Hanoi Metro: Difference between revisions
m c/e |
|||
(43 intermediate revisions by 20 users not shown) | |||
Line 8: | Line 8: | ||
| imagesize2 = 300px |
| imagesize2 = 300px |
||
| caption2 = |
| caption2 = |
||
| owner = [[ |
| owner = [[Hanoi|Hanoi People’s Committee]] |
||
| locale = [[Hanoi]], [[Vietnam]] |
| locale = [[Hanoi]], [[Vietnam]] |
||
| transit_type = [[Rapid transit]] |
| transit_type = [[Rapid transit]] |
||
| lines = |
| lines = 2 (in operation) <br/> 1 (under construction) |
||
| headway = 10 minutes |
| headway = 10 minutes |
||
| stations = |
| stations = 20 (in operation) <br/> 4 (under construction) |
||
| vehicles = |
| vehicles = 23 four-car trainset |
||
| daily_ridership = 32,000<ref>{{cite web |url=https://www.vietnamplus.vn/metro-cat-linhha-dong-thay-doi-thoi-quen-di-lai-cua-nguoi-dan/827259.vnp |title='Metro Cát Linh-Hà Đông thay đổi thói quen đi lại của người dân'|publisher=VietnamPlus|language=vi |date=2022-11-04}}</ref> |
| daily_ridership = 32,000<ref>{{cite web |url=https://www.vietnamplus.vn/metro-cat-linhha-dong-thay-doi-thoi-quen-di-lai-cua-nguoi-dan/827259.vnp |title='Metro Cát Linh-Hà Đông thay đổi thói quen đi lại của người dân'|publisher=VietnamPlus|language=vi |date=2022-11-04}}</ref> |
||
| began_operation = {{Start date and age|2021|11|06}} |
| began_operation = {{Start date and age|2021|11|06}} |
||
| operation_start = |
| operation_start = |
||
| operator = Hanoi Metro Company and [[Tokyo Metro]]<ref>{{Cite web|url=http://vneconomictimes.com/article/business/vietnam-tokyo-metro-set-up-to-run-hanoi-s-urban-railway|title=Vietnam Tokyo Metro set up to run Hanoi's urban railway}}</ref> |
| operator = Hanoi Metro Company and [[Tokyo Metro]]<ref>{{Cite web|url=http://vneconomictimes.com/article/business/vietnam-tokyo-metro-set-up-to-run-hanoi-s-urban-railway|title=Vietnam Tokyo Metro set up to run Hanoi's urban railway}}</ref> |
||
| system_length = |
| system_length = 21.6 km (in operation) <br/>4 km (under construction)<br/>318 (planned) |
||
| track_gauge = {{RailGauge|sg|allk=on}} |
| track_gauge = {{RailGauge|sg|allk=on}} |
||
| top_speed = {{convert|80|km/h|mph|abbr=on}} |
| top_speed = {{convert|80|km/h|mph|abbr=on}} |
||
Line 35: | Line 35: | ||
}} |
}} |
||
The '''Hanoi Metro''' ({{ |
The '''Hanoi Metro''' ({{langx|vi|Đường sắt đô thị Hà Nội|lit=Hanoi urban railway}}) is a [[rapid transit]] system in [[Hanoi]], the capital city of [[Vietnam]]. Owned by [[Hanoi|Hanoi's People Committee]] and operated by Hanoi Metro Company (HMC), it is the first operational [[rapid transit]] system in Vietnam. The system includes elevated and underground sections. The first line, [[Hanoi Metro Line 2A|Line 2A]], opened to service on 6 November 2021.<ref>{{cite web|url=https://www.railjournal.com/passenger/metros/hanoi-opens-vietnams-first-metro-line/ |title=Hanoi opens Vietnam's first metro line |website=IRJ |date= 9 November 2021 |first=David |last=Burroughs}}</ref> The first section of the second line [[Hanoi Metro Line 3|Line 3]] opened on August 8, 2024.<ref>{{Cite web |last=May |first=Tiana |date=2024-08-09 |title=Hanoi Metro Line 3 Commences Passenger Service |url=https://railway-news.com/hanoi-metro-line-3-commences-passenger-service/ |access-date=2024-08-09 |website=Railway-News |language=en-gb}}</ref> |
||
The system includes elevated and underground sections. Another line ([[Line 3, Hanoi Metro|Line 3 - Van Mieu Line]]) is under construction, and was expected to commence operations at the end of 2022, however, in September 2022, the authorities requested to extend the deadline to 2025,<ref>{{cite web | url=https://e.vnexpress.net/news/news/hanoi-2nd-metro-line-likely-to-be-delayed-by-5-years-4510624.html | title=Hanoi 2nd metro line likely to be delayed by 5 years - VnExpress International }}</ref> and increase the budget by a further VND1.9 trillion ($80.77m USD). |
|||
The system will eventually consist of 8 lines with a total length of {{convert|318|km}}, and is initially expected to carry 200,000 passengers per day. Upon opening, daily ridership was at 12,000.<ref name=voanews>{{cite web|url=https://www.voanews.com/amp/vietnam-first-metro-in-hanoi-hobbled-by-lack-of-riders/6351207.html|title=Vietnam's First Metro, in Hanoi, Hobbled by Lack of Riders|website=voanews.com|date=13 December 2021|access-date=4 January 2022}}</ref> |
The system will eventually consist of 8 lines with a total length of {{convert|318|km}}, and is initially expected to carry 200,000 passengers per day. Upon opening, daily ridership was at 12,000.<ref name=voanews>{{cite web|url=https://www.voanews.com/amp/vietnam-first-metro-in-hanoi-hobbled-by-lack-of-riders/6351207.html|title=Vietnam's First Metro, in Hanoi, Hobbled by Lack of Riders|website=voanews.com|date=13 December 2021|access-date=4 January 2022}}</ref> |
||
Line 48: | Line 46: | ||
In 1998, the Vietnamese government revised and agreed the “Hanoi Capital to 2020 Master Plan” which suggested that Hanoi prioritise the building of a rail transit system, with a target to build 5 lines.<ref>{{cite web|author1=Phan Văn Khải|title=Quyết định 108/1998/QĐ-TTg phê duyệt điều chỉnh quy hoạch chung Thủ đô Hà Nội đến năm 2020|url=http://www.moj.gov.vn/vbpq/lists/vn%20bn%20php%20lut/view_detail.aspx?itemid=7721|website=Hệ thống văn bản quy phạm pháp luật|publisher=Bộ Tư pháp|location=Hà Nội|access-date=12 September 2017|date=20 June 1998|language=vi}}</ref> The "Overall Plan for the Development of Vietnam's Railway Transportation Industry to 2020", released in 2002, and the "2005-2010 Economic and Social Development Plan for 2006-2010", released in 2006, both suggested the same and aimed to finish the metro system by 2010. |
In 1998, the Vietnamese government revised and agreed the “Hanoi Capital to 2020 Master Plan” which suggested that Hanoi prioritise the building of a rail transit system, with a target to build 5 lines.<ref>{{cite web|author1=Phan Văn Khải|title=Quyết định 108/1998/QĐ-TTg phê duyệt điều chỉnh quy hoạch chung Thủ đô Hà Nội đến năm 2020|url=http://www.moj.gov.vn/vbpq/lists/vn%20bn%20php%20lut/view_detail.aspx?itemid=7721|website=Hệ thống văn bản quy phạm pháp luật|publisher=Bộ Tư pháp|location=Hà Nội|access-date=12 September 2017|date=20 June 1998|language=vi}}</ref> The "Overall Plan for the Development of Vietnam's Railway Transportation Industry to 2020", released in 2002, and the "2005-2010 Economic and Social Development Plan for 2006-2010", released in 2006, both suggested the same and aimed to finish the metro system by 2010. |
||
=== |
===Survey and approval=== |
||
The start of construction was delayed continually as the government first required |
The start of construction was delayed continually as the government first required consultant companies from [[China]], [[France]] and [[Japan]], such as [[SYSTRA]] and [[Japan International Cooperation Agency]], to finish feasibility studies which ran from 2004 to 2007. These three companies suggested the Hanoi government build a network consisting of 6 lines. In 2008, the Vietnamese government approved the construction of the suggested lines, which they divided into several phases.<ref>{{cite news|title=Hoàn thành báo cáo khả thi tuyến đường sắt trên cao Hà Nội - Hà Đông|url=http://vietbao.vn/Kinh-te/Hoan-thanh-bao-cao-kha-thi-tuyen-duong-sat-tren-cao-Ha-Noi-Ha-Dong/410027413/87/|access-date=26 December 2017|work=Hà Nội Mới|publisher=Việt Báo|date=23 October 2004|language=vi|archive-date=26 December 2017|archive-url=https://web.archive.org/web/20171226182215/http://vietbao.vn/Kinh-te/Hoan-thanh-bao-cao-kha-thi-tuyen-duong-sat-tren-cao-Ha-Noi-Ha-Dong/410027413/87/|url-status=dead}}</ref><ref>{{cite web|title=The Comprehensive Urban Development Programme in Hanoi Capital City: Final Report|page=8-64~8-72|url=http://open_jicareport.jica.go.jp/pdf/11856101_04.pdf|publisher=Japan International Cooperation Agency; ALMEC Corp; Nippon Koei; Yachiyo Engineering|access-date=12 September 2017|date=March 2007|language=vi}}</ref> |
||
===Construction and opening=== |
|||
The pilot line of Hanoi Metro is Line 3.<ref>{{cite web|url=https://www.railway-technology.com/projects/hanoi-metro/?cf-view |title=Hanoi Metro |website=Railway Technology |date=20 April 2017 }}</ref> It began construction in 2009 with a projected completion date of 2015.<ref name="vnexpress_240807">{{Cite web |last=Vo |first=Hai |date=7 August 2024 |title=Vietnam's second metro line to start running Thursday |url=https://e.vnexpress.net/news/news/traffic/vietnam-s-second-metro-line-to-start-running-thursday-4778523.html }}</ref> The line was built by multiple companies, with train systems provided by Alstom.<ref>{{cite web|url=https://www.railwaygazette.com/modes/hanoi-metro-line-3-railway-systems-contract-signed/43827.article |title= |
|||
Hanoi metro Line 3 railway systems contract signed |work= Metro Report International |date=17 January 2017 }}</ref> The railway line was built by South Korean firm Daelim Industrial and other contractors.<ref>{{cite web|url=https://www.railwaygazette.com/hanoi-metro-line-3-contractor-chosen/39412.article |title=Hanoi metro Line 3 contractor chosen |work=Railway Gazette International |date=14 April 2014 }}</ref> The project was repeatedly delayed, with the completion date rescheduled to 2027.<ref name="vnexpress_240807" /> The elevated section of the line opened to the public on 8 August 2024, while the work on the underground section continued. Despite being the pilot line, Line 3 became the second operational Hanoi metro line, after Line 2A, due to the 9-year delay.<ref>{{cite web|url=https://asia.nikkei.com/Business/Transportation/Vietnam-opens-2nd-Hanoi-metro-line-after-9-year-delay |title=Vietnam opens 2nd Hanoi metro line after 9-year delay |date=8 August 2024 |website=Nikke Aisa |first=YUJI |last=NITTA }}</ref> |
