Jump to content

South Kerry Greenway: Difference between revisions

Coordinates: 52°2′32.4″N 9°57′53.5″W / 52.042333°N 9.964861°W / 52.042333; -9.964861
From Wikipedia, the free encyclopedia
Content deleted Content added
Update
Filled in 1 bare reference(s) with reFill 2
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Short description|Hiking and cycling trail in Ireland}}
{{Short description|Hiking and cycling trail in Ireland}}
{{coords|52|2|32.4299|N|9|57|53.54226|W|display=title}}
{{coords|52|2|32.4|N|9|57|53.5|W|display=title}}
{{Use dmy dates|date=June 2021}}
{{Use dmy dates|date=June 2021}}
{{Use Hiberno-English|date=June 2021}}
{{Use Hiberno-English|date=June 2021}}
Line 21: Line 21:
| difficulty =
| difficulty =
}}
}}
The '''South Kerry Greenway''' is a proposed [[greenway (landscape)|greenway]] [[rail trail]] in [[County Kerry]], [[Republic of Ireland|Ireland]]. It is intended to be {{convert|27|km|mi|abbr=off}} long when completed and run from [[Glenbeigh]] to [[Cahersiveen]].<ref name="Home">{{Cite web|access-date=2021-07-13|url=https://www.irishtimes.com/news/crime-and-law/courts/high-court/high-court-rejects-legal-challenges-to-27km-south-kerry-greenway-1.4618036|title=High Court rejects legal challenges to 27km south Kerry greenway|website=[[The Irish Times]]|first=Mary|last=Carolan|url-access=subscription|archive-date=12 July 2021|archive-url=https://web.archive.org/web/20210712122000/https://www.irishtimes.com/news/crime-and-law/courts/high-court/high-court-rejects-legal-challenges-to-27km-south-kerry-greenway-1.4618036|url-status=live}}</ref> It is an off-road trail intended for use by cyclists and walkers along some of the route of the [[Farranfore–Valentia Harbour line]], which opened 1893 and closed in 1960. The line was operated by the [[Great Southern and Western Railway]].<ref name="O'Sullivan">{{Cite episode |first=Joan |last=O'Sullivan |publisher=[[RTÉ]] |series=Nationwide |series-link=Nationwide (Irish TV programme) |date=19 February 2010 |via=[[YouTube]] |url=https://www.youtube.com/watch?v=RpEx3xGppEQ |title=The railway line from Farranfore to Valentia harbour in Co Kerry |access-date=2021-07-13}}</ref>
The '''South Kerry Greenway''' is a proposed [[greenway (landscape)|greenway]] [[rail trail]] in [[County Kerry]], [[Republic of Ireland|Ireland]]. It is intended to be {{convert|27|km|mi|abbr=off}} long when completed and run from [[Glenbeigh]] to [[Cahersiveen]].<ref name="Home">{{Cite web |last=Carolan |first=Mary |title=High Court rejects legal challenges to 27km south Kerry greenway |url=https://www.irishtimes.com/news/crime-and-law/courts/high-court/high-court-rejects-legal-challenges-to-27km-south-kerry-greenway-1.4618036 |url-access=subscription |url-status=live |archive-url=https://web.archive.org/web/20210712122000/https://www.irishtimes.com/news/crime-and-law/courts/high-court/high-court-rejects-legal-challenges-to-27km-south-kerry-greenway-1.4618036 |archive-date=12 July 2021 |access-date=2021-07-13 |website=[[The Irish Times]]}}</ref> It is an off-road trail intended for use by cyclists and walkers along some of the route of the [[Farranfore–Valentia Harbour line]], which opened 1893 and closed in 1960. The line was operated by the [[Great Southern and Western Railway]].<ref name="O'Sullivan">{{Cite episode |title=The railway line from Farranfore to Valentia harbour in Co Kerry |url=https://www.youtube.com/watch?v=RpEx3xGppEQ |access-date=2021-07-13 |series=Nationwide |series-link=Nationwide (Irish TV programme) |last=O'Sullivan |first=Joan |date=19 February 2010 |via=[[YouTube]] |publisher=[[RTÉ]]}}</ref>


