{{Short description|Passenger rail service in metropolitan Melbourne, Victoria, Australia}}
{{Short description|Passenger rail service in metropolitan Melbourne, Victoria, Australia}}
{{about|the [[Metro Trains Melbourne]] service|the physical railway itself|Gippsland railway line}}
{{about|the Metro Trains Melbourne service|the physical railway itself|Gippsland railway line}}
{{good article}}
{{good article}}
{{Use dmy dates|date=January 2023}}
{{Use dmy dates|date=January 2023}}
Line 8: Line 8:
| color = {{rcr|Melbourne|Pakenham}}
| color = {{rcr|Melbourne|Pakenham}}
| logo = {{ric|Melbourne|Pakenham|size=100px}}
| logo = {{ric|Melbourne|Pakenham|size=100px}}
| image = HCMT at Carnegie.jpg
| image = HCMT set 57 arriving at Springvale railway station (7 October 2024).jpg
| image_width = 250px
| image_width = 250px
| image_alt = A High Capacity Metro Train at Carnegie station in Melbourne.
| image_alt = A High Capacity Metro Train arriving at Springvale station Platform 2
| caption = A city-bound [[High Capacity Metro Train]] at [[Carnegie railway station|Carnegie station]].
| caption = An [[East Pakenham railway station|East Pakenham]]-bound service [[High Capacity Metro Train]] arriving at [[Springvale railway station|Springvale station]] Platform 2, October 2024
| type = [[Commuter rail]]
| type = [[Commuter rail]]
| status = Operational
| status = Operational
Line 40: Line 40:
| start = {{rwsa|Flinders Street}}
| start = {{rwsa|Flinders Street}}
| stops = 28 (including City Loop stations)
| stops = 28 (including City Loop stations)
| end = {{rwsa|Pakenham}}
| end = {{rwsa|East Pakenham}}
| distance = {{Convert|63.368|km|abbr=on}}
| distance = {{Convert|63.368|km|abbr=on}}
| journeytime = 1 hour 13 minutes (not via City Loop)<!-- not including loop as only inbound trains run via loop -->
| journeytime = 1 hour 13 minutes (not via City Loop)<!-- not including loop as only inbound trains run via loop + this probably doesn't include the time between Pakenham and East Pakenham yet -->
| frequency = {{blist|5–10 minutes weekdays peak|20 minutes weekdays off-peak and weekend daytime|20–30 minutes weekend nights|60 minutes [[Night Network (Melbourne)|early weekend mornings]]|Double frequency daytime between Flinders Street and Dandenong in combination with [[Cranbourne railway line|Cranbourne line]]}}
| frequency = {{blist|5–10 minutes weekdays peak|20 minutes weekdays off-peak and weekend daytime|20–30 minutes weekend nights|60 minutes [[Night Network (Melbourne)|early weekend mornings]]|Double frequency daytime between Flinders Street and Dandenong in combination with [[Cranbourne railway line|Cranbourne line]]}}
| line_used = [[Orbost railway line|Orbost]]
| line_used = [[Orbost railway line|Orbost]]
Line 60: Line 60:
}}
}}


The '''Pakenham line''' is a [[commuter rail]]way line in the city of [[Melbourne]], [[Victoria (Australia)|Victoria]], [[Australia]].<ref>{{Cite web |title=Pakenham Line |url=https://www.ptv.vic.gov.au/route/ |access-date=9 December 2022 |website=Public Transport Victoria |archive-date=7 September 2018 |archive-url=https://web.archive.org/web/20180907155122/https://www.ptv.vic.gov.au/route/ |url-status=live }}</ref> Operated by [[Metro Trains Melbourne]], it is the city's longest metropolitan railway line at {{convert|57|km}}. The line runs from [[Flinders Street railway station|Flinders Street station]] in central Melbourne to [[Pakenham railway station|Pakenham station]] in the south-east, serving 27 stations via the [[City Loop]], [[South Yarra railway station|South Yarra]], [[Caulfield railway station|Caulfield]], [[Oakleigh railway station|Oakleigh]], and [[Dandenong railway station|Dandenong]].<ref>{{Cite web |date=3 September 2017 |title=Metro's paper timetables mess |url=https://www.danielbowen.com/2017/09/04/metro-paper-timetable-issues/ |access-date=9 December 2022 |website=Daniel Bowen |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095505/https://www.danielbowen.com/2017/09/04/metro-paper-timetable-issues/ |url-status=live }}</ref> The line operates for approximately 20 hours a day (from approximately 4:00 am to around midnight) with 24 hour service available on Friday and Saturday nights. During peak hour, [[headway]]s of up to 5 to 10 minutes are operated with services every 20 minutes during off-peak hours.<ref>{{Cite web |last= |first= |title=Pakenham Line Timetable |url=https://www.ptv.vic.gov.au/route/ |access-date=9 January 2023 |website=Public Transport Victoria |language=en-GB |archive-date=7 September 2018 |archive-url=https://web.archive.org/web/20180907155122/https://www.ptv.vic.gov.au/route/ |url-status=live }}</ref> Trains on the Pakenham line run with a seven-car formation operated by [[High Capacity Metro Train]]s.<ref>{{Cite web |title=High Capacity Metro Trains Project, Victoria, Australia |url=https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |access-date=9 December 2022 |website=Railway Technology |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095504/https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |url-status=live }}</ref>
The '''Pakenham line''' is a weekdays-only<ref>https://www.ptv.vic.gov.au/disruptions/disruptions-information/</ref> [[Commuter rail|commuter railway]] line on the [[Railways in Melbourne|Melbourne metropolitan railway network]] serving the city of [[Melbourne]] in [[Victoria (state)|Victoria]], [[Australia]]. Operated by [[Metro Trains Melbourne]], the line is coloured [[Light blue|light blue]] and is one of the two lines that constitute the [[Metro Trains Melbourne#Caulfield Group|Caulfield group]]. It is the city's longest metropolitan railway line at {{convert|57|km}}. The line runs from [[Flinders Street railway station|Flinders Street station]] in central Melbourne to [[East Pakenham railway station|East Pakenham station]] in the south-east, serving 27 stations via [[South Yarra railway station|South Yarra]], [[Caulfield railway station|Caulfield]], [[Oakleigh railway station|Oakleigh]], and [[Dandenong railway station|Dandenong]].<ref>{{Cite web |date=3 September 2017 |title=Metro's paper timetables mess |url=https://www.danielbowen.com/2017/09/04/metro-paper-timetable-issues/ |url-status=live |archive-url=https://web.archive.org/web/20221209095505/https://www.danielbowen.com/2017/09/04/metro-paper-timetable-issues/ |archive-date=9 December 2022 |access-date=9 December 2022 |website=Daniel Bowen}}</ref>


Sections of the Pakenham line opened as early as 1859, with the line fully extended to Pakenham in October 1877. A limited number of stations were first opened, with infill stations progressively opened between 1879 and 2012.<ref name=":1122">{{Cite web |title=What year did your railway station open? {{!}} Public Transport Users Association (Victoria, Australia) |url=https://www.ptua.org.au/2018/08/03/railway-stations-years-opened/ |access-date=9 December 2022 |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095505/https://www.ptua.org.au/2018/08/03/railway-stations-years-opened/ |url-status=live }}</ref> The line was built to connect [[Melbourne]] with the rural towns of [[Caulfield, Victoria|Caulfield]], [[Oakleigh, Victoria|Oakleigh]], and [[Dandenong, Victoria|Dandenong]], amongst others. Significant growth has occurred since opening, with an extension to open on the Pakenham line one stop east to a [[East Pakenham railway station|new station]] in [[Pakenham East, Victoria|Pakenham East]] as part of the [[Level Crossing Removal Project]].<ref name=":0" /> This extension will open on 3 June 2024.<ref name=":0">{{Cite web |last=Victoria's Big Build |date=18 February 2021 |title=New Pakenham East station location announced and 3 more sets of boom gates to go |url=https://bigbuild.vic.gov.au/news/level-crossing-removal-project/new-pakenham-east-station-location-announced-and-3-more-sets-of-boom-gates-to-go |access-date=9 December 2022 |website=Victoria’s Big Build |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209101005/https://bigbuild.vic.gov.au/news/level-crossing-removal-project/new-pakenham-east-station-location-announced-and-3-more-sets-of-boom-gates-to-go |url-status=live }}</ref><ref>{{Cite web |date=10 May 2024 |url=https://pakenham.starcommunity.com.au/news/2024-05-10/stations-to-open-3-june/#:~:text=Residents%20will%20wait%20less%20than,set%20for%20Monday%2C%203%20June.|title=Stations to open 3 June|access-date=10 May 2024 |website=Pakenham Gazette |language=en}}</ref>
The line operates for approximately 20 hours a day (from approximately 4:00 am to around midnight) with 24 hour service available on Friday and Saturday nights. During peak hour, [[headway]]s of up to 5 to 10 minutes are operated with services every 20 minutes during off-peak hours.<ref>{{Cite web |last= |first= |title=Pakenham Line Timetable |url=https://www.ptv.vic.gov.au/route/ |access-date=9 January 2023 |website=Public Transport Victoria |language=en-GB |archive-date=7 September 2018 |archive-url=https://web.archive.org/web/20180907155122/https://www.ptv.vic.gov.au/route/ |url-status=live }}</ref> Trains on the Pakenham line run with a seven-car formation operated by [[High Capacity Metro Train]]s.<ref>{{Cite web |title=High Capacity Metro Trains Project, Victoria, Australia |url=https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |access-date=9 December 2022 |website=Railway Technology |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095504/https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |url-status=live }}</ref>
Sections of the Pakenham line opened as early as 1859, with the line fully extended to Pakenham in October 1877. A limited number of stations were first opened, with infill stations progressively opened between 1879 and 2012.<ref name=":1122">{{Cite web |title=What year did your railway station open? {{!}} Public Transport Users Association (Victoria, Australia) |url=https://www.ptua.org.au/2018/08/03/railway-stations-years-opened/ |access-date=9 December 2022 |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095505/https://www.ptua.org.au/2018/08/03/railway-stations-years-opened/ |url-status=live }}</ref> The line was built to connect [[Melbourne]] with the rural towns of [[Caulfield, Victoria|Caulfield]], [[Oakleigh, Victoria|Oakleigh]], and [[Dandenong, Victoria|Dandenong]], amongst others. Significant growth has occurred since opening, with an extension to open on the Pakenham line one stop east to a [[East Pakenham railway station|new station]] in [[Pakenham East, Victoria|Pakenham East]] as part of the [[Level Crossing Removal Project]].<ref name=":0" /> This extension opened on 3 June 2024.<ref name=":0">{{Cite web |last=Victoria's Big Build |date=18 February 2021 |title=New Pakenham East station location announced and 3 more sets of boom gates to go |url=https://bigbuild.vic.gov.au/news/level-crossing-removal-project/new-pakenham-east-station-location-announced-and-3-more-sets-of-boom-gates-to-go |access-date=9 December 2022 |website=Victoria’s Big Build |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209101005/https://bigbuild.vic.gov.au/news/level-crossing-removal-project/new-pakenham-east-station-location-announced-and-3-more-sets-of-boom-gates-to-go |url-status=live }}</ref><ref>{{Cite web |date=10 May 2024 |url=https://pakenham.starcommunity.com.au/news/2024-05-10/stations-to-open-3-june/#:~:text=Residents%20will%20wait%20less%20than,set%20for%20Monday%2C%203%20June.|title=Stations to open 3 June|access-date=10 May 2024 |website=Pakenham Gazette |language=en}}</ref>


