Staten Island Railway: Difference between revisions
Davidng913 (talk | contribs) No edit summary Tags: Mobile edit Mobile web edit Advanced mobile edit |
|||
(10 intermediate revisions by 6 users not shown) | |||
Line 2: | Line 2: | ||
{{Good article}} |
{{Good article}} |
||
{{Use American English|date=February 2022}} |
{{Use American English|date=February 2022}} |
||
{{Use mdy dates|date= |
{{Use mdy dates|date=November 2024}} |
||
{{Infobox public transit |
{{Infobox public transit |
||
| box_width = 300px |
| box_width = 300px |
||
Line 15: | Line 15: | ||
| image3 = R211S_Express.jpg |
| image3 = R211S_Express.jpg |
||
| imagesize3 = 300px |
| imagesize3 = 300px |
||
| alt3 = A Staten Island Railway train bypassing Stapleton |
| alt3 = A Staten Island Railway train bypassing Stapleton |
||
| caption3 = A Staten Island Railway express train of [[R211 (New York City Subway car)|R211s]] bypassing the [[Stapleton station]] |
| caption3 = A Staten Island Railway express train of [[R211 (New York City Subway car)|R211s]] bypassing the [[Stapleton station]] |
||
| transit_type = [[Rapid transit]] |
| transit_type = [[Rapid transit]] |
||
Line 52: | Line 52: | ||
The line has a route bullet similar to subway routes: the letters ''SIR'' in a blue circle. It is used on timetables, the MTA website, some signage,{{efn|name=fn1|See [[:File:Arthur Kill station sign and entrance.jpg|this photo]]. The SIR bullet is shown at signage at the new Arthur Kill station.}} and on R211S trains, but not on [[R44 (New York City Subway car)|R44]] trains. Like the New York City Subway, the line runs 24 hours a day every day of the year,<ref name="MTA">{{cite web|url=http://web.mta.info/nyct/sir/sirinfo.htm|title=MTA Staten Island Railway General Information|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=October 8, 2015}}</ref> and is one of the few 24/7 mass-transit rail systems in the United States.{{efn|name=fn2|The others are the [[PATCO Speedline]], the [[Red Line (CTA)|Red]] and [[Blue Line (CTA)|Blue Lines]] of the [[Chicago "L"]], and the [[PATH (rail system)|PATH]] system.}} Fares are only collected at two stations, St. George and nearby [[Tompkinsville station|Tompkinsville]]. |
The line has a route bullet similar to subway routes: the letters ''SIR'' in a blue circle. It is used on timetables, the MTA website, some signage,{{efn|name=fn1|See [[:File:Arthur Kill station sign and entrance.jpg|this photo]]. The SIR bullet is shown at signage at the new Arthur Kill station.}} and on R211S trains, but not on [[R44 (New York City Subway car)|R44]] trains. Like the New York City Subway, the line runs 24 hours a day every day of the year,<ref name="MTA">{{cite web|url=http://web.mta.info/nyct/sir/sirinfo.htm|title=MTA Staten Island Railway General Information|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=October 8, 2015}}</ref> and is one of the few 24/7 mass-transit rail systems in the United States.{{efn|name=fn2|The others are the [[PATCO Speedline]], the [[Red Line (CTA)|Red]] and [[Blue Line (CTA)|Blue Lines]] of the [[Chicago "L"]], and the [[PATH (rail system)|PATH]] system.}} Fares are only collected at two stations, St. George and nearby [[Tompkinsville station|Tompkinsville]]. |
||
Although the railway was originally considered a standard rail line, the existing line is severed from the [[Rail transport in the United States|national rail system]], and only a small portion of the former [[North Shore Branch]] still sees freight use. The passenger operations are now regulated as a rapid transit system, and exempt from certain regulations.<ref name=noptc>{{cite web|url=https://www.silive.com/news/2016/10/staten_island_railway_positive_train_control.html|title=No Positive Train Control for Staten Island Railway: Here's why|date=October 6, 2016|access-date=January 14, 2019}}</ref> The line uses modified [[R44 (New York City Subway car)|R44]] and [[R211 (New York City Subway car)|R211S]] subway cars, the latter of which will replace the R44s throughout 2024 and 2025.<ref name="R211prodpress">{{Citation |title=MTA News Conference – 6/29/2023 |url=https://www.youtube.com/watch?v=xOsMLJDNPEE |access-date=July 21, 2023 |language=en}}</ref> |
Although the railway was originally considered a standard rail line, the existing line is severed from the [[Rail transport in the United States|national rail system]], and only a small portion of the former [[North Shore Branch]] still sees freight use. The passenger operations are now regulated as a rapid transit system, and exempt from certain regulations.<ref name=noptc>{{cite web|url=https://www.silive.com/news/2016/10/staten_island_railway_positive_train_control.html|title=No Positive Train Control for Staten Island Railway: Here's why|date=October 6, 2016|access-date=January 14, 2019}}</ref> The line uses modified [[R44 (New York City Subway car)|R44]] and [[R211 (New York City Subway car)|R211S]] subway cars, the latter of which will replace the R44s throughout 2024 and 2025.<ref name="R211prodpress">{{Citation |title=MTA News Conference – 6/29/2023 | date=June 29, 2023 |url=https://www.youtube.com/watch?v=xOsMLJDNPEE |access-date=July 21, 2023 |language=en}}</ref> |
||
== History == |
== History == |
||
Line 90: | Line 90: | ||
[[File:STATEN ISLAND RAPID TRANSIT, PART OF THE NEW YORK SUBWAY SYSTEM, CONNECTS THE SMALL TOWNS OF THE BOROUGH OF RICHMOND - NARA - 547842.jpg|thumb|300px|alt=Train at a station, with its driver leaning out the window to pose for the camera|An R44 at Grant City heading to St. George in July 1973]] |
[[File:STATEN ISLAND RAPID TRANSIT, PART OF THE NEW YORK SUBWAY SYSTEM, CONNECTS THE SMALL TOWNS OF THE BOROUGH OF RICHMOND - NARA - 547842.jpg|thumb|300px|alt=Train at a station, with its driver leaning out the window to pose for the camera|An R44 at Grant City heading to St. George in July 1973]] |
||
The B&O became part of the larger |
