Jump to content

Pudong railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
minor change, grammar fix, please review
 
(39 intermediate revisions by 8 users not shown)
Line 1: Line 1:
{{Short description | Freight railway line in Shanghai, China}}
{{Infobox rail line
{{Infobox rail line
| name =
| name = Pudong Railway
{{Infobox Chinese|decat=yes|child= yes
| native_name=浦东铁路
| order = st
| native_name_lang=zh-Hans
| logo =
| s = {{linktext|浦东铁路}}
| logo_width = 180px
| t = {{linktext|浦東鐵路}}
| p = Pǔdōng Tiělù
| color = | image = File:SRZ25K K8351 at Haiwan.jpg
| image_width =
| lmz =
| collapse = yes}}
| image_alt =
| other_name =
| caption = Train at Haiwan station on the Pudong railway
| type = [[Heavy rail]]
| logo =
| system =
| logo_width = 180px
| status = operational (freight only)
| color =
| locale = [[Shanghai]]
| image = File:SRZ25K K8351 at Haiwan.jpg
| image_width = 300px
| start = {{CR stations|Jinshan Industrial Park}}
| image_alt =
| end = {{CR stations|Luchaogang}}
| stations = 5
| caption = Train at Haiwan railway station on the Pudong railway
| routes = 1
| type = [[Freight rail]]
| daily_ridership =
| system =
| status = Operational (freight only)
| open = {{Start date and age|2005|12|09}}<br>{{Start date and age|2008|09|01}} (passenger service)
| locale = [[Jinshan District|Jinshan]], [[Fengxian District|Fengxian]], [[Pudong]]<br>[[Shanghai]]
| close = {{Start date and age|2015|08|27}} (passenger service)
| owner =
| start = {{stl|CR|Jinshan Industrial Park}}
| operator = [[China Railway Shanghai Group]]
| end = {{stl|CR|Luchaogang}}
| character =
| stations = 5
| depot =
| routes = 1
| daily_ridership =
| stock =
| yearcommenced = {{Start date and age|2004|11|}}
| linelength = {{Convert|42.87|km|mi|2|abbr=on}}
| open = {{Start date and age|2005|12|09}} (freight service)<br>{{Start date and age|2008|09|01}} (passenger service)
| tracklength =
| tracks = 1
| close = {{Start date and age|2015|08|27}} (passenger service)
| gauge = {{RailGauge|sg}}
| owner =
| operator = [[China Railway Shanghai Group]]<br>Shanghai Pudong Railway Development Co., Ltd.<br>
| electrification = No
Shanghai Railway Container Central Station Development Co., Ltd.
| speed =
| elevation =
| character =
| website =
| depot =
| stock =
| linelength = {{Convert|42.87|km|mi|2|abbr=on}}
| map =
| tracklength =
| tracks = 1
| gauge = {{RailGauge|sg}}
| electrification = No
| speed = {{Convert|120|km/h|mph|2|abbr=on}}
| elevation =
| website =
| map =
{{sidebar Overview of public transport in Shanghai|FloatLeft=left|child=yes}}
}}
}}


The '''Pudong railway''' ({{zh|s=浦东铁路|t=浦東鐵路|p=Pǔdōng Tiělù}}) is a railway line in operated by [[China Railway]]. Located entirely in [[Shanghai]], [[China]], the {{convert|42.87|km|mi|adj=mid|-long}} railway line is used solely for freight services, although passenger services did operate along the line until 2015. At its western terminus, it branches off from the [[Jinshan railway]] at {{CR stations|Jinshan Industrial Park}} in the city's [[Jinshan District]] and runs eastward to {{CR stations|Luchaogang}} in [[Pudong]], with three intermediate stations.<ref name="shtong">{{Cite web|url=http://www.shtong.gov.cn/Newsite/node2/node19828/node76465/node76486/node76582/userobject1ai93531.html|title=(三)市政基础设施|website=Shtong.gov.cn|date=2006|accessdate=2019-02-13}}</ref>
The '''Pudong railway''' ({{zh|s=浦东铁路|t=浦東鐵路|p=Pǔdōng Tiělù}}) is a railway line operated by [[China Railway]]. Located entirely in [[Shanghai]], [[China]], the {{convert|42.87|km|mi|adj=mid|-long}} railway line is used solely for freight services, although passenger services did operate along the line until 2015. At its western terminus, it branches off from the [[Jinshan railway]] at {{stl|CR|Jinshan Industrial Park}} in the city's [[Jinshan District]] and runs eastward to {{stl|CR|Luchaogang}} in [[Pudong]], with three intermediate stations.<ref name="shtong">{{Cite web|url=http://www.shtong.gov.cn/Newsite/node2/node19828/node76465/node76486/node76582/userobject1ai93531.html|title=(三)市政基础设施|website=Shtong.gov.cn|date=2006|accessdate=2019-02-13}}</ref>


