/index.cfm?newsid=15550105&BRD=1281&PAG=461&dept_id=517515&rfi=8 Q bridge meeting is productive, New Haven Register, November 10, 2005]</ref>
Construction on the bridge itself was originally set to begin in 2005 and be completed in 2012. However, two historically significant structures—the former Yale Boathouse and the Fitch Foundry—sat directly in the path of the new bridge. The City of New Haven demanded that these two structures be preserved.<ref>{{Cite web |url=http://www.wtnh.com/Global/story.asp?s=2564977 |title=Future of Yale Boathouse, bridge development in question, WTNH TV Channel 8, November 15, 2004 |access-date=June 29, 2007 |archive-date=September 27, 2007 |archive-url=https://web.archive.org/web/20070927040731/http://www.wtnh.com/Global/story.asp?s=2564977 |url-status=dead }}</ref> Mayor DeStefano further argued that CONNDOT should include the expansion of I-95 through Long Wharf and West Haven into the overall plan instead of pursuing these projects separately. Given the impasse between CONNDOT and the City of New Haven over these two issues, the FHWA threatened to pull funding for the project unless the city and state could come to a consensus on how to proceed while keeping the project's costs under control.<ref>{{Cite web |url=http://www.wtnh.com/Global/story.asp?s=4098314 |title=New Haven trying to get agreement on Q-Bridge project, WTNH TV Channel 8, November 9, 2005 |access-date=June 29, 2007 |archive-date=September 27, 2007 |archive-url=https://web.archive.org/web/20070927040904/http://www.wtnh.com/Global/story.asp?s=4098314 |url-status=dead }}</ref><ref>[https://web.archive.org/web/20070928003402/http://www.nhregister.com/site/index.cfm?newsid=15461369&BRD=1281&PAG=461&dept_id=517515&rfi=8 Feds may halt Q-bridge rehab Highway administration unhappy with cost overruns, New Haven Register, October 27, 2005]</ref> Realizing that such a move would effectively void the already-approved EIS and require a new one to be developed, CONNDOT and the city of New Haven made a compromise in late 2005 that called for CONNDOT to provide $30 million in funding for a new Yale Boathouse on Long Wharf that would incorporate a chunk of the old boathouse's façade. In exchange, the City of New Haven agreed to allow CONNDOT to continue the environmental and design studies on the Long Wharf and West Haven sections apart from the I-91/Route 34 to Branford segment of I-95 that includes the Q-Bridge.<ref>[https://web.archive.org/web/20070930184716/http://www.nhregister.com/site/index.cfm?newsid=15550105&BRD=1281&PAG=461&dept_id=517515&rfi=8 Q bridge meeting is productive, New Haven Register, November 10, 2005]</ref>


The project was let to bid in May 2006, but there were no bids received by the December 27, 2006 deadline. Two construction firms interested in the project cited—among other things—the absence of an [[escalator clause]] in the project contract to cover the rising cost of fuel and raw materials for the lack of bids.<ref>[http://www.wtnh.com/Global/story.asp?s=6140417 Q-Bridge Construction, WTNH TV Channel 8, February 26, 2007]</ref>
The project was let to bid in May 2006, but there were no bids received by the December 27, 2006 deadline. Two construction firms interested in the project cited—among other things—the absence of an [[escalator clause]] in the project contract to cover the rising cost of fuel and raw materials for the lack of bids.<ref>{{Cite web |url=http://www.wtnh.com/Global/story.asp?s=6140417 |title=Q-Bridge Construction, WTNH TV Channel 8, February 26, 2007 |access-date=June 28, 2007 |archive-date=September 27, 2007 |archive-url=https://web.archive.org/web/20070927041028/http://www.wtnh.com/Global/story.asp?s=6140417 |url-status=dead }}</ref>


===Staged construction===
===Staged construction===
[[File:New-Q-Bridge-Dec-2011.jpg|thumb|left|Construction of the new Pearl Harbor Memorial Bridge (Q-Bridge) as viewed from the Tomlinson Bridge in 2011]]
[[File:New-Q-Bridge-Dec-2011.jpg|thumb|left|Construction of the new Pearl Harbor Memorial Bridge (Q-Bridge) as viewed from the Tomlinson Bridge in 2011]]
In response, CONNDOT divided the bridge project into multiple contracts that were let in stages as construction progresses. While this makes the project more manageable for contractors and highway officials, this approach significantly added to the time required to complete the new bridge.
In response, CONNDOT divided the bridge project into multiple contracts that were let in stages as construction progresses. While this makes the project more manageable for contractors and highway officials, this approach significantly added to the time required to complete the new bridge.