Since the 2010s, due to the heavily utilised infrastructure of the Pakenham line, significant improvements and upgrades have been made. A $15 billion upgrade of the corridor included the replacement of [[Railroad tie|sleepers]], the introduction of new signalling technology, the introduction of new rolling stock, the removal of all [[level crossing]]s, and works associated with the Metro Tunnel project. These projects have improved the quality and safety of the line<ref name=":1">{{Cite web |title=Level Crossing-Free Pakenham Line Another Step Closer |url=https://transport.vic.gov.au/about/transport-news/news-archive/level-crossing-free-pakenham-line-another-step-closer |access-date=9 December 2022 |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209110244/https://transport.vic.gov.au/about/transport-news/news-archive/level-crossing-free-pakenham-line-another-step-closer |url-status=live }}</ref> and will be completed by the opening of the [[Metro Tunnel]] in 2025.<ref name=":4">{{Cite web |last=Victoria's Big Build |date=28 November 2022 |title=About the Metro Tunnel Project |url=https://bigbuild.vic.gov.au/projects/metro-tunnel/about |access-date=9 December 2022 |website=Victoria’s Big Build |archive-date=7 December 2022 |archive-url=https://web.archive.org/web/20221207174018/https://bigbuild.vic.gov.au/projects/metro-tunnel/about |url-status=live }}</ref>
Since the 2010s, due to the heavily utilised infrastructure of the Pakenham line, significant improvements and upgrades have been made. A $15 billion upgrade of the corridor included the replacement of [[Railroad tie|sleepers]], the introduction of new signalling technology, the introduction of new rolling stock, the removal of all [[level crossing]]s, and works associated with the Metro Tunnel project. These projects have improved the quality and safety of the line<ref name=":1">{{Cite web |title=Level Crossing-Free Pakenham Line Another Step Closer |url=https://transport.vic.gov.au/about/transport-news/news-archive/level-crossing-free-pakenham-line-another-step-closer |access-date=9 December 2022 |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209110244/https://transport.vic.gov.au/about/transport-news/news-archive/level-crossing-free-pakenham-line-another-step-closer |url-status=live }}</ref> and will be completed by the opening of the [[Metro Tunnel]] in 2025.<ref name=":4">{{Cite web |last=Victoria's Big Build |date=28 November 2022 |title=About the Metro Tunnel Project |url=https://bigbuild.vic.gov.au/projects/metro-tunnel/about |access-date=9 December 2022 |website=Victoria’s Big Build |archive-date=7 December 2022 |archive-url=https://web.archive.org/web/20221207174018/https://bigbuild.vic.gov.au/projects/metro-tunnel/about |url-status=live }}</ref>
Line 86: Line 88:
=== 21st century ===
=== 21st century ===
{{Main|Pakenham railway line#Future}}
{{Main|Pakenham railway line#Future}}
[[File:Cardinia Road 2012-07-22 06.jpg|thumb|A [[Comeng (train)|Comeng train]] arriving at [[Cardinia Road railway station|Cardinia Road station]] in 2012.|alt=A train arriving at the new illuminated platforms at Cardinia Road station in the early morning]]
[[File:Cardinia Road 2012-07-22 06.jpg|thumb|A [[Comeng (train)|Comeng train]] arriving at [[Cardinia Road railway station|Cardinia Road station]], July 2012|alt=A train arriving at the new illuminated platforms at Cardinia Road station in the early morning]]
In 2002, after the closure of the nearby [[General Motors]] factory in 1991, [[General Motors railway station|General Motors station]] closed permanently after 46 years of operation.<ref>{{Cite web |last=Townsend |first=Mellissa |date=20 April 2015 |title=No plans for run down General Motors train station at Dandenong South |url=https://www.heraldsun.com.au/leader/south-east/no-plans-for-run-down-general-motors-train-station-at-dandenong-south/news-story/325b90d8ea84268edd32abd45d47ecfa |website=Herald Sun |access-date=4 June 2019 |archive-date=25 March 2018 |archive-url=https://web.archive.org/web/20180325061523/http://www.heraldsun.com.au/leader/south-east/no-plans-for-run-down-general-motors-train-station-at-dandenong-south/news-story/325b90d8ea84268edd32abd45d47ecfa |url-status=live }}</ref> A 2007 restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.<ref>{{Cite web |last=Moynihan |first=Stephen |date=3 March 2007 |title=No more Zone 3 lifts load on commuters |url=https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |access-date=29 December 2022 |website=The Age |archive-date=29 December 2022 |archive-url=https://web.archive.org/web/20221229011957/https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |url-status=live }}</ref> This brought the cost of train fares down, improving system accessibility to the public.
In 2002, after the closure of the nearby [[General Motors]] factory in 1991, [[General Motors railway station|General Motors station]] closed permanently after 46 years of operation.<ref>{{Cite web |last=Townsend |first=Mellissa |date=20 April 2015 |title=No plans for run down General Motors train station at Dandenong South |url=https://www.heraldsun.com.au/leader/south-east/no-plans-for-run-down-general-motors-train-station-at-dandenong-south/news-story/325b90d8ea84268edd32abd45d47ecfa |website=Herald Sun |access-date=4 June 2019 |archive-date=25 March 2018 |archive-url=https://web.archive.org/web/20180325061523/http://www.heraldsun.com.au/leader/south-east/no-plans-for-run-down-general-motors-train-station-at-dandenong-south/news-story/325b90d8ea84268edd32abd45d47ecfa |url-status=live }}</ref> A 2007 restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.<ref>{{Cite web |last=Moynihan |first=Stephen |date=3 March 2007 |title=No more Zone 3 lifts load on commuters |url=https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |access-date=29 December 2022 |website=The Age |archive-date=29 December 2022 |archive-url=https://web.archive.org/web/20221229011957/https://www.theage.com.au/national/no-more-zone-3-lifts-load-on-commuters-20070303-ge4cc2.html |url-status=live }}</ref> This brought the cost of train fares down, improving system accessibility to the public.


The Pakenham line received heavy investment during the 2010s to align with the [[Network Development Plan – Metropolitan Rail|2013 PTV Development Plan]]. A new station at [[Cardinia Road railway station|Cardinia Road]] opened in 2012 situated between [[Officer railway station|Officer]] and Pakenham stations.<ref name=":13" /> This is the first infill station to open on the line since 1927, with an additional station at [[East Pakenham railway station|Pakenham East]] expected to open in 2024 in conjunction with [[Level Crossing Removal Project|level crossing removal works]].<ref name=":5">{{Cite web |last=Victoria's Big Build |date=25 October 2022 |title=Main Street, Pakenham |url=https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-street-pakenham |access-date=11 December 2022 |website=Victoria’s Big Build |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209013441/https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-street-pakenham |url-status=live }}</ref> In 2018, the Pakenham East Depot opened for the newly acquired [[High Capacity Metro Train]]s. This depot has stabling capacity for 30 seven-car trains with train maintenance, driver training, and washing facilities present onsite.<ref>{{Cite web |title=High Capacity Metro Trains Project, Victoria, Australia |url=https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |access-date=19 December 2022 |website=Railway Technology |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095524/https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |url-status=live }}</ref>
The Pakenham line received heavy investment during the 2010s to align with the [[Network Development Plan – Metropolitan Rail|2013 PTV Development Plan]]. A new station at [[Cardinia Road railway station|Cardinia Road]] opened in 2012 situated between [[Officer railway station|Officer]] and Pakenham stations.<ref name=":13" /> This is the first infill station to open on the line since 1927, with an additional station at [[East Pakenham railway station|Pakenham East]] expected to open in 2024 in conjunction with [[Level Crossing Removal Project|level crossing removal works]].<ref name=":5">{{Cite web |last=Victoria's Big Build |date=25 October 2022 |title=Main Street, Pakenham |url=https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-street-pakenham |access-date=11 December 2022 |website=Victoria’s Big Build |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209013441/https://bigbuild.vic.gov.au/projects/level-crossing-removal-project/projects/main-street-pakenham |url-status=live }}</ref> In 2018, the Pakenham East Depot opened for the newly acquired [[High Capacity Metro Train]]s. This depot has stabling capacity for 30 seven-car trains with train maintenance, driver training, and washing facilities present onsite.<ref>{{Cite web |title=High Capacity Metro Trains Project, Victoria, Australia |url=https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |access-date=19 December 2022 |website=Railway Technology |archive-date=9 December 2022 |archive-url=https://web.archive.org/web/20221209095524/https://www.railway-technology.com/projects/high-capacity-metro-trains-project-victoria/ |url-status=live }}</ref>

Announced in 2021, the Pakenham line was extended one stop east to [[East Pakenham railway station|East Pakenham]]. The extension involved the removal of the Main Street and Racecourse Road level crossings, the elevation of [[Pakenham railway station|Pakenham]] station, the construction of a new station at [[East Pakenham railway station|East Pakenham]] and other associated safety and landscape works.<ref name=":5" /> These works were undertaken as part of the [[Level Crossing Removal Project]]. The rebuilt [[Pakenham railway station|Pakenham]] and [[East Pakenham railway station|East Pakenham]] opened on 3 June 2024.<ref name=":5" /><ref>{{cite web |title=Level crossings gone, new stations open |url=https://pakenham.starcommunity.com.au/news/2024-06-03/level-crossings-gone-new-stations-open/ |website=Pakenham Gazette |publisher=Star News Group Pty Ltd |access-date=3 June 2024 |date=3 June 2024 |archive-date=3 June 2024 |archive-url=https://web.archive.org/web/20240603014801/https://pakenham.starcommunity.com.au/news/2024-06-03/level-crossings-gone-new-stations-open/ |url-status=dead }}</ref>


== Route ==
== Route ==
Line 116: Line 120:


