San Vicente Dam: Difference between revisions
mNo edit summary |
grammar, red link |
||
(49 intermediate revisions by 29 users not shown) | |||
Line 1: | Line 1: | ||
{{Infobox dam |
{{Infobox dam |
||
| name |
| name = San Vicente Dam |
||
| image |
| image = SanVicenteOriginal1950.jpg |
||
| |
| image_caption = San Vicente Dam in 1950 |
||
| name_official = |
|||
| official_name = |
|||
| |
| dam_crosses = [[San Vicente Creek (San Diego County)|San Vicente Creek]] |
||
| |
| location = [[Lakeside, California|Lakeside]], [[San Diego County]], [[California]]. |
||
| |
| dam_type = Concrete gravity |
||
| |
| dam_length = {{convert|980|ft|m|abbr=on}} (original); {{convert|1425|ft|m|abbr=on}} (raised) |
||
| |
| dam_height = {{convert|220|ft|m|abbr=on}} (original); {{convert|337|ft|m|abbr=on}} (raised) |
||
| dam_width_base = |
|||
| hydraulic_head = |
|||
⚫ | |||
| width = |
|||
⚫ | |||
⚫ | |||
| construction_began = {{start date and age|1941}} (original); {{start date and age|2009}} (raising) |
|||
⚫ | |||
| opening = {{start date and age|1943}} (original); {{start date and age|2014}} (raising)| |
|||
| began = 1941 |
|||
| status = O |
|||
| open = 1943 |
|||
| cost = $2.7 million USD (original); $396 million USD (raising) |
|||
| closed = |
|||
⚫ | |||
| cost = $2.7 Million USD |
|||
⚫ | |||
⚫ | |||
| res_capacity_total = {{convert|90000|acre feet|m3|abbr=on}} (original); {{convert|249358|acre feet|m3|abbr=on}} (raised) |
|||
| maint = |
|||
⚫ | | res_catchment = {{convert|75|mi2|km2|abbr=on}}<ref>{{Cite journal|last=Hill|first=Joseph|title=Dry Rivers, Dammed Rivers and Floods: An Early History of the Struggle Between Droughts and Floods in San Diego |url=https://www.sandiegohistory.org/journal/2002-1/hill.htm|journal=The Journal of San Diego History|volume= 48|number= 1|date=Winter 2002|access-date=2010-07-28}}</ref> |
||
⚫ | |||
| |
| res_surface = {{convert|1100|acre|km2|abbr=on}} (original); {{convert|1600|acre|km2|abbr=on}} (raised) |
||
| res_max_depth = {{convert|306|ft|m}} (raised) |
|||
⚫ | | |
||
⚫ | |||
| reservoir_surface = {{convert|1100|acre|km2|abbr=on}} |
|||
| plant_turbines = |
|||
| depth = |
|||
| plant_capacity = |
|||
| plant_owner = |
|||
| plant_annual_gen = |
|||
⚫ | |||
| plant_commission = |
|||
| turbines = |
|||
| plant_decommission = |
|||
| installed_capacity = |
|||
⚫ | |||
| max_capacity = |
|||
| location_map_caption = |
|||
| annual_generation = |
|||
| location_map_size = |
|||
| pumped_storage = |
|||
| coordinates = {{coord|32|54|44|N|116|55|28|W|type:landmark|display=inline,title}} |
|||
| com = |
|||
⚫ | |||
| decom = |
|||
| extra = |
|||
| bridge_carries = |
|||
| bridge_width = |
|||
| bridge_clearance = |
|||
| bridge_traffic = |
|||
| bridge_toll = |
|||
| bridge_id = |
|||
| map_cue = |
|||
| map_image = |
|||
| map_text = |
|||
⚫ | |||
| location_map_text = |
|||
| location_map_width = |
|||
| lat_d = 32 |
|||
| lat_m = 54 |
|||
| lat_s = 44 |
|||
| lat_NS = N |
|||
| long_d = 116 |
|||
| long_m = 55 |
|||
| long_s = 28 |
|||
| long_EW = W |
|||
| coordinates_type = type:landmark |
|||
| coordinates_display= inline,title |
|||
⚫ | |||
| extra = |
|||
}} |
}} |
||
