Manchester Airport High Speed station: Difference between revisions
ChiZeroOne (talk | contribs) Official name |
Maurice Oly (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit |
||
(18 intermediate revisions by 13 users not shown) | |||
Line 1: | Line 1: | ||
{{short description|Planned HS2 railway station}} |
{{short description|Planned HS2 railway station}} |
||
⚫ | |||
{{Use British English|date=July 2017}} |
{{Use British English|date=July 2017}} |
||
⚫ | |||
{{Infobox station |
{{Infobox station |
||
| name = Manchester Interchange |
| name = Manchester Interchange |
||
Line 11: | Line 11: | ||
| borough = Davenport Green, [[Trafford]] |
| borough = Davenport Green, [[Trafford]] |
||
| country = England |
| country = England |
||
| coordinates |
| coordinates = {{coord|53.3708|-2.2941|type:railwaystation_region:GB-MAN|display=inline,title}} |
||
| platforms |
| platforms = 4 |
||
| classification |
| classification = [[United Kingdom railway station categories|DfT category]] TBC |
||
| transit_authority |
| transit_authority = [[Transport for Greater Manchester]] |
||
| opening = {{circa|2033}} |
|||
}} |
}} |
||
'''Manchester Airport High Speed Station'''<ref name="F2">{{cite web |title=Phase 2b Western Leg Information Paper F2: Manchester Airport High Speed Station |url=https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1048866/F2_Manchester_Airport_High_Speed_Station_v1.pdf |website=[[gov.uk]] |publisher=High Speed Two Limited |access-date=28 January 2022}}</ref> was a planned [[HS2|High Speed 2]] station at [[Manchester Airport]], on the southern boundary of [[Manchester]], [[England]], next to Junction 5 of the [[M56 motorway]] on the northern side of the airport {{convert|1.5|mi}} north-west of [[Manchester Airport railway station]].<ref name=dft-map-manchesterairport>{{cite web |title=Route section HSM28 plan and profile sheet 5 of 9 – drawing number HS2-MSG-MA0-ZZ-DR-RT-52805 |url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/69079/hs2-msg-ma0-zz-dr-rt-52805.pdf |work=HS2 phase two initial preferred route plan and profile maps |publisher=DfT |access-date=2 February 2013 |date=January 2013}}</ref> In 2023 plans to build the line were dropped. |
|||
==Proposal== |
|||
⚫ | |||
Manchester Airport is the [[Busiest airports in the United Kingdom by total passenger traffic|busiest airport in the UK]] outside London and offers more destinations than any other British airport. An airport station was recommended by local authorities during the consultation stage.<ref>{{Cite web|title=Council chiefs lobby ministers for TWO high speed rail stations |url=http://www.manchestereveningnews.co.uk/news/greater-manchester-news/trafford-council-chiefs-lobby-ministers-1230363 |newspaper=Manchester Evening News |date=22 January 2013 |access-date=2013-01-27 |url-status=dead |archive-url=https://web.archive.org/web/20130518065740/http://www.manchestereveningnews.co.uk/news/greater-manchester-news/trafford-council-chiefs-lobby-ministers-1230363 |archive-date=18 May 2013 }}</ref><ref name="manchub">{{Cite news|title=Manchester Airport may be high-speed rail network hub |url=http://menmedia.co.uk/manchestereveningnews/news/transport/s/1410661_manchester_airport_may_be_highspeed_rail_network_hub |newspaper=Manchester Evening News |date=13 March 2011 |access-date=11 March 2012 |url-status=dead |archive-url=https://web.archive.org/web/20110316215516/http://menmedia.co.uk/manchestereveningnews/news/transport/s/1410661_manchester_airport_may_be_highspeed_rail_network_hub |archive-date=16 March 2011 }}</ref> The government agreed in January 2013 for an airport station, but only on the basis that private investment was involved, such as funding from the [[Manchester Airports Group]] to build the station. The government approved the scheme in November 2016.<ref>{{cite web|url=https://www.bbc.co.uk/news/business-37981840|title=HS2: North West and Yorkshire routes confirmed|date=15 November 2016|publisher=BBC News}}</ref><ref>{{cite web|url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/568208/high-speed-two-crewe-manchester-west-midlands-leeds-web-version.pdf|title=High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond|work=DfT|date=November 2016}}</ref> |
|||
==History== |
|||
In 2020, revised plans were released that saw the number of platforms increased from two to four.<ref name="2020 proposals">{{Cite web|date=2020-10-08|title=HS2 Ltd Launches Public Consultation on Proposed Changes to Phase 2b|url=https://railway-news.com/hs2-ltd-launches-public-consultation-on-proposed-changes-to-phase-2b/|access-date=2020-12-15|website=Railway-News}}</ref> |
