Natomas/Sacramento Airport station: Difference between revisions
Appearance
Content deleted Content added
Thehusband (talk | contribs) No edit summary Tag: Reverted |
Amtrak California stations |
||
(12 intermediate revisions by 8 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Planned terminus for the San Joaquins and Altamont Corridor Express rail services}} |
{{Short description|Planned terminus for the San Joaquins and Altamont Corridor Express rail services}} |
||
{{ |
{{Use mdy dates|date=November 2023}} |
||
{{Infobox station |
{{Infobox station |
||
| name = Natomas, CA |
|||
⚫ | |||
| style=Amtrak |
|||
| custom_header = {{Altamont Corridor Express infobox header|{{Small|Natomas/Sacramento Airport}}}} |
|||
| image= |
|||
| image = |
|||
| image_caption = |
|||
| address = Blacktop Road,<br />[[Sacramento, California|Sacramento]], [[California]] 95673 |
|||
| coordinates = {{Coord|38.684664|-121.480089|display=inline,title}} |
|||
| line = [[Union Pacific|UP]] [[Sacramento Subdivision]]<ref name=CatchAmtrak>{{cite news |last1=Bizjak |first1=Tony |title=Catch an Amtrak toward L.A. from midtown Sacramento? Train officials propose new service. |url=https://www.sacbee.com/news/local/transportation/article177028481.html |accessdate=10 May 2020 |agency=Sacramento Bee |date=11 June 2018}}</ref> |
|||
| other= |
|||
| other = {{bus icon}} Airport Shuttle |
|||
| platform = 1 [[side platform]] |
|||
| tracks=2 |
|||
| tracks = 2 |
|||
| parking = |
|||
| bicycle = |
|||
| passengers = |
|||
| pass_year = |
|||
| opening = 2026 |
|||
| accessible = Yes |
|||
| code= |
|||
| code = |
|||
| owned= |
|||
| owned = |
|||
| services = |
|||
| other_services_header = Future service |
|||
| other_services = |
|||
| other_services = {{Adjacent stations|system1=Altamont Corridor Express|line1=San Jose-Natomas|left1=|left2=|to-left1=|to-left2=|right1=Midtown Sacramento|right2=Midtown Sacramento|to-right1=San Jose or Merced|to-right2=Oakland or Bakersfield|line2=San Joaquin|system2=Amtrak|line3=Coast Starlight|nonstop3=y}} |
|||
{{Adjacent stations |
|||
| other_services2_header = Second phase (2029) |
|||
|system1=Amtrak |
|||
| other_services2_collapsible = yes |
|||
|line1=San Joaquin|right1=Old North Sacramento|to-left1=Natomas/Airport |
|||
| other_services2 = {{Adjacent stations|system1=Altamont Corridor Express|line1=San Jose-Natomas|right1=Old North Sacramento|to-right1=San Jose or Merced |
|||
|line2=Coast Starlight |nonstop2=y |
|||
|line2=Union City-Natomas|note-mid2=2030|right2=Old North Sacramento|to-right2=Union City |
|||
⚫ | |||
|line3= |
|system3=Amtrak|line3=San Joaquin|right3=Old North Sacramento|to-right3=Oakland or Bakersfield|line4=Coast Starlight|nonstop4=y}} |
||
⚫ | |||
⚫ | |||
⚫ | |||
|line4=North Valley Rail|right4=Chico|to-right4=terminus |
|||
}} |
|||
⚫ | |||
⚫ | |||
}} |
}} |
||
'''Natomas/Sacramento Airport'''<ref name=DEIR/> is a planned [[train station]] that will be a stop on [[Altamont Corridor Express]] and [[Amtrak California]]'s ''[[San Joaquin (train)|San Joaquin]]'' services. The station site is in the [[Natomas, Sacramento, California|Natomas]] area, north of [[Sacramento]], east of Blacktop Road and immediately south of West Elkhorn Boulevard.<ref>{{cite news |last1=Todd |first1=John |title=$400M Valley Rail Station Moves Forward |url=https://www.riolindamessenger.com/400m-valley-rail-station-moves-forward/ |access-date=16 August 2021 |work=Rio Linda Messenger |date=10 August 2021}}</ref> Planned as the northern terminus of the Valley Rail project, it was expected to open no later than 2023.<ref name=DEIR>{{cite web |title=Valley Rail Sacramento Extension Project Draft Environmental Impact Report |url=https://acerail.com/wp-content/uploads/Valley-Rail-Sacramento-Extention-Project-DEIR-Vol-I-ES-to-3.5a.pdf |website=ACE |publisher=AECOM |accessdate=9 May 2020}}</ref><ref>{{cite news |last1=Hamann |first1=Emily |title=Rail plans for San Jose, Stockton move ahead |url=https://www.bizjournals.com/sacramento/news/2019/09/19/valley-rail-project-to-connect-sacramento-san-jose.html |accessdate=10 May 2020 |agency=Sacramento Business Journal |date=19 September 2019}}</ref> By 2023, |