|||
The second planned line, Line 2A, began construction in October 2011.<ref>{{cite web|url=https://www.railwaygazette.com/metros/first-metro-line-opened-in-hanoi/60285.article |title=First metro line opened in Hanoi |work=Metro Report International |date=8 November 2021 }}</ref> The line was constructed by [[China Railway Engineering Corporation]].<ref name=hoai>{{cite news|author1=Lâm Hoài|title=Khởi công tuyến đường sắt đô thị đầu tiên tại Hà Nội|url=http://tuoitre.vn/khoi-cong-tuyen-duong-sat-do-thi-dau-tien-tai-ha-noi-402324.htm|access-date=5 September 2017|work=Tuổi Trẻ|publisher=Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh|date=25 September 2010|language=vi}}</ref><ref name=zhao>{{cite news|author1=赵青|title=中铁六局承建河内城市轨道建设项目开工|url=http://intl.ce.cn/specials/zxgjzh/201110/10/t20111010_22749126.shtml|access-date=5 September 2017|work=中国经济网|location=河内|publisher=经济日报社|date=10 October 2011}}</ref> The bulk of the construction was completed by the fourth quarter of 2018.<ref>{{cite news|author1=Đoàn Loan|title=Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng|url=https://vnexpress.net/tin-tuc/thoi-su/giao-thong/duong-sat-cat-linh-ha-dong-co-the-cham-tien-do-them-11-thang-3682813.html#ctr=box_morelink_thoisu_env_4_click|accessdate=2018-01-07|work=VnExpress.net|location=Hà Nội|publisher=Bộ Khoa học Công nghệ|date=2017-12-11|language=vi}}</ref> Operational tests were conducted at the end of 2018 and again in 2019.<ref name=":0">{{Cite web|url=https://urbanisthanoi.com/hanoi-news/15956-hanoi-s-first-metro-line-begins-20-day-trial-run|title=Hanoi's First Metro Line Begins 20-Day Trial Run|last=|first=|date=29 October 2019|website=Urbanist Hanoi|language=en-gb|archive-url=|archive-date=|access-date=1 March 2020}}</ref><ref>{{cite news |title=Four major transport projects on track for completion next year |url=https://e.vnexpress.net/news/business/economy/four-major-transport-projects-on-track-for-completion-next-year-3859919.html |author=Doan Loan |location=Hà Nội |publisher=VN Express |date=2018-12-26 |language=en}}</ref> After delays, Line 2A opened to the public on 6 November 2021,<ref name=vnexpress>{{cite web|url=https://e.vnexpress.net/news/news/hanoi-metro-receives-safety-clearance-from-french-consultant-4270792.html|title=Hanoi metro receives safety clearance from French consultant|quote=Hanoi’s first metro has been awarded a safety certificate by a French consultant and is set to begin commercial operations next month.|date=2021-04-30}}</ref> becoming the first operational metro line in Hanoi and whole Vietnam.<ref>{{cite web|url=https://www.railjournal.com/passenger/metros/hanoi-opens-vietnams-first-metro-line/ |title=Hanoi opens Vietnam's first metro line |website=IRJ |date= 9 November 2021 |first=David |last=Burroughs}}</ref> |
|||
The Phase 1 includes Line 2A and Line 3 construction. The construction of Line 2A was started on 2011, and the construction of Line 3 was started on 2010. |
|||
==Network== |
==Network== |
||
According to the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016),<ref>{{Cite web|url=http://vanban.chinhphu.vn/portal/page/portal/chinhphu/hethongvanban?class_id=2&mode=detail&document_id=184101|title=Masterplan of 8 metro lines in Hanoi in 2030 and vision to 2050}}</ref> the Hanoi Metro system will consist of 8 lines, including elevated and underground sections. The Ministry of Transport (MoT) and the Hanoi People's Committee (HPC) will both be investors in the project. Phase 1 includes Line 2A and Line 3, Line 2A |
According to the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016),<ref>{{Cite web|url=http://vanban.chinhphu.vn/portal/page/portal/chinhphu/hethongvanban?class_id=2&mode=detail&document_id=184101|title=Masterplan of 8 metro lines in Hanoi in 2030 and vision to 2050}}</ref> the Hanoi Metro system will consist of 8 lines, including elevated and underground sections. The Ministry of Transport (MoT) and the Hanoi People's Committee (HPC) will both be investors in the project. Phase 1 includes Line 2A and Line 3, Line 2A and Line 3 (elevated section) are in service, and Line 3 (underground section) is currently under construction. |
||
{| class="wikitable sortable" |
{| class="wikitable sortable" |
||
Line 60: | Line 62: | ||
|+ Operational |
|+ Operational |
||
|- |
|- |
||
! Line |
! Line |
||
! Route |
|||
! Line name |
|||
! Terminus |
|||
! Length |
! Length |
||
! Stations |
! Stations |
||
Line 68: | Line 69: | ||
! Operational date |
! Operational date |
||
|- |
|- |
||
| style="text-align:center;" | {{ |
| style="text-align:center;" | {{ric|Hanoi Metro|2A|size=40}} |
||
| [[Line 2A (Hanoi Metro)|Cát Linh Line]] (C) |
|||
| [[Cat Linh station|Cat Linh]] ↔ [[Yen Nghia station|Yen Nghia]] |
| [[Cat Linh station|Cat Linh]] ↔ [[Yen Nghia station|Yen Nghia]] |
||
| style="text-align:center;" | {{convert|13.1|km|abbr=on}} |
| style="text-align:center;" | {{convert|13.1|km|abbr=on}} |
||
Line 79: | Line 79: | ||
|- |
|- |
||
|colspan=7|[[File:Map of Hanoi Metro Line 2A.svg|center|400px]] |
|colspan=7|[[File:Map of Hanoi Metro Line 2A.svg|center|400px]] |
||
|- |
|||
| style="text-align:center;" | {{ric|Hanoi Metro|3|size=40}} |
|||
| [[Nhổn station|Nhon]] ↔ [[Cầu Giấy Station|Cau Giay]] |
|||
| style="text-align:center;" | {{convert|8.5|km|abbr=on}} |
|||
| style="text-align:center;" | 8 |
|||
| Nhổn |
|||
| 8 August 2024<ref name="vnexpress_240807" /> |
|||
|} |
|} |
||
Line 85: | Line 92: | ||
|+ Under construction |
|+ Under construction |
||
|- |
|- |
||
! Line |
! Line |
||
! Route |
|||
! Line name |
|||
! Terminus |
|||
! Length |
! Length |
||
! Stations |
! Stations |
||
Line 93: | Line 99: | ||
! Operational date |
! Operational date |
||
|- |
|- |
||
| style="text-align:center;" | {{ |
| style="text-align:center;" | {{ric|Hanoi Metro|3|size=40}} |
||
| [[ |
| [[Cầu Giấy station|Cau Giay]] ↔ [[Hanoi station|Hanoi Station]] |
||
| style="text-align:center;" | {{convert|4|km|abbr=on}}<br/>{{convert|12.5|km|abbr=on}} (planned) |
|||
| [[Nhổn station|Nhon]] ↔ [[Hanoi Railway Station|Hanoi Station]] |
|||
| style="text-align:center;" | |
| style="text-align:center;" | 4<br/>14 (planned) |
||
| style="text-align:center;" | 12 (under construction) <br/> 14 (planned) |
|||
| Nhổn |
| Nhổn |
||
| 2027 |
| Late 2027 |
||
|} |
|} |
||
=== |
=== Line 2A: Cat Linh - Ha Dong === |
||
[[File:Line 2A Hanoi Metro near Van Quan station.jpg|thumb|300px|[[Line 2A (Hanoi Metro)|Line 2A of Hanoi Metro]], over Tran Phu street, near [[Van Quan station]]]] |
[[File:Line 2A Hanoi Metro near Van Quan station.jpg|thumb|300px|[[Line 2A (Hanoi Metro)|Line 2A of Hanoi Metro]], over Tran Phu street, near [[Van Quan station]]]] |
||
The {{convert|13.1|km|abbr=on}} line, consisting of 12 stations (all elevated), and connecting the districts [[Dong Da]], [[Thanh Xuan]] and [[Hà Đông District|Ha Dong]], will be the first operational line in the metro system. This line is constructed using [[Official Development Assistance]] (ODA) from [[China]] with a total investment of US$868 million. The China Railway Sixth Group is the [[Engineering, procurement, and construction|EPC]] (Engineering, Procurement and Construction) contractor for the project, and the [[Ministry of Transport (Vietnam)]] is an investor.<ref name=hoai |
The {{convert|13.1|km|abbr=on}} line, consisting of 12 stations (all elevated), and connecting the districts [[Dong Da]], [[Thanh Xuan]] and [[Hà Đông District|Ha Dong]], will be the first operational line in the metro system. This line is constructed using [[Official Development Assistance]] (ODA) from [[China]] with a total investment of US$868 million. The China Railway Sixth Group is the [[Engineering, procurement, and construction|EPC]] (Engineering, Procurement and Construction) contractor for the project, and the [[Ministry of Transport (Vietnam)]] is an investor.<ref name=hoai/><ref name=zhao/> |
||
The construction was started on 10 October 2011 and was initially targeted to begin operations in 2016. In 2016, it was announced that the completion date was to be pushed back to early 2018. However, due to funding and land acquisition issues, construction wasn't completed until September 2018.<ref>{{Cite web|url=http://hanoitimes.com.vn/economy/construction/2017/02/81E0AE73/hanoi-cat-linh-ha-dong-elevated-railway-to-be-tested-in-october/|title=Test ride of metro line 2A Cat Linh - Ha Dong}}</ref> Following completion, the pilot run and testing was conducted from September to December 2018. Line 2A was scheduled to commence operations in February 2019, before the holidays of Lunar New Year,<ref>{{cite news|author1=Đoàn Loan|title=Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng|url=https://vnexpress.net/tin-tuc/thoi-su/giao-thong/duong-sat-cat-linh-ha-dong-co-the-cham-tien-do-them-11-thang-3682813.html#ctr=box_morelink_thoisu_env_4_click|access-date=7 January 2018|work=VnExpress.net|location=Hà Nội|publisher=Bộ Khoa học Công nghệ|date=11 December 2017|language=vi}}</ref> but was postponed for the sixth time as some station construction works remained incomplete. Transport Minister Nguyen Van The had hopes that operations would begin in April 2019. |
