North-West Thermal Power Plant: Difference between revisions
Plastikspork (talk | contribs) m Format coordinates |
|||
(18 intermediate revisions by 14 users not shown) | |||
Line 1: | Line 1: | ||
{{Infobox power station |
{{Infobox power station |
||
|name = North-West Thermal Power Plant |
| name = North-West Thermal Power Plant |
||
| |
| name_official = {{lang|ru|Северо - Западная ТЭЦ}} |
||
|image = North West CHP power station |
| image = North West CHP power station 2020-06-20-2.jpg |
||
|image_caption = North-West Thermal Power Plant |
| image_caption = North-West Thermal Power Plant |
||
| |
| country = Russia |
||
| |
| location = [[Saint-Petersburg]] |
||
| coordinates = {{coord|60|0.95|N|30|5.52|E|type:landmark_region:RU|display=inline,title}} |
|||
| |
| owner = [[Inter RAO UES]] |
||
|lat_d = 60|lat_m = 0.95|lat_s = |lat_NS = N |
|||
⚫ | |||
|long_d = 30|long_m = 5.52|long_s = |long_EW = E |
|||
| th_fuel_primary = [[Natural gas]] |
|||
|coordinates_type = type:landmark_region:RU |
|||
| ps_combined_cycle = Yes |
|||
|coordinates_display = title |
|||
| ps_units_operational = 2 |
|||
|owner = [[Inter RAO UES]] |
|||
| ps_electrical_capacity = 900 MW |
|||
⚫ | |||
| |
| commissioned = 2000 |
||
| |
| decommissioned = |
||
|combined_cycle = yes |
|||
|generation_units = 2 |
|||
|installed_capacity = 900 MW |
|||
|max_planned_cap = |
|||
|average_annual_gen = |
|||
|commissioned = 2000 |
|||
|decommissioned = |
|||
}} |
}} |
||
'''North-West Thermal Power Plant''' ({{ |
'''North-West Thermal Power Plant''' ({{langx|ru|Северо - Западная ТЭЦ}}) is a [[cogeneration]] [[power station]] ([[TETs]]) in [[Saint-Petersburg]], owned by [[Inter RAO UES]]. This is a first power station in [[Russia]] to use [[combined cycle]]. |
||
==History== |
==History== |
||
Building of the station began in 1994, and in 2000 first unit of the station was started to generate electrical energy. The gas-fired combined-cycle plant has a capacity of 900 MW. 90% of all produced electric power |
Building of the station began in 1994, and in 2000 first unit of the station was started to generate electrical energy. The gas-fired combined-cycle plant has a capacity of 900 MW. 90% of all produced electric power was exported to [[Finland]] until May 2022, when the export halted. It was owned by the company of same name with majority shares held by [[RAO UES]]. In December 2007, as a result of reorganizations of RAO UES, it was decided to merge the North-West Thermal Power Plant with Inter RAO UES.<ref name=kommersant> |
||
{{Cite news |
{{Cite news |
||
| title = Inter RAO UES to Triple in Price |
| title = Inter RAO UES to Triple in Price |
||
Line 37: | Line 30: | ||
Since 2004, the power station was managed by Enel ESN Energo, a subsidiary of [[Enel (energy)|Enel]]. |
Since 2004, the power station was managed by Enel ESN Energo, a subsidiary of [[Enel (energy)|Enel]]. |
||
==See also== |
==See also== |
||
{{Portal|Russia|Energy}} |
|||
{{ |
{{Commons category|North West CHP power station}} |
||
* [[OGK-1]] |
* [[OGK-1]] |
||
Line 47: | Line 40: | ||
==External links== |
==External links== |
||
* [http://www.sztec.ru Official Site] |
* [https://web.archive.org/web/20070928004238/http://www.sztec.ru/ Official Site] |
||
* [http://www.rao-ees.ru/sevzapenergo/teplo.htm Теплоснабжение] |
* [http://www.rao-ees.ru/sevzapenergo/teplo.htm Теплоснабжение] |
||
[[Category:Energy infrastructure completed in 2000]] |
|||
[[Category:Natural gas-fired power stations in Russia]] |
[[Category:Natural gas-fired power stations in Russia]] |
||
[[Category:Inter RAO]] |
[[Category:Inter RAO]] |
||
[[Category:Cogeneration power stations in Russia]] |
|||
[[no:Severo-Zapadnaja gasskraftverk]] |
|||
[[ru:Северо-Западная ТЭЦ]] |
Latest revision as of 04:50, 5 November 2024
North-West Thermal Power Plant | |
---|---|
Official name | Северо - Западная ТЭЦ |
Country | Russia |
Location | Saint-Petersburg |
Coordinates | 60°0.95′N 30°5.52′E / 60.01583°N 30.09200°E |
Commission date | 2000 |
Owner | Inter RAO UES |
Thermal power station | |
Primary fuel | Natural gas |
Combined cycle? | Yes |
Power generation | |
Units operational | 2 |
Nameplate capacity | 900 MW |
External links | |
Commons | Related media on Commons |
North-West Thermal Power Plant (Russian: Северо - Западная ТЭЦ) is a cogeneration power station (TETs) in Saint-Petersburg, owned by Inter RAO UES. This is a first power station in Russia to use combined cycle.
History
[edit]Building of the station began in 1994, and in 2000 first unit of the station was started to generate electrical energy. The gas-fired combined-cycle plant has a capacity of 900 MW. 90% of all produced electric power was exported to Finland until May 2022, when the export halted. It was owned by the company of same name with majority shares held by RAO UES. In December 2007, as a result of reorganizations of RAO UES, it was decided to merge the North-West Thermal Power Plant with Inter RAO UES.[1] The merger was completed on 1 May 2008 and the North-West Thermal Power Plant ceased to exist as independent company.
Since 2004, the power station was managed by Enel ESN Energo, a subsidiary of Enel.
See also
[edit]References
[edit]- ^ "Inter RAO UES to Triple in Price". Kommersant. 2007-12-20. Retrieved 2008-07-27.