Jump to content

Nairobi Expressway: Difference between revisions

Coordinates: 01°15′51″S 36°44′52″E / 1.26417°S 36.74778°E / -1.26417; 36.74778
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Tag: Reverted
EdwinKKK (talk | contribs)
m cost of expressway computing
 
(43 intermediate revisions by 17 users not shown)
Line 1: Line 1:
{{short description|Kenyan toll highway}}
{{short description|Kenyan toll highway}}
{{distinguish|Mombasa–Nairobi Expressway}}
{{Use dmy dates|date=April 2019}}
{{Use dmy dates|date=April 2019}}
{{EngvarB|date=April 2019}}
{{EngvarB|date=April 2019}}
Line 6: Line 7:
|type=
|type=
|route=
|route=
|name =JKIA–Westlands Highway
|name =Nairobi Expressway
|length_mi=31
|length_mi=17
|length_round=
|length_round=
|length_ref=
|length_ref=
|history=Designated in 2019<br/>Completion in 2021 (Expected)
|history=Designated in 2019<br/>Completion in {{start date and age|2022}}
|direction_a=South
|direction_a=South
|terminus_a=[[Jomo Kenyatta International Airport]]
|terminus_a=[[Jomo Kenyatta International Airport]]
Line 18: Line 19:
}}
}}


'''TRAVIS SCOTT FORTNIET BORGER 2020''' is a planned toll road in [[Kenya]], connecting [[Jomo Kenyatta International Airport]] to the neighborhood of Rironi, in [[Kiambu County]], along the Nairobi-Limuru Road.<ref name="1R">{{cite web|publisher=Mwakilishi.com | url=https://www.mwakilishi.com/article/business-news/2018-11-20/construction-of-sh59-billion-overpass-from-jkia-set-to-begin | title=Construction of Sh59 Billion Overpass from JKIA Set to Begin |date=20 November 2018 |access-date=24 April 2019 | author=John Wanjohi |location=Nairobi}}</ref>
The '''Nairobi Expressway''' is a {{convert|27|km|0}} toll road in [[Kenya]], connecting [[Jomo Kenyatta International Airport]] to [[Nairobi]]'s [[Westlands, Nairobi|Westlands]] area, that has been constructed under a public-private partnership between the government of [[Kenya]] and [[China Road and Bridge Corporation]] (CRBC).<ref name="1R">{{cite web|work=Africa News |date=16 May 2022 | url=https://www.africanews.com/2022/05/16/relief-for-motorists-as-kenya-opens-nairobi-expressway/ | title=Relief for motorists as kenya opens Nairobi expressway |access-date=31 May 2022 | author=Africanews |location=Nairobi}}</ref>


==Location==
==Location==
The road starts at Jomo Kenyatta International Airport, along the [[Nairobi-Mombasa Road]]. The highway continues along the existing roadway to the Likoni Road Junction, a distance of approximately {{convert|12|km|0}}.<ref name="2R">{{cite web|
The 27.1-kilometer road starts from Mlolongo passing through JKIA and Nairobi’s CBD to the James Gichuru junction along Waiyaki Way. From Mlolongo, the road links up via an interchange with Airport South Road, to Jomo Kenyatta International Airport, along the [[Nairobi-Mombasa Road]]. The highway continues along the existing roadway to the Likoni Road Junction, a distance of approximately {{convert|10|km|0}}.<ref name="2R">{{google maps|
url=https://distancecalculator.globefeed.com/Kenya_Distance_Result.asp?vr=apes&fromplace=Jomo%20Kenyatta%20International%20Airport,%20Nairobi,%20KEN&toplace=PolyPlay%20%20Kenya%20Limited,Kenya | title=Distance between Jomo Kenyatta International Airport, Nairobi, Kenya and PolyPlay Kenya Limited, Kenya |date=24 April 2019 |access-date=24 April 2019 |publisher=Globefeed.com | author=Globefeed.com}}</ref>
url=https://www.google.com/maps/dir/PolyPlay+Kenya+Limited,+Kenya,+Mombasa+Road,+Sameer+Industrial+Park,+opoosite+General+Motors,+Nairobi,+Kenya/Jomo+Kenyatta+International+Airport,+Embakasi,+Nairobi,+Kenya/@-1.3030082,36.877001,11.5z/data=!4m14!4m13!1m5!1m1!1s0x182f0b329b2a4b23:0x146cbc0b65c4b85b!2m2!1d36.8664291!2d-1.3285531!1m5!1m1!1s0x182f129102505cef:0xefc58e7ef0660bf2!2m2!1d36.9260693!2d-1.3227102!3e0 |title=Distance between Jomo Kenyatta International Airport, Nairobi, Kenya and PolyPlay Kenya Limited, Nairobi, Kenya |access-date=15 July 2022}}</ref>