====Eastern approach====
The eastern approach to the Pearl Harbor Memorial Bridge was reconstructed and widened through two contracts, officially referred to as Contracts C1 and C2 at a total cost of $120 million. Contract C1 reconstructed the eastern approach from [[Lake Saltonstall (Connecticut)|Lake Saltonstall]] through [[East Haven, Connecticut|East Haven]], while Contract C2 reconstructed I-95 from the East Haven/New Haven border to the eastern abutment of the Pearl Harbor Memorial Bridge. O & G Industries of [[Torrington, Connecticut]] was the primary contractor for both contracts. While a train accident, harsh weather, and several design changes delayed the completion of Contract C1 by more than a year, O & G Industries completed Contract C2 in August 2008, one year ahead of schedule. Further east, a third contract officially referred to as Contract D, reconstructed and widened I-95 from the Lake Saltonstall bridge to Exit 54 in Branford. Pittsfield, Massachusetts-based Middlesex Company was the prime contractor for the $36 million contract. Aside from resurfacing and restriping from two to three lanes, no physical construction was performed on the I-95 bridge over Lake Saltonstall as it was rebuilt and widened in 1995.

====Western approach and I-91/Route 34 interchange====
Reconstructing the western approach to the bridge has been divided into several contracts: E, E1 and E2. The first of which, Contract E1 was completed in late 2006. Contract E1 involved the construction of earthworks that support the western abutment of the new bridge and carry the new ramps to I-91 and Route 34. L.G. DeFelice Construction was originally awarded the $14 million contract, but the company went out of business midway through the project. The contract was picked up and completed by Hallberg Construction in 2006. Contract E2 involved building the flyover bridge that carries the new ramp from I-95 northbound to Route 34 and added a transition lane to I-95 in each direction through Long Wharf. This contract was completed on June 6, 2011 by [[Walsh Construction Company]] of [[Canton, Massachusetts]] at a cost of $90 million. Contract E will complete the remainder of the interchange ramps, bridges, and new Turnpike mainline roadways.


====Removal of buildings and relocating sewer lines====
====Removal of buildings and relocating sewer lines====
The first bridge contract, which includes the demolition of buildings where the new bridge will stand, was let in October 2006. Work under this contract was completed in August 2007 with the demolition of the Yale Boathouse and the Fitch Foundry where the west abutment of the new bridge will be.
The first bridge contract, which includes the demolition of buildings where the new bridge will stand, was let in October 2006. Work under this contract was completed in August 2007 with the demolition of the Yale Boathouse and the Fitch Foundry where the west abutment of the new bridge will be.


A second contract was let on June 1, 2007, to relocate two 42-inch (1.06 meter) diameter sanitary sewer lines that lie directly beneath where part of the new bridge will be built. Construction of the new sewer lines involved [[slant drilling]] through bedrock under [[New Haven Harbor]]. The Middlesex Company, a construction contractor based in [[Littleton, Massachusetts]], was the prime contractor on the $20 million project.<ref>{{cite web|author=Department of Transportation |url=http://www.ct.gov/dot/cwp/view.asp?a=1372&Q=289130&dotNav= |title=CONNDOT Bids and RFPs |publisher=Ct.gov |date= |accessdate=August 22, 2011}}</ref>
A second contract was let on June 1, 2007, to relocate two 42-inch (1.06 meter) diameter sanitary sewer lines that lie directly beneath where part of the new bridge will be built. Construction of the new sewer lines involved [[slant drilling]] through bedrock under [[New Haven Harbor]]. The Middlesex Company, a construction contractor based in [[Littleton, Massachusetts]], was the prime contractor on the $20 million project.<ref>{{cite web|author=Department of Transportation |url=http://www.ct.gov/dot/cwp/view.asp?a=1372&Q=289130&dotNav= |title=CONNDOT Bids and RFPs |publisher=Ct.gov |access-date=August 22, 2011}}</ref>


