Beijing–Hong Kong high-speed train: Difference between revisions
No edit summary |
Adds to the history Tags: Visual edit Mobile edit Mobile web edit |
||
(8 intermediate revisions by 5 users not shown) | |||
Line 3: | Line 3: | ||
{{for|the overnight train service with numbers D909/910|Beijing–Hong Kong D-series sleeping train}} |
{{for|the overnight train service with numbers D909/910|Beijing–Hong Kong D-series sleeping train}} |
||
{{Infobox rail service |
{{Infobox rail service |
||
| name = Beijing–Hong Kong high-speed train<br>{{nobold|{{lang|zh-hans|京港高速动车组列车}}}}<br>{{nobold|{{lang|zh-hant|京港高速動車組列車}}}} |
| name = Beijing–Hong Kong high-speed train<br>{{nobold|{{lang|zh-hans|京港高速动车组列车}}}}<br>{{nobold|{{lang|zh-hant|京港高速動車組列車}}}} |
||
| image = CR400AF-Z-2335 at Lianyuqiao (20240703100508).jpg |
| image = CR400AF-Z-2335 at Lianyuqiao (20240703100508).jpg |
||
| image_width = 300px |
| image_width = 300px |
||
| caption = A [[China Railway CR400AF|CR400AF-Z]] EMU on G79 service in [[Shijingshan District]], Beijing |
| caption = A [[China Railway CR400AF|CR400AF-Z]] EMU on G79 service in [[Shijingshan District]], Beijing |
||
| logo = CRH-logo.svg |
| logo = CRH-logo.svg |
||
| logo_width = 50 |
| logo_width = 50 |
||
| type = [[G-series trains]] |
| type = [[G-series trains]] |
||
| status = Operational |
| status = Operational |
||
| locale = China |
| locale = China |
||
| predecessor = |
| predecessor = |
||
| first = {{plainlist|1= |
| first = {{plainlist|1= |
||
*26 December 2012 (Beijing West ↔ Guangzhou South) |
*26 December 2012 (Beijing West ↔ Guangzhou South) |
||
*28 December 2013 (Beijing West ↔ Shenzhen North) |
*28 December 2013 (Beijing West ↔ Shenzhen North) |
||
Line 19: | Line 19: | ||
*23 September 2018 (Beijing West ↔ Hong Kong West Kowloon) |
*23 September 2018 (Beijing West ↔ Hong Kong West Kowloon) |
||
}} |
}} |
||
| last = |
| last = |
||
| successor = |
| successor = |
||
| operator = {{rint|cn|rail}} [[CR Guangzhou]] |
| operator = {{rint|cn|rail}} [[CR Guangzhou]] |
||
| formeroperator = |
| formeroperator = |
||
| ridership = |
| ridership = |
||
| start = {{rws|Beijing West}} |
| start = {{rws|Beijing West}} |
||
| stops = {{plainlist|1= |
| stops = {{plainlist|1= |
||
*{{rws|Shijiazhuang}} |
*{{rws|Shijiazhuang}} |
||
*{{rws|Zhengzhou East}} |
*{{rws|Zhengzhou East}} |
||
Line 33: | Line 33: | ||
*{{rws|Shenzhen North}} |
*{{rws|Shenzhen North}} |
||
}} |
}} |
||
| end = {{rws|Hong Kong West Kowloon}} |
| end = {{rws|Hong Kong West Kowloon}} |
||
| distance = {{convert|2439|km}} |
| distance = {{convert|2439|km}} |
||
| journeytime = {{plainlist|1= |
| journeytime = {{plainlist|1= |
||
*8h 12m (G79) |
*8h 12m (G79) |
||
*8h 10m (G80) |
*8h 10m (G80) |
||
}} |
}} |
||
| frequency = Daily |
| frequency = Daily |
||
| trainnumber = {{plainlist|1= |
| trainnumber = {{plainlist|1= |
||
*'''G79''' (Beijing West → Hong Kong West Kowloon) |
*'''G79''' (Beijing West → Hong Kong West Kowloon) |
||
*'''G80''' (Hong Kong West Kowloon → Beijing West) |
*'''G80''' (Hong Kong West Kowloon → Beijing West) |
||
}} |
}} |
||
| line_used = [[ |
| line_used = [[Beijing–Guangzhou high-speed railway|Jingguang HSR]] |
||
[[Guangzhou-Shenzhen-Hong Kong Express Rail Link|Guangshengang XRL]] |
|||
| class = {{plainlist|1= |
| class = {{plainlist|1= |
||
*Business seat |
*Business class seat |
||
*First class seat |
*First class seat |
||
*Second class seat |
*Second class seat |
||
}} |
}} |
||
| access = |
| access = |
||
| seating = |
| seating = |
||
| catering = {{plainlist|1= |
| catering = {{plainlist|1= |
||
*Dining car |
*Dining car |
||
*Trolley refreshment service |
*Trolley refreshment service |
||
}} |
}} |
||
| stock = [[China Railway CR400AF|CR400AF-Z]] |
| stock = [[China Railway CR400AF|CR400AF-Z]] |
||
| gauge = {{RailGauge|1435mm}} |
| gauge = {{RailGauge|1435mm}} |
||
| el = |
| el = |
||
| speed = 350 km/h |
| speed = 350 km/h |
||
| owners = China Railway |
| owners = China Railway |
||
| routenumber = |
| routenumber = |
||
| map = |
| map = |
||
| map_state = |
| map_state = |
||
}} |
}} |
||
Line 74: | Line 75: | ||
On 5 January 2017, the service was extended to {{rws|Futian|Guangdong}}.<ref>{{Cite web|title = 福田高铁直达全国30市县|url = http://www.sz.gov.cn/cn/xxgk/bmtx/201701/t20170106_5865548.htm|date=2017-01-06|accessdate=2018-09-26|language=zh-cn}}</ref> |
On 5 January 2017, the service was extended to {{rws|Futian|Guangdong}}.<ref>{{Cite web|title = 福田高铁直达全国30市县|url = http://www.sz.gov.cn/cn/xxgk/bmtx/201701/t20170106_5865548.htm|date=2017-01-06|accessdate=2018-09-26|language=zh-cn}}</ref> |