=== Stations ===
=== Stations ===
The line serves 27 stations across {{convert|57|km}} of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the [[City Loop]], with the majority of elevated and lowered stations being constructed as part of the [[Level Crossing Removal Project]].<ref>{{Cite book |last=Lee |first=Robert S. |url=https://www.worldcat.org/oclc/224727085 |title=The railways of Victoria 1854–2004 |date=2007 |publisher=Melbourne University Publishing |others=Rosemary Annable, Donald S. Garden |isbn=978-0-522-85134-2 |location=Carlton, Vic. |oclc=224727085 |access-date=29 December 2022 |archive-url=https://web.archive.org/web/20220508063019/http://www.worldcat.org/oclc/224727085 |archive-date=8 May 2022 |url-status=live}}</ref><ref>{{Cite web |title=Caulfield to Dandenong Railway & Linear Park |url=https://www.aspect-studios.com/au/projects/caulfield-to-dandenong-railway-linear-park |url-status=live |archive-url=https://web.archive.org/web/20221229015129/https://www.aspect-studios.com/au/projects/caulfield-to-dandenong-railway-linear-park |archive-date=29 December 2022 |access-date=29 December 2022 |website=ASPECT Studios}}</ref> From 2025, services will cease to stop at [[Flinders Street railway station|Flinders Street]], [[Southern Cross railway station|Southern Cross]], [[Flagstaff railway station|Flagstaff]], [[Melbourne Central railway station|Melbourne Central]], [[Parliament railway station|Parliament]], [[Richmond railway station, Melbourne|Richmond]] and [[South Yarra railway station|South Yarra]] stations due to the opening of the [[Metro Tunnel]]. From March-June 2024, [[Narre Warren railway station|Narre Warren]] and [[Pakenham railway station|Pakenham]] stations were elevated as part of [[Level Crossing Removal Project]]. Once the [[Metro Tunnel]] has been constructed, the Pakenham and [[Cranbourne line]] will be routed through to [[Sunbury railway station, Melbourne|Sunbury]].
The line serves 28 stations across {{convert|57|km}} of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the [[City Loop]], with the majority of elevated and lowered stations being constructed as part of the [[Level Crossing Removal Project]].<ref>{{Cite book |last=Lee |first=Robert S. |url=https://www.worldcat.org/oclc/224727085 |title=The railways of Victoria 1854–2004 |date=2007 |publisher=Melbourne University Publishing |others=Rosemary Annable, Donald S. Garden |isbn=978-0-522-85134-2 |location=Carlton, Vic. |oclc=224727085 |access-date=29 December 2022 |archive-url=https://web.archive.org/web/20220508063019/http://www.worldcat.org/oclc/224727085 |archive-date=8 May 2022 |url-status=live}}</ref><ref>{{Cite web |title=Caulfield to Dandenong Railway & Linear Park |url=https://www.aspect-studios.com/au/projects/caulfield-to-dandenong-railway-linear-park |url-status=live |archive-url=https://web.archive.org/web/20221229015129/https://www.aspect-studios.com/au/projects/caulfield-to-dandenong-railway-linear-park |archive-date=29 December 2022 |access-date=29 December 2022 |website=ASPECT Studios}}</ref> From 2025, services will cease to stop at [[Flinders Street railway station|Flinders Street]], [[Southern Cross railway station|Southern Cross]], [[Flagstaff railway station|Flagstaff]], [[Melbourne Central railway station|Melbourne Central]], [[Parliament railway station|Parliament]], [[Richmond railway station, Melbourne|Richmond]] and [[South Yarra railway station|South Yarra]] stations due to the opening of the [[Metro Tunnel]]. From March-June 2024, [[Narre Warren railway station|Narre Warren]] and [[Pakenham railway station|Pakenham]] stations were elevated as part of [[Level Crossing Removal Project]]. Once the [[Metro Tunnel]] has been constructed, the Pakenham and [[Cranbourne line]] will be routed through to [[Sunbury railway station, Melbourne|Sunbury]].
{| class="wikitable"
{| class="wikitable"
!Station
!Station
Line 361: Line 365:
| rowspan="3" |Yes—step free access
| rowspan="3" |Yes—step free access
|1880<ref name=":112" />
|1880<ref name=":112" />
|Elevated
| rowspan="2" |Elevated
| rowspan="2" |
| rowspan="2" |
| rowspan="4" |{{Symbol|Victoria bus logo.svg|30|Buses|link=no}}
| rowspan="4" |{{Symbol|Victoria bus logo.svg|30|Buses|link=no}}
Line 368: Line 372:
|[[File:Narre Warren New Platforms.jpg|frameless|100x100px]]
|[[File:Narre Warren New Platforms.jpg|frameless|100x100px]]
|1882<ref name=":112" />
|1882<ref name=":112" />
| rowspan="6" |Ground level
|-
|-
|[[Berwick railway station, Melbourne|Berwick]]
|[[Berwick railway station, Melbourne|Berwick]]
|[[File:Berwick railway station, Melbourne.JPG|frameless|100x100px]]
|[[File:Berwick railway station, Melbourne.JPG|frameless|100x100px]]
|1877<ref name=":112" />
|1877<ref name=":112" />
| rowspan="4" |Ground level
|
{{Collapsible list
|{{Collapsible list
| title = 1 connection|
| title = 1 connection|
* {{RouteBox|Gippsland line|Gippsland V/Line rail service|#{{rcr|V/Line|Gippsland}}|white}}
* {{RouteBox|Gippsland line|Gippsland V/Line rail service|#{{rcr|V/Line|Gippsland}}|white}}
Line 387: Line 390:
|[[Officer railway station|Officer]]
|[[Officer railway station|Officer]]
|[[File:Officer railway station, Melbourne.jpg|frameless|100x100px]]
|[[File:Officer railway station, Melbourne.jpg|frameless|100x100px]]
| rowspan="3" |Yes—step free access
| rowspan="4" |Yes—step free access
|1881<ref name=":112" />
|1881<ref name=":112" />
|-
|-
Line 398: Line 401:
|[[File:Pakenham station July18.JPG|frameless|100x100px]]
|[[File:Pakenham station July18.JPG|frameless|100x100px]]
|1877<ref name=":112" />
|1877<ref name=":112" />
|Elevated
|
|
{{Collapsible list
{{Collapsible list
Line 404: Line 408:
}}
}}
|{{Symbol|Victoria bus logo.svg|30|Buses|link=no}} {{Symbol|Victoria coach logo.svg|30|Coaches|link=no}}
|{{Symbol|Victoria bus logo.svg|30|Buses|link=no}} {{Symbol|Victoria coach logo.svg|30|Coaches|link=no}}
|-
|[[East Pakenham railway station|East Pakenham]]
|[[File:East Pakenham railway station.jpg|frameless|100x100px]]
|2024<ref name=":12">{{Cite web |date=10 May 2024 |title=Stations to open 3 June |url=https://pakenham.starcommunity.com.au/news/2024-05-10/stations-to-open-3-june/#:~:text=Residents%20will%20wait%20less%20than,set%20for%20Monday%2C%203%20June. |access-date=10 May 2024 |website=Pakenham Gazette |language=en}}</ref>
|Ground Level
|
|{{Symbol|Victoria bus logo.svg|30|Buses|link=no}}
|}
|}


Line 519: Line 530:
| {{rwsa|Pakenham}} || {{TAC2|8 October 1877}} ||
| {{rwsa|Pakenham}} || {{TAC2|8 October 1877}} ||
|-
|-
| {{rwsa|East Pakenham}} || TBA || || ||
|[[East Pakenham railway station|East Pakenham]]
|{{TAC2|3 June 2024}}<ref name=":12" />
* Under construction
|
|}
|}


Line 532: Line 544:
!Other planned connections
!Other planned connections
!Notes
!Notes
|-
|[[East Pakenham railway station|East Pakenham]]
|
|3 June 2024<ref>{{Cite web |date=10 May 2024 |url=https://pakenham.starcommunity.com.au/news/2024-05-10/stations-to-open-3-june/#:~:text=Residents%20will%20wait%20less%20than,set%20for%20Monday%2C%203%20June.|title=Stations to open 3 June|access-date=10 May 2024 |website=Pakenham Gazette |language=en}}</ref>
|Ground level
|
|{{Symbol|Victoria bus logo.svg|30|Buses|link=no}}
|Opening as part of the Pakenham line extension on 3 June 2024<ref name=":0" />
|-
|-
|[[Arden railway station, Melbourne|Arden]]
|[[Arden railway station, Melbourne|Arden]]
Line 630: Line 634:
|◼ {{rwsa|Westall}} || ● || {{Pipe}} || ● || ●
|◼ {{rwsa|Westall}} || ● || {{Pipe}} || ● || ●
|-
|-
|◼ {{rwsa|Springvale}} || ● || ● || rowspan="12" | || ● || ▼
|◼ {{rwsa|Springvale}} || ● || ● || rowspan="13" | || ● || ▼
|-
|-
|{{htxt|◻}} {{rwsa|Sandown Park|m}} || ● || ● || ● || ▼
|{{htxt|◻}} {{rwsa|Sandown Park|m}} || ● || ● || ● || ▼
Line 640: Line 644:
|◼ {{rwsa|Dandenong}} || ● || ● || ● || ▼ || ●
|◼ {{rwsa|Dandenong}} || ● || ● || ● || ▼ || ●
|-
|-
|{{htxt|◻}} {{rwsa|Hallam}} || ● || ● || rowspan="7" | || ▼ || ●
|{{htxt|◻}} {{rwsa|Hallam}} || ● || ● || rowspan="8" | || ▼ || ●
|-
|-
|◼ {{rwsa|Narre Warren}} || ● || ● || ▼ || ●
|◼ {{rwsa|Narre Warren}} || ● || ● || ▼ || ●
Line 654: Line 658:
|◼ {{rwsa|Pakenham}} || ● || ● || ▼ || ●
|◼ {{rwsa|Pakenham}} || ● || ● || ▼ || ●
|-
|-
|{{htxt|◻}} {{rwsa|East Pakenham}} || colspan="6" | (under construction)
| {{rwsa|East Pakenham}} || || ● || ▼ ||
|}
|}