====Building the abutments and pier foundations====
====Building the abutments and pier foundations====
The third contract, known as Contract B1 in official documents, which covers construction of the bridge [[abutments]] and pier foundations for the northbound lanes was let on October 31, 2007. Four construction firms submitted bids for this $137 million contract February 6, 2008, according to bid results from CONNDOT.<ref>{{cite web|author=Department of Transportation |url=http://www.ct.gov/dot/cwp/view.asp?a=1400&q=260048 |title=CONNDOT Projects Scheduled for Advertising |publisher=Ct.gov |date=August 9, 2011 |accessdate=August 22, 2011}}</ref> The contract was awarded to a joint venture between the Middlesex Company and [[Pittsfield, Maine]]-based [[Cianbro]] Corporation in April 2008.
The third contract, known as Contract B1 in official documents, which covers construction of the bridge [[abutments]] and pier foundations for the northbound lanes was let on October 31, 2007. Four construction firms submitted bids for this $137 million contract February 6, 2008, according to bid results from CONNDOT.<ref>{{cite web|author=Department of Transportation |url=http://www.ct.gov/dot/cwp/view.asp?a=1400&q=260048 |title=CONNDOT Projects Scheduled for Advertising |publisher=Ct.gov |date=August 9, 2011 |access-date=August 22, 2011}}</ref> The contract was awarded to a joint venture between the Middlesex Company and [[Pittsfield, Maine]]-based Cianbro Corporation in April 2008.


====Completing the new bridge and removing the original span====
====Completing the new bridge and removing the original span====
The final contract, known as Contract B, will construct the remainder of the new bridge and demolish the existing span. Contract B was awarded to a joint venture between Walsh Construction of [[Chicago, Illinois]] and [[Denver, Colorado]]-based PCL Constructors for $417 million in July 2009. The joint venture company is also known as Walsh-PCL Joint Venture II. The two companies previously formed a joint venture to replace the [[Moses Wheeler Bridge]] over the [[Housatonic River]] several miles west in Stratford.
The final contract, known as Contract B, will construct the remainder of the new bridge and demolish the existing span. Contract B was awarded to a joint venture between Walsh Construction of [[Chicago, Illinois]] and [[Denver, Colorado]]-based PCL Constructors for $417 million in July 2009. The joint venture company is also known as Walsh-PCL Joint Venture II. The two companies previously formed a joint venture to replace the [[Moses Wheeler Bridge]] over the [[Housatonic River]] several miles west in Stratford.

====West Haven to I-91/Route 34====
Three separate projects will reconstruct and widen I-95 from I-91/Route 34 to Route 162 in West Haven. Reconstruction of I-95 from the West River to I-91/Route 34 including the stretch through Long Wharf is in the EIS phase. Current work on the Long Wharf section is required to enable a smooth transition from the existing 3-lane I-95 cross-section to the west into the new I-91/Route 34 interchange. Future work on the Long Wharf section would add travel lanes beyond the transition into the I-91/Route 34 interchange. Alternatives discussed in the Draft EIS included either elevating I-95 onto a viaduct or submerging the highway underground through tunnels, similar to Boston's [[Big Dig]]. Depending on the alternative selected, cost estimates for reconstructing the Long Wharf section of I-95 range from $200 million to $500 million.

To the west of Long Wharf, CONNDOT is replacing the aging bridge over the West River and Route 10 with a wider structure. Part of this reconstruction effort will be consolidating Exits 44 and 45 into a single interchange. Construction on the $200 million bridge began in November 2013 and is scheduled for completion in 2018. Construction of the new West River Bridge is occurring in a three-stage project similar to the reconstruction of the [[Moses Wheeler Bridge]] further west in [[Stratford, CT|Stratford]]. The first stage involving construction of the new northbound lanes was completed in the summer of 2015. The second stage involved shifting northbound traffic onto the new northbound span and shifting southbound traffic onto the former northbound lanes of the original bridge so the old southbound lanes could be demolished to make way for the new southbound lanes. That stage was completed in the summer of 2016, with southbound traffic shifted to the new southbound structure and the original bridge taken out of service. The final stage involves removal of the remaining original bridge and completing the center portion of the new bridge, scheduled for completion in late 2017 or early 2018.

The section of I-95 from Route 162 in West Haven to the West River features three narrow lanes with no shoulders, and has been the site of chronic congestion and numerous accidents. To address these issues, CONNDOT plans to reconstruct this section of roadway to three (expandable to four) lanes with full left and right shoulders, which will match the roadway profiles at either end of the segment. Construction is contingent upon funding.