In July 2021, legal challenges against the greenway planning permissions and associated compulsory purchase orders, as well as environmental impacts, were dismissed. It was announced that leave to appeal applications and further challenges would be assessed in November 2021.<ref>{{Cite news |last=O’Faolain |first=Aodhan |title=Two legal challenges aim to halt 32&nbsp;km South Kerry Greenway |language=en |work=[[The Irish Times]] |url=https://www.irishtimes.com/news/crime-and-law/courts/high-court/two-legal-challenges-aim-to-halt-32km-south-kerry-greenway-1.4457471 |access-date=2021-07-13 |archive-date=27 January 2021 |archive-url=https://web.archive.org/web/20210127175009/https://www.irishtimes.com/news/crime-and-law/courts/high-court/two-legal-challenges-aim-to-halt-32km-south-kerry-greenway-1.4457471 |url-status=live }}</ref><ref>{{Cite web |website=[[IrishExaminer.com]] |url=https://www.irishexaminer.com/news/munster/arid-40335170.html |title=Permission for south Kerry greenway valid, High Court rules |first=Ann |last=O'Loughlin |date=12 July 2021 |access-date=2021-07-13 |archive-date=13 July 2021 |archive-url=https://web.archive.org/web/20210713083258/https://www.irishexaminer.com/news/munster/arid-40335170.html |url-status=live }}</ref> On 15 October 2021, it was reported that planning permission to construct the greenway was upheld.<ref>{{cite web|title=High Court ruling brings South Kerry Greenway one step closer|access-date=16 October 2021|url=https://www.radiokerry.ie/news/high-court-ruling-brings-south-kerry-greenway-one-step-closer-254654|archive-date=16 October 2021|archive-url=https://web.archive.org/web/20211016100948/https://www.radiokerry.ie/news/high-court-ruling-brings-south-kerry-greenway-one-step-closer-254654|url-status=live}}</ref> By December 2021, [[Irish Supreme Court|Supreme Court]] proceedings had been initiated.<ref>{{Cite web |work=[[The Kerryman]] |first=Sinead |last=Kelleher |date=December 23, 2021 |access-date=2022-01-19 |url=https://www.independent.ie/regionals/kerryman/news/2m-for-south-kerry-greenway-as-supreme-court-decision-is-awaited-41177577.html |title=€2m for South Kerry Greenway as Supreme Court decision is awaited |publisher=[[Independent.ie]] |archive-date=20 January 2022 |archive-url=https://web.archive.org/web/20220120165250/https://www.independent.ie/regionals/kerryman/news/2m-for-south-kerry-greenway-as-supreme-court-decision-is-awaited-41177577.html |url-status=live }}</ref> On 8 February 2022, the Supreme Court rejected the applications seeking leave for appeal, and Kerry County Council announced that it could "now proceed with the construction of the greenway".<ref>{{cite web |title=South Kerry greenway to go ahead after Supreme Court decision |accessdate=4 April 2022 |url=https://www.irishtimes.com/news/ireland/irish-news/south-kerry-greenway-to-go-ahead-after-supreme-court-decision-1.4796936 |website=[[IrishTimes.com]] |date=8 February 2022 |archive-date=8 March 2022 |archive-url=https://web.archive.org/web/20220308115127/https://www.irishtimes.com/news/ireland/irish-news/south-kerry-greenway-to-go-ahead-after-supreme-court-decision-1.4796936 |url-status=live }}</ref><ref>{{Cite web|url=https://www.radiokerry.ie/news/south-kerry-greenway-expected-to-be-completed-before-end-of-2025-297205|title=South Kerry Greenway expected to be completed before end of 2025|website=[[RadioKerry.ie]]|date=16 September 2022|access-date=18 October 2022|archive-date=18 October 2022|archive-url=https://web.archive.org/web/20221018123825/https://www.radiokerry.ie/news/south-kerry-greenway-expected-to-be-completed-before-end-of-2025-297205|url-status=live}}</ref>
In July 2021, legal challenges against the greenway planning permissions and associated compulsory purchase orders, as well as environmental impacts, were dismissed. It was announced that leave to appeal applications and further challenges would be assessed in November 2021.<ref>{{Cite news |last=O’Faolain |first=Aodhan |title=Two legal challenges aim to halt 32&nbsp;km South Kerry Greenway |url=https://www.irishtimes.com/news/crime-and-law/courts/high-court/two-legal-challenges-aim-to-halt-32km-south-kerry-greenway-1.4457471 |url-status=live |archive-url=https://web.archive.org/web/20210127175009/https://www.irishtimes.com/news/crime-and-law/courts/high-court/two-legal-challenges-aim-to-halt-32km-south-kerry-greenway-1.4457471 |archive-date=27 January 2021 |access-date=2021-07-13 |work=[[The Irish Times]] |language=en}}</ref><ref>{{Cite web |last=O'Loughlin |first=Ann |date=12 July 2021 |title=Permission for south Kerry greenway valid, High Court rules |url=https://www.irishexaminer.com/news/munster/arid-40335170.html |url-status=live |archive-url=https://web.archive.org/web/20210713083258/https://www.irishexaminer.com/news/munster/arid-40335170.html |archive-date=13 July 2021 |access-date=2021-07-13 |website=[[IrishExaminer.com]]}}</ref> On 15 October 2021, it was reported that planning permission to construct the greenway was upheld.<ref>{{Cite web |title=High Court ruling brings South Kerry Greenway one step closer |url=https://www.radiokerry.ie/news/high-court-ruling-brings-south-kerry-greenway-one-step-closer-254654 |url-status=live |archive-url=https://web.archive.org/web/20211016100948/https://www.radiokerry.ie/news/high-court-ruling-brings-south-kerry-greenway-one-step-closer-254654 |archive-date=16 October 2021 |access-date=16 October 2021}}</ref> By December 2021, [[Irish Supreme Court|Supreme Court]] proceedings had been initiated.<ref>{{Cite web |last=Kelleher |first=Sinead |date=December 23, 2021 |title=€2m for South Kerry Greenway as Supreme Court decision is awaited |url=https://www.independent.ie/regionals/kerryman/news/2m-for-south-kerry-greenway-as-supreme-court-decision-is-awaited-41177577.html |url-status=live |archive-url=https://web.archive.org/web/20220120165250/https://www.independent.ie/regionals/kerryman/news/2m-for-south-kerry-greenway-as-supreme-court-decision-is-awaited-41177577.html |archive-date=20 January 2022 |access-date=2022-01-19 |website=[[The Kerryman]] |publisher=[[Independent.ie]]}}</ref> On 8 February 2022, the Supreme Court rejected the applications seeking leave for appeal, and Kerry County Council announced that it could "now proceed with the construction of the greenway".<ref>{{Cite web |date=8 February 2022 |title=South Kerry greenway to go ahead after Supreme Court decision |url=https://www.irishtimes.com/news/ireland/irish-news/south-kerry-greenway-to-go-ahead-after-supreme-court-decision-1.4796936 |url-status=live |archive-url=https://web.archive.org/web/20220308115127/https://www.irishtimes.com/news/ireland/irish-news/south-kerry-greenway-to-go-ahead-after-supreme-court-decision-1.4796936 |archive-date=8 March 2022 |access-date=4 April 2022 |website=[[IrishTimes.com]]}}</ref><ref>{{Cite web |date=16 September 2022 |title=South Kerry Greenway expected to be completed before end of 2025 |url=https://www.radiokerry.ie/news/south-kerry-greenway-expected-to-be-completed-before-end-of-2025-297205 |url-status=live |archive-url=https://web.archive.org/web/20221018123825/https://www.radiokerry.ie/news/south-kerry-greenway-expected-to-be-completed-before-end-of-2025-297205 |archive-date=18 October 2022 |access-date=18 October 2022 |website=[[RadioKerry.ie]]}}</ref> As of May 2023 the greenway was under construction.<ref>{{Cite news |date=28 May 2023 |title=Vast majority of South Kerry Greenway to be completed in early 2025 |url=https://www.radiokerry.ie/news/vast-majority-of-south-kerry-greenway-to-be-completed-in-early-2025-332612 |access-date=27 February 2024 |work=[[RadioKerry.ie]] |language=en}}</ref>


