Snap Lake Diamond Mine: Difference between revisions
No edit summary |
No edit summary |
||
(17 intermediate revisions by 14 users not shown) | |||
Line 1: | Line 1: | ||
{{short description|Diamond mine in the Northwest Territories of Canada operated by De Beers from 2008-2015}} |
|||
{{Use mdy dates|date=June 2011}} |
{{Use mdy dates|date=June 2011}} |
||
{{refimprove|date=December 2007}} |
|||
{{Infobox mine |
{{Infobox mine |
||
| name = Snap Lake Mine |
| name = Snap Lake Mine |
||
Line 9: | Line 9: | ||
| pushpin_label = Snap Lake Diamond Mine |
| pushpin_label = Snap Lake Diamond Mine |
||
| pushpin_map_caption = Location in Canada |
| pushpin_map_caption = Location in Canada |
||
| coordinates = {{coord|63|36|20|N|110|52|00|W|region:CA-NT|format=dms|display=inline,title}} |
|||
| latd = 63 |latm = 36 |lats = 20 |latNS = N |
|||
| longd = 110 |longm = 52 |longs = 00 |longEW = W |
|||
| coordinates_region = CA-NT |
|||
| display = inline,title |
|||
| place = {{convert|220|km|abbr=on}} northeast of [[Yellowknife]] |
| place = {{convert|220|km|abbr=on}} northeast of [[Yellowknife]] |
||
| subdivision_type = [[Provinces and territories of Canada|Territory]] |
| subdivision_type = [[Provinces and territories of Canada|Territory]] |
||
Line 18: | Line 15: | ||
| country = Canada |
| country = Canada |
||
| owner = [[De Beers]] |
| owner = [[De Beers]] |
||
| official website = |
| official website = {{URL|https://canada.debeersgroup.com/}} |
||
| acquisition year = 2001 |
| acquisition year = 2001 |
||
⚫ | |||
| stock_exchange = |
|||
| |
| financial year = |
||
⚫ | |||
| financial year = Annually |
|||
| opening year = 2008 |
| opening year = 2008 |
||
| active years = 2008 - 2015 |
|||
| closing year = |
| closing year = |
||
| discovery year = |
|||
}} |
}} |
||
'''Snap Lake Mine''' |
'''Snap Lake Mine''' was a remote fly-in/fly-out operation located about {{convert|220|km|abbr=on}} northeast of [[Yellowknife]], [[Northwest Territories]], and, according to [[De Beers]], was the first De Beers [[Mining|mine]] outside of Africa. It was also Canada's first completely underground diamond mine.<ref name="debeers">{{cite web|url= http://www.debeerscanada.com/files_2/snap_lake/factsheet.html|title= Snap Lake: Project Factsheet|publisher= De Beers Canada|date= May 28, 2009|access-date= August 13, 2009|url-status= dead|archive-url= https://web.archive.org/web/20120424060707/http://www.debeerscanada.com/files_3/snap-lake-mine.php|archive-date= April 24, 2012|df= mdy-all}}</ref> |
||
Construction began with the opening of an access winter road in 2005. By the end of 2013, De Beers had spent US$1.8 billion on construction and mine operation. Of that total, De Beers spent US$1.3 billion with Northwest Territories-based contractors and suppliers, including US$723 million with Aboriginal businesses or joint ventures.<ref>{{cite web|url=http://www.debeerscanada.com/files_3/snap-lake-mine.php |title=Snap Lake Mine |publisher=DeBeers}}</ref> |
Construction began with the opening of an access winter road in 2005. By the end of 2013, De Beers had spent US$1.8 billion on construction and mine operation. Of that total, De Beers spent US$1.3 billion with Northwest Territories-based contractors and suppliers, including US$723 million with Aboriginal businesses or joint ventures.<ref>{{cite web |url=http://www.debeerscanada.com/files_3/snap-lake-mine.php |title=Snap Lake Mine |publisher=DeBeers |url-status=dead |archive-url=https://web.archive.org/web/20120424060707/http://www.debeerscanada.com/files_3/snap-lake-mine.php |archive-date=April 24, 2012 |df=mdy-all }}</ref> |
||