Line 718: Line 722:
=== Depot ===
=== Depot ===
{{Expand section|information about the different types of depots (driver, maintenance, and stabling) if the article could qualify for FA status|date=May 2023|small=no}}
{{Expand section|information about the different types of depots (driver, maintenance, and stabling) if the article could qualify for FA status|date=May 2023|small=no}}
Rolling stock on the Pakenham line is primarily served by the [[Pakenham East Depot]] located in the outer suburb of [[Pakenham East, Victoria|Pakenham East.]] This depot was built in 2018 to exclusively house and maintain 30 brand new [[High Capacity Metro Train]]s while they are out of service.<ref>{{Cite web |title=Facilities (Pakenham East Depot) |url=https://evolutionrail.com/hcmt-project/facilities/ |access-date=2023-04-13 |website=Evolution Rail |language=en-AU}}</ref> Built by evolution rail the {{Convert|118|ha|acre}} depot consists of a stabbling yard and an advanced driver training simulator.<ref>{{Cite web |title=East Pakenham Train Maintenance Depot, Melbourne, VIC |url=https://www.acoinfrastructure.com.au/portfolio-item/east-pakenham-train-maintenance-depot-melbourne-vic/ |access-date=2023-04-13 |website=ACO Infrastructure |language=en-US}}</ref><ref name=":10">{{Cite web |title=Pakenham East Depot |url=https://www.downergroup.com/Content/cms/media/2022_AusRAIL/5863_DOW_Pakenham_East_Depot_WEB.pdf |access-date=2023-04-13 |website=Downer Rail}}</ref>
Rolling stock on the Pakenham line is primarily served by the '''Pakenham East Depot''' located in the outer suburb of [[Pakenham East, Victoria|Pakenham East]]. This depot was built in 2018 to exclusively house and maintain 30 brand new [[High Capacity Metro Train]]s while they are out of service.<ref>{{Cite web |title=Facilities (Pakenham East Depot) |url=https://evolutionrail.com/hcmt-project/facilities/ |access-date=2023-04-13 |website=Evolution Rail |language=en-AU}}</ref> Built by evolution rail the {{Convert|118|ha|acre}} depot consists of a stabbling yard and an advanced driver training simulator.<ref>{{Cite web |title=East Pakenham Train Maintenance Depot, Melbourne, VIC |url=https://www.acoinfrastructure.com.au/portfolio-item/east-pakenham-train-maintenance-depot-melbourne-vic/ |access-date=2023-04-13 |website=ACO Infrastructure |language=en-US}}</ref><ref name=":10">{{Cite web |title=Pakenham East Depot |url=https://www.downergroup.com/Content/cms/media/2022_AusRAIL/5863_DOW_Pakenham_East_Depot_WEB.pdf |access-date=2023-04-13 |website=Downer Rail}}</ref>


The depot is one of the most sustainable train maintenance regimes in Australia with:<ref name=":10" />
The depot is one of the most sustainable train maintenance regimes in Australia with:<ref name=":10" />
Line 757: Line 761:


== Future ==
== Future ==

=== Metro Tunnel ===
=== Metro Tunnel ===
{{Main|Metro Tunnel}}
{{Main|Metro Tunnel}}
[[File:Melbourne Metro Rail Tunnel route map blue.svg|thumb|The map of the Metro Tunnel route through the [[Melbourne central business district]].|alt=A map showing the route of the Melbourne Metro tunnel heading through the CBD]]
[[File:Melbourne Metro Rail Tunnel route map blue.svg|thumb|The map of the Metro Tunnel route through the [[Melbourne central business district]].|alt=A map showing the route of the Melbourne Metro tunnel heading through the CBD]]
The [[Network Development Plan – Metropolitan Rail|2012 Network Development Plan]] identified the need for a north-south tunnel connecting the Cranbourne and Pakenham lines to the [[Sunbury railway line|Sunbury line]].<ref name=":2">{{Cite web |title=Growing Our Rail Network 2018–2025 |url=https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |url-status=live |archive-url=https://web.archive.org/web/20190812025052/https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |archive-date=12 August 2019 |access-date=11 December 2022 |website=Public Transport Victoria}}</ref> In 2017, the [[Metro Tunnel]] began construction, involving the construction of five new underground stations, twin {{convert|9|km|adj=on}} tunnels, and other associated infrastructure improvements. Leaving the existing Pakenham line alignment before [[South Yarra railway station|South Yarra station]], new stations will be built at [[Anzac railway station|Anzac]], [[Town Hall railway station, Melbourne|Town Hall]] (with connections to [[Flinders Street railway station|Flinders Street station]]), [[State Library railway station|State Library]] (with connections to [[Melbourne Central railway station|Melbourne Central]]), [[Parkville railway station|Parkville]], and [[Arden railway station, Melbourne|Arden]], before continuing onto the Sunbury line. These works will be completed by 2025, and upon completion, will create a singular rail line from [[Cranbourne railway station|Cranbourne]] and Pakenham to Sunbury and [[Melbourne Airport]] ([[Melbourne Airport rail link|from 2029]]).<ref name=":4" />
The [[Network Development Plan – Metropolitan Rail|2012 Network Development Plan]] identified the need for a north-south tunnel connecting the Cranbourne and Pakenham lines to the [[Sunbury line]].<ref name=":2">{{Cite web |title=Growing Our Rail Network 2018–2025 |url=https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |url-status=live |archive-url=https://web.archive.org/web/20190812025052/https://www.ptv.vic.gov.au/footer/legal-and-policies/growing-our-rail-network-2018-2025/ |archive-date=12 August 2019 |access-date=11 December 2022 |website=Public Transport Victoria}}</ref> In 2017, the [[Metro Tunnel]] began construction, involving the construction of five new underground stations, twin {{convert|9|km|adj=on}} tunnels, and other associated infrastructure improvements. Leaving the existing Pakenham line alignment before [[South Yarra railway station|South Yarra]] station, new stations will be built at [[Anzac railway station|Anzac]], [[Town Hall railway station, Melbourne|Town Hall]] (with connections to [[Flinders Street railway station|Flinders Street]]), [[State Library railway station|State Library]] (with connections to [[Melbourne Central railway station|Melbourne Central]]), [[Parkville railway station|Parkville]], and [[Arden railway station, Melbourne|Arden]], before continuing onto the Sunbury line. These works will be completed by 2025, and upon completion, will create a singular rail line from [[Cranbourne railway station|Cranbourne]] and Pakenham to Sunbury and [[Melbourne Airport]] ([[Melbourne Airport rail link|from 2029]]).<ref name=":4" />


=== Melbourne Airport rail ===
=== Melbourne Airport rail link ===
{{Main|Melbourne Airport rail link}}
{{Main|Melbourne Airport rail link}}


The [[Melbourne Airport rail link]] will involve the construction of a {{convert|27|km|adj=on}} line from [[Sunshine railway station, Melbourne|Sunshine]] to a new station at [[Melbourne Airport railway station|Melbourne Airport]]. Connected via the Metro Tunnel, services will operate from the Cranbourne and Pakenham lines through the tunnel before splitting off at Sunshine to either Sunbury or Melbourne Airport. Construction of the line will involve the renovation of Sunshine station to allow for additional platforms, construction of new track, and the addition of two new stations at [[Keilor East railway station|Keilor East]] and Melbourne Airport.<ref name=":6">{{Cite web |last=Victoria's Big Build |date=30 October 2022 |title=Melbourne Airport Rail overview |url=https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-overview |url-status=live |archive-url=https://web.archive.org/web/20230105050343/https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-overview |archive-date=5 January 2023 |access-date=11 December 2022 |website=Victoria’s Big Build}}</ref> Construction started in 2022 with services expected to begin in 2029.<ref>{{Cite web |last=Victoria's Big Build |date=8 October 2022 |title=Melbourne Airport Rail timeline |url=https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-timeline |url-status=live |archive-url=https://web.archive.org/web/20221211102725/https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-timeline |archive-date=11 December 2022 |access-date=11 December 2022 |website=Victoria’s Big Build}}</ref>
The [[Melbourne Airport rail link]] will involve the construction of a {{convert|27|km|adj=on}} line from [[Sunshine railway station, Melbourne|Sunshine]] to a new station at [[Melbourne Airport railway station|Melbourne Airport]]. Connected via the Metro Tunnel, services will operate from the Cranbourne and Pakenham lines through the tunnel before splitting off at Sunshine to either Sunbury or Melbourne Airport. Construction of the line will involve the renovation of Sunshine station to allow for additional platforms, construction of new track, and the addition of two new stations at [[Keilor East railway station|Keilor East]] and Melbourne Airport.<ref name=":6">{{Cite web |last=Victoria's Big Build |date=30 October 2022 |title=Melbourne Airport Rail overview |url=https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-overview |url-status=live |archive-url=https://web.archive.org/web/20230105050343/https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-overview |archive-date=5 January 2023 |access-date=11 December 2022 |website=Victoria’s Big Build}}</ref> Construction started in 2022 with services expected to begin in 2029.<ref>{{Cite web |last=Victoria's Big Build |date=8 October 2022 |title=Melbourne Airport Rail timeline |url=https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-timeline |url-status=live |archive-url=https://web.archive.org/web/20221211102725/https://bigbuild.vic.gov.au/projects/melbourne-airport-rail/about/project-timeline |archive-date=11 December 2022 |access-date=11 December 2022 |website=Victoria’s Big Build}}</ref>

=== East Pakenham line extension ===
Announced in 2021, the Pakenham line will be extended one stop east to [[East Pakenham railway station|East Pakenham]]. The extension will involve the removal of the Main Street and Racecourse Road level crossings, the elevation of [[Pakenham railway station|Pakenham]] station, the construction of a new station at [[East Pakenham railway station|East Pakenham]] and other associated safety and landscape works.<ref name=":5" /> These works will be undertaken as part of the [[Level Crossing Removal Project]]. The rebuilt [[Pakenham railway station|Pakenham]] and [[East Pakenham railway station|East Pakenham]] will open on 3 June 2024. <ref name=":5" /><ref>{{Cite web |date=10 May 2024 |url=https://pakenham.starcommunity.com.au/news/2024-05-10/stations-to-open-3-june/#:~:text=Residents%20will%20wait%20less%20than,set%20for%20Monday%2C%203%20June.|title=Stations to open 3 June|access-date=10 May 2024 |website=Pakenham Gazette |language=en}}</ref>


