Batasan station: Difference between revisions
No edit summary |
Catfurball (talk | contribs) →Services: Unreferenced section. |
||
(31 intermediate revisions by 22 users not shown) | |||
Line 1: | Line 1: | ||
{{Infobox station |
{{Infobox station |
||
| name = |
|||
| name=<span style="background-color:#dc241f"><span style="color:white; font-size:125%;"> Batasan </span></span> |
|||
{{Infobox station/Header MRT7 |
|||
| type= Manila Metro Rail Transit System |
|||
|name = Batasan |
|||
| image= MRT-7 Batasan Station Construction.jpg |
|||
|line_name = 7 |
|||
| image_size= |
|||
|station_number = S06 |
|||
| image_caption= Construction progress at the site of Batasan station as the year of 2018. |
|||
}} |
|||
⚫ | |||
| image = File:Batasan_station_Road_Commonwealth_01.jpg |
|||
| line= [[Manila Metro Rail Transit System Line 7|Line 7]] |
|||
| image_size = |
|||
| image_caption = Under construction in March 2023 |
|||
⚫ | |||
⚫ | |||
| platform = |
|||
| country = [[Philippines]] |
|||
⚫ | |||
| coordinates = {{coord|14.68508|N|121.08625|E|region:PH_type:railwaystation|format=dms|display=inline,title}} |
|||
⚫ | |||
| line = {{rail color box|system=Manila MRT|line=7|inline=yes}} |
|||
⚫ | |||
| other = |
|||
⚫ | |||
⚫ | |||
⚫ | |||
| platform = 2 side platforms |
|||
⚫ | |||
⚫ | |||
| opened=2020 (estimated) |
|||
| levels = 2; one concourse and one platform |
|||
| rebuilt= |
|||
⚫ | |||
| services= {{s-rail|title=Manila MRT}} |
|||
⚫ | |||
{{s-line|system=Manila MMRT|line=7|previous=Manggahan|next=Don Antonio}} |
|||
⚫ | |||
| ADA= yes |
|||
⚫ | |||
| code=BA |
|||
⚫ | |||
⚫ | |||
| opening = 2025 |
|||
| owned= SMC-MRT7 |
|||
| status = Under construction |
|||
| zone= |
|||
| services = {{Adjacent stations|system=Manila MRT|line1=7|left1=Don Antonio|right1=Manggahan}} |
|||
| accessible = yes |
|||
| code = BA |
|||
⚫ | |||
| owned = [[San Miguel Corporation|SMC-Mass Rail Transit 7 Incorporated]] |
|||
| zone = |
|||
}} |
}} |
||
'''Batasan |
'''Batasan station''' is an under-construction [[Manila Metro Rail Transit System|Metro Rail Transit]] (MRT) station located on the [[MRT Line 7]] (MRT-7) system in [[Batasan Hills]], [[Quezon City]], [[Philippines]]. It is near the [[Sandiganbayan|Sandiganbayan Centennial Building]], Public Attorneys Office Building, Batasan TODA Terminal, the [[Commission on Audit (Philippines)|Commission on Audit Complex]] and the [[Batasan Pambansa|Batasan Pambansa Complex]]. It is the ninth station for trains headed towards the [[North Avenue Grand Central Station|North Triangle Common Station]] and the sixth station for trains headed to [[San Jose del Monte station|San Jose del Monte]]. |
||
==Construction== |
|||
==History== |
|||
[[File:Batasan Station MRT-7 Construction Update 23-03-19.jpg|thumb|left|Construction progress of Batasan station as of March 23, 2019.]] |
[[File:Batasan Station MRT-7 Construction Update 23-03-19.jpg|thumb|left|Construction progress of Batasan station as of March 23, 2019.]] |
||
[[File:MRT-7 Batasan station construction 1 2022-04-15.jpg|thumb|200px|left| Construction of Batasan station in April 2022]] |
|||
⚫ | Batasan station is part of the [[MRT Line 7 (Metro Manila)|MRT Line 7]], which was proposed initially in 2004. The line was supposed to begin its construction in 2005 with a target opening date in 2007. However, construction did not start until 2017, a decade after its target opening date. Groundbreaking of the station began on October 7, 2017, with a simple ceremony being held before the concrete pouring for the station's [[Deep foundation|bored pile foundations]].<ref>{{cite web |url=http://www.gmanetwork.com/news/news/metro/628655/concrete-pouring-at-mrt-7-batasan-station-in-qc-begins/story/ |title=Concrete pouring at MRT-7 Batasan Station in QC begins |author=Cordero, Ted |date=October 7, 2017 |publisher=[[GMA News and Public Affairs|GMA News Online]] |access-date=October 28, 2017 }}</ref> |
||
The official working name of the station is Station 6. |
The official working name of the station during the design phase is Station 6. It is also known by another previous [[working title|working name]]: ''South Batasan''. It was named so because it is located at the southern end of [[Batasan Road]] while [[Manggahan station]] was previously called as ''North Batasan''.{{citation needed|date=October 2024}} |
||
{{as of|2023|1|31}}, the project is 66.07% complete;<ref>{{cite web|url=https://www.congress.gov.ph/photojournal/zoom.php?photoid=4499|title=HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS|author=<!--Not stated-->|date=16 February 2023|publisher=Press and Public Affairs Bureau|website=[[House of Representatives of the Philippines]]|access-date=21 February 2023}}</ref> the station's construction is to be finished by June of the same year.<ref>{{Cite news|last=Balinbin|first=Arjay L.|date=25 January 2023|title=Full MRT-7 operations seen by 2nd quarter 2025|url=https://www.bworldonline.com/top-stories/2023/01/25/500680/full-mrt-7-operations-seen-by-2nd-quarter-2025/|work=[[BusinessWorld]]|publisher=[[The Philippine Star|The Philippine STAR]]|location=Philippines|access-date=25 January 2023}}</ref> |