'''Natomas/Sacramento Airport'''<ref name=DEIR/> is a planned [[train station]] that will be a stop on [[Altamont Corridor Express]] and [[Amtrak California]]'s ''[[San Joaquin (train)|San Joaquin]]'' services. The station site is in the [[Natomas, Sacramento, California|Natomas]] area, north of [[Sacramento]], east of Blacktop Road and immediately south of West Elkhorn Boulevard.<ref>{{cite news |last1=Todd |first1=John |title=$400M Valley Rail Station Moves Forward |url=https://www.riolindamessenger.com/400m-valley-rail-station-moves-forward/ |access-date=16 August 2021 |work=Rio Linda Messenger |date=10 August 2021}}</ref> Planned as the northern terminus of the Sacramento Extension of the [[Valley Rail (ACE)|Valley Rail project]], it was expected to open no later than 2023.<ref name=DEIR>{{cite web |title=Valley Rail Sacramento Extension Project Draft Environmental Impact Report |url=https://acerail.com/wp-content/uploads/Valley-Rail-Sacramento-Extention-Project-DEIR-Vol-I-ES-to-3.5a.pdf |website=ACE |publisher=AECOM |accessdate=9 May 2020 |archive-date=August 30, 2021 |archive-url=https://web.archive.org/web/20210830223415/https://acerail.com/wp-content/uploads/Valley-Rail-Sacramento-Extention-Project-DEIR-Vol-I-ES-to-3.5a.pdf |url-status=dead }}</ref><ref>{{cite news |last1=Hamann |first1=Emily |title=Rail plans for San Jose, Stockton move ahead |url=https://www.bizjournals.com/sacramento/news/2019/09/19/valley-rail-project-to-connect-sacramento-san-jose.html |accessdate=10 May 2020 |agency=Sacramento Business Journal |date=19 September 2019}}</ref> By 2023, the opening date had been pushed back to 2026.<ref>{{cite news |last1=Holland |first1=John |title=ACE rail expansion runs late, just as Modesto readies its historic downtown depot |url=https://www.modbee.com/news/local/article272920205.html |access-date=13 March 2023 |agency=Modesto Bee |date=March 13, 2023}}</ref> A [[shuttle bus]] will provide connectivity for those traveling between the station and [[Sacramento International Airport]], {{convert|8|mi}} to the east. |
||
==See also== |
|||
⚫ | |||
==References== |
==References== |
||
{{reflist}} |
{{reflist}} |
||
{{ |
{{Altamont Corridor Express navbox}} |
||
{{Amtrak California stations}} |
|||
{{DEFAULTSORT:Natomas Sacramento Airport station}} |
{{DEFAULTSORT:Natomas Sacramento Airport station}} |
Latest revision as of 23:05, 3 November 2024
Natomas/Sacramento Airport | ||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||||||||
Location | Blacktop Road, Sacramento, California 95673 | |||||||||||||||||||||||||||||||
Coordinates | 38°41′05″N 121°28′48″W / 38.684664°N 121.480089°W | |||||||||||||||||||||||||||||||
Line(s) | UP Sacramento Subdivision[1] | |||||||||||||||||||||||||||||||
Platforms | 1 side platform | |||||||||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||||||||
Connections | Airport Shuttle | |||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||
Opening | 2026 | |||||||||||||||||||||||||||||||
Future service | ||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||||
|
Natomas/Sacramento Airport[2] is a planned train station that will be a stop on Altamont Corridor Express and Amtrak California's San Joaquin services. The station site is in the Natomas area, north of Sacramento, east of Blacktop Road and immediately south of West Elkhorn Boulevard.[3] Planned as the northern terminus of the Sacramento Extension of the Valley Rail project, it was expected to open no later than 2023.[2][4] By 2023, the opening date had been pushed back to 2026.[5] A shuttle bus will provide connectivity for those traveling between the station and Sacramento International Airport, 8 miles (13 km) to the east.
See also
[edit]References
[edit]- ^ Bizjak, Tony (June 11, 2018). "Catch an Amtrak toward L.A. from midtown Sacramento? Train officials propose new service". Sacramento Bee. Retrieved May 10, 2020.
- ^ a b "Valley Rail Sacramento Extension Project Draft Environmental Impact Report" (PDF). ACE. AECOM. Archived from the original (PDF) on August 30, 2021. Retrieved May 9, 2020.
- ^ Todd, John (August 10, 2021). "$400M Valley Rail Station Moves Forward". Rio Linda Messenger. Retrieved August 16, 2021.
- ^ Hamann, Emily (September 19, 2019). "Rail plans for San Jose, Stockton move ahead". Sacramento Business Journal. Retrieved May 10, 2020.
- ^ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.