=== Level crossing removals ===
=== Level crossing removals ===
The [[Level Crossing Removal Project]] has announced the removal of all 22 remaining level crossings on the Pakenham line, to be completed in stages from 2018 to 2025. All level crossings between Caulfield and Dandenong were removed in 2018 as part of the [[Caulfield railway station|Caulfield]] to [[Dandenong railway station|Dandenong]] skyrail project.<ref>{{Cite web |date=18 March 2018 |title=Caulfield to Dandenong skyrail nears completion |url=https://www.danielbowen.com/2018/03/19/cfd-dng-skyrail-nears-completion/ |url-status=live |archive-url=https://web.archive.org/web/20221211111915/https://www.danielbowen.com/2018/03/19/cfd-dng-skyrail-nears-completion/ |archive-date=11 December 2022 |access-date=11 December 2022 |website=Daniel Bowen}}</ref> This included the removal of nine level crossings and the reconstruction of five elevated stations along the corridor.<ref>{{Cite web |title=Caulfield to Dandenong (Skyrail) {{!}} Level Crossing Removal |url=https://www.ecodynamics.com.au/projects/skyrail/ |url-status=live |archive-url=https://web.archive.org/web/20221211111915/https://www.ecodynamics.com.au/projects/skyrail/ |archive-date=11 December 2022 |access-date=11 December 2022 |website=Ecodynamics {{!}} Commercial Landscaping {{!}} Greening & Nurturing Our Communities}}</ref> The second phase of removals involves removing individual crossings along the corridor through a variety of methods by 2025.<ref>{{Cite web |date=27 July 2022 |title=Pakenham Level Crossing Removals One Step Closer |url=https://www.premier.vic.gov.au/sites/default/files/2022-07/220727%20-%20Pakenham%20Level%20Crossing%20Removals%20One%20Step%20Closer.pdf |url-status=live |archive-url=https://web.archive.org/web/20230124093210/https://www.premier.vic.gov.au/sites/default/files/2022-07/220727%20-%20Pakenham%20Level%20Crossing%20Removals%20One%20Step%20Closer.pdf |archive-date=24 January 2023 |access-date=11 December 2022}}</ref> Some crossings have been removed through elevating the rail corridor, some by lowering or raising the road, with other crossings being removed by closing the crossing off from [[Vehicle|motor traffic]].<ref>{{Cite web |last=Cardinia Shire Council |title=LXRP – Level Crossing Removal Project in Cardinia Shire |url=https://www.cardinia.vic.gov.au/info/20056/major_projects/854/lxrp_-_level_crossing_removal_project_in_cardinia_shire |url-status=live |archive-url=https://web.archive.org/web/20221211111914/https://www.cardinia.vic.gov.au/info/20056/major_projects/854/lxrp_-_level_crossing_removal_project_in_cardinia_shire |archive-date=11 December 2022 |access-date=11 December 2022 |website=www.cardinia.vic.gov.au}}</ref> These projects will leave the entirety of the Pakenham line level crossing free by 2025, with projects on the [[Sunbury railway line|Sunbury line]] leaving the entire Sunshine-Dandenong corridor crossing free by the opening of the Metro Tunnel in 2025.<ref>{{Cite web |last=O'Keane |first=Tom |date=6 January 2022 |title=Contact awarded for $844M Melbourne rail works |url=https://roadsonline.com.au/more-level-crossings-set-to-be-removed-in-pakenham-melbourne/ |url-status=live |archive-url=https://web.archive.org/web/20221211111914/https://roadsonline.com.au/more-level-crossings-set-to-be-removed-in-pakenham-melbourne/ |archive-date=11 December 2022 |access-date=11 December 2022 |website=Roads & Infrastructure Magazine}}</ref>{{clear}}
The [[Level Crossing Removal Project]] has announced the removal of all 22 remaining level crossings on the Pakenham line, to be completed in stages from 2018 to 2025. All level crossings between Caulfield and Dandenong were removed in 2018 as part of the [[Caulfield railway station|Caulfield]] to [[Dandenong railway station|Dandenong]] skyrail project.<ref>{{Cite web |date=18 March 2018 |title=Caulfield to Dandenong skyrail nears completion |url=https://www.danielbowen.com/2018/03/19/cfd-dng-skyrail-nears-completion/ |url-status=live |archive-url=https://web.archive.org/web/20221211111915/https://www.danielbowen.com/2018/03/19/cfd-dng-skyrail-nears-completion/ |archive-date=11 December 2022 |access-date=11 December 2022 |website=Daniel Bowen}}</ref> This included the removal of nine level crossings and the reconstruction of five elevated stations along the corridor.<ref>{{Cite web |title=Caulfield to Dandenong (Skyrail) {{!}} Level Crossing Removal |url=https://www.ecodynamics.com.au/projects/skyrail/ |url-status=live |archive-url=https://web.archive.org/web/20221211111915/https://www.ecodynamics.com.au/projects/skyrail/ |archive-date=11 December 2022 |access-date=11 December 2022 |website=Ecodynamics {{!}} Commercial Landscaping {{!}} Greening & Nurturing Our Communities}}</ref> The second phase of removals involves removing individual crossings along the corridor through a variety of methods by 2025.<ref>{{Cite web |date=27 July 2022 |title=Pakenham Level Crossing Removals One Step Closer |url=https://www.premier.vic.gov.au/sites/default/files/2022-07/220727%20-%20Pakenham%20Level%20Crossing%20Removals%20One%20Step%20Closer.pdf |url-status=live |archive-url=https://web.archive.org/web/20230124093210/https://www.premier.vic.gov.au/sites/default/files/2022-07/220727%20-%20Pakenham%20Level%20Crossing%20Removals%20One%20Step%20Closer.pdf |archive-date=24 January 2023 |access-date=11 December 2022}}</ref> Some crossings have been removed through elevating the rail corridor, some by lowering or raising the road, with other crossings being removed by closing the crossing off from [[Vehicle|motor traffic]].<ref>{{Cite web |last=Cardinia Shire Council |title=LXRP – Level Crossing Removal Project in Cardinia Shire |url=https://www.cardinia.vic.gov.au/info/20056/major_projects/854/lxrp_-_level_crossing_removal_project_in_cardinia_shire |url-status=live |archive-url=https://web.archive.org/web/20221211111914/https://www.cardinia.vic.gov.au/info/20056/major_projects/854/lxrp_-_level_crossing_removal_project_in_cardinia_shire |archive-date=11 December 2022 |access-date=11 December 2022 |website=www.cardinia.vic.gov.au}}</ref> These projects will leave the entirety of the Pakenham line level crossing free by 2025, with projects on the [[Sunbury line]] leaving the entire Sunshine-Dandenong corridor crossing free by the opening of the Metro Tunnel in 2025.<ref>{{Cite web |last=O'Keane |first=Tom |date=6 January 2022 |title=Contact awarded for $844M Melbourne rail works |url=https://roadsonline.com.au/more-level-crossings-set-to-be-removed-in-pakenham-melbourne/ |url-status=live |archive-url=https://web.archive.org/web/20221211111914/https://roadsonline.com.au/more-level-crossings-set-to-be-removed-in-pakenham-melbourne/ |archive-date=11 December 2022 |access-date=11 December 2022 |website=Roads & Infrastructure Magazine}}</ref>{{clear}}


==References==
==References==

Latest revision as of 12:40, 22 November 2024

Pakenham
Railways in Melbourne
A High Capacity Metro Train arriving at Springvale station Platform 2
An East Pakenham-bound service High Capacity Metro Train arriving at Springvale station Platform 2, October 2024
Overview
Service typeCommuter rail
SystemMelbourne railway network
StatusOperational
LocaleMelbourne, Victoria, Australia
Predecessor
  • Princes Bridge – Richmond (1859–1860)
  • Princes Bridge – South Yarra (1860–1879)
  • Oakleigh – Pakenham (1877–1879)
  • Dandenong ^ (1922–1954)
^ are electric services
First service8 October 1877; 147 years ago (1877-10-08) as South Gippsland line
Current operator(s)Metro Trains
Former operator(s)
Route
TerminiFlinders Street
East Pakenham
Stops28 (including City Loop stations)
Distance travelled63.368 km (39.375 mi)
Average journey time1 hour 13 minutes (not via City Loop)
Service frequency
  • 5–10 minutes weekdays peak
  • 20 minutes weekdays off-peak and weekend daytime
  • 20–30 minutes weekend nights
  • 60 minutes early weekend mornings
  • Double frequency daytime between Flinders Street and Dandenong in combination with Cranbourne line
Line(s) usedOrbost
Technical
Rolling stockHCMT
Track gauge1,600 mm (5 ft 3 in)
Electrification1500 V DC overhead
Track owner(s)VicTrack

The Pakenham line is a weekdays-only[1] commuter railway line on the Melbourne metropolitan railway network serving the city of Melbourne in Victoria, Australia. Operated by Metro Trains Melbourne, the line is coloured light blue and is one of the two lines that constitute the Caulfield group. It is the city's longest metropolitan railway line at 57 kilometres (35 mi). The line runs from Flinders Street station in central Melbourne to East Pakenham station in the south-east, serving 27 stations via South Yarra, Caulfield, Oakleigh, and Dandenong.[2]

The line operates for approximately 20 hours a day (from approximately 4:00 am to around midnight) with 24 hour service available on Friday and Saturday nights. During peak hour, headways of up to 5 to 10 minutes are operated with services every 20 minutes during off-peak hours.[3] Trains on the Pakenham line run with a seven-car formation operated by High Capacity Metro Trains.[4]

Sections of the Pakenham line opened as early as 1859, with the line fully extended to Pakenham in October 1877. A limited number of stations were first opened, with infill stations progressively opened between 1879 and 2012.[5] The line was built to connect Melbourne with the rural towns of Caulfield, Oakleigh, and Dandenong, amongst others. Significant growth has occurred since opening, with an extension to open on the Pakenham line one stop east to a new station in Pakenham East as part of the Level Crossing Removal Project.[6] This extension opened on 3 June 2024.[6][7]

Since the 2010s, due to the heavily utilised infrastructure of the Pakenham line, significant improvements and upgrades have been made. A $15 billion upgrade of the corridor included the replacement of sleepers, the introduction of new signalling technology, the introduction of new rolling stock, the removal of all level crossings, and works associated with the Metro Tunnel project. These projects have improved the quality and safety of the line[8] and will be completed by the opening of the Metro Tunnel in 2025.[9]

History

[edit]

19th century

[edit]

In 1877, the Pakenham line began operations from Oakleigh to Bunyip, as part of the main line to Gippsland.[10] The section from Oakleigh to Flinders Street station was connected at South Yarra in April 1879.[11] In 1877, the Pakenham line began operations from Oakleigh to Bunyip, as part of the single-tracked main line to Gippsland, with an extension of the duplicated section of the line opening in 1881 to Caulfield, Oakleigh in 1883, and Dandenong in 1891.[10] In 1883 the line between Richmond station and South Yarra was quadrupled to accommodate an increase in train services due to the opening of Frankston and Sandringham lines.[12]

In 1885, a number of level crossing removal works occurred between Flinders Street station and South Yarra due to an increase in freight and passenger operations.[13] These crossings were removed through a combination of lowering and raising the corridor.[13]

20th century

[edit]
4 tracks heading towards the city with signalling and electrical equipment shown.
A section of the quad-tracked corridor built in 1915 between Richmond and Caulfield stations.