'''San Vicente Dam''' is a [[concrete]] [[Dam#Gravity dams|gravity dam]] on [[San Vicente Creek (San Diego County)|San Vicente Creek]] near [[Lakeside, California|Lakeside]] and 25 km (15.5 mi) northeast of [[San Diego, California]]. The dam was built between 1941 and 1943 and created [[San Vicente Reservoir]] for the purpose of [[Reservoirs#Direct water supply|municipal water storage]], [[flood control]] and recreation. Although the reservoir is fed by [[Surface runoff|run-off]], its main source is the [[San Diego Aqueduct#First Aqueduct|First San Diego Aqueduct]]. In June 2009, construction to raise the height of the dam by {{convert|117|ft|m|abbr=on}}, in order to more than double its reservoir size, commenced. It is the largest dam raise in the United States and largest [[roller-compacted concrete]] dam raise in the world.<ref name="SDCWA">{{Cite web|title=San Vicente Dam Raise|url=http://www.sdcwa.org/infra/esp-sanvicentedamraise.phtml|publisher=San Diego County Water Authority|access-date=28 July 2010|url-status=dead|archive-url=https://web.archive.org/web/20100803220115/http://www.sdcwa.org/infra/esp-sanvicentedamraise.phtml|archive-date=3 August 2010}}</ref><ref name="penne">{{Cite web|title=Raising San Vicente Dam: Why and How|url=http://www.pennenergy.com/index/power/display/354296/articles/hydro-review/volume-26/issue-4/feature-articles/raising-san-vicente-dam-why-and-how.html|publisher=Penn Energy|access-date=28 July 2010|author1=Thomas O. Keller |author2=Jeffrey A. Shoaf |author3=Jim Zhou |author4=Jesus M. Meda |author5=Michael F. Rogers |name-list-style=amp }}</ref> The dam raise project was originally set for the end of 2012,<ref name="penne" /> but was completed in early 2014.<ref name="enhancing">{{cite web|title=Enhancing Water Supply Reliability|url=http://www.sdcwa.org/enhancing-water-supply-reliability#diversification|publisher=San Diego County Water Authority|access-date=17 July 2013}}</ref> Efforts to replace the water supply pipelines and prepare the reservoir for the public will be underway until 2015–2017.<ref name="complete">{{cite web | url=http://www.sdcwa.org/water-authority-makes-history-san-vicente-dam | title=Water Authority Makes History at San Vicente Dam | publisher=San Diego County Water Authority | access-date=11 July 2014}}</ref> |
|||
==History== |
==History== |
||
[[Image:SanVicenteOriginalUC.jpg|thumb|200px|left|San Vicente Dam under construction in 1942]] |
[[Image:SanVicenteOriginalUC.jpg|thumb|200px|left|San Vicente Dam under construction in 1942]] |
||
In the late 19th century, San Diego began constructing dams to help supply [[municipal water]], mitigate [[drought]] and control floods in the [[San Diego River|San Diego River Basin]]. In 1928, the [[Metropolitan Water District of Southern California]] was created and charged with transferring water from the [[Colorado River]] to southern California but San Diego was excluded from the project. Construction of the Colorado River Aqueduct had |
In the late 19th century, San Diego began constructing dams to help supply [[municipal water]], mitigate [[drought]] and control floods in the [[San Diego River|San Diego River Basin]]. In 1928, the [[Metropolitan Water District of Southern California]] was created and charged with transferring water from the [[Colorado River]] to southern California but San Diego was excluded from the project. Construction of the Colorado River Aqueduct had begun in 1933 and was completed in 1941. However, construction on San Vicente Dam began in 1941 with anticipation of San Diego receiving water through the [[Colorado River Aqueduct]].<ref name="his">{{Cite web|title=City of San Diego Water History|url=http://www.sandiego.gov/water/gen-info/history.shtml|publisher=The City of San Diego|access-date=28 July 2010|url-status=dead|archive-url=https://web.archive.org/web/20100803193802/http://www.sandiego.gov/water/gen-info/history.shtml|archive-date=3 August 2010}}</ref> San Diego residents had initially rejected proposals to build San Vicente Dam in 1939 but after the realization of the city's growing population, voters quickly approved funding for San Vicente Dam in 1940.<ref>{{Cite web|last=Pourade|first=Richard F.|title=The History of San Diego|url=https://www.sandiegohistory.org/books/pourade/dream/dreamchapter2.htm|work=CHAPTER 2: Water - the Real Key to a City's Survival|publisher=Copley Newspapers|access-date=28 July 2010}}</ref> |
