Chashma Barrage: Difference between revisions
No edit summary |
added template |
||
(39 intermediate revisions by 30 users not shown) | |||
Line 1: | Line 1: | ||
{{Use Pakistani English|date=August 2014}} |
|||
{{Use dmy dates|date=August 2014}} |
|||
{{Infobox dam |
{{Infobox dam |
||
| name = Chashma Barrage |
| name = Chashma Barrage |
||
| image = |
| image = Chashma Barrage Lake.jpg |
||
| image_caption = |
| image_caption = Chashma Barrage Lake |
||
| name_official = |
| name_official = |
||
| dam_crosses = [[Indus River]] |
| dam_crosses = [[Indus River]] |
||
Line 15: | Line 18: | ||
| dam_volume = |
| dam_volume = |
||
| spillway_type = |
| spillway_type = |
||
| spillway_capacity ={{Convert| |
| spillway_capacity ={{Convert|27000|m3/s|ft3/s|abbr=on}} |
||
| purpose = Irrigation, power |
| purpose = Irrigation, power |
||
| status = O |
| status = O |
||
| construction_began = 1967 |
| construction_began = 1967 |
||
| opening = 1971 |
| opening = 1971 |
||
| cost = Rs 399 million<ref name="Wapda">{{cite web|url=http://www.wapda.gov.pk/htmls/chashmabarrage.htm|title=CHASHMA BARRAGE / CHASHMA RIGHT BANK CANAL PROJECT|publisher=Wapda.gov.pk|access-date=24 December 2014|url-status=dead|archive-url=https://web.archive.org/web/20140707060835/http://wapda.gov.pk/htmls/chashmabarrage.htm|archive-date=7 July 2014|df=dmy-all}}</ref> |
|||
| closed = |
|||
| cost = Rs 399 million <ref>http://www.wapda.gov.pk/htmls/chashmabarrage.htm</ref> |
|||
| owner = [[WAPDA]] |
| owner = [[WAPDA]] |
||
| res_name = |
| res_name = |
||
Line 34: | Line 36: | ||
| plant_operator = |
| plant_operator = |
||
| plant_commission = |
| plant_commission = |
||
| plant_turbines = 8 x 23 MW Kaplan |
| plant_turbines = 8 x 23 MW [[Kaplan turbine|Kaplan-type turbines]] |
||
| plant_capacity = 184 [[Megawatt|MW]] |
| plant_capacity = 184 [[Megawatt|MW]] |
||
| plant_annual_gen = 675 GWh<ref> |
| plant_annual_gen = 675 GWh<ref name="Engr Rana M Shakeel">{{cite web|url=https://www.academia.edu/4842831|title=Internship Report of 184 MW hydro Power plant Chashma, Mianwali Pakistan|author=Engr Rana M Shakeel|publisher=Academia.edu|access-date=24 December 2014}}</ref> |
||
| plant_decommission = |
| plant_decommission = |
||
| location_map =Pakistan |
| location_map =Pakistan |
||
| location_map_caption = |
| location_map_caption = |
||
| coordinates = {{coord|32|26|02|N|71|22|44|E|type:landmark|display=inline,title}} |
|||
| lat_d = 32 |
|||
| lat_m = 26 |
|||
| lat_s = 02 |
|||
| lat_NS = N |
|||
| long_d = 71 |
|||
| long_m = 22 |
|||
| long_s = 44 |
|||
| long_EW = E |
|||
| coordinates_type = type:landmark |
|||
| coordinates_display = inline,title |
|||
| website = |
| website = |
||
| extra = |
| extra = {{Designation list |
||
| embed = yes |
|||
| designation1 = Ramsar |
|||
| designation1_date = 22 March 1996 |
|||
| designation1_number = 816<ref>{{Cite web|title=Chashma Barrage|website=[[Ramsar Convention|Ramsar]] Sites Information Service|url=https://rsis.ramsar.org/ris/816|access-date=25 April 2018}}</ref>}} |
|||
}} |
}} |
||
'''Chashma Barrage''' is a [[barrage (dam)|barrage]] on the [[River Indus]] in [[Mianwali District]] of the [[Punjab (Pakistan)|Punjab]] province of [[Pakistan]] |