As of December 2023, Kerry County Council proposed that a "main contractor" for the works would be appointed in mid-2024 and that the greenway could be completed by mid-2026.<ref>{{Cite web |date=7 December 2023 |title=Main contractor for South Kerry Greenway works expected to be appointed in mid 2024 |url=https://www.radiokerry.ie/news/main-contractor-for-south-kerry-greenway-works-expected-to-be-appointed-in-mid-2024-360062 |access-date=27 February 2024 |website=[[RadioKerry.ie]] |quote=Kerry County Council says the Main Contractor will be appointed in mid-2024, with an estimated completion date for the South Kerry Greenway of mid-2026}}</ref> Public consultation on the [[Cahersiveen]] to [[Reenard]] section began in October 2024.<ref>{{Cite web |date=10 October 2024 |title=Public consultation to choose preferred route to extend Greenway |url=https://www.radiokerry.ie/news/first-public-consultation-to-choose-preferred-route-to-extend-south-kerry-greenway-404276 |website=[[RadioKerry.ie]]}}</ref>
As of 2023 the greenway is under construction and scheduled to be completed in 2025. A 5km extension of the greenway (which formed part of the initial application for the greenway but was rejected by An Bord Pleanala) to Renard is also planned by TII.<ref>{{cite news |title=Vast majority of South Kerry Greenway to be completed in early 2025 |url=https://www.radiokerry.ie/news/vast-majority-of-south-kerry-greenway-to-be-completed-in-early-2025-332612 |work=RadioKerry.ie |date=28 May 2023 |language=en}}</ref>