||
Construction on the dam included pouring concrete into blocks measuring {{convert|5|by|50|ft|m}} and incorporating a {{convert|275|ft|m|abbr=on}} wide uncontrolled ogee-type [[spillway]] on the dam's downstream face. The [[outlet works]], which release water for municipal use, connected the reservoir intake on the upstream side of the crest with San Vicente Pipelines 1 and 2 via three cast-iron pipes {{convert|36|in|mm}} in diameter.<ref name="penne"/> In 1944, the San Diego County Water Authority (SDCWA) was formed and would soon begin construction on an aqueduct from the Colorado River Aqueduct called the [[San Diego Aqueduct]] to supply projected future water needs. Construction on |
Construction on the dam included pouring concrete into blocks measuring {{convert|5|by|50|ft|m}} and incorporating a {{convert|275|ft|m|abbr=on}} wide uncontrolled ogee-type [[spillway]] on the dam's downstream face. The [[outlet works]], which release water for municipal use, connected the reservoir intake on the upstream side of the crest with San Vicente Pipelines 1 and 2 via three cast-iron pipes {{convert|36|in|mm}} in diameter.<ref name="penne"/> In 1944, the San Diego County Water Authority (SDCWA) was formed and would soon begin construction on an aqueduct from the Colorado River Aqueduct called the [[San Diego Aqueduct]] to supply projected future water needs. Construction on San Vicente Dam was completed in 1943 but construction on the [[San Diego Aqueduct#First Aqueduct|First San Diego Aqueduct]], which was supplied by the Colorado River Aqueduct, did not begin until 1945. It was not until 1947 that the First Aqueduct was complete and San Vicente Reservoir began to receive its water.<ref name="his"/><ref>{{Cite web|title=Hillcrest's Water History|url=http://www.hillquest.com/history/hillcrest-and-san-diego-water-history-timeline/|publisher=Hillquest|access-date=27 August 2015}}</ref> |
||
===Dam raising |
===Dam raising=== |
||
As part of the SDCWA's $1 billion Emergency Storage Project which began in 2000, the |
As part of the SDCWA's $1 billion Emergency Storage Project which began in 2000, the [[San Vicente Dam Raise]] increased the height of the {{convert|220|ft|m|abbr=on}} dam by {{convert|117|ft|m|abbr=on}} to {{convert|337|ft|m|abbr=on}}. This in turn will more than double the reservoir's original capacity of {{convert|90000|acre feet|m3|abbr=on}} by increasing it {{convert|152000|acre feet|m3|abbr=on}} to a total of {{convert|242000|acre feet|m3|abbr=on}}. The original designers had predicted that raising the dam would be necessary in the future and positioned the dam in such a way that its height could be increased by as much as 120 ft along with ensuring its [[grout curtain]] was extended for a larger foundation.<ref name="penne"/> |
||
In 2006, the SDCWA awarded [[Montgomery Watson Harza]] (MWH) with a $20.4 million contract which included developing the raised-dam's design and other engineering services during construction. Construction on the [[roller-compacted concrete]] (RCC) dam raise is being managed by [[Black & Veatch]] and [[Parsons Corporation|Parsons]] and |