The B&O became part of the larger [[Chessie System]] in a merger with the [[Chesapeake and Ohio Railway]] (C&O), and the island's freight operation was renamed the Staten Island Railroad Corporation in 1971.<ref name="RoyalBlueLine" />{{Rp|174}} The B&O and C&O became isolated from their other properties in New Jersey and Staten Island with the creation of [[Conrail]] on April 1, 1976, in a merger of bankrupt lines in the northeastern U.S. Their freight service now terminated in [[Philadelphia]], but for several years afterward B&O locomotives and one B&O freight train a day ran to [[Cranford, New Jersey|Cranford Junction]].<ref name="RoyalBlueLine" />{{Rp|174}}<ref>{{Cite book|url=https://books.google.com/books?id=BqZuYcaRoCkC&q=%22april+1,+1976%22+%22conrail%22+%22staten+island%22|title=ConRail Authorization, Fiscal Year 1979: Hearings Before the Subcommittee on Transportation and Commerce of the Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-fifth Congress, Second Session, on H.R. 11492 ... April 11, 12, and 17, 1978|last=Commerce|first=United States Congress House Committee on Interstate and Foreign Commerce Subcommittee on Transportation and|date=1978|publisher=U.S. Government Printing Office|pages=107, 134|language=en}}</ref> In 1973, the [[Central Railroad of New Jersey|Jersey Central's]] [[car float]] yard was closed;<ref>{{Cite book|url=https://books.google.com/books?id=SbhIAQAAIAAJ&q=Since+1973,+there+has+been+no+CNJ+carfloating+activity|title=Recent Tanker Accidents: Hearings Before the Committee on Commerce, United States Senate, Ninety-fifth Congress, First Session ...|last=Commerce|first=United States Congress Senate Committee on|date=1977|publisher=U.S. Government Printing Office|pages=229|language=en}}</ref> however, the B&O's car-float operation was later brought back to Staten Island at Saint George Yard, after having ended in September 1976. This car-float operation was taken over by the New York Dock Railway in September 1979, and ended the following year.<ref name="RoyalBlueLine" />{{Rp|173}} |
||
Only a few isolated industries on Staten Island continued to use rail services, and the yard at Saint George was essentially abandoned.<ref name="SIRT" />{{Rp|9}} In April 1985, as a result of a decline in freight traffic, the Chessie System sold the Staten Island Railway to the [[New York, Susquehanna and Western Railway]] (NYS&W), a [[Delaware Otsego Corporation|Delaware Otsego]] (DO) subsidiary, for $1.5 million via a promissory note payable for over ten years.<ref name="Hartley 1988">{{Cite magazine |last=Hartley |first=Scott |date=January 1988 |title=Regionals In Review – The Delaware Otsego Story |url=https://www.trains.com/trn/magazine/archive-access/trains-january-1988/ |url-access=limited |access-date=October 8, 2024 |magazine=Trains |publisher=Kalmbach Publishing |page=34 |pages= |volume=48 |issue=3}}</ref> The NYS&W subsequently retained the Staten Island's freight operations, which served only ten customers by that time, and they had hopes of attracting more to boost profitability on the line.<ref name="Hartley 1988" /> In 1989, the NYS&W embargoed the trackage east of [[Elm Park (Staten Island Railway station)|Elm Park]] on the [[North Shore Branch]], ending all freight service to Saint George. |
|||
[[Procter & Gamble]], the line's primary customer, closed in 1990, resulting in a further decline in freight traffic. On July 25, 1991, the Arthur Kill Bridge was removed from service, and the line's final freight train operated on April 21, 1992.<ref>{{Cite book |last=Tupaczewski |first=Paul R. |title=New York, Susquehanna and Western In Color |publisher=Morning Sun Books, Inc. |year=2002 |isbn=1-58248-070-2 |location=[[Scotch Plains, New Jersey]] |pages=114}}</ref> The North Shore Branch and the Arthur Kill Bridge were then taken over by Chessie's successor, [[CSX Transportation]] (CSX). The line and bridge were sold again in 1994 to the [[New York City Economic Development Corporation]] (NYCEDC), followed by a decade of false starts.<ref name="SIRT" />{{Rp|9}} |
|||
SIRT was transferred from the New York City Transit Authority's Surface Transit Division to its Department of Rapid Transit on July 26, 1993,<ref>{{Cite news|title=SIRT Switched From One Division To Another. T.A. Reorganization Leaves Bus Service Without Manager|date=July 27, 1993|work=Staten Island Advance}}</ref> and that year the [[Dongan Hills (Staten Island Railway station)|Dongan Hills]] station became accessible, making it compliant with the [[Americans with Disabilities Act of 1990]].<ref>{{Cite news|title=Island Disabled Subject of SIRT Station Hearing. MTA To Discuss Dongan Hills Plans|date=April 25, 1992|work=Staten Island Advance}}</ref> [[MetroCard]]s were accepted for fare payment at the St. George station beginning on March 31, 1994, and the station became the 50th MTA rapid transit station to accept them.<ref>{{Cite news|title=MetroCard Christened at St. George Station. Transit Officials Say Ferry Is Next In Line For New Fare System|date=April 1, 1994|work=Staten Island Advance}}</ref> The [[Metropolitan Transportation Authority]] (MTA) restored the line's original name on April 2 of that year as the MTA Staten Island Railway (SIR).<ref name="SIRT" />{{Rp|9}}<ref>{{Cite news|title=It's Island Railway, Not Rapid Transit. MTA Has New Names For Its Transportation Systems. Out With the Old In With the New|date=April 2, 1994|work=Staten Island Advance}}</ref> On July 4, 1997, the MTA eliminated fares for travel between [[Tompkinsville (Staten Island Railway station)|Tompkinsville]] and [[Tottenville (Staten Island Railway station)|Tottenville]] as part of the year's "One City, One Fare" fare reductions.<ref>{{Cite news|title=Staten Island Railway Traverses Our Borough|date=April 29, 2001|work=Staten Island Advance}}</ref> United Transportation Union Local 1440, the union representing SIR employees, was concerned about the fare reduction in part because of an expected increase in ridership.<ref>{{Cite news|title=S.I. Railway: More May Ride Train For Free And That Has Workers Worried|date=April 10, 1997|work=Staten Island Advance}}</ref> No turnstiles were installed at the other stations on the line, and passengers at St. George began paying when entering and exiting;<ref>{{Cite news|title=Free Rides To Most Stations On Staten Island Railway. Only Those Who Enter And Leave At St. George Pay For The Commute|date=April 26, 1998|work=Staten Island Advance}}</ref> fares had previously been collected on board by the conductor.<ref>{{Cite news|title=Railway Riders Will Pay Only At St. George. On-Board Collection Will Be Eliminated As Line Joins The City's One-Fare System July 4|date=May 14, 1997|work=Staten Island Advance}}</ref> The removal of fares was blamed for an immediate spike in crime along the line.