===How the new bridge was built===
===How the new bridge was built===
The new Pearl Harbor Memorial Bridge was built in three stages. The first half of the new bridge was built alongside and to the south of the existing bridge. This span now carries northbound lanes of I-95. On June 25, 2012, the new northbound bridge was opened, and carried three travel lanes in each direction while the old bridge was demolished and the remaining half of the new span was built.<ref name=courant20120612>{{cite news|last=Robbins|first=Rebecca D.|title=New Haven Highway Traffic Could Come To Crawl This Weekend|url=http://www.courant.com/news/connecticut/hc-new-haven-traffic-bridge-0621-20120621,0,3139765.story|accessdate=June 21, 2012|newspaper=The Hartford Courant|location=[[Hartford, Connecticut]]|date=June 21, 2012}}</ref> Once the southbound span was complete, the southbound lanes were shifted to the second span. Currently each span carries three lanes in each direction, pending completion of construction of the I-91/Route 34 interchange immediately to the west. Adding to the challenge of building the new bridge is that work must be coordinated with the ongoing reconstruction of the massive I-91/Route 34 interchange just west of the bridge. As a result, completion of the project is now scheduled for 2016, four years later than originally planned, although this might change as the southern half was opened six months early.
The new Pearl Harbor Memorial Bridge was built in three stages. The first stage included the construction of the southern span alongside and to the south of the original bridge, which now carries northbound lanes of I-95. On June 25, 2012, the new northbound bridge was opened and carried three travel lanes in each direction while the old bridge was demolished and the remaining half of the new span was built.<ref name=courant20120612>{{cite news|last=Robbins|first=Rebecca D.|title=New Haven Highway Traffic Could Come To Crawl This Weekend|url=http://www.courant.com/news/connecticut/hc-new-haven-traffic-bridge-0621-20120621,0,3139765.story|archive-url=https://archive.today/20130119182235/http://www.courant.com/news/connecticut/hc-new-haven-traffic-bridge-0621-20120621,0,3139765.story|url-status=dead|archive-date=January 19, 2013|access-date=June 21, 2012|newspaper=The Hartford Courant|location=[[Hartford, Connecticut]]|date=June 21, 2012}}</ref> Once the southbound span was complete, the southbound lanes were shifted to the second span. Currently each span carries three lanes in each direction, pending completion of construction of the I-91/Route 34 interchange immediately to the west. Adding to the challenge of building the new bridge is that work must be coordinated with the ongoing reconstruction of the massive I-91/Route 34 interchange just west of the bridge. As a result, completion of the project is now scheduled for 2016, four years later than originally planned, although this might change as the southern half was opened six months early.

===Financing the new bridge===
When the EIS for rebuilding I-95 between the I-91/Route 34 interchange and Exit 54 in Branford was issued in 1997, the project's cost was projected at $800 million. Of that, replacement of the Pearl Harbor Memorial Bridge was estimated to be $360 million. Early on in the EIS process, officials considered placing a toll plaza at the east end of the bridge. The toll option would have had cars paying $4.00 to cross the bridge. Officials scrapped toll plans due to widespread opposition and legislation banning the placement of tolls on Connecticut highways. When the project's costs were reassessed in 2007, the bridge's construction cost has skyrocketed to beyond $500 million, and the total cost for rebuilding I-95 from New Haven to Branford was increased to $1.36 billion. Some officials estimate that rebuilding the seven-mile turnpike segment will balloon to over $2 billion by the time construction is completed in 2016. Regardless, construction will be financed with 90% federal funds and 10% state and local funds.


===Northbound span===
===Northbound span===
[[File:Q Bridge Opening Ceremony (7421994942).jpg|thumb|Officials, including Governor [[Dannel Malloy]], Senator [[Richard Blumenthal]], Congresswoman [[Rosa DeLauro]], and mayor [[John DeStefano Jr.]], cut the ribbon on the northbound span on June 22, 2012]]
The Northbound section of the bridge opened to three lanes of traffic on June 25, 2012, after being completed 6 months ahead of schedule.<ref>http://www.i95newhaven.com/</ref><!-- doesn't seem to say what is being attributed to it. --> On July 26, 2013, southbound traffic was shifted from the original bridge over to the new northbound span. The northbound span will carry three lanes of both northbound and southbound traffic while the original bridge is demolished, and the new southbound span is built.
The Northbound section of the bridge opened to three lanes of traffic on June 25, 2012, after being completed 6 months ahead of schedule.<ref>{{cite web| url = http://www.i95newhaven.com/| title = I-95 New Haven Harbor Crossing Improvement Program}}</ref><!-- doesn't seem to say what is being attributed to it. --> On July 26, 2013, southbound traffic was shifted from the original bridge over to the new northbound span. The northbound span will carry three lanes of both northbound and southbound traffic while the original bridge is demolished, and the new southbound span is built.