In 2006, the SDCWA awarded [[Montgomery Watson Harza]] (MWH) with a $20.4 million contract which included developing the raised-dam's design and other engineering services during construction. Construction on the [[roller-compacted concrete]] (RCC) dam raise is being managed by [[Black & Veatch]] and [[Parsons Corporation|Parsons]] and was done in specific stages.<ref>{{Cite web|title=On the up – the San Vicente Dam raise project|url=http://www.waterpowermagazine.com/story.asp?sc=2056648|work=Feature|publisher=International Water Power & Dam Construction|access-date=28 July 2010|date=15 June 2010|url-status=dead|archive-url=https://web.archive.org/web/20110614045333/http://www.waterpowermagazine.com/story.asp?sc=2056648|archive-date=14 June 2011}}</ref> The first stage began in June 2009 and consisted of preparing the dam's foundation and was completed in 2010 after which the dam raise began. The construction reached a milestone in October 2012 as the dam reached its final height of 337 feet. The new dam is 117 feet higher than the old one, the tallest dam raise in the United States.<ref>{{Cite web|title=San Vicente Dam Reaches New Full Height of 337 Feet|url=http://www.sdcwa.org/san-vicente-dam-reaches-new-full-height-337-feet|access-date=1 January 2013|date=17 October 2012}}</ref> The dam raise was completed in early 2014.<ref name="enhancing"/><ref name="complete"/> The reservoir's replacement pipeline will last until 2015. The reservoir, which was closed for recreation when construction began, will reopen between 2014 and 2017 depending on when it reaches normal levels.<ref name="SDCWA"/> The San Vicente Dam Raise itself was estimated to cost $568 million<ref>{{Cite web|title=Fraco Involved in the Tallest Dam Raise in the United States|url=http://www.masoncontractors.org/newsandevents/masonryheadlines/headline.php?id=20100624060000|publisher=Fraco Products Ltd|access-date=28 July 2010|date=24 June 2010|url-status=dead|archive-url=https://web.archive.org/web/20100630173427/http://www.masoncontractors.org/newsandevents/masonryheadlines/headline.php?id=20100624060000|archive-date=30 June 2010}}</ref> and will be complemented with a new pumping facility and the San Vicente Pipeline which will connect San Vicente Reservoir to the [[San Diego Aqueduct#First Aqueduct|Second San Diego Aqueduct]]. The RCC raised-dam will be the tallest dam raise in the United States along with the tallest of its type in the world.<ref name="SDCWA"/><ref name="penne"/> |
||
==See also== |
==See also== |
||
Line 76: | Line 53: | ||
*[[Lower Otay Reservoir]] |
*[[Lower Otay Reservoir]] |
||
*[[Saluda Dam]] |
*[[Saluda Dam]] |
||
⚫ | |||
{{Reflist}} |
|||
==External links== |
==External links== |
||
{{Commons category|San Vicente Dam}} |
{{Commons category|San Vicente Dam}} |
||
*[https://www.sandiego.gov/reservoirs-lakes/san-vicente-reservoir San Vicente Reservoir] |
|||
*[http://www.sdcwa.org/ |
*[http://www.sdcwa.org/san-vicente-dam-raise San Diego County Water Authority – San Vicente Dam Raise] |
||
*[http://www.sdcwa.org/ |
*[http://www.sdcwa.org/emergency-storage-project San Diego County Water Authority – Emergency Storage Project] |
||
*Live Construction Web Cams: [http://cipcam.sdcwa.org/SVCAM1 Topside], [http://cipcam.sdcwa.org/SVCAM2 Downstream] |
|||
*{{HAER |survey=CA-2267 |id=ca3630 |title=San Vicente Dam, At the north end of Moreno Avenue, 6300 feet north of the intersection of Moreno Avenue and Vigilante Road, Lakeside, San Diego County, CA}} |
|||
⚫ | |||
{{San Diego County dams}} |
|||
{{reflist}} |
|||
[[Category:Dams in California]] |
[[Category:Dams in California]] |
||
[[Category:Buildings and structures in San Diego County, California]] |
|||
[[Category:Gravity dams]] |
|||
[[Category:United States local public utility dams]] |
|||
[[Category:Dams completed in 1943]] |
|||
[[Category:Historic American Engineering Record in California]] |
|||
[[Category:Roller-compacted concrete dams]] |
|||
[[Category:1943 establishments in California]] |
Latest revision as of 05:04, 7 November 2024
San Vicente Dam | |
---|---|
Location | Lakeside, San Diego County, California. |