<ref>{{Cite news|title=Free Ride to Commit a Crime. Elimination of Fare For Most on the Staten Island Railway Allows Trouble-Causing Youths to Get On and Off at Will|date=August 22, 1999|work=Staten Island Advance}}</ref> Three afternoon express trains were added to the schedule on April 7, 1999, nearly doubling the previous express service. The express trains skipped stops between St. George and Great Kills.<ref>{{Cite news|title=3 Additional Express Runs Begin Tonight on Railway. New Trains Almost Double The Evening Express Service From St. George to Great Kills|date=April 7, 1999|work=Staten Island Advance}}</ref> A several-hundred-foot section of the easternmost portion of the North Shore Branch was reopened for passenger service to the [[Richmond County Bank Ballpark]], home of the [[Staten Island Yankees]] minor-league baseball team, on June 24, 2001; the service was discontinued on June 18, 2010.<ref>{{cite web|url=http://web.mta.info/mta/news/books/docs/NYCT_2010_Service_Reduction_Evaluation.pdf|title=Evaluation of 2010 Service Reductions|date=September 23, 2011|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=December 16, 2015}}</ref> A new station building at [[Tompkinsville (Staten Island Railway station)|Tompkinsville]] opened on January 20, 2010, with [[turnstile]]s installed to prevent passengers from exiting (free of charge) at Tompkinsville and walking the short distance to the St. George ferry terminal.<ref name="Mooney 2008" /> |
SIRT was transferred from the New York City Transit Authority's Surface Transit Division to its Department of Rapid Transit on July 26, 1993,<ref>{{Cite news|title=SIRT Switched From One Division To Another. T.A. Reorganization Leaves Bus Service Without Manager|date=July 27, 1993|work=Staten Island Advance}}</ref> and that year the [[Dongan Hills (Staten Island Railway station)|Dongan Hills]] station became accessible, making it compliant with the [[Americans with Disabilities Act of 1990]].<ref>{{Cite news|title=Island Disabled Subject of SIRT Station Hearing. MTA To Discuss Dongan Hills Plans|date=April 25, 1992|work=Staten Island Advance}}</ref> [[MetroCard]]s were accepted for fare payment at the St. George station beginning on March 31, 1994, and the station became the 50th MTA rapid transit station to accept them.<ref>{{Cite news|title=MetroCard Christened at St. George Station. Transit Officials Say Ferry Is Next In Line For New Fare System|date=April 1, 1994|work=Staten Island Advance}}</ref> The [[Metropolitan Transportation Authority]] (MTA) restored the line's original name on April 2 of that year as the MTA Staten Island Railway (SIR).<ref name="SIRT" />{{Rp|9}}<ref>{{Cite news|title=It's Island Railway, Not Rapid Transit. MTA Has New Names For Its Transportation Systems. Out With the Old In With the New|date=April 2, 1994|work=Staten Island Advance}}</ref> On July 4, 1997, the MTA eliminated fares for travel between [[Tompkinsville (Staten Island Railway station)|Tompkinsville]] and [[Tottenville (Staten Island Railway station)|Tottenville]] as part of the year's "One City, One Fare" fare reductions.<ref>{{Cite news|title=Staten Island Railway Traverses Our Borough|date=April 29, 2001|work=Staten Island Advance}}</ref> United Transportation Union Local 1440, the union representing SIR employees, was concerned about the fare reduction in part because of an expected increase in ridership.<ref>{{Cite news|title=S.I. Railway: More May Ride Train For Free And That Has Workers Worried|date=April 10, 1997|work=Staten Island Advance}}</ref> No turnstiles were installed at the other stations on the line, and passengers at St. George began paying when entering and exiting;<ref>{{Cite news|title=Free Rides To Most Stations On Staten Island Railway. Only Those Who Enter And Leave At St. George Pay For The Commute|date=April 26, 1998|work=Staten Island Advance}}</ref> fares had previously been collected on board by the conductor.<ref>{{Cite news|title=Railway Riders Will Pay Only At St. George. On-Board Collection Will Be Eliminated As Line Joins The City's One-Fare System July 4|date=May 14, 1997|work=Staten Island Advance}}</ref> The removal of fares was blamed for an immediate spike in crime along the line.<ref>{{Cite news|title=Free Ride to Commit a Crime. Elimination of Fare For Most on the Staten Island Railway Allows Trouble-Causing Youths to Get On and Off at Will|date=August 22, 1999|work=Staten Island Advance}}</ref> Three afternoon express trains were added to the schedule on April 7, 1999, nearly doubling the previous express service. The express trains skipped stops between St. George and Great Kills.<ref>{{Cite news|title=3 Additional Express Runs Begin Tonight on Railway. New Trains Almost Double The Evening Express Service From St. George to Great Kills|date=April 7, 1999|work=Staten Island Advance}}</ref> A several-hundred-foot section of the easternmost portion of the North Shore Branch was reopened for passenger service to the [[Richmond County Bank Ballpark]], home of the [[Staten Island Yankees]] minor-league baseball team, on June 24, 2001; the service was discontinued on June 18, 2010.<ref>{{cite web|url=http://web.mta.info/mta/news/books/docs/NYCT_2010_Service_Reduction_Evaluation.pdf|title=Evaluation of 2010 Service Reductions|date=September 23, 2011|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=December 16, 2015}}</ref> A new station building at [[Tompkinsville (Staten Island Railway station)|Tompkinsville]] opened on January 20, 2010, with [[turnstile]]s installed to prevent passengers from exiting (free of charge) at Tompkinsville and walking the short distance to the St. George ferry terminal.<ref name="Mooney 2008" /> |
||
Line 107: | Line 111: | ||
|image2= Kawasaki R211S Local Inaugural Round Trip @ Bay Terrace - October 2024.jpg |
|image2= Kawasaki R211S Local Inaugural Round Trip @ Bay Terrace - October 2024.jpg |
||
|caption2=R211S train at Bay Terrace, bound for Saint George on its first day of service |
|caption2=R211S train at Bay Terrace, bound for Saint George on its first day of service |
||
|image3= |
|image3=Staten Island Railway 777.jpg |
||
|caption3=Staten Island Railway BL20G # |
|caption3=Staten Island Railway BL20G #777 at Tottenville |
||
}} |
}} |
||