In 2020, revised plans were released that saw the number of platforms increased from two to four.<ref name="2020 proposals">{{Cite web|date=2020-10-08|title=HS2 Ltd Launches Public Consultation on Proposed Changes to Phase 2b|url=https://railway-news.com/hs2-ltd-launches-public-consultation-on-proposed-changes-to-phase-2b/|access-date=2020-12-15|website=Railway-News}}</ref> |
||
The proposed new station was officially abandoned when the United Kingdom government under Prime Minister [[Rishi Sunak]] and chancellor [[Jeremy Hunt]] announced the cancellation of the Manchester leg of High Speed 2 on 4 October 2023.<ref>{{cite web | url=https://www.manchestereveningnews.co.uk/news/greater-manchester-news/live-hs2-rishi-sunak-manchester-27837525 | title=LIVE: HS2 Manchester link cancelled by Rishi Sunak - updates and reaction | date=4 October 2023 }}</ref> |
|||
⚫ | Had the station been built, journey times from [[London Euston]] to Manchester Airport would have been estimated at between 59{{nbsp}}minutes and 63{{nbsp}}minutes.<ref>{{cite web|url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/568369/hs2-phase-2b-sobc-economic-case.pdf |title=High Speed Two Phase 2b Strategic Outline Business Case Economic Case |page=32}}</ref><ref name="guardian-hs2-journey-times">{{cite web|last1=Arnett|first1=George|title=How will HS2 change journey times to and from London?|url=https://www.theguardian.com/news/datablog/2014/mar/17/hs2-change-journey-times-london|website=The Guardian|access-date=18 December 2017|archive-url=https://web.archive.org/web/20171218110527/https://www.theguardian.com/news/datablog/2014/mar/17/hs2-change-journey-times-london|archive-date=18 December 2017|date=17 March 2014|url-status=live}}</ref> Additionally, the high speed service would have been less than 10{{nbsp}}minutes from Manchester Piccadilly to the airport – down from 15{{nbsp}}minutes at present on the congested [[Styal Line]] which is used by a mix of commuter, express and freight services and susceptible to delays. However, the proposed station is not actually at the airport. Passengers would be required to use a shuttle bus to get to the station from the airport, so air passengers wishing to reach Manchester on arrival at the airport would be better served by the existing train service from the station in the airport. |
||
==Metrolink tram stop== |
==Metrolink tram stop== |
||
{{Infobox station |
{{Infobox station |
||
Line 35: | Line 39: | ||
| opened = |
| opened = |
||
| opening = |
| opening = |
||
| |
| mapframe = yes |
||
| mapframe-custom = {{maplink|from=Manchester Metrolink.map|zoom=13|frame=yes|plain=yes|frame-width=300|frame-height=300|type2=point|marker2=rail-light|marker-color2=#C0C0C0}} |
|||
⚫ | |||
| map_state = collapsed |
|||
}} |
}} |
||
⚫ | |||
⚫ | Before the High Speed 2 station was cancelled, extant proposals did not detail passenger interchange facilities, but indicated that various options were being considered to integrate the station with existing transport networks, including extending the [[Manchester Metrolink]] tram line to serve the HS2 station directly.<ref name="manc-airport-2013">{{cite web|title=Manchester Airport High Speed Station|url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/382000/HS2_Phase_Two_Manchester_Airport_High_Speed_station_factsheet.pdf|website=UK Government website|publisher=High Speed Two (HS2) Limited|access-date=18 December 2017|archive-url=https://web.archive.org/web/20171218104221/https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/382000/HS2_Phase_Two_Manchester_Airport_High_Speed_station_factsheet.pdf|archive-date=18 December 2017|date=2013|url-status=live}}</ref><ref name="HSR-manchester-interchange">{{cite book|author1=Department for Transport|author-link1=Department for Transport|title=High Speed Rail: Investing in Britain's Future – Phase Two, the Route to Leeds, Manchester and Beyond|date=2013|publisher=The Stationery Office|isbn=9780101850827|page=38|url=https://books.google.com/books?id=sOfRI8yd2-gC&q=Manchester%20Airport%20HS2%20station%20interchange&pg=PA38|access-date=18 December 2017|language=en}}</ref> |
||
⚫ | [[Transport for Greater Manchester]] |
||
