Darwin Bank: Difference between revisions
Fortius-94 (talk | contribs) mNo edit summary |
|||
(4 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
'''Darwin Bank''' ({{ |
'''Darwin Bank''' ({{langx|az|Darvin bankası}}) is an [[Azerbaijan]]i [[Bank (topography)|bank]] [[oil field]] in the [[Caspian Sea]], {{convert|45|km|mi|}} – {{convert|50|km|mi|}} north-east of [[Baku]] and {{convert|6|km|mi|}} west of [[Pirallahi Island]]. Industrially significant oil and [[natural gas]] resources were discovered here in the 1950s.<ref name=Caspian> |
||
{{cite news |
{{cite news |
||
|url=http://caspenergy.com/index.shtml?id_node=20&id_file=7081&lang=ru |
|url=http://caspenergy.com/index.shtml?id_node=20&id_file=7081&lang=ru |
||
|script-title=ru:В 2010 году на месторождении "Банка Дарвина" будет установлена новая скважина |
|script-title=ru:В 2010 году на месторождении "Банка Дарвина" будет установлена новая скважина |
||
| |
|trans-title=In 2010, a new well will be drilled on "Darwin Bank" |
||
|publisher=Caspian Energy |
|publisher=Caspian Energy |
||
|author= |
|||
|date=2009-12-23 |
|date=2009-12-23 |
||
|accessdate=2010-01-06 |
|accessdate=2010-01-06 |
||
|language=Russian |
|language=Russian |
||
| |
|url-status=dead |
||
|archiveurl=https://web.archive.org/web/20120302040841/http://caspenergy.com/index.shtml?id_node=20&id_file=7081&lang=ru |
|archiveurl=https://web.archive.org/web/20120302040841/http://caspenergy.com/index.shtml?id_node=20&id_file=7081&lang=ru |
||
|archivedate=2012-03-02 |
|archivedate=2012-03-02 |
||
|df= |
|||
}} |
}} |
||
</ref> To date, 16.2 million [[ton]]s of oil and 1.5 billion cubic meters of gas were extracted.<ref>{{cite web|url=http://www.365.az/content/view/1266/18/|script-title=ru:ГНКАР отправила новую платформу на морскую структуру "Банка Дарвина"|publisher=365.az |accessdate=2008-05-16|language=ru}}</ref> [[State Oil Company of Azerbaijan Republic]] is in the process of building a new [[oil platform]] which will be installed in the field for drilling of 12 wells in 2010. A similar platform No. 660 has already been commenced on site and another platform for drilling of 20 wells is being finalized.<ref name=Caspian/> |
</ref> To date, 16.2 million [[ton]]s of oil and 1.5 billion cubic meters of gas were extracted.<ref>{{cite web|url=http://www.365.az/content/view/1266/18/|script-title=ru:ГНКАР отправила новую платформу на морскую структуру "Банка Дарвина"|publisher=365.az |accessdate=2008-05-16|language=ru}}</ref> [[State Oil Company of Azerbaijan Republic]] is in the process of building a new [[oil platform]] which will be installed in the field for drilling of 12 wells in 2010. A similar platform No. 660 has already been commenced on site, and another platform for drilling of 20 wells is being finalized.<ref name=Caspian/> |
||
Another platform operated by ''Absheronneft'' drilled two more wells in 2009 with an overall output of |
Another platform operated by ''Absheronneft'' drilled two more wells in 2009 with an overall output of 7–8.5 tonnes of oil.<ref> |
||
{{cite news |
{{cite news |
||
|url=http://www.1news.az/economy/oil_n_gas/20091223105757254.html |
|url=http://www.1news.az/economy/oil_n_gas/20091223105757254.html |
||
|script-title=ru:На месторождении "Банка Дарвина" будет установлена новая платформа |
|script-title=ru:На месторождении "Банка Дарвина" будет установлена новая платформа |
||
| |
|trans-title=A new platform will be installed on "Darwin Bank" |
||
|publisher=1news.az |
|publisher=1news.az |
||
|author=Alena Salayeva |
|author=Alena Salayeva |
||
Line 25: | Line 23: | ||
|accessdate=2010-01-06 |
|accessdate=2010-01-06 |
||
|language=Russian |
|language=Russian |
||
| |
|url-status=dead |
||
|archiveurl=https://web.archive.org/web/20091226175643/http://www.1news.az/economy/oil_n_gas/20091223105757254.html |
|archiveurl=https://web.archive.org/web/20091226175643/http://www.1news.az/economy/oil_n_gas/20091223105757254.html |
||
|archivedate=2009-12-26 |
|archivedate=2009-12-26 |
||
|df= |
|||
}} |
}} |
||
</ref> |
</ref> |
Latest revision as of 17:10, 6 November 2024
Darwin Bank (Azerbaijani: Darvin bankası) is an Azerbaijani bank oil field in the Caspian Sea, 45 kilometres (28 mi) – 50 kilometres (31 mi) north-east of Baku and 6 kilometres (3.7 mi) west of Pirallahi Island. Industrially significant oil and natural gas resources were discovered here in the 1950s.[1] To date, 16.2 million tons of oil and 1.5 billion cubic meters of gas were extracted.[2] State Oil Company of Azerbaijan Republic is in the process of building a new oil platform which will be installed in the field for drilling of 12 wells in 2010. A similar platform No. 660 has already been commenced on site, and another platform for drilling of 20 wells is being finalized.[1] Another platform operated by Absheronneft drilled two more wells in 2009 with an overall output of 7–8.5 tonnes of oil.[3]
Reservoir
[edit]The field holds 3 million tonnes of oil and 0.5 billion cubic meters (cm) of gas.[1] A mud volcano is in the bank's central part.
See also
[edit]References
[edit]- ^ a b c В 2010 году на месторождении "Банка Дарвина" будет установлена новая скважина [In 2010, a new well will be drilled on "Darwin Bank"] (in Russian). Caspian Energy. 2009-12-23. Archived from the original on 2012-03-02. Retrieved 2010-01-06.
- ^ ГНКАР отправила новую платформу на морскую структуру "Банка Дарвина" (in Russian). 365.az. Retrieved 2008-05-16.
- ^ Alena Salayeva (2009-12-23). На месторождении "Банка Дарвина" будет установлена новая платформа [A new platform will be installed on "Darwin Bank"] (in Russian). 1news.az. Archived from the original on 2009-12-26. Retrieved 2010-01-06.
- Azerbaijani Soviet Encyclopedia (1979), vol. 3, p. 337