The construction was started on 10 October 2011 and was initially targeted to begin operations in 2016. In 2016, it was announced that the completion date was to be pushed back to early 2018. However, due to funding and land acquisition issues, construction wasn't completed until September 2018.<ref>{{Cite web|url=http://hanoitimes.com.vn/economy/construction/2017/02/81E0AE73/hanoi-cat-linh-ha-dong-elevated-railway-to-be-tested-in-october/|title=Test ride of metro line 2A Cat Linh - Ha Dong}}</ref> Following completion, the pilot run and testing was conducted from September to December 2018. Line 2A was scheduled to commence operations in February 2019, before the holidays of Lunar New Year,<ref>{{cite news|author1=Đoàn Loan|title=Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng|url=https://vnexpress.net/tin-tuc/thoi-su/giao-thong/duong-sat-cat-linh-ha-dong-co-the-cham-tien-do-them-11-thang-3682813.html#ctr=box_morelink_thoisu_env_4_click|access-date=7 January 2018|work=VnExpress.net|location=Hà Nội|publisher=Bộ Khoa học Công nghệ|date=11 December 2017|language=vi}}</ref> but was postponed for the sixth time as some station construction works remained incomplete. Transport Minister Nguyen Van The had hopes that operations would begin in April 2019. |
||
Line 112: | Line 117: | ||
On 30 April 2019, a representative from the Railway Project Management Board informed the press that the line was not yet operational, the reason stated being that the system had not yet been issued with a safety certificate and it had not been accepted by the State Acceptance Council. By the deadline of 30 April 2019, the General Chinese Contractor had not completed some stations, depot areas, escalator roofs for stations, drainage connections for Ring Road Station 3, landscaping, trees, electricity and ticketing systems.<ref>{{Cite web|url=https://www.rfa.org/vietnamese/news/vietnamnews/chinese-invested-metro-delayed-10th-times-04302019080038.html|title=Đường sắt Cát Linh – Hà Đông lùi tiến độ lần thứ 10|website=Radio Free Asia|language=vi|access-date=4 June 2019}}</ref> |
On 30 April 2019, a representative from the Railway Project Management Board informed the press that the line was not yet operational, the reason stated being that the system had not yet been issued with a safety certificate and it had not been accepted by the State Acceptance Council. By the deadline of 30 April 2019, the General Chinese Contractor had not completed some stations, depot areas, escalator roofs for stations, drainage connections for Ring Road Station 3, landscaping, trees, electricity and ticketing systems.<ref>{{Cite web|url=https://www.rfa.org/vietnamese/news/vietnamnews/chinese-invested-metro-delayed-10th-times-04302019080038.html|title=Đường sắt Cát Linh – Hà Đông lùi tiến độ lần thứ 10|website=Radio Free Asia|language=vi|access-date=4 June 2019}}</ref> |
||
After multiple delays, the trial run was restarted on 28 October 2019, to last for 20 days. Beginning in December 2020, Line 2A underwent a full-scale test run in order to check its safety before approval for commercial service. Line 2A opened to the public on 6 Nov 2021.<ref name=vnexpress |
After multiple delays, the trial run was restarted on 28 October 2019, to last for 20 days. Beginning in December 2020, Line 2A underwent a full-scale test run in order to check its safety before approval for commercial service. Line 2A opened to the public on 6 Nov 2021.<ref name=vnexpress/> |
||
=== |
=== Line 3: Nhon - Hanoi Station Section === |
||
[[File:Line 3 of Hanoi Metro passing over Xuan Thuy road, viewed from above.jpg|thumb|300px|Line 3 passing over Xuan Thuy road, viewed from above]] |
|||
[[File:Hanoi Metro line 3 in Minh Khai Station.jpg|thumb|Line 3 under construction in 2016]] |
|||
The Hanoi Metro Rail System Project (Line 3: Nhon - [[Hanoi Railway Station|Hanoi Station]] section) is in line with the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016). The project has the Hanoi Metropolitan Railway Management Board, French government, [[Asian Development Bank]], and [[European Investment Bank]] as the investors, and will be built in two phases. Phase 1 is {{convert|12.5|km|abbr=on}} long in total and consists of 12 stations,<ref>{{Cite web|url=https://www.adb.org/projects/40080-013/main|title=Ha Noi Metro Rail System Project (Line 3: Nhon-Ha Noi Station Section)|date=10 December 2015}}</ref> with {{convert|8.5|km|abbr=on}} elevated and {{convert|4|km|abbr=on}} underground, and will serve residents from districts such as [[Nam Từ Liêm district|Nam Tu Liem]], [[Bắc Từ Liêm district|Bac Tu Liem]], [[Cau Giay]], [[Ba Đình District|Ba Dinh]], [[Dong Da]], and [[Hoan Kiem]]. |
The Hanoi Metro Rail System Project (Line 3: Nhon - [[Hanoi Railway Station|Hanoi Station]] section) is in line with the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016). The project has the Hanoi Metropolitan Railway Management Board, French government, [[Asian Development Bank]], and [[European Investment Bank]] as the investors, and will be built in two phases. Phase 1 is {{convert|12.5|km|abbr=on}} long in total and consists of 12 stations,<ref>{{Cite web|url=https://www.adb.org/projects/40080-013/main|title=Ha Noi Metro Rail System Project (Line 3: Nhon-Ha Noi Station Section)|date=10 December 2015}}</ref> with {{convert|8.5|km|abbr=on}} elevated and {{convert|4|km|abbr=on}} underground, and will serve residents from districts such as [[Nam Từ Liêm district|Nam Tu Liem]], [[Bắc Từ Liêm district|Bac Tu Liem]], [[Cau Giay]], [[Ba Đình District|Ba Dinh]], [[Dong Da]], and [[Hoan Kiem]]. |
||
Construction for Line 3 began in 2010 and was initially targeted to commence service in 2018. However, in 2017, it was announced that the construction would not be complete until 2021, and that the operation start was deferred to 2022. In July 2018, the Hanoi Metropolitan Railway Management Board (MRB) announced that only 43% of the work for Line 3 had been completed, and the launch date of elevated section would most likely be delayed until early 2023. |
Construction for Line 3 began in 2010 and was initially targeted to commence service in 2018. However, in 2017, it was announced that the construction would not be complete until 2021, and that the operation start was deferred to 2022. In July 2018, the Hanoi Metropolitan Railway Management Board (MRB) announced that only 43% of the work for Line 3 had been completed, and the launch date of elevated section would most likely be delayed until early 2023. However, in September 2022, the authorities requested to extend the deadline to 2025,<ref>{{cite web |title=Hanoi 2nd metro line likely to be delayed by 5 years - VnExpress International |url=https://e.vnexpress.net/news/news/hanoi-2nd-metro-line-likely-to-be-delayed-by-5-years-4510624.html}}</ref> and increase the budget by a further VND1.9 trillion ($80.77m USD). The line was further delayed in September 2022 when the authorities announced that they expected the line to fully open in 2027.<ref>{{Cite web |url=https://vnexpress.net/metro-nhon-ga-ha-noi-du-kien-van-hanh-doan-tren-cao-dip-30-4-4677730.html|title=Metro Nhổn - ga Hà Nội dự kiến vận hành đoạn trên cao dịp 30/4|access-date=2023-11-16 |archive-url=https://web.archive.org/web/20231119233502/https://vnexpress.net/metro-nhon-ga-ha-noi-du-kien-van-hanh-doan-tren-cao-dip-30-4-4677730.html|archive-date=2023-11-19|url-status=live}}</ref> |
||
== Future plans == |
== Future plans == |
||
[[File:Hanoi metro Future - geo.png|thumb|center| |
[[File:Hanoi metro Future - geo.png|thumb|center|200px]] |
||
{| class="wikitable sortable" |
{| class="wikitable sortable" |
||
|- |
|- |
||
!colspan="9"|Planning and |
!colspan="9"|Planning and future lines |
||
|- |
|- |
||
!| Line |
!| Line |
||
!| Alternate name |
|||
!| Symbol |
|||
!| Line number |
|||
!| Line name |
|||
!| Route |
!| Route |
||
! Length (km) |
! Length (km) |
||
Line 137: | Line 139: | ||
! Depots |
! Depots |
||
|- |
|- |
||
| style=" |
| style="text-align:center;" rowspan=2 | {{ric|Hanoi Metro|1|size=40}} |
||
| rowspan=2 | Long Biên Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|L|Line 1, Hanoi Metro|#B22222|white}}}} |
|||
| [[Yên Viên railway station|Yên Viên]] ↔ [[Ngọc Hồi Station|Ngọc Hồi]] |
|||
| Line 1 |
|||
| style="text-align:center;" | {{convert|26|km|1|abbr=on}} |
|||
| Long Biên Line (L) |
|||
| pending budget approval<br>(opens in 2030) |
|||
| [[Yên Viên railway station|Yên Viên]]/Dương Xá - [[Long Biên]] - [[Hanoi railway station]] - Ngọc Hồi |
|||
| style="text-align:center;" | |
| style="text-align:center;" | 16 |
||
| Yên Viên<br>Ngọc Hồi |
|||
| final planning |
|||
|- |
|||
| style="text-align:center;" | 23 |
|||
| |
| Dương Xá ↔ [[Gia Lâm station|Gia Lâm]] |
||
| style="text-align:center;" | {{convert|10|km|1|abbr=on}} |
|||
| initial planning |
|||
| style="text-align:center;" | 7 |
|||
| Dương Xá |
|||
|- |
|||
| style="text-align:center;" rowspan=4 | {{ric|Hanoi Metro|2|size=40}} |
|||
| rowspan=4 | Hoàn Kiếm Line |
|||
| [[Noi Bai International Airport]] ↔ Nam Thăng Long |
|||
| style="text-align:center;" | {{convert|18|km|4=1|abbr=on}} |
|||
| pending budget approval |
|||
| {{N/A}} |
|||
| rowspan=4 | Xuân Đỉnh<br>Phủ Lỗ |
|||
|- |
|||
| Nam Thăng Long ↔ Trần Hưng Đạo |
|||
| style="text-align:center;" | {{convert|11.5|km|4=1|abbr=on}} |
|||
| land clearance |
|||
| style="text-align:center;" | 10 |
|||
|- |
|||
| Trần Hưng Đạo ↔ {{stn|Thượng Đình}} |
|||
| style="text-align:center;" | {{convert|6|km|4=1|abbr=on}} |