===Southbound span===
===Southbound span===
On July 17, 2015, construction workers held a barbecue lunch on the southern span of the new bridge to celebrate its completion. Officials expect the new southern span to partially open, with an off-ramp to I-91 northbound in September 2015, and to fully open with complete access ramps by mid-2016.<ref>http://www.nhregister.com/lifestyle/20150717/party-on-new-havens-q-bridge-means-span-is-complete</ref>
On July 17, 2015, construction workers held a barbecue lunch on the southern span of the new bridge to celebrate its completion. Officials expect the new southern span to partially open, with an off-ramp to I-91 northbound in September 2015, and to fully open with complete access ramps by mid-2016.<ref>{{Cite web|url=http://www.nhregister.com/lifestyle/20150717/party-on-new-havens-q-bridge-means-span-is-complete|title = Party on New Haven's 'Q' bridge means span is complete|date = July 17, 2015}}</ref>

As of July 2016, construction on the new bridge is complete, with all ten lanes (six continuous and four ramp lanes) completely open. Construction on the I-95/I-91/CT-34 interchange at the west end of the bridge is nearly complete, with all new ramps opened, and vegetation and drainage expected to be completed by the end of 2016.


==Awards==
==Awards==
The bridge was named the Grand Prize winner of [[American Association of State Highway and Transportation Officials|AASHTO]]'s 2016 America's Transportation Awards, prevailing over 83 other entries from state DOTs nationwide.<ref>{{cite web|title=Transportation Projects in Connecticut and Florida Win Top National Awards|url=https://americastransportationawards.org/|website=America's Transportation Awards|accessdate=22 January 2017}}</ref><ref>{{cite web|title=Pearl Harbor Memorial Bridge Project Receives Grand Prize in 2016 America's Transportation Awards Competition|url=http://www.wsp-pb.com/en/WSP-USA/Who-we-are-USA1/Newsroom/News-Releases/2016/Pearl-Harbor-Memorial-Bridge-Project-Receives-Grand-Prize-in-2016-Americas-Transportation-Awards-Competition/|publisher=WSP&#124;Parsons Brinckerhoff|accessdate=20 January 2017}}</ref>
The bridge was named the Grand Prize winner of [[American Association of State Highway and Transportation Officials|AASHTO]]'s 2016 America's Transportation Awards, prevailing over 83 other entries from state DOTs nationwide.<ref>{{cite web|title=Transportation Projects in Connecticut and Florida Win Top National Awards|url=https://americastransportationawards.org/|website=America's Transportation Awards|access-date=22 January 2017}}</ref><ref>{{cite web|title=Pearl Harbor Memorial Bridge Project Receives Grand Prize in 2016 America's Transportation Awards Competition|url=http://www.wsp-pb.com/en/WSP-USA/Who-we-are-USA1/Newsroom/News-Releases/2016/Pearl-Harbor-Memorial-Bridge-Project-Receives-Grand-Prize-in-2016-Americas-Transportation-Awards-Competition/|publisher=WSP&#124;Parsons Brinckerhoff|access-date=20 January 2017}}</ref>


==See also==
==See also==
* {{Portal-inline|Bridges}}
* {{Portal-inline|Transport}}
* {{Portal-inline|Engineering}}
* {{Portal-inline|Connecticut}}
* {{Portal-inline|Connecticut}}


Line 171: Line 116:
{{commons category}}
{{commons category}}
* [http://i95newhaven.com/ i95newhaven.com] - Official website for the highway reconstruction projects around New Haven Harbor
* [http://i95newhaven.com/ i95newhaven.com] - Official website for the highway reconstruction projects around New Haven Harbor
* {{Structurae|id=s0010932|title=Quinnipiac Bridge}} (next bridge)
* {{Structurae|id=20010932|title=Quinnipiac Bridge}} (next bridge)
* {{Structurae|id=s0010933|title=Pearl Harbor Memorial Bridge}} (current bridge)
* {{Structurae|id=20010933|title=Pearl Harbor Memorial Bridge}} (current bridge)