⚫ | [[Transport for Greater Manchester]] had proposed that the Metrolink [[Airport Line (Manchester Metrolink)|Airport Line]] — which currently terminates at [[Manchester Airport station]] — be extended via a new "western loop" around Wythenshawe. This proposed tram line which would cross the [[M56 motorway]] via the Thorley Lane Bridge, with an HS2 interchange stop at Davenport Green, before looping around via [[Wythenshawe Hospital]]. Local politicians have begun lobbying central government for political support for this extension scheme, which is currently unfunded.<ref>{{cite web|url=https://www.bbc.co.uk/news/uk-england-manchester-29842268|title=Wythenshawe 'western loop' Metrolink tram line to be proposed|work=BBC News|access-date=20 November 2015|date=31 October 2014}}</ref> |
||
Revised proposals published in 2020 include provision for an east-west tram line that serves this station.<ref name="2020 proposals" /> |
Revised proposals published in 2020 include provision for an east-west tram line that serves this station.<ref name="2020 proposals" /> |
||
==Services== |
==Services== |
||
<!-- linked from redirect [[Manchester Interchange Metrolink Station]] --> |
<!-- linked from redirect [[Manchester Interchange Metrolink Station]] --> |
||
Service proposals prior to cancellation would have seen five trains per hour north to [[Manchester Piccadilly station|Manchester Piccadilly]], three trains per hour south to [[Old Oak Common railway station|Old Oak Common]] and [[London Euston]] (one service additionally calls at [[Birmingham Interchange]]), and two trains south to [[Birmingham Curzon Street railway station|Birmingham Curzon Street]]. The station was also planned to be an intermediate stop on the proposed [[Northern Powerhouse Rail]] line. |
|||
{{Adjacent stations|noclear=y |
|||
{{Future rail start}} |
|||
|hide-system1=y|system1=Manchester Metrolink |
|||
{{rail line |previous=[[Crewe railway station|Crewe]]|next={{rws|Manchester Piccadilly}}|route=TBA<br>[[High Speed 2]] |col={{temporary rail colour}} }} |
|||
|header2=Future services |
|||
{{rail line |previous=[[Birmingham Curzon Street railway station|Birmingham Curzon Street]] or [[Birmingham Interchange railway station|Birmingham Interchange]] or [[Old Oak Common railway station|Old Oak Common]]|next={{rws|Manchester Piccadilly}}|route=[[Avanti West Coast]]<br>[[High Speed 2]] |col={{AWC colour}} }} |
|||
{{rail line|previous={{rws|Warrington Bank Quay}}|next={{rws|Manchester Piccadilly}}|route=TBA<br>[[Northern Powerhouse Rail]]|col={{temporary rail colour}} }} |
{{rail line|previous={{rws|Warrington Bank Quay}}|next={{rws|Manchester Piccadilly}}|route=TBA<br>[[Northern Powerhouse Rail]]|col={{temporary rail colour}} }} |
||
⚫ | |||
{{s-rail|title=MML}} |
|||
|line3=Manchester Airport|left3=Davenport Green|right3=Newall Green|to-left3=Cornbrook|to-right3=Roundthorn |
|||
}} |
|||
==References== |
==References== |
||
Line 57: | Line 66: | ||
==External links== |
==External links== |
||
*[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/225268/route-section-hsm28-plan-and-profile-sheet-5-of-9.pdf Route |
*[https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/225268/route-section-hsm28-plan-and-profile-sheet-5-of-9.pdf Route Section Map & Profile] |
||
*[https://www.manchester-airportcars.co.uk/taxi-fare/manchester-airport-to-leeds.html Manchester Airport Transfers] |
|||
{{Rail infrastructure projects in the United Kingdom}} |
{{Rail infrastructure projects in the United Kingdom}} |
||
[[Category:High Speed 2]] |
[[Category:High Speed 2]] |
||
⚫ | |||
[[Category:Railway stations in Manchester]] |
[[Category:Railway stations in Manchester]] |
||
[[Category:Proposed railway stations in England]] |
[[Category:Proposed railway stations in England]] |
||
⚫ | |||
[[Category:Proposed Manchester Metrolink tram stops]] |
[[Category:Proposed Manchester Metrolink tram stops]] |
Latest revision as of 02:49, 18 November 2024
General information | |
---|---|
Location | Davenport Green, Trafford England |
Coordinates | 53°22′15″N 2°17′39″W / 53.3708°N 2.2941°W |
Transit authority | Transport for Greater Manchester |
Platforms | 4 |
Other information | |
Classification | DfT category TBC |
Manchester Airport High Speed Station[1] was a planned High Speed 2 station at Manchester Airport, on the southern boundary of Manchester, England, next to Junction 5 of the M56 motorway on the northern side of the airport 1.5 miles (2.4 km) north-west of Manchester Airport railway station.[2] In 2023 plans to build the line were dropped.