From the Likoni Road junction, the toll highway continues northwards to the James Gichuru Road junction, a distance of approximately {{convert|13.5|km|0}}.<ref name="3R">{{google maps|
From the Likoni Road junction, the toll highway continues northwards to the James Gichuru Road junction, a distance of approximately {{convert|12.5|km|0}}.<ref name="3R">{{cite web| publisher=Globefeed.com |author=Globefeed.com |date=24 April 2019 |url=https://distancecalculator.globefeed.com/Kenya_Distance_Result.asp?vr=apes&fromplace=PolyPlay%20Kenya%20Limited,Kenya&toplace=Java%20ABC,Kenya |title=Distance between PolyPlay Kenya Limited, Kenya and Java ABC, Kenya |access-date=24 April 2019}}</ref> From there, the road continues for approximately {{convert|25|km|0}} to Rironi, along the Nairobi–Nakuru Road, where the toll highway ends.<ref name="4R">{{cite web|date=24 April 2019 |access-date=24 April 2019 |publisher=Globefeed.com |author=Globefeed.com | url=https://distancecalculator.globefeed.com/Kenya_Distance_Result.asp?vr=apes&fromplace=Java%20ABC,%20Nairobi,%20Kenya,Kenya&toplace=PCEA%20Rironi%20Mother%20Church,Kenya&fromplace=Java%20ABC,%20Nairobi,%20Kenya,Kenya&toplace=PCEA%20Rironi%20Mother%20Church,Kenya | title=Distance between Java ABC, Nairobi, Kenya and PCEA Rironi Mother Church, Kenya}}</ref> The total length of the toll highway is about {{convert|50|km|0}}.
url=https://www.google.com/maps/dir/Odds+%26+Ends+Ltd-Embakasi+South,+Mombasa+Road,+Nairobi,+Kenya/Java+At+Abc+Place(Head+Office),+ABC+Place,+Waiyaki+Way,+Nairobi,+Kenya/@-1.2829403,36.8299652,12.25z/data=!4m14!4m13!1m5!1m1!1s0x182f1135f780a2a1:0x917a6ffd5a5bf031!2m2!1d36.8526944!2d-1.3268955!1m5!1m1!1s0x182f19d966a08457:0x494dafaf87328ba5!2m2!1d36.7761865!2d-1.2598081!3e0 |title=Travel Distance Between Odds & Ends Limited, Embakasi South, Vision Plaza, Mombasa Road, Nairobi, Kenya And Java Head Office, ABC Place, Waiyaki Way, Nairobi, Kenya |access-date=15 July 2022}}</ref>