Rolling stock consists of modified [[R44 (New York City Subway car)|R44]] subway-type cars built in early 1973,<ref name="tenyearprogram" />{{Rp|53}} added to the end of the R44 order of subway cars for New York City Transit; they were the last cars built by the [[St. Louis Car Company]].<ref>{{Cite book|url=https://books.google.com/books?id=6WFHNSXBpocC&q=Gene+SANSONE+subway+cars|title=New York Subways: An Illustrated History of New York City's Transit Cars|last=Sansone|first=Gene|date=October 25, 2004|publisher=[[Johns Hopkins University Press]]|isbn=978-0-8018-7922-7|location=Baltimore, Maryland|pages=257|language=en}}</ref><ref>{{Cite book|url=https://books.google.com/books?id=BjpPAAAAMAAJ&q=R44|title=The History of the St. Louis Car Company, "Quality Shops"|last1=Young|first1=Andrew D.|last2=Provenzo|first2=Eugene F. Jr.|date=1978|publisher=Howell-North Books|isbn=978-0-8310-7114-1|location=Berkeley, California|pages=284|language=en}}</ref> They are being |
Rolling stock consists of modified [[R44 (New York City Subway car)|R44]] subway-type cars built in early 1973,<ref name="tenyearprogram" />{{Rp|53}} added to the end of the R44 order of subway cars for New York City Transit; they were the last cars built by the [[St. Louis Car Company]].<ref>{{Cite book|url=https://books.google.com/books?id=6WFHNSXBpocC&q=Gene+SANSONE+subway+cars|title=New York Subways: An Illustrated History of New York City's Transit Cars|last=Sansone|first=Gene|date=October 25, 2004|publisher=[[Johns Hopkins University Press]]|isbn=978-0-8018-7922-7|location=Baltimore, Maryland|pages=257|language=en}}</ref><ref>{{Cite book|url=https://books.google.com/books?id=BjpPAAAAMAAJ&q=R44|title=The History of the St. Louis Car Company, "Quality Shops"|last1=Young|first1=Andrew D.|last2=Provenzo|first2=Eugene F. Jr.|date=1978|publisher=Howell-North Books|isbn=978-0-8310-7114-1|location=Berkeley, California|pages=284|language=en}}</ref> They are being replaced by seventy-five [[R211 (New York City Subway car)|R211S]] subway cars,<ref>{{cite web | last=Matteo | first=Mike | title=Staten Island Railway to get new cars by end of year, but some feel we don't deserve them | website=silive | date=June 26, 2024 | url=https://www.silive.com/news/2024/06/staten-island-railway-to-get-new-cars-by-end-of-year-but-some-feel-we-dont-deserve-them.html | access-date=June 26, 2024}}</ref><ref>{{cite web | last=Khalifeh | first=Ramsey | title=Staten Island Railway to get new trains for first time in 50 years | website=Gothamist | date=June 24, 2024 | url=https://gothamist.com/news/staten-island-railway-to-get-new-trains-for-first-time-in-50-years | access-date=October 6, 2024}}</ref> which entered service on October 8, 2024.<ref>{{cite web | last=Brachfeld | first=Ben | title=New R211 subway cars roll into service on Staten Island Railway | website=amNewYork | date=October 8, 2024 | url=https://www.amny.com/transit/new-r211-subway-cars-staten-island-railway/ | access-date=October 8, 2024}}</ref><ref>{{cite web | last=Matteo | first=Mike | title=New Staten Island Railway cars: First train takes inaugural ride Tuesday | website=silive | date=October 8, 2024 | url=https://www.silive.com/news/2024/10/new-staten-island-railway-cars-first-train-takes-inaugural-ride-tuesday.html | access-date=October 8, 2024}}</ref> The line also has four [[BL20G]] locomotives manufactured by [[Brookville Equipment|Brookville]], which were delivered in 2009 and are used for work service.<ref>{{cite book | last=Pitanza | first=Marc | title=Staten Island Rapid Transit | publisher=Arcadia Publishing | series=Images of America | year=2015 | isbn=978-1-4671-2338-9 | url=https://books.google.com/books?id=eOSsCQAAQBAJ&pg=PA120 | language=en| page=120}}</ref> Heavy maintenance is performed at NYCT's Clifton Shops, and any work unable to be done at Clifton requires the cars to be trucked over the [[Verrazzano-Narrows Bridge]] to the subway's [[Coney Island Complex]] in [[Brooklyn]]. The [[Right-of-way (transportation)|right-of-way]] includes elevated, embankment and open-cut sections, as well as a tunnel near St. George.<ref name="tracks" />{{rp|102–103}} |
||
The Staten Island Railway uses Baltimore & Ohio Railroad-style [[North American railroad signals#Color position light|color position light]] signals dating back to its B&O days. In 2007, a $72-million project to enhance the old signal system was completed. The Signaling system was enhanced with an FRA-compliant 100 Hz, track-circuit-based automatic train control (ATC) signal system. As part of the project, forty [[R44 (New York City Subway car)|R44]] subway cars and four locomotives were modified with onboard cab signaling equipment for ATC bi-directional movement. A new rail control center and backup control center were built as part of the project.<ref name="Signal">{{cite web |url=http://www.transitresources.net/hts_sir2012.pdf |title=Staten Island Signal Modernization |publisher=Transit Resources |access-date=December 16, 2015}}</ref> The line uses [[New York City Transit Authority|NYC Transit-standard]] 600 V DC third-rail power.<ref>{{Cite journal|date=May 17, 1924|title=Staten Island Line to Electrify|url=https://archive.org/details/electricrailwayj632mcgrrich|journal=[[Electric Railway Journal]]|location=New York, New York|volume=63|issue=20|pages=776–777|oclc=990315014}}</ref> Trains run up to {{convert|45|mph}} in passenger service, although trains are limited to {{convert|10|mph}} on tail tracks, sidings and in yards.<ref name="Bascome 2022 p483">{{cite web | last=Bascome | first=Erik | title=MTA looking for ways to speed up Staten Island Railway | website=silive | date=September 21, 2022 | url=https://www.silive.com/news/2022/09/mta-looking-for-ways-to-speed-up-staten-island-railway.html | access-date=November 11, 2023}}</ref> |
