Jump to content

British Rail Class D3/6: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Undid revision 1085322219 by 109.79.79.138 (talk)
Tags: Undo Reverted
 
(9 intermediate revisions by 7 users not shown)
Line 1: Line 1:
{{Use dmy dates|date=December 2016}}
{{Use dmy dates|date=December 2016}}
{{Use British English|date=December 2016}}
{{Use British English|date=December 2016}}
{{Infobox Locomotive
{{Infobox locomotive
|name = British Rail Class D3/6
|name = British Rail Class D3/6
|powertype = Diesel-electric
|powertype = Diesel-electric
Line 15: Line 15:
|primemover = [[English Electric diesel engines|English Electric 6K]]
|primemover = [[English Electric diesel engines|English Electric 6K]]
|tractionmotors = English Electric, 2 off
|tractionmotors = English Electric, 2 off
|whytetype = 0-6-0 DE
|whytetype = [[0-6-0]] DE
|uicclass = C
|uicclass = C
|wheeldiameter = {{convert|4|ft|0+1/2|in|m|3|abbr=on}}
|wheeldiameter = {{convert|4|ft|0+1/2|in|m|3|abbr=on}}
Line 38: Line 38:
|disposition = One preserved, remainder scrapped
|disposition = One preserved, remainder scrapped
}}
}}
The British Rail '''Class D3/6''' were diesel [[Switcher|shunters]] designed in 1934/5 by [[English Electric]] for the [[London, Midland and Scottish Railway]]. (LMSR)
The British Rail '''Class D3/6''' were diesel [[Switcher|shunters]] designed in 1934/5 by [[English Electric]] for the [[London, Midland and Scottish Railway]]. (LMS)

==Prototype==
==Prototype==
Between 1931 and 1934 the LMSR ordered nine prototype [[0-6-0]] [[LMS diesel shunters|diesel shunters]] of different designs. The last of these was based on the English Electric 6K of {{convert|300|hp}} diesel engine, with a long bonnet ("nose"), 0-6-0 wheel arrangement, EE 6K prime mover and 2 axle-hung [[traction motors]]. It was built by [[Hawthorne Leslie]] to [[English Electric]] design.<ref>{{Strickland Locomotive Directory|page=48}}</ref> Similar prototypes were later built for the [[Southern Railway (UK)|Southern Railway]] ([[British Rail Class D3/12|SR1-3]]), [[Great Western Railway]] ([[British Rail Class D3/10|GWR2]]), and [[London and North Eastern Railway]] ([[British Rail Class D3/9|8000-8004]]) and this configuration was repeated in most subsequent large diesel shunters built in Britain, such as the [[British Rail Class 11]] and even more numerous [[British Rail Class 08]] that entered service after World War II.
Between 1931 and 1934, the LMS ordered nine prototype [[0-6-0]] [[LMS diesel shunters|diesel shunters]] of different designs. The last of these was based on the English Electric 6K of {{convert|300|hp}} diesel engine, with a long bonnet ("nose"), 0-6-0 wheel arrangement, EE 6K prime mover and two axle-hung [[traction motors]]. It was built by [[Hawthorne Leslie]] to [[English Electric]] design.<ref>{{Strickland Locomotive Directory|page=48}}</ref> Similar prototypes were later built for the [[Southern Railway (UK)|Southern Railway]] ([[British Rail Class D3/12|SR1-3]]), [[Great Western Railway]] ([[British Rail Class D3/10|GWR2]]), and [[London and North Eastern Railway]] ([[British Rail Class D3/9|8000-8004]]) and this configuration was repeated in most subsequent large diesel shunters built in Britain, such as the [[British Rail Class 11]] and even more numerous [[British Rail Class 08]] that entered service after World War II.

After modification and uprating to {{convert|350|hp}} the prototype was taken into LMSR stock in 1936 and numbered 7079, (later [[British Railways]] number 12002. It was withdrawn and scrapped in 1956.<ref>{{Strickland Locomotive Directory|page=49}}</ref>
After modification and uprating to {{convert|350|hp}}, the prototype was taken into LMS stock in 1936 and numbered 7079, (later [[British Rail]]ways number 12002. It was withdrawn and scrapped in 1956.<ref>{{Strickland Locomotive Directory|page=49}}</ref>


==Production Series==
==Production series==
Ten further locomotives of the same design, with minor alterations and uprated to {{convert|350|hp}} were built during 1935 and taken into LMSR stock in 1936. These were numbered 7069-7078 by the LMS. Three of these later became [[British Rail]] numbers 12000–12002 (previously 7074/76/79 respectively). They spent their working lives allocated to Crewe South Locomotive Depot.
Ten further locomotives of the same design, with minor alterations and uprated to {{convert|350|hp}}, were built in 1935 and taken into LMSR stock in 1936. These were numbered 7069-7078 by the LMS. Three of these later became [[British Rail]]ways numbers 12000–12002 (previously 7074/76/79 respectively). They spent their working lives allocated to Crewe South Locomotive Depot.