|||
| pending budget approval |
|||
| style="text-align:center;" | 6 |
|||
|- |
|||
| {{stn|Thượng Đình}} ↔ Hoàng Quốc Việt |
|||
| style="text-align:center;" | {{convert|7|km|4=1|abbr=on}} |
|||
| initial planning |
|||
| {{N/A}} |
|||
|- |
|||
| style="text-align:center;" | {{ric|Hanoi Metro|2A|size=40}} |
|||
| Cát Linh Line |
|||
| {{stn|Yên Nghĩa}} ↔ Xuân Mai |
|||
| style="text-align:center;" | ... |
|||
| initial planning |
|||
| {{N/A}} |
|||
| {{N/A}} |
|||
|- |
|||
| style="text-align:center;" rowspan=2 | {{ric|Hanoi Metro|3|size=40}} |
|||
| rowspan=2 | Văn Miếu Line |
|||
| Trôi ↔ {{stn|Nhổn}} |
|||
| style="text-align:center;" | {{convert|36|km|4=1|abbr=on}} |
|||
| initial planning |
|||
| {{N/A}} |
|||
| {{N/A}} |
|||
|- |
|- |
||
| {{stn|Hanoi}} ↔ Yên Sở (Hoàng Mai) |
|||
| style="background:#074C8C;"| {{Color|white|blue}} |
|||
| style="text-align:center;" | {{ |
| style="text-align:center;" | {{convert|8.8|km|4=1|abbr=on}} |
||
| Line 2 |
|||
| Hoàn Kiếm Line (H) |
|||
| [[Noi Bai International Airport]] - [[Nhật Tân Bridge]] - Hoàng Hoa Thám - [[Hoàn Kiếm Lake]] - Hàng Bài - Đại Cồ Việt - Thuợng Đình |
|||
| style="text-align:center;" | {{convert|42|km|4=1|abbr=on}} |
|||
| pending budget approval |
| pending budget approval |
||
| style="text-align:center;" | |
| style="text-align:center;" | 7 |
||
| Yên Sở |
|||
| Xuân Đỉnh, Phủ Lỗ |
|||
|- |
|- |
||
| style=" |
| style="text-align:center;" | {{ric|Hanoi Metro|4|size=40}} |
||
| Thăng Long Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|T|Line 4, Hanoi Metro|#FF8C00|white}}}} |
|||
| (circular line) Mê Linh ↔ Liên Hà |
|||
| Line 4 |
|||
| Thăng Long Line (T) |
|||
| (circular line) [[Mê Linh district|Mê Linh]] - [[Đông Anh]] - [[Sài Đồng]] - [[Vĩnh Tuy]] - Ring road 2.5 - [[Cổ Nhuế]] - Liên Hà |
|||
| style="text-align:center;" | {{convert|54|km|4=1|abbr=on}} |
| style="text-align:center;" | {{convert|54|km|4=1|abbr=on}} |
||
| initial planning |
| initial planning |
||
| style="text-align:center;" | 41 |
| style="text-align:center;" | 41 |
||
| Liên Hà |
| Liên Hà<br>Đại Mạch |
||
|- |
|- |
||
| style=" |
| style="text-align:center;" | {{ric|Hanoi Metro|5|size=40}} |
||
| Kim Mã Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|K|Line 5, Hanoi Metro|#FFD700|white}}}} |
|||
| Văn Cao ↔ Hòa Lạc |
|||
| Line 5 |
|||
| style="text-align:center;" | {{convert|38.4|km|4=1|abbr=on}} |
|||
| Kim Mã Line (K) |
|||
| pending budget approval |
|||
| South [[Tây Hồ]] - Ngọc Khánh - Thăng Long Boulevard Expressway - An Khánh - Ring road 4 - Hoà Lạc |
|||
| style="text-align:center;" | |
| style="text-align:center;" | 21 |
||
| Sơn Đồng<br>Yên Bình |
|||
| initial planning |
|||
| style="text-align:center;" | 17 |
|||
| Sơn Đồng, Hoà Lạc |
|||
|- |
|- |
||
| style=" |
| style="text-align:center;" | {{ric|Hanoi Metro|6|size=40}} |
||
| Nội Bài Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|N|Line 6, Hanoi Metro|#A9A9A9|white}}}} |
|||
| [[Noi Bai Airport]] ↔ Ngọc Hồi |
|||
| Line 6 |
|||
| Nội Bài Line (N) |
|||
| [[Noi Bai Airport]] - Phú Diễn - [[Hà Đông District|Hà Đông]] - Ngọc Hồi |
|||
| style="text-align:center;" | {{convert|43|km|4=1|abbr=on}} |
| style="text-align:center;" | {{convert|43|km|4=1|abbr=on}} |
||
| |
| research planning |
||
| style="text-align:center;" | 29 |
| style="text-align:center;" | 29 |
||
| Ngọc Hồi |
| Ngọc Hồi<br>Kim Mỗ |
||
|- |
|- |
||
| style=" |
| style="text-align:center;" | {{ric|Hanoi Metro|7|size=40}} |
||
| Hà Đông Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|A|Line 7, Hanoi Metro|#ef5ba1|white}}}} |
|||
| Mê Linh ↔ Dương Nội |
|||
| Line 7 |
|||
| Hà Đông Line (A) |
|||
| [[Mê Linh District|Mê Linh]] - Nhổn - Vân Canh - Dương Nội - Hà Đông |
|||
| style="text-align:center;" | {{convert|28|km|4=1|abbr=on}} |
| style="text-align:center;" | {{convert|28|km|4=1|abbr=on}} |
||
| initial planning |
| initial planning |
||
| style="text-align:center;" | 23 |
| style="text-align:center;" | 23 |
||
| Mê Linh |
| Mê Linh |
||
|- |
|- |
||
| style=" |
| style="text-align:center;" | {{ric|Hanoi Metro|8|size=40}} |
||
| Mỹ Đình Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|M|Line 8, Hanoi Metro|#4F079B|white}}}} |
|||
| Sơn Đồng ↔ Mai Dịch ↔ Dương Xá |
|||
| Line 8 |
|||
| Mỹ Đình Line (M) |
|||
| Sơn Đồng - Mai Dịch - Ring road 3 - Lĩnh Nam - Dương Xá |
|||
| style="text-align:center;" | {{convert|37|km|4=1|abbr=on}} |
| style="text-align:center;" | {{convert|37|km|4=1|abbr=on}} |
||
| pending budget approval |
|||
| initial planning |
|||
| style="text-align:center;" | 26 |
| style="text-align:center;" | 26 |
||
| Sơn Đồng |
| Sơn Đồng<br>Cổ Bì |
||
|- |
|- |
||
| style=" |
| style="text-align:center;" | {{ric|Hanoi Metro|9|size=40}} |
||
| Sơn Tây Line |
|||
| style="text-align:center;" | {{large|{{RouteBox|S|Line 9, Hanoi Metro|SaddleBrown|white}}}} |
|||
| Sơn Tây ↔ Hoà Lạc ↔ Xuân Mai |
|||
| Line 9 |
|||
| {{N/A}} |
|||
| Sơn Tây Line (S) |
|||
| Sơn Tây - Hoà Lạc - Xuân Mai |
|||
| style="text-align:center;" | |
|||
| initial planning |
| initial planning |
||
| {{N/A}} |
|||
| style="text-align:center;" | |
|||
| Sơn Tây |
| Sơn Tây<br>Xuân Mai |
||
|- |
|||
| style="text-align:center;" | [[File:Hanoi Metro Monorail 1.svg|40px|link=Monorail 1 (Hanoi Metro)|alt=Hanoi Metro Monorail 1]] |
|||
| {{N/A}} |
|||
| Liên Hà ↔ Tân Lập ↔ An Khánh |
|||
| style="text-align:center;" | {{convert|11|km|4=1|abbr=on}} |
|||
| initial planning |
|||
| {{N/A}} |
|||
| {{N/A}} |
|||
|- |
|||
| style="text-align:center;" | [[File:Hanoi Metro Monorail 2.svg|40px|link=Monorail 2 (Hanoi Metro)|alt=Hanoi Metro Monorail 2]] |
|||
| {{N/A}} |
|||
| Giáp Bát ↔ Thanh Liệt ↔ Phú Lương<br>Mai Dịch ↔ Mỹ Đình ↔ Văn Mỗ ↔ Phúc La |
|||
| style="text-align:center;" | {{convert|22|km|4=1|abbr=on}} |
|||
| initial planning |
|||
| {{N/A}} |
|||
| {{N/A}} |
|||
|- |
|||
| style="text-align:center;" | [[File:Hanoi Metro Monorail 3.svg|40px|link=Monorail 3 (Hanoi Metro)|alt=Hanoi Metro Monorail 3]] |
|||
| {{N/A}} |
|||
| Nam Hồng ↔ Mê Linh ↔ Đại Thịnh |
|||
| style="text-align:center;" | {{convert|11|km|4=1|abbr=on}} |
|||
| initial planning |
|||
| {{N/A}} |
|||
| {{N/A}} |
|||
|} |
|} |
||
(Source: <ref>[[:vi:Đường sắt đô thị Hà Nội]]</ref> except for some numbers here) |
|||
=== Progress === |
=== Progress === |
||
'''Line 1 (Long Biên |
'''Line 1 (Long Biên Line): Ngọc Hồi - Gia Lâm (Phase 1) (Yên Viên - Ngọc Hồi)''' |
||
The Ngọc Hồi - Gia Lâm section of Metro Line 1 is {{convert|15.4|km|4=|abbr=on}} long and elevated (including {{convert|8.9|km|4=1|abbr=on}} elevated, {{convert|1.7|km|4=1|abbr=on}} km bridge and {{convert|4.8|km|4=1|abbr=on}} on surface). The line has the Railway Project Management Unit (RPMU) as its investor and Ministry of Transport as [[project owner]]. Its budget is from Japanese ODA. Currently it is in the detailed design phase. |
The Ngọc Hồi - Gia Lâm section of Metro Line 1 is {{convert|15.4|km|4=|abbr=on}} long and elevated (including {{convert|8.9|km|4=1|abbr=on}} elevated, {{convert|1.7|km|4=1|abbr=on}} km bridge and {{convert|4.8|km|4=1|abbr=on}} on surface). The line has the Railway Project Management Unit (RPMU) as its investor and Ministry of Transport as [[project owner]]. Its budget is from Japanese ODA. Currently it is in the detailed design phase. |
||
Furthermore, Ministry of Transportation has reported to National Assembly that the ministry has transferred the railway section from Yên Viên to Ngọc Hồi including Hà Nội railway station and Giáp Bát railway station to Hanoi People's Committee to implement Hanoi urban railway line (AKA Long Biên line) to feed the future North-South High Speed train since there will be a construction of the Northern terminus (AKA the Hà Nội High Speed train station which will be functioned as the new Hà Nội railway station) of North-South High Speed train at Ngọc Hồi on 151 hectares of land.<ref>{{cite news|author1=Mai Hà|title=Xin Bộ Chính trị chủ trương đầu tư đường sắt tốc độ cao Bắc - Nam|url=https://thanhnien.vn/xin-bo-chinh-tri-chu-truong-dau-tu-duong-sat-toc-do-cao-bac-nam-post1467177.html|access-date=18 August 2022|work=Thanh niên Online|date=9 June 2022|language=vi}}</ref><ref>{{cite news|title=Ga Hà Nội, Giáp Bát sẽ chuyển đổi để làm đường sắt Yên Viên - Ngọc Hồi|url=https://vov.vn/xa-hoi/tin-24h/ga-ha-noi-giap-bat-se-chuyen-doi-de-lam-duong-sat-yen-vien-ngoc-hoi-post964137.vov|access-date=18 August 2022|work=VOV Online|date=18 August 2022|language=vi}}</ref><ref>{{cite news|author1=Anh Tú |
Furthermore, Ministry of Transportation has reported to National Assembly that the ministry has transferred the railway section from Yên Viên to Ngọc Hồi including Hà Nội railway station and Giáp Bát railway station to Hanoi People's Committee to implement Hanoi urban railway line (AKA Long Biên line) to feed the future North-South High Speed train since there will be a construction of the Northern terminus (AKA the Hà Nội High Speed train station which will be functioned as the new Hà Nội railway station) of North-South High Speed train at Ngọc Hồi on 151 hectares of land.<ref>{{cite news|author1=Mai Hà|title=Xin Bộ Chính trị chủ trương đầu tư đường sắt tốc độ cao Bắc - Nam|url=https://thanhnien.vn/xin-bo-chinh-tri-chu-truong-dau-tu-duong-sat-toc-do-cao-bac-nam-post1467177.html|access-date=18 August 2022|work=Thanh niên Online|date=9 June 2022|language=vi}}</ref><ref>{{cite news|title=Ga Hà Nội, Giáp Bát sẽ chuyển đổi để làm đường sắt Yên Viên - Ngọc Hồi|url=https://vov.vn/xa-hoi/tin-24h/ga-ha-noi-giap-bat-se-chuyen-doi-de-lam-duong-sat-yen-vien-ngoc-hoi-post964137.vov|access-date=18 August 2022|work=VOV Online|date=18 August 2022|language=vi}}</ref><ref>{{cite news|author1=Anh Tú|title="Chốt" di dời ga Hà Nội, ga Giáp Bát để làm metro Yên Viên - Ngọc Hồi|url=https://vneconomy.vn/chot-di-doi-ga-ha-noi-ga-giap-bat-de-lam-metro-yen-vien-ngoc-hoi.htmv|access-date=19 August 2022|work=VnEconomy|date=18 August 2022|language=vi}}{{Dead link|date=July 2024 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> |