The Staten Island Railway uses Baltimore & Ohio Railroad-style [[North American railroad signals#Color position light|color position light]] signals dating back to its B&O days. In 2007, a $72-million project to enhance the old signal system was completed. The Signaling system was enhanced with an FRA-compliant 100 Hz, track-circuit-based automatic train control (ATC) signal system. As part of the project, forty [[R44 (New York City Subway car)|R44]] subway cars and four locomotives were modified with onboard cab signaling equipment for ATC bi-directional movement. A new rail control center and backup control center were built as part of the project.<ref name="Signal">{{cite web |url=http://www.transitresources.net/hts_sir2012.pdf |title=Staten Island Signal Modernization |publisher=Transit Resources |access-date=December 16, 2015}}</ref> The line uses [[New York City Transit Authority|NYC Transit-standard]] 600 V DC third-rail power.<ref>{{Cite journal|date=May 17, 1924|title=Staten Island Line to Electrify|url=https://archive.org/details/electricrailwayj632mcgrrich|journal=[[Electric Railway Journal]]|location=New York, New York|volume=63|issue=20|pages=776–777|oclc=990315014}}</ref> Trains run up to {{convert|45|mph}} in passenger service, although trains are limited to {{convert|10|mph}} on tail tracks, sidings and in yards.<ref name="Bascome 2022 p483">{{cite web | last=Bascome | first=Erik | title=MTA looking for ways to speed up Staten Island Railway | website=silive | date=September 21, 2022 | url=https://www.silive.com/news/2022/09/mta-looking-for-ways-to-speed-up-staten-island-railway.html | access-date=November 11, 2023}}</ref> |
||
Line 117: | Line 121: | ||
[[File:Conductor 5-Car at Grant City.jpg|thumb|Disused Conductor indicator for a 5-car train at Grant City. Used during 5-car train tests in the early 2010s. By 2019, almost all of these had been removed, as the SIRTOA continued to use 4-car trains.]] |
[[File:Conductor 5-Car at Grant City.jpg|thumb|Disused Conductor indicator for a 5-car train at Grant City. Used during 5-car train tests in the early 2010s. By 2019, almost all of these had been removed, as the SIRTOA continued to use 4-car trains.]] |
||
Demetrius Crichlow has been the railway's president and chief officer since his appointment in October 2024.<ref>{{cite web | last=Ley | first=Ana | title=MTA Promotes New Subway President, Demetrius Crichlow, After 27 Years of Service | website=The New York Times | date=October 23, 2024 | url=https://www.nytimes.com/2024/10/23/nyregion/mta-subway-crichlow.html | access-date=October 23, 2024}}</ref><ref>{{cite web | url=https://new.mta.info/press-release/mta-chair-and-ceo-janno-lieber-appoints-demetrius-crichlow-12th-president-of-new-york | title=MTA Chair and CEO Janno Lieber Appoints Demetrius Crichlow as the 12th President of New York City Transit }}</ref> The workforce, about 200 [[Hourly worker|hourly employees]], is represented by [[United Transportation Union]] Local 1440.<ref>{{Cite web|url=http://1440.utu.org/UTU_Web/|title=Proudly Serving the Riders of the MTA Staten Island Railway (SIRTOA)!|website=1440.utu.org|publisher=[[United Transportation Union|UTU Local 1440]]|archive-url=https://web.archive.org/web/20150228222845/http://1440.utu.org/UTU_Web/|archive-date=February 28, 2015|url-status=dead|access-date=April 23, 2018}}</ref> |
|||
==== Accessibility ==== |
==== Accessibility ==== |
||
Only the [[Dongan Hills (Staten Island Railway station)|Dongan Hills]], [[St. George Terminal|St. George]], [[Great Kills (Staten Island Railway station)|Great Kills]], [[New Dorp station|New Dorp]] and [[Tottenville (Staten Island Railway station)|Tottenville]] stations have been renovated to comply with the [[Americans with Disabilities Act of 1990]]; these stations have elevators and/or ramps.<ref name="MTA" /><ref>{{cite web |url=http://web.mta.info/accessibility/stations.htm#sir |title=MTA Guide to Accessible Transit |website=mta.info |publisher=Metropolitan Transportation Authority|access-date=April 22, 2018}}</ref> As part of the MTA's 2020–2024 capital plan, two additional stations are planned to be renovated to become ADA-accessible, [[Huguenot station|Huguenot]] and [[Clifton station (Staten Island Railway)|Clifton]].<ref>{{cite web |url=https://www.silive.com/news/2019/09/3-staten-island-railway-stations-to-get-accessibility-upgrades.html |title=Staten Island Railway Stations to get accessibility upgrades |website=siLive.com |publisher=Staten Island Advance|access-date=September 3, 2019}}</ref> |
Only the [[Dongan Hills (Staten Island Railway station)|Dongan Hills]], [[St. George Terminal|St. George]], [[Great Kills (Staten Island Railway station)|Great Kills]], [[New Dorp station|New Dorp]] and [[Tottenville (Staten Island Railway station)|Tottenville]] stations have been renovated to comply with the [[Americans with Disabilities Act of 1990]]; these stations have elevators and/or ramps.<ref name="MTA" /><ref>{{cite web |url=http://web.mta.info/accessibility/stations.htm#sir |title=MTA Guide to Accessible Transit |website=mta.info |publisher=Metropolitan Transportation Authority|access-date=April 22, 2018}}</ref> As part of the MTA's 2020–2024 capital plan, two additional stations are planned to be renovated to become ADA-accessible, [[Huguenot station|Huguenot]] and [[Clifton station (Staten Island Railway)|Clifton]].<ref>{{cite web |url=https://www.silive.com/news/2019/09/3-staten-island-railway-stations-to-get-accessibility-upgrades.html |title=Staten Island Railway Stations to get accessibility upgrades |website=siLive.com |publisher=Staten Island Advance|access-date=September 3, 2019}}</ref> |
||
Line 128: | Line 132: | ||
==== Fare ==== |
==== Fare ==== |
||
{{Main|New York City transit fares}} |
{{Main|New York City transit fares}} |
||
The cash fare is $2.90, the same fare as the New York City Subway and [[MTA Regional Bus Operations|MTA buses]]. Fares are paid on entry and exit only at [[St. George (Staten Island Railway station)|St. George]] and [[Tompkinsville station|Tompkinsville]]. Rides not originating or terminating at St. George or Tompkinsville are free. Fares are payable by [[MetroCard]] or [[OMNY]]. Since the card enables free transfers for a continuous ride on the subway and bus systems, for many riders there is effectively no fare for riding the SIR. Riders can also transfer between a Staten Island bus, the SIR and a Manhattan bus (or subway) near [[South Ferry – Whitehall Street (New York City Subway)|South Ferry]].<ref name="MTA2">{{cite web|url=http://web.mta.info/nyct/sir/sirfare.htm|title=MTA Staten Island Railway Fare and Transfer Information|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=October 8, 2015}}</ref> Because of this, the SIR's 2001 [[farebox recovery ratio]] was 0.16; for every dollar of expense, 16 cents was recovered in fares (the lowest ratio of MTA agencies).<ref>{{Cite web|url=https://www.nymtc.org/Portals/0/Pdf/Regional%20Transportation%20Statistics/rtsr2002.pdf|title=Regional Transportation Statistical Report|date=January 2005|website=nymtc.org|publisher=New York Metropolitan Transportation Council|page=57|access-date=January 16, 2019}}</ref> The low farebox recovery ratio is part of the reason the MTA sought to merge the SIR with the subway to form MTA Subways in October 2002: to simplify accounting and subsidy of a single line.<ref>{{Cite news|url=https://nypost.com/2002/10/10/mta-plans-major-restructuring-job/|title=MTA Plans Major Restructuring Job|last=Mangan|first=Dan|date=October 10, 2002|work=New York Post|access-date=January 16, 2019}}</ref> |