Coordinates | 32°54′44″N 116°55′28″W / 32.91222°N 116.92444°W |
Status | Operational |
Construction began | 1941 | (original); 2009 (raising)
Opening date | 1943 | (original); 2014 (raising)
Construction cost | $2.7 million USD (original); $396 million USD (raising) |
Owner(s) | City of San Diego |
Dam and spillways | |
Type of dam | Concrete gravity |
Impounds | San Vicente Creek |
Height | 220 ft (67 m) (original); 337 ft (103 m) (raised) |
Length | 980 ft (300 m) (original); 1,425 ft (434 m) (raised) |
Spillway type | Ogee, uncontrolled |
Reservoir | |
Creates | San Vicente Reservoir |
Total capacity | 90,000 acre⋅ft (110,000,000 m3) (original); 249,358 acre⋅ft (307,579,000 m3) (raised) |
Catchment area | 75 sq mi (190 km2)[1] |
Surface area | 1,100 acres (4.5 km2) (original); 1,600 acres (6.5 km2) (raised) |
Maximum water depth | 306 feet (93 m) (raised) |
San Vicente Dam is a concrete gravity dam on San Vicente Creek near Lakeside and 25 km (15.5 mi) northeast of San Diego, California. The dam was built between 1941 and 1943 and created San Vicente Reservoir for the purpose of municipal water storage, flood control and recreation. Although the reservoir is fed by run-off, its main source is the First San Diego Aqueduct. In June 2009, construction to raise the height of the dam by 117 ft (36 m), in order to more than double its reservoir size, commenced. It is the largest dam raise in the United States and largest roller-compacted concrete dam raise in the world.[2][3] The dam raise project was originally set for the end of 2012,[3] but was completed in early 2014.[4] Efforts to replace the water supply pipelines and prepare the reservoir for the public will be underway until 2015–2017.[5]
History
[edit]In the late 19th century, San Diego began constructing dams to help supply municipal water, mitigate drought and control floods in the San Diego River Basin. In 1928, the Metropolitan Water District of Southern California was created and charged with transferring water from the Colorado River to southern California but San Diego was excluded from the project. Construction of the Colorado River Aqueduct had begun in 1933 and was completed in 1941. However, construction on San Vicente Dam began in 1941 with anticipation of San Diego receiving water through the Colorado River Aqueduct.[6] San Diego residents had initially rejected proposals to build San Vicente Dam in 1939 but after the realization of the city's growing population, voters quickly approved funding for San Vicente Dam in 1940.[7]
Construction on the dam included pouring concrete into blocks measuring 5 by 50 feet (1.5 by 15.2 m) and incorporating a 275 ft (84 m) wide uncontrolled ogee-type spillway on the dam's downstream face. The outlet works, which release water for municipal use, connected the reservoir intake on the upstream side of the crest with San Vicente Pipelines 1 and 2 via three cast-iron pipes 36 inches (910 mm) in diameter.[3] In 1944, the San Diego County Water Authority (SDCWA) was formed and would soon begin construction on an aqueduct from the Colorado River Aqueduct called the San Diego Aqueduct to supply projected future water needs. Construction on San Vicente Dam was completed in 1943 but construction on the First San Diego Aqueduct, which was supplied by the Colorado River Aqueduct, did not begin until 1945. It was not until 1947 that the First Aqueduct was complete and San Vicente Reservoir began to receive its water.[6][8]
Dam raising