==Overview==
==Overview==
This road, is intended to ease traffic from Jomo Kenyatta International Airport that accesses [[Nairobi]] city center. Also traffic from Central Nairobi is expected to be facilitated, to reduce the number of departing passengers who miss their fights, while stuck in road traffic jams on the city streets.<ref name="5R">{{cite web|url=https://kenyanwallstreet.com/cabinet-approves-sh-478-bn-expressway-project-connecting-jkia-to-westlands/ |title=Cabinet approves expressway project linking JKIA to Westlands |date=24 April 2019 |publisher=The Kenyan Wall Street |access-date=24 April 2014 |author=Miriam Wangui | location=Nairobi}}</ref> The work involves expansion of the existing road to four-lanes one-way, (8 lanes total), with foot paths, drainage channels, overpass bridges and street lighting.<ref name="6R">{{cite web|newspaper=[[The Standard (Kenya)]] | url=https://www.standardmedia.co.ke/article/2001322387/kenya-to-sign-deal-for-sh65b-jkia-westlands-expressway |title=Kenya to sign deal for Sh51 billion JKIA-Westlands expressway |date=24 April 2019 |access-date=24 April 2019 |author=Geoffrey Mosoku | location=Nairobi}}</ref>
The Nairobi Expressway is aimed at easing traffic and providing seamless access to Jomo Kenyatta International Airport and its environs.<ref name="5R">{{cite web|url=https://kenyanwallstreet.com/cabinet-approves-sh-478-bn-expressway-project-connecting-jkia-to-westlands/ |title=Cabinet approves expressway project linking JKIA to Westlands |date=24 April 2019 |publisher=The Kenyan Wall Street |access-date=24 April 2014 |author=Miriam Wangui | location=Nairobi}}</ref> The work involves the expansion of the existing road to four lanes one-way (eight lanes total) with footpaths, drainage channels, overpass bridges, and street lighting.<ref name="6R">{{cite web|newspaper=[[The Standard (Kenya)]] | url=https://www.standardmedia.co.ke/article/2001322387/kenya-to-sign-deal-for-sh65b-jkia-westlands-expressway |title=Kenya to sign deal for Sh51 billion JKIA-Westlands expressway |date=24 April 2019 |access-date=24 April 2019 |author=Geoffrey Mosoku | location=Nairobi}}</ref>


Motorists can calculate their toll fees for trips along the expressway, from Westlands to Mlolongo and vice versa, using the [https://calculator.co.ke/nairobi-expressway-toll-calculator/ Nairobi Expressway Toll Calculator]. This tool helps users determine the toll costs whether paying with cash (M-Pesa), MTC, or ETC, and even estimate total commuting expenses per week or month.
==Upgrade and funding==

The [[government of Kenya]] has contracted with [[China Road and Bridge Corporation]] (CRBC) to build this toll road on a public-private partnership (PPP) basis. CRBC will use their own money to construct the road expansion, interchanges and toll stations. They will collect the toll fees until their investment is recovered, then the road will revert to government.<ref name="7R">{{cite web| url=https://kenyanwallstreet.com/chinese-private-investors-commit-to-support-jkia-westlands-expressway/ |title=Chinese Private Investors Commit to Support JKIA-Westlands Expressway |date=5 September 2018 |publisher=The Kenyan Wall Street |access-date=24 April 2019 |author=Angeline Mbogo |location=Nairobi}}</ref>

==Construction and funding==
The [[government of Kenya]] has contracted with [[China Road and Bridge Corporation]] (CRBC) to build this toll road on a public-private partnership (PPP) basis. CRBC will use its own money to construct the road expansion, interchanges, and toll stations. The company will collect the toll fees until their investment is recovered, then the road will revert to government.<ref name="7R">{{cite web| url=https://kenyanwallstreet.com/chinese-private-investors-commit-to-support-jkia-westlands-expressway/ |title=Chinese Private Investors Commit to Support JKIA-Westlands Expressway |date=5 September 2018 |publisher=The Kenyan Wall Street |access-date=24 April 2019 |author=Angeline Mbogo |location=Nairobi}}</ref>