Construction of the railway line was completed on 9 December 2005.<ref name="shtong" /> Passenger service on the line started on 1 September 2008, with trains travelling between {{CR stations|Shanghai South}} and Luchaogang, with an intermediate stop at {{CR stations|Haiwan}}. These trains would use the [[Jinshan railway]] between Shanghai South and Jinshan Industrial Park, before switching to the Pudong railway and travelling the entire length of the line.<ref name="xinmin">{{Cite web|url=http://sh.xinmin.cn/shizheng/2008/08/31/1323295.html|archive-url=https://web.archive.org/web/20150107075047/http://sh.xinmin.cn/shizheng/2008/08/31/1323295.html|url-status=dead|archive-date=2015-01-07|title=明起上海南-芦潮港的旅客列车正式开行|author=Xinmin Evening News|date=2008-08-31|accessdate=2019-02-13}}</ref>
Construction of the railway line was completed on 9 December 2005.<ref name="shtong" /> Passenger service on the line started on 1 September 2008, with trains travelling between {{stl|CR|Shanghai South}} and Luchaogang, with an intermediate stop at {{stl|CR|Haiwan}}. These trains would use the [[Jinshan railway]] between Shanghai South and Jinshan Industrial Park, before switching to the Pudong railway and travelling the entire length of the line.<ref name="xinmin">{{Cite web|url=http://sh.xinmin.cn/shizheng/2008/08/31/1323295.html|archive-url=https://web.archive.org/web/20150107075047/http://sh.xinmin.cn/shizheng/2008/08/31/1323295.html|url-status=dead|archive-date=2015-01-07|title=明起上海南-芦潮港的旅客列车正式开行|author=Xinmin Evening News|date=2008-08-31|accessdate=2019-02-13}}</ref>


Passenger service on the line was suspended on 27 August 2015, due to the presence of a hazardous chemicals storage yard near Luchaogang station. This safety measure was taken in response to the [[2015 Tianjin explosions]].<ref name="weibo">{{Cite web|url=https://www.weibo.com/1882290537/CxDTfvgVD?from=page_1006061882290537_profile&wvr=6&mod=weibotime&type=comment|title=再见!芦潮港小火车|website=Weibo|author=上海轨道交通俱乐部|date=2015-08-26|accessdate=2019-02-13}}</ref>
Passenger service on the line was suspended on 27 August 2015, due to the presence of a hazardous chemicals storage yard near Luchaogang station. This safety measure was taken in response to the [[2015 Tianjin explosions]].<ref name="weibo">{{Cite web|url=https://www.weibo.com/1882290537/CxDTfvgVD?from=page_1006061882290537_profile&wvr=6&mod=weibotime&type=comment|title=再见!芦潮港小火车|website=Weibo|author=上海轨道交通俱乐部|date=2015-08-26|accessdate=2019-02-13}}</ref>


== Stations ==
== History ==
* It was the first suburban line in Shanghai.
* {{CR stations|Jinshan Industrial Park}}
* The investment for the line was 1.951 billion yuan.
* Caojing
* The first phase of Pudong Railway was completed on 9 December 2005.
* Haiwan
* Passenger trains 5051-5052 and 5053/5054 officially opened on 1 September 2008.
* Situan
* The passenger train was renamed K8351/8352, K8353/8354 times on 1 April 2009.
* Luchaogang
* Passenger trains increased two-way stops at Haiwan Station on 15 September.
* The number of individual passengers per train is roughly 50; about 200 people per day (4 trains) which led to a daily occupancy rate of only 35%.
* Passenger trains suspended on 27 August 2015.