||
With the inauguration of the [[Guangzhou–Shenzhen–Hong Kong Express Rail Link Hong Kong section|Guangzhou–Shenzhen–Hong Kong XRL Hong Kong section]] on 23 September 2018, the southern terminus of the service was again extended to {{rws|Hong Kong West Kowloon}} |
With the inauguration of the [[Guangzhou–Shenzhen–Hong Kong Express Rail Link Hong Kong section|Guangzhou–Shenzhen–Hong Kong XRL Hong Kong section]] on 23 September 2018, the southern terminus of the service was again extended to {{rws|Hong Kong West Kowloon}},<ref>{{Cite web|title = Hong Kong Launches First High Speed Rail Service|url = https://finance.yahoo.com/news/hong-kong-launches-first-high-122100337.html|website = finance.yahoo.com|accessdate = 2018-09-26}}</ref><ref>{{Cite web|title = 北京开往香港首趟高铁满员启程|url = http://www.dzwww.com/xinwen/shehuixinwen/201809/t20180924_17875003.htm?jdfwkey=0r0tl1|accessdate = 2018-09-26|language=zh-cn}}</ref> while Futian was removed from the service. |
||
On 30 January 2020 the service was suspended due to the [[COVID-19 pandemic]].<ref>{{Cite web|title = High Speed Rail train service has been suspended and Hong Kong West Kowloon Station closed since 30 January until further notice|url = |
On 30 January 2020 the service to West Kowloon was suspended due to the [[COVID-19 pandemic]].<ref>{{Cite web|title = High Speed Rail train service has been suspended and Hong Kong West Kowloon Station closed since 30 January until further notice|url = |
||
https://tnews.highspeed.mtr.com.hk/en/d/}}</ref> |
https://tnews.highspeed.mtr.com.hk/en/d/}}</ref> |
||
Line 82: | Line 83: | ||
On 1 April 2023, services to West Kowloon station were restored.<ref name="New"/> |
On 1 April 2023, services to West Kowloon station were restored.<ref name="New"/> |
||
On 15 June 2024, the maximum speed of the Beijing-Hong Kong High Speed Rail was increased from 300km/h to 350km/h, reducing the journey time by 46 minutes from Hong Kong to Beijing. |
|||
==Operations== |
==Operations== |
||
Line 125: | Line 128: | ||
| 17 || 60 || 90 || 75 || 48 || 90 || 60 || 28 + 5 |
| 17 || 60 || 90 || 75 || 48 || 90 || 60 || 28 + 5 |
||
|} |
|} |
||
From 1 April 2023, all trains were replaced by the newer [[China Railway CR400BF|China Railway CR400BF-Z]](Base in Guangzhou South Depot). However, from 15 June 2024, they were again replaced by the [[Double heading|double-headed]] [[China Railway CR400AF|CR400AF-Z]](Base in Shenzhen Depot) to enable quiet cars on this route. |
|||
===Previously used rolling stocks=== |
===Previously used rolling stocks=== |
Latest revision as of 09:52, 26 October 2024
Overview | |
---|---|
Service type | G-series trains |
Status | Operational |
Locale | China |
First service |
|
Current operator(s) | CR Guangzhou |
Route | |
Termini | Beijing West Hong Kong West Kowloon |
Stops | |
Distance travelled | 2,439 kilometres (1,516 mi) |
Average journey time |
|
Service frequency | Daily |
Train number(s) |
|
Line(s) used | Jingguang HSR Guangshengang XRL |
On-board services | |
Class(es) |
|
Catering facilities |
|
Technical | |
Rolling stock | CR400AF-Z |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 350 km/h |
Track owner(s) | China Railway |
The Beijing–Hong Kong high-speed train (simplified Chinese: 京港高速动车组列车; traditional Chinese: 京港高速動車組列車) is a high-speed train service operated by China Railway Guangzhou Group (CR Guangzhou) on Beijing–Guangzhou–Shenzhen–Hong Kong HSR in China. Operated with G79/80 train numbers between Beijing West and Hong Kong West Kowloon on a daily basis, it is currently the fastest train service and the only high-speed train service between Beijing and Hong Kong, with an approximate travelling time of 8 hours and 10 minutes.[1][2]
History
[edit]The G79/80 service dates back to 26 December 2012, when the Beijing–Zhengzhou section of the Beijing–Guangzhou–Shenzhen–Hong Kong HSR was opened. At its opening, the service was between Beijing West and Guangzhou South under the numbers G79/82. Later on 28 December 2013, the southern terminus of the service was extended to Shenzhen North and the number of the Shenzhen-bound service was changed from G82 to G80.[3]
On 5 January 2017, the service was extended to Futian.[4]
With the inauguration of the Guangzhou–Shenzhen–Hong Kong XRL Hong Kong section on 23 September 2018, the southern terminus of the service was again extended to Hong Kong West Kowloon,[5][6] while Futian was removed from the service.