The road expansion is to be done in stages. The [[World Bank]] had indicated interest in funding the road expansion, but those plans have been overtaken by events.<ref name="8R">{{cite web| url=https://nairobinews.nation.co.ke/news/construction-of-jkia-westlands-superhighway-to-commence-this-december |date=20 August 2015 |title=Construction of JKIA–Westlands Superhighway to commence this December |publisher=[[Daily Nation|Nairobi News]] | access-date=25 April 2019 |author=Kenfrey Kiberenge | location=Nairobi}}</ref> The cost of the toll highway is quoted as between KSh51 billion (US$510 million) and KSh65 billion (US$650 million).<ref name="6R"/>
The road expansion is to be done in stages. The [[World Bank]] had indicated interest in funding the road expansion, but those plans have been overtaken by events.<ref name="8R">{{cite web| url=https://nairobinews.nation.co.ke/news/construction-of-jkia-westlands-superhighway-to-commence-this-december |date=20 August 2015 |title=Construction of JKIA–Westlands Superhighway to commence this December |publisher=[[Daily Nation|Nairobi News]] | access-date=25 April 2019 |author=Kenfrey Kiberenge | location=Nairobi}}</ref> The cost of the toll highway is quoted as between KSh51 billion (US$510 million) and KSh65 billion (US$650 million).<ref name="6R"/>

==Recent events==
In April 2022, [[98.4 Capital FM]] reported that the construction of the expressway was complete and was awaiting political and commercial commissioning. The road project, which cost over US$560 million to build, is expected to reduce travel time from Jomo Kenyatta International Airport (JKIA) to the Nairobi [[central business district]] to between 15 and 20 minutes, instead of the one hour it took during off-peak and two hours it took during peak hours, before the expressway was built.<ref name="9R">{{cite web| work=[[98.4 Capital FM]] |date=19 April 2022 | url=https://www.capitalfm.co.ke/lifestyle/2022/04/19/exclusive-nairobi-expressway-in-pictures-the-dos-donts-how-to-access-it/ | title=Exclusive: Nairobi Expressway in Pictures; The Do's, Don'ts & How to Access it |author=Grace Njeri |access-date=24 April 2022 |location=Nairobi, Kenya}}</ref>


==See also==
==See also==
Line 44: Line 52:
==External links==
==External links==
* [http://www.kenha.co.ke/ Webpage of the Kenya National Highway Authority]
* [http://www.kenha.co.ke/ Webpage of the Kenya National Highway Authority]
* [https://www.standardmedia.co.ke/nairobi/article/2001389921/nairobi-expressway-troubles-not-over-yet/ Nairobi Expressway Troubles Not Over Yet] As of 13 October 2020.


{{Authority control}}
{{coord|01|15|51|S|36|44|52|E|display=title}}
{{coord|01|15|51|S|36|44|52|E|display=title}}


{{DEFAULTSORT:JKIA-Westlands Highway}}
{{DEFAULTSORT:JKIA-Westlands Highway}}
[[Category:Roads in Kenya]]
[[Category:Roads in Kenya]]
[[Category:Geography of Kenya]]
[[Category:Transport in Kenya]]
[[Category:Nairobi]]
[[Category:Nairobi]]
[[Category:Kiambu County]]
[[Category:Kiambu County]]
[[Category:Transport infrastructure in Kenya]]
[[Category:2022 establishments in Kenya]]
[[Category:Transport in Nairobi]]

Latest revision as of 11:43, 8 November 2024

Nairobi Expressway
Route information
Length17 mi (27 km)
HistoryDesignated in 2019
Completion in 2022; 2 years ago (2022)
Major junctions
South endJomo Kenyatta International Airport
Major intersectionsLikoni Road Junction
James Gichuru Road Junction
North endRironi
Location
CountryKenya
Highway system

The Nairobi Expressway is a 27 kilometres (17 mi) toll road in Kenya, connecting Jomo Kenyatta International Airport to Nairobi's Westlands area, that has been constructed under a public-private partnership between the government of Kenya and China Road and Bridge Corporation (CRBC).[1]

Location

[edit]