The cash fare is $2.90, the same fare as the New York City Subway and [[MTA Regional Bus Operations|MTA buses]]. Fares are paid on entry and exit only at [[St. George (Staten Island Railway station)|St. George]] and [[Tompkinsville station|Tompkinsville]]. Rides not originating or terminating at St. George or Tompkinsville are free. Fares are payable by [[MetroCard]] or [[OMNY]]. Since the card enables free transfers for a continuous ride on the subway and bus systems, for many riders there is effectively no fare for riding the SIR, as long as they do not need to make a second transfer. Riders can also transfer between a Staten Island bus, the SIR and a Manhattan bus (or subway) near [[South Ferry – Whitehall Street (New York City Subway)|South Ferry]].<ref name="MTA2">{{cite web|url=http://web.mta.info/nyct/sir/sirfare.htm|title=MTA Staten Island Railway Fare and Transfer Information|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=October 8, 2015}}</ref> Because of this, the SIR's 2001 [[farebox recovery ratio]] was 0.16; for every dollar of expense, 16 cents was recovered in fares (the lowest ratio of MTA agencies).<ref>{{Cite web|url=https://www.nymtc.org/Portals/0/Pdf/Regional%20Transportation%20Statistics/rtsr2002.pdf|title=Regional Transportation Statistical Report|date=January 2005|website=nymtc.org|publisher=New York Metropolitan Transportation Council|page=57|access-date=January 16, 2019}}</ref> The low farebox recovery ratio is part of the reason the MTA sought to merge the SIR with the subway to form MTA Subways in October 2002: to simplify accounting and subsidy of a single line.<ref>{{Cite news|url=https://nypost.com/2002/10/10/mta-plans-major-restructuring-job/|title=MTA Plans Major Restructuring Job|last=Mangan|first=Dan|date=October 10, 2002|work=New York Post|access-date=January 16, 2019}}</ref> |
||
Before the 1997 introduction of the one-fare zone,<ref name="mayors_message">{{cite web|url=http://www.nyc.gov/html/records/rwg/html/97a/me970629.html|title=Archives of Rudolph W. Giuliani Mayor's Message|last=Giuliani|first=Rudolph|date=June 29, 1997|website=nyc.gov|publisher=New York City Department of Records|access-date=December 5, 2011|archive-date=March 4, 2016|archive-url=https://web.archive.org/web/20160304110132/http://www.nyc.gov/html/records/rwg/html/97a/me970629.html|url-status=dead}}</ref> with the MetroCard's free transfers from the SIR to the subway system and MTA buses, fares were collected from passengers boarding at stops other than St. George by onboard conductors.<ref name="Linder">{{Cite journal|last=Linder|first=Bernard|date=January 2018|title=Staten Island's 157-Year-Old Railroad|url=https://gallery.mailchimp.com/53077b4eb8363107e691b3757/files/bf1a5c1d-f35f-46da-a26f-823a73eb0fbe/January_2018_ERA_Bulletin.pdf|journal=The Bulletin|location=New York, New York|publisher=Electric Railroaders' Association|volume=61|issue=1|pages=1}}</ref> In the past, passengers had avoided paying the fare by exiting at Tompkinsville and walking a short distance to the St. George Ferry Terminal. As a result, the MTA installed [[turnstile]]s at Tompkinsville and a new station building, which opened on January 20, 2010.<ref name="Mooney 2008">{{cite news|url=https://www.nytimes.com/2008/09/07/nyregion/thecity/07disp.html?_r=0|title=Soon, It Won't Even Pay to Walk|last=Mooney|first=Jake|date=September 7, 2008|work=The New York Times|access-date=October 8, 2015|issn=0362-4331}}</ref> |
Before the 1997 introduction of the one-fare zone,<ref name="mayors_message">{{cite web|url=http://www.nyc.gov/html/records/rwg/html/97a/me970629.html|title=Archives of Rudolph W. Giuliani Mayor's Message|last=Giuliani|first=Rudolph|date=June 29, 1997|website=nyc.gov|publisher=New York City Department of Records|access-date=December 5, 2011|archive-date=March 4, 2016|archive-url=https://web.archive.org/web/20160304110132/http://www.nyc.gov/html/records/rwg/html/97a/me970629.html|url-status=dead}}</ref> with the MetroCard's free transfers from the SIR to the subway system and MTA buses, fares were collected from passengers boarding at stops other than St. George by onboard conductors.<ref name="Linder">{{Cite journal|last=Linder|first=Bernard|date=January 2018|title=Staten Island's 157-Year-Old Railroad|url=https://gallery.mailchimp.com/53077b4eb8363107e691b3757/files/bf1a5c1d-f35f-46da-a26f-823a73eb0fbe/January_2018_ERA_Bulletin.pdf|journal=The Bulletin|location=New York, New York|publisher=Electric Railroaders' Association|volume=61|issue=1|pages=1}}</ref> In the past, passengers had avoided paying the fare by exiting at Tompkinsville and walking a short distance to the St. George Ferry Terminal. As a result, the MTA installed [[turnstile]]s at Tompkinsville and a new station building, which opened on January 20, 2010.<ref name="Mooney 2008">{{cite news|url=https://www.nytimes.com/2008/09/07/nyregion/thecity/07disp.html?_r=0|title=Soon, It Won't Even Pay to Walk|last=Mooney|first=Jake|date=September 7, 2008|work=The New York Times|access-date=October 8, 2015|issn=0362-4331}}</ref> |
||
Line 215: | Line 219: | ||
| |
| |
||
| {{bus icon|12px|NYCT Bus}} NYCT Bus: S51<ref name=SIBus /> |
| {{bus icon|12px|NYCT Bus}} NYCT Bus: S51<ref name=SIBus /> |
||
----Originally [[Vanderbilt's Landing station|Vanderbilt's Landing]]; |
----Originally [[Vanderbilt's Landing station|Vanderbilt's Landing]]; no access from last car northbound<ref name="sirschedule" /> |
||
|- |
|- |
||
| align=center | {{NYCS SSI|alltimes}} |
| align=center | {{NYCS SSI|alltimes}} |
||
Line 366: | Line 370: | ||
| |
| |
||
| {{bus icon|12px|NYCT Bus}} NYCT Bus: {{NYC bus link|SIM26}}<ref name=SIBus /> |
| {{bus icon|12px|NYCT Bus}} NYCT Bus: {{NYC bus link|SIM26}}<ref name=SIBus /> |
||
---- |