==Stations==
At the time when it was operating, it took 1 hour and 10 minutes for a train trip between Luchaogang Station and Shanghai South Railway Station, and the fare was 17 yuan.
===Service routes===
{| class="wikitable mw-collapsible"| style="width: 60%;
!colspan="11" style="text-align:center; background:#{{rcr|SHM|pudong}};"| {{font color | white|Pudong railway service routes}}
|-
| colspan="11" style="text-align: left" |
* Currently no passenger services run on the Pudong railway
* September 1, 2008 - April 1, 2009: 5051/5052, 5053/5054 passenger trains
* April 1, 2009 - August 27, 2015: K8351/8352, K8353/8354 passenger trains
|-bgcolor=#{{rcr|SHM|pudong}}
! colspan="3" | Routes
! colspan="3" | Station name
! rowspan="2" | Connections
! colspan="2" rowspan="2" | Distance<br>{{small|km}}
! rowspan="2" | Location
|-bgcolor=#{{rcr|SHM|js}}
!
!
!
! {{small|№}}
! {{small|English}}
! {{small|Chinese}}
|- style = "background:#{{rcr|SHM|js}}; height: 2pt"
| colspan = "10" |
|-
|align="center"|
|align="center"|
|align="center"|
|UCH
|{{stl|CR|Luchaogang}}
|{{large|{{lang|zh-cn|芦潮港}}}}
|
|0 || 0
|rowspan="1"|[[Pudong]]
|-
|align="center"|
|align="center"|
|align="center"|
|STH
|{{stl|CR|Situan}}
|{{large|{{lang|zh-cn|四团}}}}
|
|10 || 10
|rowspan="2"|[[Fengxian District|Fengxian]]
|-
|align="center"|
|align="center"|
|align="center"|
|RWH
|{{stl|CR|Haiwan}}
|{{large|{{lang|zh-cn|海湾}}}}
|
|20 || 30
|-
|align="center"|
|align="center"|
|align="center"|
|CPH
|{{stl|CR|Caojing}}
|{{large|{{lang|zh-cn|漕泾}}}}
|
|15 || 45
|rowspan="2"|[[Jinshan District|Jinshan]]
|-
|align="center"|
|align="center"|
|align="center"|
|REH
|{{stl|CR|Jinshan Yuanqu}}<br><small>(Jinshan Industry Park)</small>
|{{large|{{lang|zh-cn|金山园区}}}}
| Through operations on {{rint|shanghai|Jinshan}} to {{nowrap|{{rint|cn|rail|link=Shanghai South railway station}} [[Shanghai South railway station|SNH]]}}
|6 || 51
|- style = "background:#{{rcr|SHM|pudong}}; height: 2pt"
| colspan = "10" |
|}

===Station name change===
* On September 28, 2012, Ruanxiang railway station was renamed [[Jinshan Yuanqu railway station]].

==Technology==
===Rolling stock===
There were eight China Railway 25Z passenger cars (body marked 25K) on the bottom of the double-decker passenger train, all of which are soft seats. The K8351/8352 and K8353/8354 trains use a set of bottoms, using 4 square Bombardier RZ25T plus a KD25G / KD25K generator car.{{cn|date=June 2022}}


== References ==
== References ==
<references />
<references />

{{Shanghai}}
{{Shanghai transit}}
{{Shanghai transit}}
{{Shanghai Metropolitan Area Intercity Railway
|line2=yes}}
{{Regional and commuter rail transit in China}}
{{Regional and commuter rail transit in China}}
{{Rapid transit in China}}
{{Rapid transit in China}}
{{Portal bar|China|Transport|Railways|Trains}}

[[Category:Rail transport in Shanghai]]
[[Category:Rail transport in Shanghai]]
[[Category:Railway lines opened in 2005]]
[[Category:Railway lines opened in 2005]]