[[Category:Extradosed bridges in the United States]]
[[Category:Buildings and structures in New Haven, Connecticut]]
[[Category:Buildings and structures in New Haven, Connecticut]]
[[Category:Transportation in New Haven, Connecticut]]
[[Category:Transportation in New Haven, Connecticut]]
[[Category:Bridges completed in 1958]]
[[Category:Bridges completed in 1958]]
[[Category:1958 establishments in Connecticut]]
[[Category:1958 establishments in Connecticut]]
[[Category:Proposed bridges in the United States]]
[[Category:Bridges in New Haven County, Connecticut]]
[[Category:Bridges in New Haven County, Connecticut]]
[[Category:Road bridges in Connecticut]]
[[Category:Road bridges in Connecticut]]

Latest revision as of 21:33, 19 September 2024

Pearl Harbor Memorial Bridge
The Pearl Harbor Memorial Bridge, locally known as the Q Bridge, crosses over the Quinnipiac River.
Coordinates41°17′55″N 72°54′14″W / 41.2986°N 72.9039°W / 41.2986; -72.9039
Carries10 lanes of I-95
CrossesQuinnipiac River
LocaleNew Haven, Connecticut, U.S.
Maintained byConnecticut Department of Transportation
Characteristics
DesignExtradosed bridge
Total length4,735 ft (1,443.2 m)
Width182 ft (55.4 m)
Height150 ft (45.7 m)
Longest span515 ft (157.0 m)
Clearance below60 ft (18.3 m)
History
Opened1958 (original span) reconstructed 2005-2015
Location
Map

The Pearl Harbor Memorial Bridge, commonly referred to as the Q Bridge by locals, is an extradosed bridge that carries Interstate 95 (Connecticut Turnpike) over the mouth of the Quinnipiac River in New Haven, in the U.S. state of Connecticut.[1] This bridge replaced the original 1,300 m (0.8 mi) span which opened on January 2, 1958. The old bridge had a girder and floorbeam design where steel beams supported a concrete bridge deck that carried three lanes of traffic in each direction with no inside or outside shoulders. The bridge was officially dedicated as the Pearl Harbor Memorial Bridge in 1995 to commemorate the attack on Pearl Harbor.[2]

The old Pearl Harbor Memorial Bridge was replaced by a $554 million 10-lane extradosed bridge; the northbound span of which opened to traffic on June 22, 2012. Southbound traffic was shifted onto the new bridge, sharing the northbound span with northbound traffic until the new southbound span was completed in late 2015. Since the Gibbs Street Bridge in Portland, Oregon was redesigned from an extradosed span to a box girder bridge, the Pearl Harbor Memorial Bridge was the first extradosed bridge completed in the United States when it fully opened in September 2015.[3] The new bridge is the centerpiece of a $2 billion megaproject called the New Haven Harbor Crossing Improvement Program.

History

[edit]
(Old) Pearl Harbor Memorial Bridge
Q Bridge with the Tomlinson Lift Bridge behind it
Coordinates41°17′55″N 72°54′14″W / 41.29861°N 72.90389°W / 41.29861; -72.90389
CarriesSix lanes of I-95 / Conn. Turnpike
CrossesQuinnipiac River
LocaleNew Haven, Connecticut
Maintained byConnecticut Department of Transportation
Characteristics
DesignGirder and floorbeam
Total length4,735 ft (1,443.2 m)
Width84 ft (25.6 m)
Clearance below60 ft (18.3 m)
History
OpenedJanuary 2, 1958 (Reconstructed 2005-2015)
ClosedJuly 26, 2013
Location
Map

The original span at this site was created as part of a project to build the Connecticut Turnpike, a toll road stretching from Greenwich to Killingly. This steel girder bridge was completed January 2, 1958. It was designed for a capacity of 90,000 vehicles per day.[4] By 1993, the Quinnipiac River bridge was considered outdated, and traffic bottlenecks had been a chronic problem.[5]

Signature span replacement

[edit]

Returning to the drawing board

[edit]

In response to the controversy over the design of the new bridge, CONNDOT organized the Intermodal Concept Development Committee (ICDC), which included representatives from New Haven, East Haven, and Branford, environmental groups, local business associations, the FHWA, the Army Corps of Engineers, and the Coast Guard.

The ICDC examined over 100 alternatives before narrowing the list to seven in the Supplemental DEIS, presented in April 1997. The final EIS was issued in March 1999, which called for a 10-lane Q Bridge; eight lanes to East Haven and six lanes to Branford, and a new Metro-North/Shore Line East train station at State Street in New Haven. The FHWA issued a Record of Decision, approving the FEIS in August 1999.[6] CONNDOT is preparing two separate studies to reconstruct the remainder of the corridor through the Long Wharf section of New Haven and West Haven.