----No access from last car<ref name="threecar">{{cite web|url=http://web.mta.info/nyct/service/ServChanges_Grasmere.htm|title=Please Use The First Three Cars to Enter or Exit the Train at the Following Stations|website=mta.info|publisher=Metropolitan Transportation Authority|access-date=August 14, 2017}}</ref> |
||
|-style="background:#dfdfdf;" |
|-style="background:#dfdfdf;" |
||
| align=center | |
| align=center | |
Latest revision as of 23:54, 22 November 2024
The Staten Island Railway (SIR) is a railroad line in the New York City borough of Staten Island. It is owned by the Staten Island Rapid Transit Operating Authority (SIRTOA), a subsidiary of the Metropolitan Transportation Authority, and operated by the New York City Transit Authority Department of Subways. SIR operates 24 hours a day, seven days a week, providing local service between St. George and Tottenville, along the east side of the island. There is currently only one line on the island, and there is no direct rail link between the SIR and the New York City Subway system, but SIR riders do receive a free transfer to New York City Transit bus and subway lines, and the line is included on official New York City Subway maps.[4] Commuters on the railway typically use the Staten Island Ferry to reach Manhattan. The line is accessible from within the Ferry Terminal, and most of its trains are timed to connect with the ferry. In 2023, the system had a ridership of 6,151,400, or about 16,600 per weekday as of the third quarter of 2024.
The line has a route bullet similar to subway routes: the letters SIR in a blue circle. It is used on timetables, the MTA website, some signage,[a] and on R211S trains, but not on R44 trains. Like the New York City Subway, the line runs 24 hours a day every day of the year,[5] and is one of the few 24/7 mass-transit rail systems in the United States.[b] Fares are only collected at two stations, St. George and nearby Tompkinsville.
Although the railway was originally considered a standard rail line, the existing line is severed from the national rail system, and only a small portion of the former North Shore Branch still sees freight use. The passenger operations are now regulated as a rapid transit system, and exempt from certain regulations.[6] The line uses modified R44 and R211S subway cars, the latter of which will replace the R44s throughout 2024 and 2025.[7]
History
[edit]19th century
[edit]The Staten Island Rail Road was incorporated on August 2, 1851, after Perth Amboy and Staten Island residents petitioned for a Tottenville-to-Stapleton rail line. The railroad was financed with a loan from Cornelius Vanderbilt, the sole Staten Island-to-Manhattan ferry operator on the East Shore, his first involvement in a railroad.[8] The line was completed to Tottenville on June 2, 1860.[9]: 7 [10]: 225 Under the leadership of Vanderbilt's brother, Jacob H. Vanderbilt, the Staten Island Rail Road took over several independent ferries.[11] The Staten Island Railway and ferry line made a modest profit until the explosion of the ferry Westfield at Whitehall Street Terminal on July 30, 1871.[9]: 7 [12]: 36 By July 1872, the railroad and ferry were in receivership. On September 17, 1872, the company was sold to George Law in foreclosure.[8][10]: 225–228 [13]: 462 The following April 1, the Staten Island Rail Road was transferred to the Staten Island Railway Company.[14]: 1255
By 1880 the railway was barely operational, and New York State sued (through Attorney General Hamilton Ward) to dissolve the company in May of that year.[10]: 229 [15] Erastus Wiman, one of the island's most prominent residents, organized the Staten Island Rapid Transit Company (SIRT) on March 25, 1880, and partnered with the Baltimore & Ohio Railroad (B&O) to build a large rail terminal on the island and centralize the six-to-eight ferry landings.[9]: 7 [10]: 7 [12]: 37 He secured an extension on a land-purchase option from George Law by offering to name it "St. George" after him.[16]: 4 [17]: 8
Construction of the Vanderbilt's Landing-to-Tompkinsville portion of the North Shore Branch began on March 17, 1884,[10]: 230 [12]: 37 [18] and the line opened for passenger service on August 1 of that year.[19] The lighthouse just above Tompkinsville impeded the line's extension to St. George but, after the SIRT lobbied for an act of Congress, construction of a two-track, 580-foot (180 m) tunnel under the lighthouse began in 1885 for about $190,000.[20]: 690 The SIR was leased to the B&O for 99 years in 1885.[9]: 7–8 [10]: 230 [12]: 37 Proceeds of the lease were used to complete the terminal at Saint George, pay for two miles of waterfront property, complete the Rapid Transit Railroad, build a bridge over the Kill Van Kull at Elizabethport, and build other terminal facilities.[21] The North Shore Branch opened for service on February 23, 1886, to Elm Park.[20]: 690 The Saint George terminal opened on March 7, 1886, and all SIR lines were extended to the station.[10]: 231 [12]: 37 The remainder of the North Shore Branch, to its terminus at Erastina, was opened in the summer of 1886.[9] On January 1, 1888, the South Beach Branch opened for passenger service to Arrochar.[22]: 257–258 [23] In 1893, the South Beach Branch was extended from Arrochar to a new terminal at South Beach.[24] The new lines opened by the B&O were known as the Staten Island Rapid Transit Railway, and the original line (from Clifton to Tottenville) was called the Staten Island Railway.[25]
In 1886, Congress passed a law authorizing the construction of a 500-foot (150 m) swing bridge over Arthur Kill, after three years of effort by Wiman.[12][26] The bridge was completed three days early, on June 13, 1888, at 3 p.m.[8][13][27] The Arthur Kill Bridge was the world's largest drawbridge when it opened, and there were no fatalities in its construction.[26] In 1889, construction began on the Baltimore and New York Railway— 5.25-mile (8.45 km) line from Arthur Kill to the Jersey Central at Cranford, and was finished later in the year. On January 1, 1890, the first train operated from St. George Terminal to Cranford Junction.[9]: 8 [28][29] When the Arthur Kill Bridge was completed, the United States War Department was unsuccessfully pressured by the Lehigh Valley and Pennsylvania Railroads to have the newly built bridge replaced with a bridge with a different design; according to the railroads, it was an obstruction to navigation of the large numbers of coal barges past Holland Hook on Arthur Kill.[12] In 1897, the terminal at Saint George (which served the railroad and the ferry to Manhattan) was completed.[10]