||
<ref>{{cite news|author1=Doan Loan |title=Hanoi train station infrastructure to be relocated for metro project|url=https://e.vnexpress.net/news/news/hanoi-train-station-infrastructure-to-be-relocated-for-railway-project-4501297.html|access-date=18 August 2022|work=VnExpress|date=22 August 2022|language=en}}</ref> |
<ref>{{cite news|author1=Doan Loan |title=Hanoi train station infrastructure to be relocated for metro project|url=https://e.vnexpress.net/news/news/hanoi-train-station-infrastructure-to-be-relocated-for-railway-project-4501297.html|access-date=18 August 2022|work=VnExpress|date=22 August 2022|language=en}}</ref> |
||
The line will be completed in 3 phases: |
The line will be completed in 3 phases: |
||
Line 229: | Line 283: | ||
* Phase 2: Gia Lâm - Yên Viên (13.3 km) |
* Phase 2: Gia Lâm - Yên Viên (13.3 km) |
||
* Phase 3: Gia Lâm - Dương Xá (10 km) |
* Phase 3: Gia Lâm - Dương Xá (10 km) |
||
The first 2 phases of Line 1 will have 16 stations: [[Yên Viên railway station|Yên Viên]], Cầu Đuống, Đức Giang, [[Gia Lâm station|Gia Lâm]], Long Biên North, Long Biên South, Phùng Hưng, {{stn|Hanoi}}, Thống Nhất Park, Bạch Mai, Phương Liệt, Giáp Bát, Hoàng Liệt, Văn Điển, Vĩnh Quỳnh, Ngọc Hồi |
|||
'''Line 2 (Hoan Kiem |
'''Line 2 (Hoan Kiem Line): Nam Thăng Long - Trần Hưng Đạo (Phase 1) (Noi Bai Airport - Nam Thăng Long - Trần Hưng Đạo - Thượng Đình - Hoàng Quốc Việt)''' |
||
This section is 42 km in length, connecting Noi Bai Airport with the city center. There will be 32 stations and 2 depots. The 4 phases of the project are: |
This section is 42 km in length, connecting Noi Bai Airport with the city center. There will be 32 stations and 2 depots. The 4 phases of the project are: |
||
* Phase 1: Nam |
* Phase 1: Nam Thăng Long - Trần Hưng Đạo: 11.5 km long, of which 8.9 km are underground and 2.6 km are elevated. It consists of 10 stations including 7 underground, 3 elevated and 1 depot. The project owner is Hanoi Metropolitan Railway Management Board. The project will be funded by Japanese ODA. At present cost estimate is pending to be approved.<br><br>This phase will have 10 stations: Nam Thăng Long, Ngoại Giao Đoàn, Tây Hồ Tây, Bưởi, Quần Ngựa, Bách Thảo, Hồ Tây, Hàng Đậu, Hoàn Kiếm Lake, Trần Hưng Đạo |
||
* Phase 2: |
* Phase 2: Trần Hưng Đạo - Thượng Đình: 5.9 km long, fully underground and now is at feasibility study phase.<br><br>This phase will have 6 other stations after Trần Hưng Đạo: Cầu Dền, Bách Khoa, Kim Liên, Chùa Bộc, Ngã Tư Sở, {{stn|Thượng Đình}}. |
||
* Phase 3: |
* Phase 3: Thượng Đình - Ring road 2.5 - Hoàng Quốc Việt |
||
* Phase 4: |
* Phase 4: Nội Bài Airport - Nam Thang Long: 12.5 km long |
||
'''Line 4 (Thang Long |
'''Line 4 (Thang Long Line): Me Linh - Dong Anh - Hoang Mai - Ring road 2.5 - Co Nhue - Lien Ha''' |
||
Line 4 is the longest out of 8 lines, with 41 stations and 2 depots. It will work as a loop line that takes into account connections with lines 1, 2A, 3, 5, 6 and 7. |
|||
'''Line 5 (Kim Ma |
'''Line 5 (Kim Ma Line): South West Lake - Hoa Lac - Ba Vi (Văn Cao - Hòa Lạc)''' |
||
In 2012, the project was expected to start in 2017 but the commencement date has now been postponed. It will be 38.4 km long with 17 stations and 2 depots. Right now feasibility study is carried out by the [[Japan International Cooperation Agency]] (JICA). Its project owner is the Hanoi Metropolitan Railway Management Board. 2 phases are: |
In 2012, the project was expected to start in 2017 but the commencement date has now been postponed. It will be 38.4 km long with 17 stations and 2 depots. Right now feasibility study is carried out by the [[Japan International Cooperation Agency]] (JICA). Its project owner is the Hanoi Metropolitan Railway Management Board. 2 phases are: |
||
Line 248: | Line 303: | ||
* Phase 2: An Khanh - Ba Vi: 24.1 km with 7 stations |
* Phase 2: An Khanh - Ba Vi: 24.1 km with 7 stations |
||
'''Line 6 (Noi Bai |
'''Line 6 (Noi Bai Line): Noi Bai Airport - Phu Dien - Ha Dong - [[Ngọc Hồi Station|Ngoc Hoi]]''' |
||
Line 6's total length is {{convert|43|km|4=|abbr=on}} with 29 stations and 2 depots. The route runs mainly on the current national track system, connecting the southern districts to the northern ones and Noi Bai airport (T2 terminal). |
|||
'''Line 7 (Ha Dong |
'''Line 7 (Ha Dong Line): Me Linh - Nhon - Van Canh - Duong Noi''' |
||
Line 7 is 27.6 km long with 23 stations and 1 depot at Me Linh. The route runs in the north to the south, connecting Me Linh urban area to urban area series in the midst of ring roads 3 and 4 and downtown in the west of Hanoi. |
|||
'''Line 8 (My Dinh |
'''Line 8 (My Dinh Line): Son Dong - Mai Dich - Linh Nam - Duong Xa''' |
||
Line 8 is {{convert|37.4|km|4=|abbr=on}} long with 26 stations and 2 depots. The underground section is from Mai Dich to Linh Nam, and elevated sections are 2 parts: Son Dong to Mai Dich and Linh Nam to Duong Xa. |
|||
== Rolling stock == |
== Rolling stock == |
||
Line 268: | Line 323: | ||
Each train will consist of 4 carriages, with capacity for over 1,200 passengers. Each carriage weighs around {{Convert|35|t}}, is {{convert|19|m|ftin|1|abbr=}} long, {{convert|3.8|m|ftin|1|abbr=}} high, and {{convert|2.8|m|ftin||abbr=}} wide. The first train arrived in Hanoi in March 2017 via the port of [[Hai Phong]]. The [[CRRC]] supplied a total of 13 four-car train-sets in 2018, which are all currently stabled at a depot at [[Phu Luong]], east of Yen Nghia.<ref>{{cite news|author1=Tuắn Phùng|title=Hình ảnh đoàn tàu đầu tiên tuyến đường sắt Cát Linh - Hà Đông|url=http://tuoitre.vn/tin/chinh-tri-xa-hoi/20170219/hinh-anh-doan-tau-dau-tien-tuyen-duong-sat-cat-linh-ha-dong/1267414.html|access-date=3 August 2017|work=Tuổi Trẻ|publisher=Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh|date=19 February 2017|language=vi}}</ref> Trains are powered by a 750 V third rail, a first for Vietnam. |
Each train will consist of 4 carriages, with capacity for over 1,200 passengers. Each carriage weighs around {{Convert|35|t}}, is {{convert|19|m|ftin|1|abbr=}} long, {{convert|3.8|m|ftin|1|abbr=}} high, and {{convert|2.8|m|ftin||abbr=}} wide. The first train arrived in Hanoi in March 2017 via the port of [[Hai Phong]]. The [[CRRC]] supplied a total of 13 four-car train-sets in 2018, which are all currently stabled at a depot at [[Phu Luong]], east of Yen Nghia.<ref>{{cite news|author1=Tuắn Phùng|title=Hình ảnh đoàn tàu đầu tiên tuyến đường sắt Cát Linh - Hà Đông|url=http://tuoitre.vn/tin/chinh-tri-xa-hoi/20170219/hinh-anh-doan-tau-dau-tien-tuyen-duong-sat-cat-linh-ha-dong/1267414.html|access-date=3 August 2017|work=Tuổi Trẻ|publisher=Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh|date=19 February 2017|language=vi}}</ref> Trains are powered by a 750 V third rail, a first for Vietnam. |
||
[[File:Cửa tàu - Tuyến 2A - Metro Hanoi.jpg|thumb|300px|Inside |
[[File:Cửa tàu - Tuyến 2A - Metro Hanoi.jpg|thumb|300px|Inside line 2A train]] |
||
The trains' exteriors are painted green, and the seal of the Hanoi [[Temple of Literature, Hanoi|Temple of Literature]], which is the symbol Khue Van of Hanoi, is shown on the front of the train, and the line name “Cat Linh - Ha Dong” is displayed along the bottom in white. A small LED screen is place at the left top corner to show the name of the line. |
The trains' exteriors are painted green, and the seal of the Hanoi [[Temple of Literature, Hanoi|Temple of Literature]], which is the symbol Khue Van of Hanoi, is shown on the front of the train, and the line name “Cat Linh - Ha Dong” is displayed along the bottom in white. A small LED screen is place at the left top corner to show the name of the line. |
||
===Line 3: Alstom trains=== |
===Line 3: Alstom trains=== |
||
[[File:Controller cabin of Line 3, Hanoi Metro.jpg|thumb|300px|Controller cabin of line 3 train]] |
|||
On 17 January 2017, Hanoi Metro Company signed a contract with French locomotive manufacturer [[Alstom]] to supply the rolling stock for Line 3, which will come from its [[Alstom Metropolis]] series. The current order is for 10 train sets, costing around US$128 million. The trains features an [[air-conditioning system]], speakers, automatic [[LED lights]]. The interior is [[wheelchair accessible]], and also includes dedicated space and seating for senior citizens. Each train can carry 950 passengers.<ref name=hung>{{cite news|author1=Việt Hùng|author2=Trọng Đảng|title=Năm 2021, Hà Nội có tàu điện ngầm|url=http://www.tienphong.vn/xa-hoi/nam-2021-ha-noi-co-tau-dien-ngam-1113425.tpo|access-date=3 August 2017|work=Tiền Phong|publisher=Đoàn Thanh niên Cộng sản Hồ Chí Minh|date=18 January 2017|language=vi}}</ref> First four-car trains were shipped from the port of [[Dunkirk]], on 9 September 2020.<ref>{{Cite web|url=https://www.railjournal.com/fleet/alstom-ships-first-train-for-hanoi-metro/|title=Alstom ships first train for Hanoi metro|date=14 September 2020}}</ref> |
