D11 motorway (Czech Republic): Difference between revisions
m stub sorting using AWB |
|||
(36 intermediate revisions by 27 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Czech motorway}} |
|||
{{ |
{{More citations needed|date=August 2008}} |
||
{{Expand Czech|topic=transp}} |
|||
{{Infobox road |
{{Infobox road |
||
|country=CZE |
| country = CZE |
||
|type=D |
| type = D |
||
|route=11 |
| route = 11 |
||
| map = {{MapframeForObjects|frame=yes|plain=yes|type=line|frame-align=center|frame-width=290|stroke-width=3}} |
|||
|map=D11 Highway (Czech Republic).svg |
|||
| map_custom = yes |
|||
|e-road= [[ |
| e-road = [[File:CZ traffic sign IS17 - E67.svg|40px|E67]] |
||
|length_km= |
| length_km = 115 |
||
|length_notes=Planned: {{convert| |
| length_notes = Planned: {{convert|156|km|mi|abbr=on}} |
||
|terminus_a= [[ |
| terminus_a = [[File:CZ traffic sign IS16a - D0.svg|20px]] [[D0 motorway (Czech Republic)|D0]] in Prague |
||
|junction=[[Image:SilniceI35.svg|20px]] [[Expressway R35|R35]] near [[Hradec Králové]] |
|||
| |
| junction = [[File:CZ traffic sign IS16a - D35.svg|20px]] [[D35 motorway (Czech Republic)|D35]] near [[Hradec Králové]] |
||
| terminus_b = [[File:S3-PL.svg|20px]] [[Expressway S3 (Poland)|S3]] border with Poland |
|||
|regions= |
| regions = Prague, [[Central Bohemian Region|Central Bohemian]], [[Pardubice Region|Pardubice]], [[Hradec Králové Region|Hradec Králové]] |
||
|cities=Praha |
|||
| cities = Prague, Hradec Králové |
|||
| photo = Motorway_D11-CZ_map.svg |
|||
}} |
}} |
||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | |||
⚫ | Plans to build a highway connecting [[Prague]] and [[Hradec Králové]] date from 1938; construction finally began in 1978. Today it consists of one continuous segment Praha - [[Poděbrady]] - [[Libice nad Cidlinou]] - [[Libčany]] - [[Plačice]] - [[Plotiště]] - [[Smiřice]] - [[Jaroměř]] and last segment [[Jaroměř]] - [[Trutnov]] - border CZ/PL (polish expressway S3) is planned and waits for permits. |
||
It is part of [[European route E67]] "Via Baltica" from [[Prague]] in the Czech Republic to [[Helsinki]] in Finland by way of [[Poland]], [[Lithuania]], [[Latvia]], and [[Estonia]]. Three lanes in each direction are planned by 2025 between Prague and [[Jirny]] (8 km)<ref>{{Cite web|url=https://zdopravy.cz/prehledne-kde-pripravuje-stat-sestiproude-dalnice-vyrostou-hlavne-u-prahy-28490/|title = Přehledně: Kde stát připravuje šestiproudé dálnice. Vyrostou hlavně u Prahy|date = 21 May 2019}}</ref> and to [[Poděbrady]] after 2025. |
|||
== Unfinished sections == |
|||
{| class="wikitable" |
|||
!Section |
|||
!Length |
|||
!Start of construction |
|||
!Completion |
|||
!Intersection |
|||
|- |
|||
|Jaroměř – [[Trutnov]] |
|||
|19,63 km |
|||
|planned |
|||
2025 |
|||
|planned |
|||
2028 |
|||
|Choustníkovo Hradiště |
|||
Kocbeře |
|||
|- |
|||
|Trutnov – state border with [[Poland]] |
|||
|21,28 km |
|||
|planned |
|||
2024 |
|||
|planned |
|||
2027 |
|||
|Střítež |
|||
Poříčí |
|||
Zlatá Olešnice |
|||
Královec |
|||
|} |
|||
==Images== |
|||
<gallery mode="packed"> |
|||
⚫ | |||
File:Voleč, dálnice D11.jpg|D11 motorway near [[Voleč]], [[Pardubice Region]]. |
|||
File:MostUPodebrad A. CelkovyPohled.jpg|Bridge on D11 near [[Poděbrady]] |
|||
</gallery> |
|||
==References== |
|||
{{Reflist}} |
|||
{{CzechHighways}} |
{{CzechHighways}} |
||
{{coord|50|6|59.62|N|15|12|9.01|E|region:CZ|display=title}} |
|||
{{Authority control}} |
|||
[[Category:Motorways in the Czech Republic|D11]] |
[[Category:Motorways in the Czech Republic|D11]] |
||
Line 25: | Line 79: | ||
{{CzechRepublic-road-stub}} |
{{CzechRepublic-road-stub}} |
||
[[cs:Dálnice D11]] |
|||
[[de:Dálnice 11]] |
|||
[[nl:D11 (Tsjechië)]] |
|||
[[pl:Autostrada D11 (Czechy)]] |
|||
[[sv:D11 (motorväg, Tjeckien)]] |
Latest revision as of 10:37, 10 November 2024
This article needs additional citations for verification. (August 2008) |
You can help expand this article with text translated from the corresponding article in Czech. Click [show] for important translation instructions.
|
D11 Motorway | |
---|---|
Dálnice D11 | |
Route information | |
Part of | |
Length | 115 km (71 mi) Planned: 156 km (97 mi) |
Major junctions | |
From | D0 in Prague |
D35 near Hradec Králové | |
To | S3 border with Poland |
Location | |
Country | Czech Republic |
Regions | Prague, Central Bohemian, Pardubice, Hradec Králové |
Major cities | Prague, Hradec Králové |
Highway system | |
The D11 motorway (Czech: Dálnice D11) is a highway in the Czech Republic.
Plans to build a highway connecting Prague and Hradec Králové date from 1938; construction finally began in 1978. Today it consists of one continuous segment Praha - Poděbrady - Libice nad Cidlinou - Libčany - Plačice - Plotiště - Smiřice - Jaroměř and last segment Jaroměř - Trutnov - border CZ/PL (polish expressway S3) is planned and waits for permits. It is part of European route E67 "Via Baltica" from Prague in the Czech Republic to Helsinki in Finland by way of Poland, Lithuania, Latvia, and Estonia. Three lanes in each direction are planned by 2025 between Prague and Jirny (8 km)[1] and to Poděbrady after 2025.
Unfinished sections
[edit]Section | Length | Start of construction | Completion | Intersection |
---|---|---|---|---|
Jaroměř – Trutnov | 19,63 km | planned
2025 |
planned
2028 |
Choustníkovo Hradiště
Kocbeře |
Trutnov – state border with Poland | 21,28 km | planned
2024 |
planned
2027 |
Střítež
Poříčí Zlatá Olešnice Královec |
Images
[edit]-
D11 motorway near Bříství, Nymburk District.
-
D11 motorway near Voleč, Pardubice Region.
-
Bridge on D11 near Poděbrady
References
[edit]50°6′59.62″N 15°12′9.01″E / 50.1165611°N 15.2025028°E