The mine began commercial production on January 16, 2008 and was officially opened on July 25, 2008. In 2013, Snap Lake Mine provided 776 person years of employment, including 274 person years of employment to Northwest Territories residents, close to the 300 NWT resident employees predicted during the mine’s environmental assessment. Approximately 400 people are working at the mine on any given day. Lifetime of the mine |
The mine began commercial production on January 16, 2008 and was officially opened on July 25, 2008. In 2013, Snap Lake Mine provided 776 person years of employment, including 274 person years of employment to Northwest Territories residents, close to the 300 NWT resident employees predicted during the mine’s environmental assessment. Approximately 400 people are working at the mine on any given day. Lifetime of the mine was estimated to be about 15 years. Resource estimates suggest 16.1 million carats over life of mine.<ref>{{cite web|title=De Beers Analyst Seminar|url=http://www.angloamerican.com/~/media/Files/A/Anglo-American-PLC-V2/presentations/2014pres/de-beers-analyst-seminar-presentation.pdf|website=Anglo American|accessdate=3 November 2014}}</ref> |
||
The Snap Lake mine was featured in ''[[Ice Road Truckers]]'', a television series on [[History (U.S. TV channel)|The History Channel]]. The Snap Lake mine was also featured on the Canadian Discovery channel show [[Daily Planet]] as part of the special feature 'Daily Planet Goes North – More Ice for the Arctic'.<ref>{{cite web|url=http://broadband.discoverychannel.ca/?vid=20671|title=Daily Planet Goes North – More Ice for the Arctic|publisher=Discovery Channel|accessdate=February 22, 2008}}</ref> |
The Snap Lake mine was featured in ''[[Ice Road Truckers]]'', a television series on [[History (U.S. TV channel)|The History Channel]]. The Snap Lake mine was also featured on the Canadian Discovery channel show [[Daily Planet]] as part of the special feature 'Daily Planet Goes North – More Ice for the Arctic'.<ref>{{cite web|url=http://broadband.discoverychannel.ca/?vid=20671|title=Daily Planet Goes North – More Ice for the Arctic|publisher=Discovery Channel|accessdate=February 22, 2008}}</ref> |
||
The mine |
The mine was served by the [[Snap Lake Airport]], a private airport that was strictly for cargo and passengers entering and leaving the remote site. |
||
==Closure== |
|||
On December 4, 2015, De Beers announced that due to a drop in the market price of diamonds and a necessary costly license exemption they would stop production of diamonds at the Snap Lake Mine, putting it into "care and maintenance" state so that it could be re-opened at a later date if so desired. Approximately 70 employees would remain on the site as a result, but 434 were laid off.<ref>{{cite web|title=N.W.T.'s Snap Lake diamond mine halts operation, De Beers says|url=http://www.cbc.ca/news/canada/north/n-w-t-s-snap-lake-diamond-mine-to-cease-operations-immediately-1.3350770|website=CBC.ca|accessdate=4 December 2015}}</ref> |
|||
==See also== |
==See also== |
||
[[File:Snap Lake Diamond Mine Processing Plant.jpg|thumb |
[[File:Snap Lake Diamond Mine Processing Plant.jpg|thumb|Two [[loader (equipment)|loader]]s work outside the ore processing and recovery plant.]] |
||
*[[Ekati Diamond Mine]] |
*[[Ekati Diamond Mine]] |
||
*[[Diavik Diamond Mine]] |
*[[Diavik Diamond Mine]] |
||
Line 45: | Line 45: | ||
== References == |
== References == |
||
{{ |
{{Reflist}} |
||
==External links== |
==External links== |
||
* [ |
* [https://www.wired.com/science/planetearth/magazine/16-12/ff_diamonds_sb "Digging for Diamonds 24/7 Under Frozen Snap Lake"], ''[[Wired (magazine)|Wired]]'', November 24, 2008 |
||
*[ |
*[https://web.archive.org/web/20091114130932/http://debeerscanada.com/files_3/image-galleries-snap-lake-mine.php Photo gallery] at [[De Beers Canada]] |