The remainder of the class were sold to the British [[War Department (UK)|War Department]] in 1940 and were shipped to France during World War II. Of these, the first production locomotive, no. 7069, survived the war and was used in industrial service in [[France]]. It was later repatriated for preservation and is currently located and being restored at the [[Berkeley Vale Railway]].<ref>{{cite web|title=First Locomotive arrives at Sharpness|url=http://valeofberkeleyrailway.co.uk/?q=node/63|website=Vale of Berkeley Railway|access-date=26 September 2015}}</ref>
The remainder of the class were sold to the British [[War Department (UK)|War Department]] in 1940 and were shipped to France during World War II. Of these, the first production locomotive, No. 7069, survived the war and was used in industrial service in [[France]]. It is being restored at the [[Berkeley Vale Railway]].<ref>{{cite web|title=First Locomotive arrives at Sharpness|url=http://valeofberkeleyrailway.co.uk/?q=node/63|website=Vale of Berkeley Railway|access-date=26 September 2015}}</ref>


==Footnotes==
==Footnotes==
Line 68: Line 70:
[[Category:Railway locomotives introduced in 1934]]
[[Category:Railway locomotives introduced in 1934]]
[[Category:Standard gauge locomotives of Great Britain]]
[[Category:Standard gauge locomotives of Great Britain]]
[[Category:Diesel-electric locomotives of Great Britain]]
[[Category:Diesel–electric locomotives of Great Britain]]
[[Category:Shunting locomotives]]

Latest revision as of 06:12, 25 October 2024

British Rail Class D3/6
7069 undergoing restoration
Type and origin
Power typeDiesel-electric
DesignerEnglish Electric
BuilderHawthorn Leslie
Serial numberHL: 3841–3850, 3816
Build date1934 (7079), 1935 (7069-78)
Total produced11
Specifications
Configuration:
 • Whyte0-6-0 DE
 • UICC
Gauge4 ft 8+12 in (1,435 mm) standard gauge
Wheel diameter4 ft 0+12 in (1.232 m)
Loco weight51.45 long tons (52.28 t; 57.62 short tons)
Prime moverEnglish Electric 6K
Traction motorsEnglish Electric, 2 off
MU workingNot fitted
Train heatingNone
Performance figures
Maximum speed30 mph (48 km/h)
Power outputEngine: 350 hp (261 kW)
Tractive effort30,000 lbf (133.4 kN)
Career
OperatorsLondon, Midland and Scottish Railway,
War Department,
British Railways
ClassLMS: 0F; BR: D3/6
NumbersLMS 7069–7079;
BR 12000–12002
Axle load classRoute availability 5
Retired1940-1962
DispositionOne preserved, remainder scrapped

The British Rail Class D3/6 were diesel shunters designed in 1934/5 by English Electric for the London, Midland and Scottish Railway. (LMS)

Prototype

[edit]

Between 1931 and 1934, the LMS ordered nine prototype 0-6-0 diesel shunters of different designs. The last of these was based on the English Electric 6K of 300 horsepower (220 kW) diesel engine, with a long bonnet ("nose"), 0-6-0 wheel arrangement, EE 6K prime mover and two axle-hung traction motors. It was built by Hawthorne Leslie to English Electric design.[1] Similar prototypes were later built for the Southern Railway (SR1-3), Great Western Railway (GWR2), and London and North Eastern Railway (8000-8004) and this configuration was repeated in most subsequent large diesel shunters built in Britain, such as the British Rail Class 11 and even more numerous British Rail Class 08 that entered service after World War II.

After modification and uprating to 350 horsepower (260 kW), the prototype was taken into LMS stock in 1936 and numbered 7079, (later British Railways number 12002. It was withdrawn and scrapped in 1956.[2]

Production series

[edit]

Ten further locomotives of the same design, with minor alterations and uprated to 350 horsepower (260 kW), were built in 1935 and taken into LMSR stock in 1936. These were numbered 7069-7078 by the LMS. Three of these later became British Railways numbers 12000–12002 (previously 7074/76/79 respectively). They spent their working lives allocated to Crewe South Locomotive Depot.

The remainder of the class were sold to the British War Department in 1940 and were shipped to France during World War II. Of these, the first production locomotive, No. 7069, survived the war and was used in industrial service in France. It is being restored at the Berkeley Vale Railway.[3]

Footnotes

[edit]
  1. ^ Strickland, David C. (September 1983). Locomotive Directory: Every Single One There Has Ever Been. Camberley: Diesel and Electric Group. p. 48. ISBN 978-0-906375-10-5. OCLC 16601890. OL 27959920M. Wikidata Q105978499.
  2. ^ Strickland, David C. (September 1983). Locomotive Directory: Every Single One There Has Ever Been. Camberley: Diesel and Electric Group. p. 49. ISBN 978-0-906375-10-5. OCLC 16601890. OL 27959920M. Wikidata Q105978499.
  3. ^ "First Locomotive arrives at Sharpness". Vale of Berkeley Railway. Retrieved 26 September 2015.

References

[edit]

See also

[edit]