[edit]As part of the SDCWA's $1 billion Emergency Storage Project which began in 2000, the San Vicente Dam Raise increased the height of the 220 ft (67 m) dam by 117 ft (36 m) to 337 ft (103 m). This in turn will more than double the reservoir's original capacity of 90,000 acre⋅ft (110,000,000 m3) by increasing it 152,000 acre⋅ft (187,000,000 m3) to a total of 242,000 acre⋅ft (299,000,000 m3). The original designers had predicted that raising the dam would be necessary in the future and positioned the dam in such a way that its height could be increased by as much as 120 ft along with ensuring its grout curtain was extended for a larger foundation.[3]
In 2006, the SDCWA awarded Montgomery Watson Harza (MWH) with a $20.4 million contract which included developing the raised-dam's design and other engineering services during construction. Construction on the roller-compacted concrete (RCC) dam raise is being managed by Black & Veatch and Parsons and was done in specific stages.[9] The first stage began in June 2009 and consisted of preparing the dam's foundation and was completed in 2010 after which the dam raise began. The construction reached a milestone in October 2012 as the dam reached its final height of 337 feet. The new dam is 117 feet higher than the old one, the tallest dam raise in the United States.[10] The dam raise was completed in early 2014.[4][5] The reservoir's replacement pipeline will last until 2015. The reservoir, which was closed for recreation when construction began, will reopen between 2014 and 2017 depending on when it reaches normal levels.[2] The San Vicente Dam Raise itself was estimated to cost $568 million[11] and will be complemented with a new pumping facility and the San Vicente Pipeline which will connect San Vicente Reservoir to the Second San Diego Aqueduct. The RCC raised-dam will be the tallest dam raise in the United States along with the tallest of its type in the world.[2][3]
See also
[edit]References
[edit]- ^ Hill, Joseph (Winter 2002). "Dry Rivers, Dammed Rivers and Floods: An Early History of the Struggle Between Droughts and Floods in San Diego". The Journal of San Diego History. 48 (1). Retrieved 2010-07-28.
- ^ a b c "San Vicente Dam Raise". San Diego County Water Authority. Archived from the original on 3 August 2010. Retrieved 28 July 2010.
- ^ a b c d e Thomas O. Keller; Jeffrey A. Shoaf; Jim Zhou; Jesus M. Meda & Michael F. Rogers. "Raising San Vicente Dam: Why and How". Penn Energy. Retrieved 28 July 2010.
- ^ a b "Enhancing Water Supply Reliability". San Diego County Water Authority. Retrieved 17 July 2013.
- ^ a b "Water Authority Makes History at San Vicente Dam". San Diego County Water Authority. Retrieved 11 July 2014.
- ^ a b "City of San Diego Water History". The City of San Diego. Archived from the original on 3 August 2010. Retrieved 28 July 2010.
- ^ Pourade, Richard F. "The History of San Diego". CHAPTER 2: Water - the Real Key to a City's Survival. Copley Newspapers. Retrieved 28 July 2010.
- ^ "Hillcrest's Water History". Hillquest. Retrieved 27 August 2015.
- ^ "On the up – the San Vicente Dam raise project". Feature. International Water Power & Dam Construction. 15 June 2010. Archived from the original on 14 June 2011. Retrieved 28 July 2010.
- ^ "San Vicente Dam Reaches New Full Height of 337 Feet". 17 October 2012. Retrieved 1 January 2013.
- ^ "Fraco Involved in the Tallest Dam Raise in the United States". Fraco Products Ltd. 24 June 2010. Archived from the original on 30 June 2010. Retrieved 28 July 2010.
External links
[edit]- San Vicente Reservoir
- San Diego County Water Authority – San Vicente Dam Raise
- San Diego County Water Authority – Emergency Storage Project
- Live Construction Web Cams: Topside, Downstream
- Historic American Engineering Record (HAER) No. CA-2267, "San Vicente Dam, At the north end of Moreno Avenue, 6300 feet north of the intersection of Moreno Avenue and Vigilante Road, Lakeside, San Diego County, CA"