'''Chashma Barrage''' is a [[barrage (dam)|barrage]] on the [[River Indus]] in the [[Mianwali District]] of the [[Punjab (Pakistan)|Punjab]] province of [[Pakistan]]. It is 304 km northwest of [[Lahore]] and 56 km downstream of [[Jinnah Barrage]]. The contract for Chashma Barrage works was awarded on 10 February, 1967, to French Consortium Société Dumez and Société Borie and was successfully completed by 25 March, 1971. The total cost of Chashma Barrage works was Rs.399 million<ref name="Wapda"/> but power generation started later in 2001. The installed capacity of power station is 184 MW, from eight [[Kaplan-type]] bulb turbine units, each with a 23 MW capacity.{{Citation needed|date=August 2023}} The bulb turbines have been installed for the first time in [[Pakistan]]. The first unit was commissioned in January 2001, while final commissioning of all units was completed in July 2001.<ref name="Engr Rana M Shakeel"/> The 8 [[Kaplan-type]] turbines and synchronous generator units were made by Fuji, [[Japan]]. |
||
Chashma Barrage is used for irrigation, flood control and power generation. A [[Ramsar Convention|Ramsar]] site is located nearby. |
Chashma Barrage is used for irrigation, [[flood control]] and power generation. A [[Ramsar Convention|Ramsar]] site is located nearby. |
||
==Salient |
==Salient features== |
||
Length between abutments: 3556 |
Length between abutments: 3556 ft.<br> |
||
Total Bays: 52 <br> |
Total Bays: 52 <br> |
||
Standard Bays: 41 <br> |
Standard Bays: 41 <br> |
||
Undersluce Bays: 11 <br> |
Undersluce Bays: 11 <br> |
||
Normal Pond Level: 642 |
Normal Pond Level: 642 ft<br> |
||
Maximum Storage Level: 649 |
Maximum Storage Level: 649 ft. <br> |
||
Maximum Flood Discharge: 950000 Cusecs<br> |
Maximum Flood Discharge: 950000 Cusecs<br> |
||
Maximum Intensity of Discharge: 300Cs. Per ft.<br> |
Maximum Intensity of Discharge: 300Cs. Per ft.<br> |
||
Width of Carriage Way: 24 |
Width of Carriage Way: 24 ft.<br> |
||
Length of Navigation Lock: 155 |
Length of Navigation Lock: 155 ft.<br> |
||
Width of Navigation Lock: 30 |
Width of Navigation Lock: 30 ft.<br> |
||
Area of Reservoir: 139 |
Area of Reservoir: 139 square metres.<br> |
||
Initial Capacity: 0.87 MAF<br> |
Initial Capacity: 0.87 MAF<br> |
||
Contract Price: Rs |
Contract Price: Rs 399 Million<br> |
||
Date Commencement: |
Date Commencement: 10 February 1967<br> |
||
Date of Completion: |
Date of Completion: 25 March 1971<br> |
||
Contractor: Societe Dumes Enterprises Borie of France |
Contractor: Societe Dumes Enterprises Borie of France<br> |
||
Consulting Engineer: COODE & Partner London |
Consulting Engineer: COODE & Partner London<ref name="Wapda"/> |
||
==See |
==See also== |
||
* [[List of barrages and headworks in Pakistan]] |
* [[List of barrages and headworks in Pakistan]] |
||
* [[List of dams and reservoirs in Pakistan]] |
* [[List of dams and reservoirs in Pakistan]] |
||
* [[List of power stations in Pakistan]] |
* [[List of power stations in Pakistan]] |
||
==References== |
|||
{{Reflist}} |
|||
{{Pakistani Dams and Water Locks}} |
{{Pakistani Dams and Water Locks}} |
||
{{Protected areas of Pakistan}} |
|||
{{Indus River dams}} |
|||
[[Category:Dams in Pakistan]] |