In 1915, the line between South Yarra and Caulfield was quadrupled, as part of level crossing removal works. This section of the line was lowered into a cutting to eliminate numerous level crossings.[13] Power signalling was provided between Richmond and Hawksburn at the same time, then on to Caulfield in 1921.[14]

Electrification of the line to Dandenong occurred in two stages during 1922. In May 1922, the section from South Yarra to Oakleigh station was electrified, with the section to Dandenong being electrified later in December 1922.[15][16] The electrification of the line allowed for the introduction of Swing Door electric multiple unit trains for the first time.[15][17]

Power signalling was extended to Carnegie in 1933, Oakleigh in 1940, and to Dandenong in stages between 1970 and 1972.[14]

The line between Dandenong, Pakenham and Traralgon was electrified in 1954. Initially single track, duplication of the line between Dandenong, Pakenham and Nar Nar Goon was completed in 1955 and 1956.[14] Suburban services were extended beyond Dandenong to Pakenham in January 1975.[18] Previously, the stations between Dandenong and Pakenham were only served by regional passenger trains connecting Gippsland to Melbourne.[19]

In 1981, Pakenham line services commenced operations through the City Loop, after previously terminating at Flinders or Spencer Street stations.[20] The commencement of operations involved the service stopping at three new stations—Parliament, Melbourne Central (formally Museum), and Flagstaff.[21] The Loop follows La Trobe and Spring Streets along the northern and eastern edges of the Hoddle Grid.[22] The Loop connects with Melbourne's two busiest stations, Flinders Street and Southern Cross, via the elevated Flinders Street Viaduct.[22] From 2025, the Pakenham line will no longer operate through the City Loop, instead operating via the north-south Metro Tunnel corridor.[9]

21st century

[edit]
A train arriving at the new illuminated platforms at Cardinia Road station in the early morning
A Comeng train arriving at Cardinia Road station, July 2012

In 2002, after the closure of the nearby General Motors factory in 1991, General Motors station closed permanently after 46 years of operation.[23] A 2007 restructure of train ticketing in Melbourne involved the removal of Zone 3, with Zone 3 stations being re-classified to Zone 2.[24] This brought the cost of train fares down, improving system accessibility to the public.

The Pakenham line received heavy investment during the 2010s to align with the 2013 PTV Development Plan. A new station at Cardinia Road opened in 2012 situated between Officer and Pakenham stations.[10] This is the first infill station to open on the line since 1927, with an additional station at Pakenham East expected to open in 2024 in conjunction with level crossing removal works.[25] In 2018, the Pakenham East Depot opened for the newly acquired High Capacity Metro Trains. This depot has stabling capacity for 30 seven-car trains with train maintenance, driver training, and washing facilities present onsite.[26]

Announced in 2021, the Pakenham line was extended one stop east to East Pakenham. The extension involved the removal of the Main Street and Racecourse Road level crossings, the elevation of Pakenham station, the construction of a new station at East Pakenham and other associated safety and landscape works.[25] These works were undertaken as part of the Level Crossing Removal Project. The rebuilt Pakenham and East Pakenham opened on 3 June 2024.[25][27]

Route

[edit]
Map
Interactive map of the Pakenham line in south-eastern Melbourne.

The Pakenham line forms a relatively linear route from the Melbourne central business district to its terminus in Pakenham. The route is 57 kilometres (35 mi) long and is predominantly doubled tracked, however between Flinders Street and Richmond, the corridor is widened to 12 tracks, narrowing to six tracks between Richmond and South Yarra before again narrowing to four tracks between South Yarra and Caulfield.[28] After Caulfield station, the corridor again narrows to two tracks for the rest of the route. The only underground section of the Pakenham line is in the City Loop, where the service stops at 3 underground stations.[29] Exiting the city, the Pakenham line traverses mainly flat country with few curves and fairly minimal earthworks for most of the line. However, between South Yarra and Malvern, the rail corridor has been lowered into a cutting to eliminate level crossings, and between Malvern and Caulfield, the corridor has been raised on an embankment for the same reason.[30] After Caulfield, the line formerly had numerous level crossings, however, all have now been removed between Caulfield and Dandenong as part of an elevated rail project, as well as some older bridges over and under roads.[31] Remaining level crossings between Dandenong and Pakenham stations will be removed by 2025 under smaller level crossing removal works.

The line follows the same alignment as the Cranbourne line with the two services splitting onto different routes at Dandenong. The Pakenham line continues on its eastern alignment, whereas the Cranbourne line takes a southerly alignment towards its final destination of Cranbourne station.[32] Most of the rail line goes through built-up suburbs and some industrial areas, but after Dandenong, the line passes through more open countryside, including open fields and farms, particularly after Beaconsfield.[32] This outer portion of the line is one of Melbourne's main growth corridors, where farmland is being replaced with housing and commercial developments, leading to a rise in patronage.[33]

Stations

[edit]

The line serves 28 stations across 57 kilometres (35 mi) of track. The stations are a mix of elevated, lowered, underground, and ground level designs. Underground stations are present only in the City Loop, with the majority of elevated and lowered stations being constructed as part of the Level Crossing Removal Project.[34][35] From 2025, services will cease to stop at Flinders Street, Southern Cross, Flagstaff, Melbourne Central, Parliament, Richmond and South Yarra stations due to the opening of the Metro Tunnel. From March-June 2024, Narre Warren and Pakenham stations were elevated as part of Level Crossing Removal Project. Once the Metro Tunnel has been constructed, the Pakenham and Cranbourne line will be routed through to Sunbury.

Station Image Accessibility Opened Terrain Train connections Other connections
Flinders Street Yes—step free access 1854[36] Lowered Trams Buses
Southern Cross 1859[36] Ground level Trams Buses Coaches SkyBus
Flagstaff 1985[36] Underground Trams
Melbourne Central 1981[36] Trams Buses
Parliament 1983[36] Trams
Richmond No—steep ramp 1859[36] Elevated Trams Buses
South Yarra 1860[36] Lowered
3 connections
Trams
Malvern 1879[36]
2 connections
Caulfield Ground level
3 connections
Trams Buses
Carnegie Yes—step free access Elevated
1 connection
Buses
Murrumbeena
Hughesdale 1925[36]
Oakleigh 1877[36] Ground level
Huntingdale No—steep ramp 1927[36]
Clayton Yes—step free access 1880[36] Elevated
2 connections
Westall 1951[36] Ground level
1 connection
Springvale 1880[36] Lowered
Sandown Park No—steep ramp 1888[37] Ground level
Noble Park Yes—step free access 1913[36] Elevated
Yarraman No—steep ramp 1976[36] Ground level
Dandenong 1877[36]
2 connections
Buses Coaches
Hallam Yes—step free access 1880[36] Elevated Buses
Narre Warren 1882[36]
Berwick 1877[36] Ground level
1 connection
Beaconsfield No—steep ramp 1879[36]
Officer Yes—step free access 1881[36]
Cardinia Road 2012[36] Buses
Pakenham 1877[36] Elevated
1 connection
Buses Coaches
East Pakenham 2024[38] Ground Level Buses
Station histories
Station Opened[37] Closed[37] Age Notes[9]
Flinders Street 12 September 1854 170 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Melbourne Terminus
Southern Cross 17 January 1859 165 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Batman's Hill
  • Formerly Spencer Street
Flagstaff 27 May 1985 39 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
Melbourne Central 26 January 1981 43 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Museum
Parliament 22 January 1983 41 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
Princes Bridge 8 February 1859 1 October 1866 7 years
2 April 1879 30 June 1980 101 years
Botanic Gardens 2 March 1859 c. April 1862 Approx. 3 years
Punt Road 8 February 1859 12 December 1859 10 months
  • Replaced by Swan Street (200m further along line)
Richmond 12 December 1859 164 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Swan Street
Cremorne 12 December 1859 c. 28 December 1863 Approx. 4 years
South Yarra 22 December 1860 163 years
  • From 2025, services will cease to stop due to the opening of the Metro Tunnel
  • Formerly Gardiner's Creek Road
Hawksburn 7 May 1889 135 years
  • Not a stop since 31 January 2021 due to a timetable reshuffle
Toorak 7 May 1879 145 years
  • Not a stop since 31 January 2021 due to a timetable reshuffle
Armadale 7 May 1879 145 years
  • Not a stop since 31 January 2021 due to a timetable reshuffle
Malvern 7 May 1879 145 years
Caulfield 7 May 1879 145 years
Carnegie 14 May 1879 145 years
  • Formerly Rosstown
Murrumbeena 14 May 1879 145 years
Hughesdale 28 February 1925 99 years
Oakleigh 8 October 1877 147 years
Huntingdale 25 June 1927 97 years
  • Formerly Eastoakleigh
Clayton 6 January 1880 144 years
  • Formerly Clayton's Road
Westall 6 February 1951 73 years
APEX Siding (Westall) ?
Springvale 1 September 1880 144 years
  • Formerly Spring Vale
Sandown Park c. December 1888 15 May 1955 Approx. 66 years
  • Formerly Oakleigh Park Racecourse
19 June 1965 59 years
Noble Park 3 February 1913 111 years
Yarraman 21 December 1976 47 years
Dandenong 8 October 1877 147 years
General Motors 1 October 1956 28 July 2002 45 years
Hallam 1 December 1880 143 years
  • Formerly Hallam's Road
Narre Warren 10 March 1882 142 years
Berwick 8 October 1877 147 years
Beaconsfield 1 December 1879 144 years
Hargraves Siding ? ?
Officer 4 August 1881 143 years
  • Formerly Officer's Siding
Cardinia Road 22 April 2012 12 years
Pakenham 8 October 1877 147 years
East Pakenham 3 June 2024 5 months[38]

Planned stations

[edit]
Station Accessibility Expected opening Terrain Planned train connections Other planned connections Notes
Arden Yes - Step Free Access 2025 Underground
2 connections
Opening as part of the Metro tunnel project in 2025[9]
Parkville Trams
State Library Trains Trams Buses
Town Hall Trains Trams Buses Trains
Anzac Trams

Services

[edit]

Services on the Pakenham line operates from approximately 4:00 am to around 11:30 daily.[16] In general, during peak hours, train frequency is 5 minutes on the Dandenong corridor (combined with the Cranbourne line) and 10 minutes in the AM peak on the Pakenham Line while during non-peak hours the frequency is reduced to 20–30 minutes throughout the entire route.[39] Services run anticlockwise through the City Loop, and from 2025, Pakenham line services will cease to stop at South Yarra, Richmond, and all City Loop stations when trains are rerouted through the Metro Tunnel upon opening.[39] On Friday nights and weekends, services run 24 hours a day, with 60 minute frequencies available outside of normal operating hours.[40] Since 13 February 2022, some off-peak daytime Pakenham and Cranbourne line services stop at Malvern station, running express between South Yarra and Malvern stations.[41]

Train services on the Pakenham line are also subjected to maintenance and renewal works, usually on selected Fridays and Saturdays. Shuttle bus services are provided throughout the duration of works for affected commuters.[42]

Stopping patterns

[edit]

Legend — Station status

  • Premium Station – Station staffed from first to last train
  • Host Station – Usually staffed during morning peak, however this can vary for different stations on the network.