|||
⚫ | Groundbreaking of the station began on October 7, 2017, with a simple ceremony being held before the concrete pouring for the station's [[Deep foundation|bored pile foundations]].<ref>{{cite web |url=http://www.gmanetwork.com/news/news/metro/628655/concrete-pouring-at-mrt-7-batasan-station-in-qc-begins/story/ |title=Concrete pouring at MRT-7 Batasan Station in QC begins |author=Cordero, Ted |date=October 7, 2017 |
||
==Services== |
|||
{{unreferenced section|date=October 2024}} |
|||
Batasan station is a part of the [[MRT Line 7 (Metro Manila)|MRT Line 7]], which runs from [[San Jose del Monte]], [[Bulacan]] up to [[North Avenue, Quezon City|North Avenue]], [[Quezon City]]. It is the sixth northbound station from the [[North Avenue Grand Central Station|North Triangle Common Station]] in Quezon City and the ninth southbound station from [[San Jose del Monte station|San Jose del Monte]]. The station is served by jeepneys and bus lines, and the nearby Batasan TODA Station improves its access throughout [[Batasan Hills]] and nearby places. |
|||
==References== |
==References== |
||
Line 42: | Line 52: | ||
==External links== |
==External links== |
||
* {{Commons category-inline}} |
|||
⚫ | |||
{{commons}} |
|||
⚫ | |||
{{SRTS}} |
{{SRTS}} |
||
{{coord missing|Philippines}} |
|||
[[Category:Manila Metro Rail Transit System stations]] |
[[Category:Manila Metro Rail Transit System stations]] |
Latest revision as of 19:45, 4 October 2024
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Commonwealth Avenue, Batasan Hills Quezon City, Metro Manila Philippines | ||||||||||
Coordinates | 14°41′06″N 121°05′11″E / 14.68508°N 121.08625°E | ||||||||||
Owned by | SMC-Mass Rail Transit 7 Incorporated | ||||||||||
Line(s) | MRT Line 7 | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Platform levels | 2; one concourse and one platform | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Status | Under construction | ||||||||||
Station code | BA | ||||||||||
History | |||||||||||
Opening | 2025 | ||||||||||
Services | |||||||||||
|
Batasan station is an under-construction Metro Rail Transit (MRT) station located on the MRT Line 7 (MRT-7) system in Batasan Hills, Quezon City, Philippines. It is near the Sandiganbayan Centennial Building, Public Attorneys Office Building, Batasan TODA Terminal, the Commission on Audit Complex and the Batasan Pambansa Complex. It is the ninth station for trains headed towards the North Triangle Common Station and the sixth station for trains headed to San Jose del Monte.
History
[edit]Batasan station is part of the MRT Line 7, which was proposed initially in 2004. The line was supposed to begin its construction in 2005 with a target opening date in 2007. However, construction did not start until 2017, a decade after its target opening date. Groundbreaking of the station began on October 7, 2017, with a simple ceremony being held before the concrete pouring for the station's bored pile foundations.[1]
The official working name of the station during the design phase is Station 6. It is also known by another previous working name: South Batasan. It was named so because it is located at the southern end of Batasan Road while Manggahan station was previously called as North Batasan.[citation needed]
As of 31 January 2023[update], the project is 66.07% complete;[2] the station's construction is to be finished by June of the same year.[3]
Services
[edit]Batasan station is a part of the MRT Line 7, which runs from San Jose del Monte, Bulacan up to North Avenue, Quezon City. It is the sixth northbound station from the North Triangle Common Station in Quezon City and the ninth southbound station from San Jose del Monte. The station is served by jeepneys and bus lines, and the nearby Batasan TODA Station improves its access throughout Batasan Hills and nearby places.
References
[edit]- ^ Cordero, Ted (October 7, 2017). "Concrete pouring at MRT-7 Batasan Station in QC begins". GMA News Online. Retrieved October 28, 2017.
- ^ "HOUSE TACKLES DOTR'S RAILWAY PROJECTS STATUS, URGES AGENCY TO FIX PROJECT DELAYS". House of Representatives of the Philippines. Press and Public Affairs Bureau. 16 February 2023. Retrieved 21 February 2023.
- ^ Balinbin, Arjay L. (25 January 2023). "Full MRT-7 operations seen by 2nd quarter 2025". BusinessWorld. Philippines: The Philippine STAR. Retrieved 25 January 2023.
External links
[edit]- Media related to Batasan station at Wikimedia Commons
- Proposed Batasan MRT Station