|||
⚫ | |||
[[Category:Ramsar sites in Pakistan]] |
[[Category:Ramsar sites in Pakistan]] |
||
[[Category:Irrigation in Pakistan]] |
[[Category:Irrigation in Pakistan]] |
||
[[Category:Mianwali District]] |
[[Category:Mianwali District]] |
||
[[Category:Dams on the Indus River]] |
[[Category:Dams on the Indus River]] |
||
⚫ | |||
{{Pakistan-dam-stub}} |
|||
{{reflist}} |
Latest revision as of 18:01, 17 November 2024
Chashma Barrage | |
---|---|
Location | Chashma, Mianwali District |
Coordinates | 32°26′02″N 71°22′44″E / 32.43389°N 71.37889°E |
Purpose | Irrigation, power |
Status | Operational |
Construction began | 1967 |
Opening date | 1971 |
Construction cost | Rs 399 million[1] |
Owner(s) | WAPDA |
Dam and spillways | |
Impounds | Indus River |
Height | 11.28 m (37 ft) |
Length | 1,084 m (3,556 ft) |
Spillway capacity | 27,000 m3/s (950,000 cu ft/s) |
Power Station | |
Hydraulic head | 4.8 m (16 ft) (rated) |
Turbines | 8 x 23 MW Kaplan-type turbines |
Installed capacity | 184 MW |
Annual generation | 675 GWh[2] |
Designated | 22 March 1996 |
Reference no. | 816[3] |
Chashma Barrage is a barrage on the River Indus in the Mianwali District of the Punjab province of Pakistan. It is 304 km northwest of Lahore and 56 km downstream of Jinnah Barrage. The contract for Chashma Barrage works was awarded on 10 February, 1967, to French Consortium Société Dumez and Société Borie and was successfully completed by 25 March, 1971. The total cost of Chashma Barrage works was Rs.399 million[1] but power generation started later in 2001. The installed capacity of power station is 184 MW, from eight Kaplan-type bulb turbine units, each with a 23 MW capacity.[citation needed] The bulb turbines have been installed for the first time in Pakistan. The first unit was commissioned in January 2001, while final commissioning of all units was completed in July 2001.[2] The 8 Kaplan-type turbines and synchronous generator units were made by Fuji, Japan.
Chashma Barrage is used for irrigation, flood control and power generation. A Ramsar site is located nearby.
Salient features
[edit]Length between abutments: 3556 ft.
Total Bays: 52
Standard Bays: 41
Undersluce Bays: 11
Normal Pond Level: 642 ft
Maximum Storage Level: 649 ft.
Maximum Flood Discharge: 950000 Cusecs
Maximum Intensity of Discharge: 300Cs. Per ft.
Width of Carriage Way: 24 ft.
Length of Navigation Lock: 155 ft.
Width of Navigation Lock: 30 ft.
Area of Reservoir: 139 square metres.
Initial Capacity: 0.87 MAF
Contract Price: Rs 399 Million
Date Commencement: 10 February 1967
Date of Completion: 25 March 1971
Contractor: Societe Dumes Enterprises Borie of France
Consulting Engineer: COODE & Partner London[1]
See also
[edit]- List of barrages and headworks in Pakistan
- List of dams and reservoirs in Pakistan
- List of power stations in Pakistan
References
[edit]- ^ a b c "CHASHMA BARRAGE / CHASHMA RIGHT BANK CANAL PROJECT". Wapda.gov.pk. Archived from the original on 7 July 2014. Retrieved 24 December 2014.
- ^ a b Engr Rana M Shakeel. "Internship Report of 184 MW hydro Power plant Chashma, Mianwali Pakistan". Academia.edu. Retrieved 24 December 2014.
- ^ "Chashma Barrage". Ramsar Sites Information Service. Retrieved 25 April 2018.