Legend — Stopping patterns
Some services do not operate via the City Loop

  • ● – All trains stop
  • ◐ – Some services do not stop
  • ▲ – Only inbound trains stop (trains operate counter-clockwise through the city loop all day)
  • ▼ – Only outbound trains stop
  • | – Trains pass and do not stop
Pakenham Services[43]
Station Zone Local Ltd Express Westall Dandenong Morning Shuttle Weekday Shuttle
Flinders Street 1
Southern Cross
Flagstaff
Melbourne Central
Parliament
Richmond
South Yarra
Malvern | | |
Caulfield
Carnegie
Murrumbeena
Hughesdale 1/2
Oakleigh
Huntingdale
Clayton 2
Westall |
Springvale
Sandown Park
Noble Park
Yarraman |
Dandenong
Hallam
Narre Warren
Berwick
Beaconsfield
Officer
Cardinia Road
Pakenham
East Pakenham

Operators

[edit]

The Pakenham line has had a total of 7 operators since its opening in 1877. The majority of operations throughout its history have been government run: from its first service in 1877 until the 1999 privatisation of Melbourne's rail network, four different government operators have run the line.[44] These operators, Victorian Railways, the Metropolitan Transit Authority, the Public Transport Corporation and Bayside Trains have a combined operational length of 122 years.

Bayside Trains was privatised in August 1999 and later rebranded M>Train. In 2002, M>Train was placed into receivership and the state government regained ownership of the line, with KPMG appointed as receivers to operate M>Train on behalf of the state government.[45][46][47] Two years later, rival train operator Connex Melbourne took over the M>Train operations including the Pakenham line. Metro Trains Melbourne, the current private operator, then took over the operations in 2009. The private operators have had a combined operational period of 25 years.[48]

Past and present operators of the Pakenham line:
Operator Assumed operations Ceased operations Length of operations
Victorian Railways 1877 1983 106 years
Metropolitan Transit Authority 1983 1989 6 years
Public Transport Corporation 1989 1998 9 years
Bayside Trains (government operator) 1998 1999 1 years
M>Train 1999 2004 5 years
Connex Melbourne 2004 2009 5 years
Metro Trains Melbourne 2009 incumbent 14 years (ongoing)

Infrastructure

[edit]

Rolling stock

[edit]
A long train arriving into Dandenong station, with 4 tracks, signalling, and electrical equipment shown
A HCMT operating a Pakenham-bound service.

The Pakenham line uses a fleet of electric multiple unit (EMU) High Capacity Metro Trains operating in a seven-car configuration, with three doors per side on each carriage and can accommodate of up to 1,380 passengers in each train-set. Shared with the Cranbourne, Sunbury, and Airport lines, the rolling stock will consist of 70 High Capacity Metro Trains (HCMT), once fully delivered.[49] They are built in Changchun, China, with final assembly occurring in Newport, Melbourne, by Evolution Rail, a consortium composed of CRRC Changchun Railway Vehicles, Downer Rail and Plenary Group.[50]

A diesel infrastructure evaluation carriage crossing a bridge at Mordialloc
An infrastructure evaluation carriage being hauled by a T-class diesel electric locomotive.

Previously, the Pakenham line was served by a fleet of Comeng and Siemens Nexas trains. The oldest Comeng trains (stage 1 and some stage 2) have been retired and scrapped as part of the HCMT introduction, however, some of these trains have been displaced onto other Melbourne metropolitan lines.[51] In comparison, the Siemens Nexas trains have not been retired, instead being moved onto other lines to replace older Comeng sets. Since the end of 2022, the Pakenham line is almost exclusively operated by High Capacity Metro Trains.[52]

Alongside the passenger trains, Pakenham line tracks and equipment are maintained by a fleet of engineering trains. The four types of engineering trains are: the shunting train; designed for moving trains along non-electrified corridors and for transporting other maintenance locomotives, for track evaluation; designed for evaluating track and its condition, the overhead inspection train; designed for overhead wiring inspection, and the infrastructure evaluation carriage designed for general infrastructure evaluation.[53] Most of these trains are repurposed locomotives previously used by V/Line, Metro Trains, and the Southern Shorthaul Railroad.[53]

Depot

[edit]

Rolling stock on the Pakenham line is primarily served by the Pakenham East Depot located in the outer suburb of Pakenham East. This depot was built in 2018 to exclusively house and maintain 30 brand new High Capacity Metro Trains while they are out of service.[54] Built by evolution rail the 118 hectares (290 acres) depot consists of a stabbling yard and an advanced driver training simulator.[55][56]

The depot is one of the most sustainable train maintenance regimes in Australia with:[56]

  • Energy savings of 23%
  • Water savings of 46%
  • 77% of water recycled
  • 13% enchanment of biodiversity
  • 115,000 kilograms (254,000 lb) of carbon saved every year

Signalling

[edit]
A diagram demonstrating the difference between fixed and moving blocked signalling using trains as example demonstrating this concept.
A diagram demonstrating the difference between fixed and moving blocked signalling.

Since the mid to late 20th century, the Pakenham line has used a fixed block three position signalling system designed for lower frequencies and less services.[14] However, the ageing system had undermined reliability due to the presence of system faults and limited frequencies, requiring the Pakenham, Cranbourne, and Sunbury lines to upgrade their signalling system. Since 2021, high-capacity signalling (HCS) has been rolling out on the Pakenham, Cranbourne, and Sunbury lines, allowing trains to safely run closer together and run more frequently.[57] The new system is being delivered by CPB Contractors and Bombardier Transportation under the Rail Systems Alliance. These works valued at $1 billion includes the roll-out of 55 kilometres (34 mi) of HCS and communications systems on the aforementioned lines, allowing an increase in reliability and frequency.[58] The line will be equipped with Bombardier’s CityFlo 650 communications-based train control system, that will enable operation at 2–3 minute headways.

The upgrading works were completed in phases from 2021. With the upgraded signalling system, trains are now able to run closer to each other. The new system was tested on the Mernda line and a section of the Cranbourne line before being fully implemented on the lines.[59] In March 2022, the Pakenham line underwent further testing of high-tech signalling equipment, to ensure the new trains and signalling system can safely run alongside older-generation trains—including freight and V/Line trains—and the existing signalling system.[60]

Stations facilities

[edit]

Customer service

[edit]
Customer service centre at the former platforms 1 and 2 at Oakleigh railway station

All premium railway stations on the Pakenham line have customer service centres that are open from the first to the last service.[61] Host stations on the line also have customer service centres, however these are only staffed for a few hours during the morning peak.[62]

At the service centres, passengers can:[61]

  • Buy tickets (Myki)
  • Pick up timetables
  • Collect change for vending machines and payphones

Accessibility

[edit]

In compliance with the Disability Discrimination Act of 1992, all stations that are new-built or rebuilt are fully accessible and comply with these guidelines.[63] The majority of stations on the corridor are fully accessible, however, there are some stations that haven't been upgraded to meet these guidelines.[64] These stations do feature ramps, however, they have a gradient greater than 1 in 14.[64] Stations that are fully accessible feature ramps that have a gradient less than 1 in 14, have at-grade paths, or feature lifts.[64] These stations typically also feature tactile boarding indicators, independent boarding ramps, wheelchair accessible myki barriers, hearing loops, and widened paths.[64][65]

Projects improving station accessibility have included the Level Crossing Removal Project that involves station rebuilds and upgrades, individual station upgrade projects, and associated Metro Tunnel works.[66][67] These works have made significant strides in improving network accessibility, with more than 60% of Pakenham line stations classed as fully accessible. This number is expected to grow within the coming years, as a network restructure associated with the opening of the Metro Tunnel is completed and level crossing removal works are completed on the corridor by 2025.[68]

Passenger information displays

[edit]
A display showing a Pakenham bound service arriving in 12 minutes at Parliament station

Most stations on the Pakenham line are equipped with passenger information displays which provide real time departure information. These displays are owned by Public Transport Victoria and are managed by Metro Trains Melbourne.[69] With the exception of the five central stations, most stations on the network are equipped with 2 line LED displays. However, since 2016 these are being replaced by flat screen displays that additionally show every station the train will serve.[70]

Future

[edit]

Metro Tunnel

[edit]
A map showing the route of the Melbourne Metro tunnel heading through the CBD
The map of the Metro Tunnel route through the Melbourne central business district.

The 2012 Network Development Plan identified the need for a north-south tunnel connecting the Cranbourne and Pakenham lines to the Sunbury line.[71] In 2017, the Metro Tunnel began construction, involving the construction of five new underground stations, twin 9-kilometre (5.6 mi) tunnels, and other associated infrastructure improvements. Leaving the existing Pakenham line alignment before South Yarra station, new stations will be built at Anzac, Town Hall (with connections to Flinders Street), State Library (with connections to Melbourne Central), Parkville, and Arden, before continuing onto the Sunbury line. These works will be completed by 2025, and upon completion, will create a singular rail line from Cranbourne and Pakenham to Sunbury and Melbourne Airport (from 2029).[9]

[edit]

The Melbourne Airport rail link will involve the construction of a 27-kilometre (17 mi) line from Sunshine to a new station at Melbourne Airport. Connected via the Metro Tunnel, services will operate from the Cranbourne and Pakenham lines through the tunnel before splitting off at Sunshine to either Sunbury or Melbourne Airport. Construction of the line will involve the renovation of Sunshine station to allow for additional platforms, construction of new track, and the addition of two new stations at Keilor East and Melbourne Airport.[72] Construction started in 2022 with services expected to begin in 2029.[73]

Level crossing removals

[edit]

The Level Crossing Removal Project has announced the removal of all 22 remaining level crossings on the Pakenham line, to be completed in stages from 2018 to 2025. All level crossings between Caulfield and Dandenong were removed in 2018 as part of the Caulfield to Dandenong skyrail project.[74] This included the removal of nine level crossings and the reconstruction of five elevated stations along the corridor.[75] The second phase of removals involves removing individual crossings along the corridor through a variety of methods by 2025.[76] Some crossings have been removed through elevating the rail corridor, some by lowering or raising the road, with other crossings being removed by closing the crossing off from motor traffic.[77] These projects will leave the entirety of the Pakenham line level crossing free by 2025, with projects on the Sunbury line leaving the entire Sunshine-Dandenong corridor crossing free by the opening of the Metro Tunnel in 2025.[78]