The 27.1-kilometer road starts from Mlolongo passing through JKIA and Nairobi’s CBD to the James Gichuru junction along Waiyaki Way. From Mlolongo, the road links up via an interchange with Airport South Road, to Jomo Kenyatta International Airport, along the Nairobi-Mombasa Road. The highway continues along the existing roadway to the Likoni Road Junction, a distance of approximately 10 kilometres (6 mi).[2]

From the Likoni Road junction, the toll highway continues northwards to the James Gichuru Road junction, a distance of approximately 13.5 kilometres (8 mi).[3]

Overview

[edit]

The Nairobi Expressway is aimed at easing traffic and providing seamless access to Jomo Kenyatta International Airport and its environs.[4] The work involves the expansion of the existing road to four lanes one-way (eight lanes total) with footpaths, drainage channels, overpass bridges, and street lighting.[5]

Motorists can calculate their toll fees for trips along the expressway, from Westlands to Mlolongo and vice versa, using the Nairobi Expressway Toll Calculator. This tool helps users determine the toll costs whether paying with cash (M-Pesa), MTC, or ETC, and even estimate total commuting expenses per week or month.


Construction and funding

[edit]

The government of Kenya has contracted with China Road and Bridge Corporation (CRBC) to build this toll road on a public-private partnership (PPP) basis. CRBC will use its own money to construct the road expansion, interchanges, and toll stations. The company will collect the toll fees until their investment is recovered, then the road will revert to government.[6]

The road expansion is to be done in stages. The World Bank had indicated interest in funding the road expansion, but those plans have been overtaken by events.[7] The cost of the toll highway is quoted as between KSh51 billion (US$510 million) and KSh65 billion (US$650 million).[5]

Recent events

[edit]

In April 2022, 98.4 Capital FM reported that the construction of the expressway was complete and was awaiting political and commercial commissioning. The road project, which cost over US$560 million to build, is expected to reduce travel time from Jomo Kenyatta International Airport (JKIA) to the Nairobi central business district to between 15 and 20 minutes, instead of the one hour it took during off-peak and two hours it took during peak hours, before the expressway was built.[8]

See also

[edit]

References

[edit]
  1. ^ Africanews (16 May 2022). "Relief for motorists as kenya opens Nairobi expressway". Africa News. Nairobi. Retrieved 31 May 2022.
  2. ^ "Distance between Jomo Kenyatta International Airport, Nairobi, Kenya and PolyPlay Kenya Limited, Nairobi, Kenya" (Map). Google Maps. Retrieved 15 July 2022.
  3. ^ "Travel Distance Between Odds & Ends Limited, Embakasi South, Vision Plaza, Mombasa Road, Nairobi, Kenya And Java Head Office, ABC Place, Waiyaki Way, Nairobi, Kenya" (Map). Google Maps. Retrieved 15 July 2022.
  4. ^ Miriam Wangui (24 April 2019). "Cabinet approves expressway project linking JKIA to Westlands". Nairobi: The Kenyan Wall Street. Retrieved 24 April 2014.
  5. ^ a b Geoffrey Mosoku (24 April 2019). "Kenya to sign deal for Sh51 billion JKIA-Westlands expressway". The Standard (Kenya). Nairobi. Retrieved 24 April 2019.
  6. ^ Angeline Mbogo (5 September 2018). "Chinese Private Investors Commit to Support JKIA-Westlands Expressway". Nairobi: The Kenyan Wall Street. Retrieved 24 April 2019.
  7. ^ Kenfrey Kiberenge (20 August 2015). "Construction of JKIA–Westlands Superhighway to commence this December". Nairobi: Nairobi News. Retrieved 25 April 2019.
  8. ^ Grace Njeri (19 April 2022). "Exclusive: Nairobi Expressway in Pictures; The Do's, Don'ts & How to Access it". 98.4 Capital FM. Nairobi, Kenya. Retrieved 24 April 2022.
[edit]


01°15′51″S 36°44′52″E / 1.26417°S 36.74778°E / -1.26417; 36.74778