On 17 January 2017, Hanoi Metro Company signed a contract with French locomotive manufacturer [[Alstom]] to supply the rolling stock for Line 3, which will come from its [[Alstom Metropolis]] series. The current order is for 10 train sets, costing around US$128 million. The trains features an [[air-conditioning system]], speakers, automatic [[LED lights]]. The interior is [[wheelchair accessible]], and also includes dedicated space and seating for senior citizens. Each train can carry 950 passengers.<ref name=hung>{{cite news|author1=Việt Hùng|author2=Trọng Đảng|title=Năm 2021, Hà Nội có tàu điện ngầm|url=http://www.tienphong.vn/xa-hoi/nam-2021-ha-noi-co-tau-dien-ngam-1113425.tpo|access-date=3 August 2017|work=Tiền Phong|publisher=Đoàn Thanh niên Cộng sản Hồ Chí Minh|date=18 January 2017|language=vi}}</ref> First four-car trains were shipped from the port of [[Dunkirk]], on 9 September 2020.<ref>{{Cite web|url=https://www.railjournal.com/fleet/alstom-ships-first-train-for-hanoi-metro/|title=Alstom ships first train for Hanoi metro|date=14 September 2020}}</ref> |
||
Line 284: | Line 339: | ||
=== Line 2A Fares and ticketing === |
=== Line 2A Fares and ticketing === |
||
The price of the tickets for the Cat Linh-Ha Dong metro, with the lowest one being VND 8,000 (USD 0. |
The price of the tickets for the Cat Linh-Ha Dong metro, with the lowest one being VND 8,000 (USD 0.32) for a short trip, VND 15,000 (USD 0.60) for a longest trip, and VND 30,000 (USD 1.2) for a day pass. |
||
=== Line 3 Fares and ticketing === |
|||
A monthly pass for a common passenger is priced at VND 200,000 (USD 8.78). |
|||
The price of the tickets for the Nhon-Ha Noi station metro, with the lowest one being VND 8,000 (USD 0.32) for a short trip, VND 12,000 (USD 0.48) for a longest trip, and VND 24,000 (USD 0.96) for a day pass. |
|||
=== Monthly pass and others === |
|||
==Network map== |
|||
- A monthly pass for a common passenger is priced at VND 200,000 (USD 8.78), for a group of more than 30 people is priced at VND 140,000(USD 5.61)/person. |
|||
{{Rapid transit OSM map |
|||
- A monthly pass for a student/worker in industrial park is priced at VND 100,000(USD 4.00) |
|||
|system_qid = Q1934701 |
|||
- Children(under 6), old people(over 60), disabled people and registered poor people get a free pass. |
|||
|frame-lat = 21.00 |
|||
|frame-long = 105.80 |
|||
|frame-height = 400 |
|||
|frame-width = 550 |
|||
|zoom = 11 |
|||
}} |
|||
== See also == |
== See also == |
||
Line 309: | Line 360: | ||
==External links== |
==External links== |
||
*{{commons category-inline|Hanoi Metro}} |
*{{commons category-inline|Hanoi Metro}} |
||
*{{Official website|1=https://hanoimetro.net.vn/en |
*{{Official website|1=https://hanoimetro.net.vn/}} {{in lang|vi|en}} |
||
{{Vietnam rapid transit}} |
{{Vietnam rapid transit}} |
||
Line 320: | Line 371: | ||
[[Category:Underground rapid transit in Vietnam]] |
[[Category:Underground rapid transit in Vietnam]] |
||
[[Category:750 V DC railway electrification]] |
[[Category:750 V DC railway electrification]] |
||
[[Category:Railway lines opened in 2021]] |
Latest revision as of 08:08, 8 November 2024
Hanoi Metro | |||
---|---|---|---|
Overview | |||
Native name | Đường sắt đô thị Hà Nội | ||
Owner | Hanoi People’s Committee | ||
Locale | Hanoi, Vietnam | ||
Transit type | Rapid transit | ||
Number of lines | 2 (in operation) 1 (under construction) | ||
Number of stations | 20 (in operation) 4 (under construction) | ||
Daily ridership | 32,000[1] | ||
Annual ridership | 10.7 million (2023)[2][3] | ||
Website | hanoimetro | ||
Operation | |||
Began operation | November 6, 2021 | ||
Operator(s) | Hanoi Metro Company and Tokyo Metro[4] | ||
Number of vehicles | 23 four-car trainset | ||
Headway | 10 minutes | ||
Technical | |||
System length | 21.6 km (in operation) 4 km (under construction) 318 (planned) | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Electrification | Third rail | ||
Top speed | 80 km/h (50 mph) | ||
|
The Hanoi Metro (Vietnamese: Đường sắt đô thị Hà Nội, lit. 'Hanoi urban railway') is a rapid transit system in Hanoi, the capital city of Vietnam. Owned by Hanoi's People Committee and operated by Hanoi Metro Company (HMC), it is the first operational rapid transit system in Vietnam. The system includes elevated and underground sections. The first line, Line 2A, opened to service on 6 November 2021.[5] The first section of the second line Line 3 opened on August 8, 2024.[6]
The system will eventually consist of 8 lines with a total length of 318 kilometres (198 mi), and is initially expected to carry 200,000 passengers per day. Upon opening, daily ridership was at 12,000.[7]
History
[edit]Pre-planning
[edit]As the capital city of Vietnam, Hanoi's population is growing rapidly. As of 2010 (the year when construction started on the first line), Hanoi's population was around 6,910,000. Hoàn Kiếm District and Ba Đình District are the districts with the highest population density.[8] The government expects the population of Hanoi to increase up to 8,000,000 by 2030.[9] The growing population would affect the city's operation and development.[10] To solve this issue, the Vietnamese government and the Hanoi People's Committee proposed to build an urban rail transit system, which was first proposed in the late 1990s.
In 1998, the Vietnamese government revised and agreed the “Hanoi Capital to 2020 Master Plan” which suggested that Hanoi prioritise the building of a rail transit system, with a target to build 5 lines.[11] The "Overall Plan for the Development of Vietnam's Railway Transportation Industry to 2020", released in 2002, and the "2005-2010 Economic and Social Development Plan for 2006-2010", released in 2006, both suggested the same and aimed to finish the metro system by 2010.
Survey and approval
[edit]The start of construction was delayed continually as the government first required consultant companies from China, France and Japan, such as SYSTRA and Japan International Cooperation Agency, to finish feasibility studies which ran from 2004 to 2007. These three companies suggested the Hanoi government build a network consisting of 6 lines. In 2008, the Vietnamese government approved the construction of the suggested lines, which they divided into several phases.[12][13]
Construction and opening
[edit]The pilot line of Hanoi Metro is Line 3.[14] It began construction in 2009 with a projected completion date of 2015.[15] The line was built by multiple companies, with train systems provided by Alstom.[16] The railway line was built by South Korean firm Daelim Industrial and other contractors.[17] The project was repeatedly delayed, with the completion date rescheduled to 2027.[15] The elevated section of the line opened to the public on 8 August 2024, while the work on the underground section continued. Despite being the pilot line, Line 3 became the second operational Hanoi metro line, after Line 2A, due to the 9-year delay.[18]
The second planned line, Line 2A, began construction in October 2011.[19] The line was constructed by China Railway Engineering Corporation.[20][21] The bulk of the construction was completed by the fourth quarter of 2018.[22] Operational tests were conducted at the end of 2018 and again in 2019.[23][24] After delays, Line 2A opened to the public on 6 November 2021,[25] becoming the first operational metro line in Hanoi and whole Vietnam.[26]
Network
[edit]According to the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016),[27] the Hanoi Metro system will consist of 8 lines, including elevated and underground sections. The Ministry of Transport (MoT) and the Hanoi People's Committee (HPC) will both be investors in the project. Phase 1 includes Line 2A and Line 3, Line 2A and Line 3 (elevated section) are in service, and Line 3 (underground section) is currently under construction.
Line | Route | Length | Stations | Depots | Operational date | |
---|---|---|---|---|---|---|
Cat Linh ↔ Yen Nghia | 13.1 km (8.1 mi) | 12 | Yên Nghĩa | 6 November 2021[28] | ||
Route map | ||||||
Nhon ↔ Cau Giay | 8.5 km (5.3 mi) | 8 | Nhổn | 8 August 2024[15] |
Line | Route | Length | Stations | Depots | Operational date |
---|---|---|---|---|---|
Cau Giay ↔ Hanoi Station | 4 km (2.5 mi) 12.5 km (7.8 mi) (planned) |
4 14 (planned) |
Nhổn | Late 2027 |
Line 2A: Cat Linh - Ha Dong
[edit]The 13.1 km (8.1 mi) line, consisting of 12 stations (all elevated), and connecting the districts Dong Da, Thanh Xuan and Ha Dong, will be the first operational line in the metro system. This line is constructed using Official Development Assistance (ODA) from China with a total investment of US$868 million. The China Railway Sixth Group is the EPC (Engineering, Procurement and Construction) contractor for the project, and the Ministry of Transport (Vietnam) is an investor.[20][21]
The construction was started on 10 October 2011 and was initially targeted to begin operations in 2016. In 2016, it was announced that the completion date was to be pushed back to early 2018. However, due to funding and land acquisition issues, construction wasn't completed until September 2018.[29] Following completion, the pilot run and testing was conducted from September to December 2018. Line 2A was scheduled to commence operations in February 2019, before the holidays of Lunar New Year,[30] but was postponed for the sixth time as some station construction works remained incomplete. Transport Minister Nguyen Van The had hopes that operations would begin in April 2019.