== References ==
== References ==

Latest revision as of 20:32, 12 October 2024

52°2′32.4″N 9°57′53.5″W / 52.042333°N 9.964861°W / 52.042333; -9.964861

South Kerry Greenway
The Gleensk Valley viaduct is one of a number of bridges and tunnels due to carry the greenway
Length27 km (17 mi)
LocationCounty Kerry, Ireland
Designationproposed greenway
TrailheadsGlenbeigh, Cahersiveen
UseCycling and Walking
SeasonAny
Surfacehard

The South Kerry Greenway is a proposed greenway rail trail in County Kerry, Ireland. It is intended to be 27 kilometres (17 miles) long when completed and run from Glenbeigh to Cahersiveen.[1] It is an off-road trail intended for use by cyclists and walkers along some of the route of the Farranfore–Valentia Harbour line, which opened 1893 and closed in 1960. The line was operated by the Great Southern and Western Railway.[2]

In July 2021, legal challenges against the greenway planning permissions and associated compulsory purchase orders, as well as environmental impacts, were dismissed. It was announced that leave to appeal applications and further challenges would be assessed in November 2021.[3][4] On 15 October 2021, it was reported that planning permission to construct the greenway was upheld.[5] By December 2021, Supreme Court proceedings had been initiated.[6] On 8 February 2022, the Supreme Court rejected the applications seeking leave for appeal, and Kerry County Council announced that it could "now proceed with the construction of the greenway".[7][8] As of May 2023 the greenway was under construction.[9]

As of December 2023, Kerry County Council proposed that a "main contractor" for the works would be appointed in mid-2024 and that the greenway could be completed by mid-2026.[10] Public consultation on the Cahersiveen to Reenard section began in October 2024.[11]

References

[edit]
  1. ^ Carolan, Mary. "High Court rejects legal challenges to 27km south Kerry greenway". The Irish Times. Archived from the original on 12 July 2021. Retrieved 13 July 2021.
  2. ^ O'Sullivan, Joan (19 February 2010). "The railway line from Farranfore to Valentia harbour in Co Kerry". Nationwide. RTÉ. Retrieved 13 July 2021 – via YouTube.
  3. ^ O’Faolain, Aodhan. "Two legal challenges aim to halt 32 km South Kerry Greenway". The Irish Times. Archived from the original on 27 January 2021. Retrieved 13 July 2021.
  4. ^ O'Loughlin, Ann (12 July 2021). "Permission for south Kerry greenway valid, High Court rules". IrishExaminer.com. Archived from the original on 13 July 2021. Retrieved 13 July 2021.
  5. ^ "High Court ruling brings South Kerry Greenway one step closer". Archived from the original on 16 October 2021. Retrieved 16 October 2021.
  6. ^ Kelleher, Sinead (23 December 2021). "€2m for South Kerry Greenway as Supreme Court decision is awaited". The Kerryman. Independent.ie. Archived from the original on 20 January 2022. Retrieved 19 January 2022.
  7. ^ "South Kerry greenway to go ahead after Supreme Court decision". IrishTimes.com. 8 February 2022. Archived from the original on 8 March 2022. Retrieved 4 April 2022.
  8. ^ "South Kerry Greenway expected to be completed before end of 2025". RadioKerry.ie. 16 September 2022. Archived from the original on 18 October 2022. Retrieved 18 October 2022.
  9. ^ "Vast majority of South Kerry Greenway to be completed in early 2025". RadioKerry.ie. 28 May 2023. Retrieved 27 February 2024.
  10. ^ "Main contractor for South Kerry Greenway works expected to be appointed in mid 2024". RadioKerry.ie. 7 December 2023. Retrieved 27 February 2024. Kerry County Council says the Main Contractor will be appointed in mid-2024, with an estimated completion date for the South Kerry Greenway of mid-2026
  11. ^ "Public consultation to choose preferred route to extend Greenway". RadioKerry.ie. 10 October 2024.