In 2001, New Haven Mayor John DeStefano, Jr. pressed CONNDOT and the FHWA to design the new Q Bridge as a signature span. A cable-stayed design was originally considered, but the Federal Aviation Administration raised concerns over the height of the towers interfering with the approach into Tweed-New Haven Airport, which compelled CONNDOT to consider an extradosed bridge, which retains the aesthetic qualities of a cable-stayed structure but can be built with shorter towers due to the roadway also being supported by girders (in this case prestressed concrete box girders).

Construction on the eastern approach to the bridge in Branford and East Haven began in 2001; while work began in 2004 on the earthworks for the western approach around the I-91/Route 34 interchange. The United Illuminating Company erected new pylons and rerouted its 115 kilovolt transmission lines away from the bridge in 2003, to make way for the larger bridge to be built.

More construction delays

[edit]

Construction on the bridge itself was originally set to begin in 2005 and be completed in 2012. However, two historically significant structures—the former Yale Boathouse and the Fitch Foundry—sat directly in the path of the new bridge. The City of New Haven demanded that these two structures be preserved.[7] Mayor DeStefano further argued that CONNDOT should include the expansion of I-95 through Long Wharf and West Haven into the overall plan instead of pursuing these projects separately. Given the impasse between CONNDOT and the City of New Haven over these two issues, the FHWA threatened to pull funding for the project unless the city and state could come to a consensus on how to proceed while keeping the project's costs under control.[8][9] Realizing that such a move would effectively void the already-approved EIS and require a new one to be developed, CONNDOT and the city of New Haven made a compromise in late 2005 that called for CONNDOT to provide $30 million in funding for a new Yale Boathouse on Long Wharf that would incorporate a chunk of the old boathouse's façade. In exchange, the City of New Haven agreed to allow CONNDOT to continue the environmental and design studies on the Long Wharf and West Haven sections apart from the I-91/Route 34 to Branford segment of I-95 that includes the Q-Bridge.[10]

The project was let to bid in May 2006, but there were no bids received by the December 27, 2006 deadline. Two construction firms interested in the project cited—among other things—the absence of an escalator clause in the project contract to cover the rising cost of fuel and raw materials for the lack of bids.[11]

Staged construction

[edit]
Construction of the new Pearl Harbor Memorial Bridge (Q-Bridge) as viewed from the Tomlinson Bridge in 2011

In response, CONNDOT divided the bridge project into multiple contracts that were let in stages as construction progresses. While this makes the project more manageable for contractors and highway officials, this approach significantly added to the time required to complete the new bridge.

Removal of buildings and relocating sewer lines

[edit]

The first bridge contract, which includes the demolition of buildings where the new bridge will stand, was let in October 2006. Work under this contract was completed in August 2007 with the demolition of the Yale Boathouse and the Fitch Foundry where the west abutment of the new bridge will be.

A second contract was let on June 1, 2007, to relocate two 42-inch (1.06 meter) diameter sanitary sewer lines that lie directly beneath where part of the new bridge will be built. Construction of the new sewer lines involved slant drilling through bedrock under New Haven Harbor. The Middlesex Company, a construction contractor based in Littleton, Massachusetts, was the prime contractor on the $20 million project.[12]

Building the abutments and pier foundations

[edit]

The third contract, known as Contract B1 in official documents, which covers construction of the bridge abutments and pier foundations for the northbound lanes was let on October 31, 2007. Four construction firms submitted bids for this $137 million contract February 6, 2008, according to bid results from CONNDOT.[13] The contract was awarded to a joint venture between the Middlesex Company and Pittsfield, Maine-based Cianbro Corporation in April 2008.

Completing the new bridge and removing the original span

[edit]

The final contract, known as Contract B, will construct the remainder of the new bridge and demolish the existing span. Contract B was awarded to a joint venture between Walsh Construction of Chicago, Illinois and Denver, Colorado-based PCL Constructors for $417 million in July 2009. The joint venture company is also known as Walsh-PCL Joint Venture II. The two companies previously formed a joint venture to replace the Moses Wheeler Bridge over the Housatonic River several miles west in Stratford.