Proposal
[edit]Manchester Airport is the busiest airport in the UK outside London and offers more destinations than any other British airport. An airport station was recommended by local authorities during the consultation stage.[3][4] The government agreed in January 2013 for an airport station, but only on the basis that private investment was involved, such as funding from the Manchester Airports Group to build the station. The government approved the scheme in November 2016.[5][6]
In 2020, revised plans were released that saw the number of platforms increased from two to four.[7]
The proposed new station was officially abandoned when the United Kingdom government under Prime Minister Rishi Sunak and chancellor Jeremy Hunt announced the cancellation of the Manchester leg of High Speed 2 on 4 October 2023.[8]
Had the station been built, journey times from London Euston to Manchester Airport would have been estimated at between 59 minutes and 63 minutes.[9][10] Additionally, the high speed service would have been less than 10 minutes from Manchester Piccadilly to the airport – down from 15 minutes at present on the congested Styal Line which is used by a mix of commuter, express and freight services and susceptible to delays. However, the proposed station is not actually at the airport. Passengers would be required to use a shuttle bus to get to the station from the airport, so air passengers wishing to reach Manchester on arrival at the airport would be better served by the existing train service from the station in the airport.
Metrolink tram stop
[edit]Manchester Interchange | |||||
---|---|---|---|---|---|
Metrolink station | |||||
General information | |||||
Location | Davenport Green, Trafford England | ||||
Coordinates | 53°22′15″N 2°17′39″W / 53.3708°N 2.2941°W | ||||
Other information | |||||
Status | Proposed station | ||||
|
Before the High Speed 2 station was cancelled, extant proposals did not detail passenger interchange facilities, but indicated that various options were being considered to integrate the station with existing transport networks, including extending the Manchester Metrolink tram line to serve the HS2 station directly.[11][12]
Transport for Greater Manchester had proposed that the Metrolink Airport Line — which currently terminates at Manchester Airport station — be extended via a new "western loop" around Wythenshawe. This proposed tram line which would cross the M56 motorway via the Thorley Lane Bridge, with an HS2 interchange stop at Davenport Green, before looping around via Wythenshawe Hospital. Local politicians have begun lobbying central government for political support for this extension scheme, which is currently unfunded.[13]
Revised proposals published in 2020 include provision for an east-west tram line that serves this station.[7]
Services
[edit]Service proposals prior to cancellation would have seen five trains per hour north to Manchester Piccadilly, three trains per hour south to Old Oak Common and London Euston (one service additionally calls at Birmingham Interchange), and two trains south to Birmingham Curzon Street. The station was also planned to be an intermediate stop on the proposed Northern Powerhouse Rail line.
Future services | ||||
---|---|---|---|---|
Birmingham Curzon Street or Birmingham Interchange or Old Oak Common | Avanti West Coast High Speed 2 |
Manchester Piccadilly | ||
Warrington Bank Quay | TBA Northern Powerhouse Rail |
Manchester Piccadilly | ||
Preceding station | Manchester Metrolink | Following station | ||
Davenport Green towards Cornbrook
|
Manchester Airport Line (proposed)
|
Newall Green towards Roundthorn
|
References
[edit]- ^ "Phase 2b Western Leg Information Paper F2: Manchester Airport High Speed Station" (PDF). gov.uk. High Speed Two Limited. Retrieved 28 January 2022.
- ^ "Route section HSM28 plan and profile sheet 5 of 9 – drawing number HS2-MSG-MA0-ZZ-DR-RT-52805" (PDF). HS2 phase two initial preferred route plan and profile maps. DfT. January 2013. Retrieved 2 February 2013.
- ^ "Council chiefs lobby ministers for TWO high speed rail stations". Manchester Evening News. 22 January 2013. Archived from the original on 18 May 2013. Retrieved 27 January 2013.
- ^ "Manchester Airport may be high-speed rail network hub". Manchester Evening News. 13 March 2011. Archived from the original on 16 March 2011. Retrieved 11 March 2012.
- ^ "HS2: North West and Yorkshire routes confirmed". BBC News. 15 November 2016.
- ^ "High Speed Two: From Crewe to Manchester, the West Midlands to Leeds and beyond" (PDF). DfT. November 2016.
- ^ a b "HS2 Ltd Launches Public Consultation on Proposed Changes to Phase 2b". Railway-News. 8 October 2020. Retrieved 15 December 2020.
- ^ "LIVE: HS2 Manchester link cancelled by Rishi Sunak - updates and reaction". 4 October 2023.
- ^ "High Speed Two Phase 2b Strategic Outline Business Case Economic Case" (PDF). p. 32.
- ^ Arnett, George (17 March 2014). "How will HS2 change journey times to and from London?". The Guardian. Archived from the original on 18 December 2017. Retrieved 18 December 2017.
- ^ "Manchester Airport High Speed Station" (PDF). UK Government website. High Speed Two (HS2) Limited. 2013. Archived (PDF) from the original on 18 December 2017. Retrieved 18 December 2017.
- ^ Department for Transport (2013). High Speed Rail: Investing in Britain's Future – Phase Two, the Route to Leeds, Manchester and Beyond. The Stationery Office. p. 38. ISBN 9780101850827. Retrieved 18 December 2017.
- ^ "Wythenshawe 'western loop' Metrolink tram line to be proposed". BBC News. 31 October 2014. Retrieved 20 November 2015.