||
*[ |
*[https://www.flickr.com/photos/mrfuller/sets/72057594132472740/with/144903107/ Snap Lake project], gallery at [[Flickr]] |
||
{{Anglo American plc}} |
{{Anglo American plc}} |
||
[[Category:Diamond mines in Canada]] |
[[Category:Diamond mines in Canada]] |
||
[[Category:Mines in the Northwest Territories]] |
[[Category:Mines in the Northwest Territories]] |
||
[[Category:Underground mines in Canada]] |
[[Category:Underground mines in Canada]] |
||
[[Category:De Beers]] |
[[Category:De Beers]] |
||
[[Category:2008 establishments in the Northwest Territories]] |
Latest revision as of 02:41, 21 October 2024
Location | |
---|---|
Location | 220 km (140 mi) northeast of Yellowknife |
Territory | Northwest Territories |
Country | Canada |
Coordinates | 63°36′20″N 110°52′00″W / 63.60556°N 110.86667°W |
Production | |
Products | Diamonds |
History | |
Opened | 2008 |
Active | 2008 - 2015 |
Owner | |
Company | De Beers |
Website | canada |
Year of acquisition | 2001 |
Snap Lake Mine was a remote fly-in/fly-out operation located about 220 km (140 mi) northeast of Yellowknife, Northwest Territories, and, according to De Beers, was the first De Beers mine outside of Africa. It was also Canada's first completely underground diamond mine.[1]
Construction began with the opening of an access winter road in 2005. By the end of 2013, De Beers had spent US$1.8 billion on construction and mine operation. Of that total, De Beers spent US$1.3 billion with Northwest Territories-based contractors and suppliers, including US$723 million with Aboriginal businesses or joint ventures.[2]
The mine began commercial production on January 16, 2008 and was officially opened on July 25, 2008. In 2013, Snap Lake Mine provided 776 person years of employment, including 274 person years of employment to Northwest Territories residents, close to the 300 NWT resident employees predicted during the mine’s environmental assessment. Approximately 400 people are working at the mine on any given day. Lifetime of the mine was estimated to be about 15 years. Resource estimates suggest 16.1 million carats over life of mine.[3]
The Snap Lake mine was featured in Ice Road Truckers, a television series on The History Channel. The Snap Lake mine was also featured on the Canadian Discovery channel show Daily Planet as part of the special feature 'Daily Planet Goes North – More Ice for the Arctic'.[4]
The mine was served by the Snap Lake Airport, a private airport that was strictly for cargo and passengers entering and leaving the remote site.
Closure
[edit]On December 4, 2015, De Beers announced that due to a drop in the market price of diamonds and a necessary costly license exemption they would stop production of diamonds at the Snap Lake Mine, putting it into "care and maintenance" state so that it could be re-opened at a later date if so desired. Approximately 70 employees would remain on the site as a result, but 434 were laid off.[5]
See also
[edit]References
[edit]- ^ "Snap Lake: Project Factsheet". De Beers Canada. May 28, 2009. Archived from the original on April 24, 2012. Retrieved August 13, 2009.
- ^ "Snap Lake Mine". DeBeers. Archived from the original on April 24, 2012.
- ^ "De Beers Analyst Seminar" (PDF). Anglo American. Retrieved November 3, 2014.
- ^ "Daily Planet Goes North – More Ice for the Arctic". Discovery Channel. Retrieved February 22, 2008.
- ^ "N.W.T.'s Snap Lake diamond mine halts operation, De Beers says". CBC.ca. Retrieved December 4, 2015.
External links
[edit]- "Digging for Diamonds 24/7 Under Frozen Snap Lake", Wired, November 24, 2008
- Photo gallery at De Beers Canada
- Snap Lake project, gallery at Flickr