On 30 April 2019, a representative from the Railway Project Management Board informed the press that the line was not yet operational, the reason stated being that the system had not yet been issued with a safety certificate and it had not been accepted by the State Acceptance Council. By the deadline of 30 April 2019, the General Chinese Contractor had not completed some stations, depot areas, escalator roofs for stations, drainage connections for Ring Road Station 3, landscaping, trees, electricity and ticketing systems.[31]
After multiple delays, the trial run was restarted on 28 October 2019, to last for 20 days. Beginning in December 2020, Line 2A underwent a full-scale test run in order to check its safety before approval for commercial service. Line 2A opened to the public on 6 Nov 2021.[25]
Line 3: Nhon - Hanoi Station Section
[edit]The Hanoi Metro Rail System Project (Line 3: Nhon - Hanoi Station section) is in line with the Prime Minister's decision approving the transport development of Hanoi by 2030 and vision to 2050 (519/QD-TTg dated 31 March 2016). The project has the Hanoi Metropolitan Railway Management Board, French government, Asian Development Bank, and European Investment Bank as the investors, and will be built in two phases. Phase 1 is 12.5 km (7.8 mi) long in total and consists of 12 stations,[32] with 8.5 km (5.3 mi) elevated and 4 km (2.5 mi) underground, and will serve residents from districts such as Nam Tu Liem, Bac Tu Liem, Cau Giay, Ba Dinh, Dong Da, and Hoan Kiem.
Construction for Line 3 began in 2010 and was initially targeted to commence service in 2018. However, in 2017, it was announced that the construction would not be complete until 2021, and that the operation start was deferred to 2022. In July 2018, the Hanoi Metropolitan Railway Management Board (MRB) announced that only 43% of the work for Line 3 had been completed, and the launch date of elevated section would most likely be delayed until early 2023. However, in September 2022, the authorities requested to extend the deadline to 2025,[33] and increase the budget by a further VND1.9 trillion ($80.77m USD). The line was further delayed in September 2022 when the authorities announced that they expected the line to fully open in 2027.[34]
Future plans
[edit]Planning and future lines | ||||||||
---|---|---|---|---|---|---|---|---|
Line | Alternate name | Route | Length (km) | Status | Number of stations | Depots | ||
Long Biên Line | Yên Viên ↔ Ngọc Hồi | 26 km (16.2 mi) | pending budget approval (opens in 2030) |
16 | Yên Viên Ngọc Hồi | |||
Dương Xá ↔ Gia Lâm | 10 km (6.2 mi) | initial planning | 7 | Dương Xá | ||||
Hoàn Kiếm Line | Noi Bai International Airport ↔ Nam Thăng Long | 18 km (11.2 mi) | pending budget approval | — | Xuân Đỉnh Phủ Lỗ | |||
Nam Thăng Long ↔ Trần Hưng Đạo | 11.5 km (7.1 mi) | land clearance | 10 | |||||
Trần Hưng Đạo ↔ Thượng Đình | 6 km (3.7 mi) | pending budget approval | 6 | |||||
Thượng Đình ↔ Hoàng Quốc Việt | 7 km (4.3 mi) | initial planning | — | |||||
Cát Linh Line | Yên Nghĩa ↔ Xuân Mai | ... | initial planning | — | — | |||
Văn Miếu Line | Trôi ↔ Nhổn | 36 km (22.4 mi) | initial planning | — | — | |||
Hanoi ↔ Yên Sở (Hoàng Mai) | 8.8 km (5.5 mi) | pending budget approval | 7 | Yên Sở | ||||
Thăng Long Line | (circular line) Mê Linh ↔ Liên Hà | 54 km (33.6 mi) | initial planning | 41 | Liên Hà Đại Mạch | |||
Kim Mã Line | Văn Cao ↔ Hòa Lạc | 38.4 km (23.9 mi) | pending budget approval | 21 | Sơn Đồng Yên Bình | |||
Nội Bài Line | Noi Bai Airport ↔ Ngọc Hồi | 43 km (26.7 mi) | research planning | 29 | Ngọc Hồi Kim Mỗ | |||
Hà Đông Line | Mê Linh ↔ Dương Nội | 28 km (17.4 mi) | initial planning | 23 | Mê Linh | |||
Mỹ Đình Line | Sơn Đồng ↔ Mai Dịch ↔ Dương Xá | 37 km (23.0 mi) | pending budget approval | 26 | Sơn Đồng Cổ Bì | |||
Sơn Tây Line | Sơn Tây ↔ Hoà Lạc ↔ Xuân Mai | — | initial planning | — | Sơn Tây Xuân Mai | |||
— | Liên Hà ↔ Tân Lập ↔ An Khánh | 11 km (6.8 mi) | initial planning | — | — | |||
— | Giáp Bát ↔ Thanh Liệt ↔ Phú Lương Mai Dịch ↔ Mỹ Đình ↔ Văn Mỗ ↔ Phúc La |
22 km (13.7 mi) | initial planning | — | — | |||
— | Nam Hồng ↔ Mê Linh ↔ Đại Thịnh | 11 km (6.8 mi) | initial planning | — | — |
(Source: [35] except for some numbers here)
Progress
[edit]Line 1 (Long Biên Line): Ngọc Hồi - Gia Lâm (Phase 1) (Yên Viên - Ngọc Hồi)
The Ngọc Hồi - Gia Lâm section of Metro Line 1 is 15.4 km (9.6 mi) long and elevated (including 8.9 km (5.5 mi) elevated, 1.7 km (1.1 mi) km bridge and 4.8 km (3.0 mi) on surface). The line has the Railway Project Management Unit (RPMU) as its investor and Ministry of Transport as project owner. Its budget is from Japanese ODA. Currently it is in the detailed design phase. Furthermore, Ministry of Transportation has reported to National Assembly that the ministry has transferred the railway section from Yên Viên to Ngọc Hồi including Hà Nội railway station and Giáp Bát railway station to Hanoi People's Committee to implement Hanoi urban railway line (AKA Long Biên line) to feed the future North-South High Speed train since there will be a construction of the Northern terminus (AKA the Hà Nội High Speed train station which will be functioned as the new Hà Nội railway station) of North-South High Speed train at Ngọc Hồi on 151 hectares of land.[36][37][38] [39] The line will be completed in 3 phases:
- Phase 1: Ngọc Hồi - Hà Nội railway station - Gia Lâm (15.4 km (9.6 mi))
- Phase 2: Gia Lâm - Yên Viên (13.3 km)
- Phase 3: Gia Lâm - Dương Xá (10 km)
The first 2 phases of Line 1 will have 16 stations: Yên Viên, Cầu Đuống, Đức Giang, Gia Lâm, Long Biên North, Long Biên South, Phùng Hưng, Hanoi, Thống Nhất Park, Bạch Mai, Phương Liệt, Giáp Bát, Hoàng Liệt, Văn Điển, Vĩnh Quỳnh, Ngọc Hồi
Line 2 (Hoan Kiem Line): Nam Thăng Long - Trần Hưng Đạo (Phase 1) (Noi Bai Airport - Nam Thăng Long - Trần Hưng Đạo - Thượng Đình - Hoàng Quốc Việt)
This section is 42 km in length, connecting Noi Bai Airport with the city center. There will be 32 stations and 2 depots. The 4 phases of the project are:
- Phase 1: Nam Thăng Long - Trần Hưng Đạo: 11.5 km long, of which 8.9 km are underground and 2.6 km are elevated. It consists of 10 stations including 7 underground, 3 elevated and 1 depot. The project owner is Hanoi Metropolitan Railway Management Board. The project will be funded by Japanese ODA. At present cost estimate is pending to be approved.
This phase will have 10 stations: Nam Thăng Long, Ngoại Giao Đoàn, Tây Hồ Tây, Bưởi, Quần Ngựa, Bách Thảo, Hồ Tây, Hàng Đậu, Hoàn Kiếm Lake, Trần Hưng Đạo - Phase 2: Trần Hưng Đạo - Thượng Đình: 5.9 km long, fully underground and now is at feasibility study phase.
This phase will have 6 other stations after Trần Hưng Đạo: Cầu Dền, Bách Khoa, Kim Liên, Chùa Bộc, Ngã Tư Sở, Thượng Đình. - Phase 3: Thượng Đình - Ring road 2.5 - Hoàng Quốc Việt
- Phase 4: Nội Bài Airport - Nam Thang Long: 12.5 km long
Line 4 (Thang Long Line): Me Linh - Dong Anh - Hoang Mai - Ring road 2.5 - Co Nhue - Lien Ha
Line 4 is the longest out of 8 lines, with 41 stations and 2 depots. It will work as a loop line that takes into account connections with lines 1, 2A, 3, 5, 6 and 7.
Line 5 (Kim Ma Line): South West Lake - Hoa Lac - Ba Vi (Văn Cao - Hòa Lạc)
In 2012, the project was expected to start in 2017 but the commencement date has now been postponed. It will be 38.4 km long with 17 stations and 2 depots. Right now feasibility study is carried out by the Japan International Cooperation Agency (JICA). Its project owner is the Hanoi Metropolitan Railway Management Board. 2 phases are:
- Phase 1: South West Lake - An Khanh: 14.1 km with 10 stations
- Phase 2: An Khanh - Ba Vi: 24.1 km with 7 stations
Line 6 (Noi Bai Line): Noi Bai Airport - Phu Dien - Ha Dong - Ngoc Hoi
Line 6's total length is 43 km (27 mi) with 29 stations and 2 depots. The route runs mainly on the current national track system, connecting the southern districts to the northern ones and Noi Bai airport (T2 terminal).
Line 7 (Ha Dong Line): Me Linh - Nhon - Van Canh - Duong Noi
Line 7 is 27.6 km long with 23 stations and 1 depot at Me Linh. The route runs in the north to the south, connecting Me Linh urban area to urban area series in the midst of ring roads 3 and 4 and downtown in the west of Hanoi.
Line 8 (My Dinh Line): Son Dong - Mai Dich - Linh Nam - Duong Xa
Line 8 is 37.4 km (23.2 mi) long with 26 stations and 2 depots. The underground section is from Mai Dich to Linh Nam, and elevated sections are 2 parts: Son Dong to Mai Dich and Linh Nam to Duong Xa.