References

[edit]
  1. ^ https://www.ptv.vic.gov.au/disruptions/disruptions-information/
  2. ^ "Metro's paper timetables mess". Daniel Bowen. 3 September 2017. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  3. ^ "Pakenham Line Timetable". Public Transport Victoria. Archived from the original on 7 September 2018. Retrieved 9 January 2023.
  4. ^ "High Capacity Metro Trains Project, Victoria, Australia". Railway Technology. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  5. ^ "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  6. ^ a b Victoria's Big Build (18 February 2021). "New Pakenham East station location announced and 3 more sets of boom gates to go". Victoria’s Big Build. Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  7. ^ "Stations to open 3 June". Pakenham Gazette. 10 May 2024. Retrieved 10 May 2024.
  8. ^ "Level Crossing-Free Pakenham Line Another Step Closer". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  9. ^ a b c d e Victoria's Big Build (28 November 2022). "About the Metro Tunnel Project". Victoria’s Big Build. Archived from the original on 7 December 2022. Retrieved 9 December 2022.
  10. ^ a b c "Bunyip Railway History". Bunyip Historical Society. 22 November 2018. Archived from the original on 25 October 2022. Retrieved 11 January 2023.
  11. ^ "Opening Of The Oakleigh Railway". Weekly Times. 5 April 1879. p. 16. Archived from the original on 24 January 2023. Retrieved 9 January 2023.
  12. ^ "Victorian Heritage Database place details. Former South Yarra Railway Station". 9 January 2023. Archived from the original on 9 January 2023. Retrieved 9 January 2023.
  13. ^ a b c Woodcock, Ian; Stone, John (2016). "The Benefits Of Level Crossing Removals. Lessons from Melbourne's historical experience" (PDF). p. 18. Archived (PDF) from the original on 9 January 2023. Retrieved 9 January 2023.
  14. ^ a b c d Fisher, Peter (2007). Victorian Signalling: by Accident or Design?. Australian Railway Historical Society (Victorian Division). ISBN 978-1-920892-50-0
  15. ^ a b "Report upon the Application of electric traction to the Melbourne suburban railway system". Trove. Archived from the original on 24 January 2023. Retrieved 20 December 2022.
  16. ^ a b "More Melburnians could hop on a train or tram every 10 minutes under ambitious Greens proposal". ABC News. 22 August 2022. Archived from the original on 17 December 2022. Retrieved 18 December 2022.
  17. ^ S.E. Dornan and R.G. Henderson: (1979) The Electric Railways of Victoria
  18. ^ "Newsrail Volume 3 1975". Newsrail.
  19. ^ "Improved Suburban Services". Newsrail. Australian Railway Historical Society. February 1975. p. 33.
  20. ^ "Trove". trove.nla.gov.au. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
  21. ^ "City Loop closure". Public Transport Victoria. Archived from the original on 14 January 2023. Retrieved 14 January 2023.
  22. ^ a b "Guide to navigating the City Loop | Public Transport Users Association (Victoria, Australia)". Archived from the original on 12 December 2022. Retrieved 14 January 2023.
  23. ^ Townsend, Mellissa (20 April 2015). "No plans for run down General Motors train station at Dandenong South". Herald Sun. Archived from the original on 25 March 2018. Retrieved 4 June 2019.
  24. ^ Moynihan, Stephen (3 March 2007). "No more Zone 3 lifts load on commuters". The Age. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
  25. ^ a b c Victoria's Big Build (25 October 2022). "Main Street, Pakenham". Victoria’s Big Build. Archived from the original on 9 December 2022. Retrieved 11 December 2022.
  26. ^ "High Capacity Metro Trains Project, Victoria, Australia". Railway Technology. Archived from the original on 9 December 2022. Retrieved 19 December 2022.
  27. ^ "Level crossings gone, new stations open". Pakenham Gazette. Star News Group Pty Ltd. 3 June 2024. Archived from the original on 3 June 2024. Retrieved 3 June 2024.
  28. ^ Carey, Adam (4 June 2015). "Multimillion-dollar Richmond railway station revamp in limbo". The Age. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  29. ^ "Guide to navigating the City Loop | Public Transport Users Association (Victoria, Australia)". Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  30. ^ Wong, Marcus (10 May 2021). "Level crossing removals in 1920s Melbourne". Waking up in Geelong. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  31. ^ "Sky train project for Melbourne's busiest rail line gets go-ahead". ABC News. 6 February 2016. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  32. ^ a b Wray, Tyson. "Melbourne's train lines definitively ranked from best to worst". Time Out Melbourne. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  33. ^ Hui, Jin (2 December 2020). "Big train gain: Pakenham line extended". Pakenham Gazette. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  34. ^ Lee, Robert S. (2007). The railways of Victoria 1854–2004. Rosemary Annable, Donald S. Garden. Carlton, Vic.: Melbourne University Publishing. ISBN 978-0-522-85134-2. OCLC 224727085. Archived from the original on 8 May 2022. Retrieved 29 December 2022.
  35. ^ "Caulfield to Dandenong Railway & Linear Park". ASPECT Studios. Archived from the original on 29 December 2022. Retrieved 29 December 2022.
  36. ^ a b c d e f g h i j k l m n o p q r s t u v w x "What year did your railway station open? | Public Transport Users Association (Victoria, Australia)". Archived from the original on 9 December 2022. Retrieved 9 December 2022.
  37. ^ a b c Anderson, Rick (2010). Stopping All Stations. Clunes, Victoria: Full Parallel Productions. ISBN 978-0646543635. OCLC 671303814.
  38. ^ a b "Stations to open 3 June". Pakenham Gazette. 10 May 2024. Retrieved 10 May 2024.
  39. ^ a b "New timetable train line information – Public Transport Victoria". 1 March 2021. Archived from the original on 1 March 2021. Retrieved 18 December 2022.
  40. ^ "Melbourne Weekend Night Network Train Map" (PDF). 2022. Archived (PDF) from the original on 12 January 2023. Retrieved 18 December 2022.
  41. ^ "Timetable changes on the Cranbourne Line". Public Transport Victoria. Archived from the original on 9 February 2022. Retrieved 9 February 2022.
  42. ^ "Where do train replacement buses come from?". ABC News. 15 November 2016. Archived from the original on 14 December 2022. Retrieved 18 December 2022.
  43. ^ "Pakenham Line". Public Transport Victoria. Archived from the original on 29 November 2022. Retrieved 26 December 2022.
  44. ^ "Melbourne's Rail Network to be Split" Railway Digest November 1997 page 12
  45. ^ National Express walks out of Australian rail service The Daily Telegraph (London) 17 December 2002
  46. ^ Receivers take over train, tram group The Age 24 December 2002
  47. ^ Victorian passenger services get new managers Rail Express 28 January 2003
  48. ^ Cooper, Mex (25 June 2009). "New train, tram operators for Melbourne". The Age. Archived from the original on 1 January 2023. Retrieved 1 January 2023.
  49. ^ "High Capacity Metro Trains". Archived from the original on 8 March 2020. Retrieved 2 January 2022.
  50. ^ Galloway, Anthony (24 August 2016). "Alarm over Chinese trains".
  51. ^ "Comeng trains starting to be scrapped". Daniel Bowen. 17 October 2021. Archived from the original on 12 December 2022. Retrieved 12 December 2022.
  52. ^ Victorian Government Department of Transport and Planning (2023). "New train and tram orders". Archived from the original on 1 December 2021. Retrieved 9 January 2023.
  53. ^ a b "NETWORK SERVICE PLAN | Addenda". 1 February 2011. Archived from the original on 7 March 2011.
  54. ^ "Facilities (Pakenham East Depot)". Evolution Rail. Retrieved 13 April 2023.
  55. ^ "East Pakenham Train Maintenance Depot, Melbourne, VIC". ACO Infrastructure. Retrieved 13 April 2023.
  56. ^ a b "Pakenham East Depot" (PDF). Downer Rail. Retrieved 13 April 2023.
  57. ^ Victoria's Big Build (18 March 2022). "High Capacity Signalling". Victoria’s Big Build. Archived from the original on 13 December 2022. Retrieved 13 December 2022.
  58. ^ "Victoria awards Melbourne Metro high-capacity signalling contract". Railway PRO. 19 July 2017. Archived from the original on 13 December 2022. Retrieved 13 December 2022.
  59. ^ Victoria's Big Build (18 March 2022). "Testing on the Mernda line". Victoria’s Big Build. Archived from the original on 13 December 2022. Retrieved 13 December 2022.
  60. ^ Mirage News (24 December 2021). "Upgrades to bring more trains more often". Mirage News. Archived from the original on 24 January 2023. Retrieved 13 December 2022.
  61. ^ a b "Staffed stations". Public Transport Victoria. Retrieved 13 April 2023.
  62. ^ "Customer Charter" (PDF). Metro Trains Melbourne.
  63. ^ "Accessibility – Public Transport Ombudsman Victoria". www.ptovic.com.au. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  64. ^ a b c d "Station accessibility features". Metro Trains Melbourne. 2023. Archived from the original on 8 December 2022. Retrieved 3 January 2023.
  65. ^ "Accessing public transport". City of Melbourne. n.d. Archived from the original on 6 December 2022. Retrieved 3 January 2023.
  66. ^ "Left behind: the fight for accessible public transport in Victoria". the Guardian. 12 June 2022. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  67. ^ Victoria’s Big Build (17 October 2022). "Urban design framework". Victoria’s Big Build. Archived from the original on 3 January 2023. Retrieved 3 January 2023.
  68. ^ "Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 3 January 2023.
  69. ^ "Digital tools". Public Transport Victoria. Retrieved 16 April 2023.
  70. ^ "Passenger Information Displays (PIDs) at stations are evolving". Daniel Bowen. 15 October 2018. Retrieved 16 April 2023.
  71. ^ "Growing Our Rail Network 2018–2025". Public Transport Victoria. Archived from the original on 12 August 2019. Retrieved 11 December 2022.
  72. ^ Victoria's Big Build (30 October 2022). "Melbourne Airport Rail overview". Victoria’s Big Build. Archived from the original on 5 January 2023. Retrieved 11 December 2022.
  73. ^ Victoria's Big Build (8 October 2022). "Melbourne Airport Rail timeline". Victoria’s Big Build. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
  74. ^ "Caulfield to Dandenong skyrail nears completion". Daniel Bowen. 18 March 2018. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
  75. ^ "Caulfield to Dandenong (Skyrail) | Level Crossing Removal". Ecodynamics | Commercial Landscaping | Greening & Nurturing Our Communities. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
  76. ^ "Pakenham Level Crossing Removals One Step Closer" (PDF). 27 July 2022. Archived (PDF) from the original on 24 January 2023. Retrieved 11 December 2022.
  77. ^ Cardinia Shire Council. "LXRP – Level Crossing Removal Project in Cardinia Shire". www.cardinia.vic.gov.au. Archived from the original on 11 December 2022. Retrieved 11 December 2022.
  78. ^ O'Keane, Tom (6 January 2022). "Contact awarded for $844M Melbourne rail works". Roads & Infrastructure Magazine. Archived from the original on 11 December 2022. Retrieved 11 December 2022.