Latest revision as of 01:34, 1 November 2024

Pudong Railway
Chinese name
Simplified Chinese浦东铁路
Traditional Chinese浦東鐵路
Transcriptions
Standard Mandarin
Hanyu PinyinPǔdōng Tiělù
Train at Haiwan railway station on the Pudong railway
Overview
StatusOperational (freight only)
LocaleJinshan, Fengxian, Pudong
Shanghai
Termini
Stations5
Service
TypeFreight rail
Services1
Operator(s)China Railway Shanghai Group
Shanghai Pudong Railway Development Co., Ltd.
Shanghai Railway Container Central Station Development Co., Ltd.
History
CommencedNovember 2004; 20 years ago (2004-11)
OpenedDecember 9, 2005; 19 years ago (2005-12-09) (freight service)
September 1, 2008; 16 years ago (2008-09-01) (passenger service)
ClosedAugust 27, 2015; 9 years ago (2015-08-27) (passenger service)
Technical
Line length42.87 km (26.64 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationNo
Operating speed120 km/h (74.56 mph)
Route map

The Pudong railway (simplified Chinese: 浦东铁路; traditional Chinese: 浦東鐵路; pinyin: Pǔdōng Tiělù) is a railway line operated by China Railway. Located entirely in Shanghai, China, the 42.87-kilometre-long (26.64 mi) railway line is used solely for freight services, although passenger services did operate along the line until 2015. At its western terminus, it branches off from the Jinshan railway at Jinshan Industrial Park in the city's Jinshan District and runs eastward to Luchaogang in Pudong, with three intermediate stations.[1]

Construction of the railway line was completed on 9 December 2005.[1] Passenger service on the line started on 1 September 2008, with trains travelling between Shanghai South and Luchaogang, with an intermediate stop at Haiwan. These trains would use the Jinshan railway between Shanghai South and Jinshan Industrial Park, before switching to the Pudong railway and travelling the entire length of the line.[2]

Passenger service on the line was suspended on 27 August 2015, due to the presence of a hazardous chemicals storage yard near Luchaogang station. This safety measure was taken in response to the 2015 Tianjin explosions.[3]

History

[edit]
  • It was the first suburban line in Shanghai.
  • The investment for the line was 1.951 billion yuan.
  • The first phase of Pudong Railway was completed on 9 December 2005.
  • Passenger trains 5051-5052 and 5053/5054 officially opened on 1 September 2008.
  • The passenger train was renamed K8351/8352, K8353/8354 times on 1 April 2009.
  • Passenger trains increased two-way stops at Haiwan Station on 15 September.
  • The number of individual passengers per train is roughly 50; about 200 people per day (4 trains) which led to a daily occupancy rate of only 35%.
  • Passenger trains suspended on 27 August 2015.

Stations

[edit]

At the time when it was operating, it took 1 hour and 10 minutes for a train trip between Luchaogang Station and Shanghai South Railway Station, and the fare was 17 yuan.

Service routes

[edit]
Pudong railway service routes
  • Currently no passenger services run on the Pudong railway
  • September 1, 2008 - April 1, 2009: 5051/5052, 5053/5054 passenger trains
  • April 1, 2009 - August 27, 2015: K8351/8352, K8353/8354 passenger trains
Routes Station name Connections Distance
km
Location
English Chinese
UCH Luchaogang 芦潮港 0 0 Pudong
STH Situan 四团 10 10 Fengxian
RWH Haiwan 海湾 20 30
CPH Caojing 漕泾 15 45 Jinshan
REH Jinshan Yuanqu
(Jinshan Industry Park)
金山园区 Through operations on  Jinshan  to Shanghai South railway station SNH 6 51

Station name change

[edit]

Technology

[edit]

Rolling stock

[edit]

There were eight China Railway 25Z passenger cars (body marked 25K) on the bottom of the double-decker passenger train, all of which are soft seats. The K8351/8352 and K8353/8354 trains use a set of bottoms, using 4 square Bombardier RZ25T plus a KD25G / KD25K generator car.[citation needed]

References

[edit]
  1. ^ a b "(三)市政基础设施". Shtong.gov.cn. 2006. Retrieved 2019-02-13.
  2. ^ Xinmin Evening News (2008-08-31). "明起上海南-芦潮港的旅客列车正式开行". Archived from the original on 2015-01-07. Retrieved 2019-02-13.
  3. ^ 上海轨道交通俱乐部 (2015-08-26). "再见!芦潮港小火车". Weibo. Retrieved 2019-02-13.