Rolling stock
[edit]Line 2A: CRRC trains
[edit]On 20 October 2015, the Railway Project Management Unit (RPMU) organized the Cat Linh - Ha Dong sample train exhibition at Giang Vo Exhibition Center, Ba Dinh District. The decision was made to use Chinese rolling stock manufacturer CRRC Corporation Limited (CRRC) trains, made by Beijing Subway Rolling Stock Equipment, to supply the rolling stock for Line 2A.
Each train will consist of 4 carriages, with capacity for over 1,200 passengers. Each carriage weighs around 35 tonnes (34 long tons; 39 short tons), is 19 metres (62 ft 4.0 in) long, 3.8 metres (12 ft 5.6 in) high, and 2.8 metres (9 ft 2 in) wide. The first train arrived in Hanoi in March 2017 via the port of Hai Phong. The CRRC supplied a total of 13 four-car train-sets in 2018, which are all currently stabled at a depot at Phu Luong, east of Yen Nghia.[40] Trains are powered by a 750 V third rail, a first for Vietnam.
The trains' exteriors are painted green, and the seal of the Hanoi Temple of Literature, which is the symbol Khue Van of Hanoi, is shown on the front of the train, and the line name “Cat Linh - Ha Dong” is displayed along the bottom in white. A small LED screen is place at the left top corner to show the name of the line.
Line 3: Alstom trains
[edit]On 17 January 2017, Hanoi Metro Company signed a contract with French locomotive manufacturer Alstom to supply the rolling stock for Line 3, which will come from its Alstom Metropolis series. The current order is for 10 train sets, costing around US$128 million. The trains features an air-conditioning system, speakers, automatic LED lights. The interior is wheelchair accessible, and also includes dedicated space and seating for senior citizens. Each train can carry 950 passengers.[41] First four-car trains were shipped from the port of Dunkirk, on 9 September 2020.[42]
The cyan, pink and grey of the exterior design symbolises rice seeding leaves and dragon fruit, some of the main products in Vietnam.[43] Additionally, like Line 2A, the seal of the Hanoi Temple of Literature is displayed on the front of the train.
Fares and ticketing
[edit]The ticket system will allow for connection between all routes and will be usable with other public transportation such as bus, taxi, etc. The tickets will be available for purchase at the terminal (ticket office or vending machine), using a modern, compact form of ticket (similar to an ATM card). Tickets will use modern technology, with value retention and high security.
There will be many types of tickets for passengers to choose from: Tickets take turns, Ticket by day, week, month, Group ticket and Electronic ticket (IC Card) combines many other gadgets.[citation needed]
Line 2A Fares and ticketing
[edit]The price of the tickets for the Cat Linh-Ha Dong metro, with the lowest one being VND 8,000 (USD 0.32) for a short trip, VND 15,000 (USD 0.60) for a longest trip, and VND 30,000 (USD 1.2) for a day pass.
Line 3 Fares and ticketing
[edit]The price of the tickets for the Nhon-Ha Noi station metro, with the lowest one being VND 8,000 (USD 0.32) for a short trip, VND 12,000 (USD 0.48) for a longest trip, and VND 24,000 (USD 0.96) for a day pass.
Monthly pass and others
[edit]- A monthly pass for a common passenger is priced at VND 200,000 (USD 8.78), for a group of more than 30 people is priced at VND 140,000(USD 5.61)/person. - A monthly pass for a student/worker in industrial park is priced at VND 100,000(USD 4.00) - Children(under 6), old people(over 60), disabled people and registered poor people get a free pass.
See also
[edit]References
[edit]- ^ "'Metro Cát Linh-Hà Đông thay đổi thói quen đi lại của người dân'" (in Vietnamese). VietnamPlus. 4 November 2022.
- ^ Đinh, Luyện (9 January 2024). "Đường sắt đô thị Cát Linh - Hà Đông vận chuyển được 10,7 triệu lượt khách". Lao động thủ đô. Archived from the original on 11 January 2024. Retrieved 11 January 2024.
- ^ Bích Phương (9 January 2024). "Hà Nội đặt mục tiêu kiềm chế, kéo giảm tai nạn giao thông năm 2024". Vietnam Government Portal. Archived from the original on 11 January 2024. Retrieved 11 January 2024.
- ^ "Vietnam Tokyo Metro set up to run Hanoi's urban railway".
- ^ Burroughs, David (9 November 2021). "Hanoi opens Vietnam's first metro line". IRJ.
- ^ May, Tiana (9 August 2024). "Hanoi Metro Line 3 Commences Passenger Service". Railway-News. Retrieved 9 August 2024.
- ^ "Vietnam's First Metro, in Hanoi, Hobbled by Lack of Riders". voanews.com. 13 December 2021. Retrieved 4 January 2022.
- ^ Trung Hiếu (10 December 2010). "Dân số Hà Nội: 6.913.161 người". Báo An ninh Thủ đô (in Vietnamese). Retrieved 24 August 2017.
- ^ "Hanoi Metro, Vietnam" (PDF). Systra. Retrieved 24 August 2017.
- ^ "Ex-ante Project Evaluation" (PDF). Japan International Cooperation Agency. 2008. Retrieved 24 August 2017.
- ^ Phan Văn Khải (20 June 1998). "Quyết định 108/1998/QĐ-TTg phê duyệt điều chỉnh quy hoạch chung Thủ đô Hà Nội đến năm 2020". Hệ thống văn bản quy phạm pháp luật (in Vietnamese). Hà Nội: Bộ Tư pháp. Retrieved 12 September 2017.
- ^ "Hoàn thành báo cáo khả thi tuyến đường sắt trên cao Hà Nội - Hà Đông". Hà Nội Mới (in Vietnamese). Việt Báo. 23 October 2004. Archived from the original on 26 December 2017. Retrieved 26 December 2017.
- ^ "The Comprehensive Urban Development Programme in Hanoi Capital City: Final Report" (PDF) (in Vietnamese). Japan International Cooperation Agency; ALMEC Corp; Nippon Koei; Yachiyo Engineering. March 2007. p. 8-64~8-72. Retrieved 12 September 2017.
- ^ "Hanoi Metro". Railway Technology. 20 April 2017.
- ^ a b c Vo, Hai (7 August 2024). "Vietnam's second metro line to start running Thursday".
- ^ "Hanoi metro Line 3 railway systems contract signed". Metro Report International. 17 January 2017.
- ^ "Hanoi metro Line 3 contractor chosen". Railway Gazette International. 14 April 2014.
- ^ NITTA, YUJI (8 August 2024). "Vietnam opens 2nd Hanoi metro line after 9-year delay". Nikke Aisa.
- ^ "First metro line opened in Hanoi". Metro Report International. 8 November 2021.
- ^ a b Lâm Hoài (25 September 2010). "Khởi công tuyến đường sắt đô thị đầu tiên tại Hà Nội". Tuổi Trẻ (in Vietnamese). Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh. Retrieved 5 September 2017.
- ^ a b 赵青 (10 October 2011). "中铁六局承建河内城市轨道建设项目开工". 中国经济网. 河内: 经济日报社. Retrieved 5 September 2017.
- ^ Đoàn Loan (11 December 2017). "Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng". VnExpress.net (in Vietnamese). Hà Nội: Bộ Khoa học Công nghệ. Retrieved 7 January 2018.
- ^ "Hanoi's First Metro Line Begins 20-Day Trial Run". Urbanist Hanoi. 29 October 2019. Retrieved 1 March 2020.
- ^ Doan Loan (26 December 2018). "Four major transport projects on track for completion next year". Hà Nội: VN Express.
- ^ a b "Hanoi metro receives safety clearance from French consultant". 30 April 2021.
Hanoi's first metro has been awarded a safety certificate by a French consultant and is set to begin commercial operations next month.
- ^ Burroughs, David (9 November 2021). "Hanoi opens Vietnam's first metro line". IRJ.
- ^ "Masterplan of 8 metro lines in Hanoi in 2030 and vision to 2050".
- ^ "Khai thác thương mại đường sắt Cát Linh - Hà Đông vào quý III/2021". Báo điện tử Tiền Phong (in Vietnamese). 10 June 2021. Retrieved 17 July 2021.
- ^ "Test ride of metro line 2A Cat Linh - Ha Dong".
- ^ Đoàn Loan (11 December 2017). "Đường sắt Cát Linh - Hà Đông có thể chậm tiến độ thêm 11 tháng". VnExpress.net (in Vietnamese). Hà Nội: Bộ Khoa học Công nghệ. Retrieved 7 January 2018.
- ^ "Đường sắt Cát Linh – Hà Đông lùi tiến độ lần thứ 10". Radio Free Asia (in Vietnamese). Retrieved 4 June 2019.
- ^ "Ha Noi Metro Rail System Project (Line 3: Nhon-Ha Noi Station Section)". 10 December 2015.
- ^ "Hanoi 2nd metro line likely to be delayed by 5 years - VnExpress International".
- ^ "Metro Nhổn - ga Hà Nội dự kiến vận hành đoạn trên cao dịp 30/4". Archived from the original on 19 November 2023. Retrieved 16 November 2023.
- ^ vi:Đường sắt đô thị Hà Nội
- ^ Mai Hà (9 June 2022). "Xin Bộ Chính trị chủ trương đầu tư đường sắt tốc độ cao Bắc - Nam". Thanh niên Online (in Vietnamese). Retrieved 18 August 2022.
- ^ "Ga Hà Nội, Giáp Bát sẽ chuyển đổi để làm đường sắt Yên Viên - Ngọc Hồi". VOV Online (in Vietnamese). 18 August 2022. Retrieved 18 August 2022.
- ^ Anh Tú (18 August 2022). ""Chốt" di dời ga Hà Nội, ga Giáp Bát để làm metro Yên Viên - Ngọc Hồi". VnEconomy (in Vietnamese). Retrieved 19 August 2022.[permanent dead link ]
- ^ Doan Loan (22 August 2022). "Hanoi train station infrastructure to be relocated for metro project". VnExpress. Retrieved 18 August 2022.
- ^ Tuắn Phùng (19 February 2017). "Hình ảnh đoàn tàu đầu tiên tuyến đường sắt Cát Linh - Hà Đông". Tuổi Trẻ (in Vietnamese). Đoàn Thanh niên Cộng sản Hồ Chí Minh Thành phố Hồ Chí Minh. Retrieved 3 August 2017.
- ^ Việt Hùng; Trọng Đảng (18 January 2017). "Năm 2021, Hà Nội có tàu điện ngầm". Tiền Phong (in Vietnamese). Đoàn Thanh niên Cộng sản Hồ Chí Minh. Retrieved 3 August 2017.
- ^ "Alstom ships first train for Hanoi metro". 14 September 2020.
- ^ "Hanoi Reveals Train Designs for Metro Line 3, Seeks Public Feedback". Urbanist Hanoi. 8 September 2018. Retrieved 9 December 2018.
External links
[edit]- Media related to Hanoi Metro at Wikimedia Commons
- Official website (in Vietnamese and English)