On 30 January 2020 the service to West Kowloon was suspended due to the COVID-19 pandemic.[7]
On 28 March 2020, the service was restored between Beijing West and Shenzhen North, but service to West Kowloon station was still suspended.
On 1 April 2023, services to West Kowloon station were restored.[2]
On 15 June 2024, the maximum speed of the Beijing-Hong Kong High Speed Rail was increased from 300km/h to 350km/h, reducing the journey time by 46 minutes from Hong Kong to Beijing.
Operations
[edit]The service operates on a daily basis under the following timetable:[1][8][9][2]
Effective from 15 June 2024 | |||||
---|---|---|---|---|---|
G79 | Stops | G80 | |||
Arrive | Depart | Arrive | Depart | ||
— | 10:00 | Beijing West | 19:30 | — | |
11:00 | 11:02 | Shijiazhuang | 18:27 | 18:29 | |
12:18 | 12:21 | Zhengzhou East | 17:08 | 17:11 | |
13:55 | 13:59 | Wuhan | 15:31 | 15:34 | |
15:10 | 15:13 | Changsha South | 14:16 | 14:19 | |
17:16 | 17:21 | Guangzhou South | 12:10 | 12:13 | |
17:50 | 17:54 | Shenzhen North | 11:38 | 11:41 | |
18:12 | — | Hong Kong West Kowloon | — | 11:20 |
Train formation
[edit]The service was operated by 16-car CR400AF-A trainsets with the formation shown below. Car 3-14 are for second class seats with 3+2 seating. The dining car is located in Car 9 and wheelchair space is provided on Car 8. Car 2 and 15 are first class car with 2+2 seating. Car 1 is for business seats only and Car 16 is a hybrid of first class seats and business seats.[10]
From 1 April 2023, all trains were replaced by the newer China Railway CR400BF-Z(Base in Guangzhou South Depot). However, from 15 June 2024, they were again replaced by the double-headed CR400AF-Z(Base in Shenzhen Depot) to enable quiet cars on this route.
Previously used rolling stocks
[edit]- 16-car CRH380BL (from 26 December 2012 to early 2016)
- 16-car CRH380AL (from early 2016 to October 2017)
- Double-headed 8-car CR400AF (from October 2017 to June 2018)
-
A CRH380AL on G79 service leaving Beijing West in Feb. 2017
-
A double-headed CR400AF on G79 service leaving Beijing West in Oct. 2017
-
A double-headed CR400AF on G80 service at Zhengzhou East in Oct. 2017
-
Information screen of the new CR400BF
References
[edit]- ^ a b "Long-haul train schedule" (PDF). MTR. Retrieved 2024-06-18.
- ^ a b c 裴剑飞; 王贵彬 (2023-04-01). "北京赴港高铁今起恢复运行,北京西站至香港西九龙只需8个半小时". 新京报. Retrieved 2023-04-01.
- ^ "郑州铁路局12月28日实行新运行图 新增旅客列车11对" (in Chinese (China)). Retrieved 2018-09-26.
- ^ "福田高铁直达全国30市县" (in Chinese (China)). 2017-01-06. Retrieved 2018-09-26.
- ^ "Hong Kong Launches First High Speed Rail Service". finance.yahoo.com. Retrieved 2018-09-26.
- ^ "北京开往香港首趟高铁满员启程" (in Chinese (China)). Retrieved 2018-09-26.
- ^ "High Speed Rail train service has been suspended and Hong Kong West Kowloon Station closed since 30 January until further notice".
- ^ "G79时刻表" (in Chinese (China)). Retrieved 2024-07-05.
- ^ "G80时刻表" (in Chinese (China)). Retrieved 2024-07-05.
- ^ "CR400AF-A/B动车组". www.china-emu.cn (in Chinese (China)). Retrieved 2018-09-27.