How the new bridge was built

[edit]

The new Pearl Harbor Memorial Bridge was built in three stages. The first stage included the construction of the southern span alongside and to the south of the original bridge, which now carries northbound lanes of I-95. On June 25, 2012, the new northbound bridge was opened and carried three travel lanes in each direction while the old bridge was demolished and the remaining half of the new span was built.[14] Once the southbound span was complete, the southbound lanes were shifted to the second span. Currently each span carries three lanes in each direction, pending completion of construction of the I-91/Route 34 interchange immediately to the west. Adding to the challenge of building the new bridge is that work must be coordinated with the ongoing reconstruction of the massive I-91/Route 34 interchange just west of the bridge. As a result, completion of the project is now scheduled for 2016, four years later than originally planned, although this might change as the southern half was opened six months early.

Northbound span

[edit]
Officials, including Governor Dannel Malloy, Senator Richard Blumenthal, Congresswoman Rosa DeLauro, and mayor John DeStefano Jr., cut the ribbon on the northbound span on June 22, 2012

The Northbound section of the bridge opened to three lanes of traffic on June 25, 2012, after being completed 6 months ahead of schedule.[15] On July 26, 2013, southbound traffic was shifted from the original bridge over to the new northbound span. The northbound span will carry three lanes of both northbound and southbound traffic while the original bridge is demolished, and the new southbound span is built.

Southbound span

[edit]

On July 17, 2015, construction workers held a barbecue lunch on the southern span of the new bridge to celebrate its completion. Officials expect the new southern span to partially open, with an off-ramp to I-91 northbound in September 2015, and to fully open with complete access ramps by mid-2016.[16]

Awards

[edit]

The bridge was named the Grand Prize winner of AASHTO's 2016 America's Transportation Awards, prevailing over 83 other entries from state DOTs nationwide.[17][18]

See also

[edit]

References

[edit]
  1. ^ "Pearl Harbor Memorial Bridge Factsheet, Accessed March 10, 2010" (PDF). Archived from the original (PDF) on July 23, 2011. Retrieved August 22, 2011.
  2. ^ "Connecticut General Assembly Public Act No. 95-325". Cga.ct.gov. Retrieved August 22, 2011.
  3. ^ "Welcome to the Gibbs Street Pedestrian Bridge Website!". Gibbs Street Bridge. Archived from the original on December 5, 2008. Retrieved December 8, 2008.
  4. ^ "Pearl Harbor Memorial Bridge". Structurae: International Database and Gallery of Structures. Retrieved October 31, 2021.
  5. ^ MILLER, JULIE (September 5, 1993). "State Seeks to Open a Bottleneck". The New York Times. New York, New York. Retrieved February 13, 2011.
  6. ^ I-95 New Haven Harbor Crossing Improvement Program History Archived August 14, 2007, at the Wayback Machine
  7. ^ "Future of Yale Boathouse, bridge development in question, WTNH TV Channel 8, November 15, 2004". Archived from the original on September 27, 2007. Retrieved June 29, 2007.
  8. ^ "New Haven trying to get agreement on Q-Bridge project, WTNH TV Channel 8, November 9, 2005". Archived from the original on September 27, 2007. Retrieved June 29, 2007.
  9. ^ Feds may halt Q-bridge rehab Highway administration unhappy with cost overruns, New Haven Register, October 27, 2005
  10. ^ Q bridge meeting is productive, New Haven Register, November 10, 2005
  11. ^ "Q-Bridge Construction, WTNH TV Channel 8, February 26, 2007". Archived from the original on September 27, 2007. Retrieved June 28, 2007.
  12. ^ Department of Transportation. "CONNDOT Bids and RFPs". Ct.gov. Retrieved August 22, 2011.
  13. ^ Department of Transportation (August 9, 2011). "CONNDOT Projects Scheduled for Advertising". Ct.gov. Retrieved August 22, 2011.
  14. ^ Robbins, Rebecca D. (June 21, 2012). "New Haven Highway Traffic Could Come To Crawl This Weekend". The Hartford Courant. Hartford, Connecticut. Archived from the original on January 19, 2013. Retrieved June 21, 2012.
  15. ^ "I-95 New Haven Harbor Crossing Improvement Program".
  16. ^ "Party on New Haven's 'Q' bridge means span is complete". July 17, 2015.
  17. ^ "Transportation Projects in Connecticut and Florida Win Top National Awards". America's Transportation Awards. Retrieved January 22, 2017.
  18. ^ "Pearl Harbor Memorial Bridge Project Receives Grand Prize in 2016 America's Transportation Awards Competition". WSP|Parsons Brinckerhoff. Retrieved January 20, 2017.
[edit]