20th century
[edit]Improvements were made to the SIRT after the Pennsylvania Railroad (PRR) took control of the B&O in 1900,[30]: 194–195, 199–200 after which the B&O became profitable again.[31][better source needed] On October 25, 1905, New York City took ownership of the ferry and terminals and evicted the B&O from the Whitehall Street terminal. The St. George Terminal was then built by the city for $2,318,720, equivalent to $78,630,372 in 2023.[32]
In anticipation of a tunnel under the Narrows to Brooklyn and a connection there with the BMT Fourth Avenue Line of the New York City Subway, the SIRT electrified its lines with third rail power distribution and cars similar to those of the Brooklyn–Manhattan Transit Corporation (BMT).[33] The first electric train was operated on the South Beach Branch between South Beach and Fort Wadsworth on May 30, 1925, and the other branches were electrified by November of that year.[33][34] Electrification did not greatly increase traffic, and the tunnel was never built.[35] During the 1920s, a branch line along Staten Island's West Shore was built to haul building materials for the Outerbridge Crossing.[9]: 111 The branch was cut back to a point south of the crossing after the bridge was built. The Gulf Oil Corporation opened a dock and tank farm along Arthur Kill in 1928; to serve it, the Travis Branch was built south from Arlington Yard into the marshes of the island's western shore to Gulfport in the early 1930s.[9]: 41 [36]
The Port Richmond–Tower Hill viaduct, the nation's largest grade-crossing-elimination project, was completed on February 25, 1937. The viaduct, more than a mile long, spanned eight grade crossings on the SIRT's North Shore Branch and was the final part of a $6 million grade-crossing-elimination project on the island which eliminated thirty-four crossings on its north and south shores.[37]
Year | Traffic |
---|---|
1925 | 67 |
1944 | 81 |
1960 | 37 |
1967 | 38 |
Freight and World War II traffic helped pay some of the SIRT's accumulated debt, and the line was briefly profitable in the 1940s. All East Coast military-hospital trains were handled by the SIRT during the war, and some trains stopped at Staten Island's Arlington station to transfer wounded soldiers to a large military hospital. The need to transport war materiel, POW trains and troops made the stretch of the Baltimore & New York Railway between Cranford Junction and Arthur Kill extremely busy.[31] The B&O also operated special trains for important officials, such as Winston Churchill.[38] On June 25, 1946, a fire destroyed the St. George Terminal; three people were killed, twenty-two were injured and damage totaled $22 million.[10]: 239 [12] The fire destroyed the ferry terminal, the four slips used for service to Manhattan and the SIRT terminal.[39][40] Normal service was not restored until July 13, 1946, and a request for bids to build a temporary terminal was issued on August 21 of that year. On February 10, 1948, a replacement terminal was promised by Mayor William O'Dwyer. The new $23 million terminal opened on June 8, 1951, with ferry, bus and rail service in one building; portions of the new terminal were phased into service earlier.[10]: 240 [41]: 55 [42]
Ridership decreased from 12.3 million in 1947 to 4.4 million in 1949 as passengers switched from the rail line to city-operated buses due to a bus-fare reduction.[43] In September 1948, about half of weekday trains were cut, night trains after 1:29 a.m. were cancelled, and thirty percent of the company's employees were laid off.[44][45][46] After backlash, service was slightly increased.[47] On September 22, the Interstate Commerce Commission allowed the SIRT to abandon the ferry it had operated for 88 years between Tottenville and Perth Amboy, New Jersey, and the ferry operation was transferred to Sunrise Ferries of Elizabeth, New Jersey on October 16.[48][49] SIRT discontinued passenger service on the North Shore Branch and the South Beach Branch at midnight on March 31, 1953, due to competition from city-operated buses; the South Beach Branch was abandoned shortly afterwards, and the North Shore Branch continued to carry freight.[50][51] On September 7, 1954, SIRT applied to discontinue passenger service on the Tottenville Branch on October 7 of that year;[52] a large city subsidy allowed passenger service on the branch to continue.[8]
In 1956, work began on the replacement of the Arthur Kill swing bridge by a single-track, 558-foot (170 m) vertical-lift bridge, which opened in August 1959.[12]: 135 [53] The prefabricated, 2,000-ton bridge was floated into place.[9]: 8 The new bridge could rise 135 feet (41 m) and, since it aided navigation on Arthur Kill, the federal government assumed 90% of the project's $11 million cost. Freight trains started crossing the bridge when it opened on August 25, 1959.[30]: 349 The Travis Branch was extended in 1958 to a new Consolidated Edison power plant in Travis (on the West Shore), allowing coal trains from West Virginia to serve the plant.[9]: 8
Operation of the Tottenville line was turned over to the Staten Island Rapid Transit Operating Authority (a division of the state's Metropolitan Transportation Authority) on July 1, 1971, and the line was purchased by the city of New York.[54] As part of the agreement, freight on the line would continue to be handled by the B&O under the Staten Island Railroad.[9]: 9 The first six R44 cars (the same as the newest cars then in use on the subway lines in the other boroughs) were put into SIRT service on February 28, 1973, replacing the ME-1 cars which had been in service since 1925.[55] Between 1971 and 1973, a project began to extend the high-level platforms at six stations.[56]: 11–12, 49, 52 A station-rebuilding program began in 1985, and the line's R44s were overhauled starting in 1987.[57]
The B&O became part of the larger Chessie System in a merger with the Chesapeake and Ohio Railway (C&O), and the island's freight operation was renamed the Staten Island Railroad Corporation in 1971.[12]: 174 The B&O and C&O became isolated from their other properties in New Jersey and Staten Island with the creation of Conrail on April 1, 1976, in a merger of bankrupt lines in the northeastern U.S. Their freight service now terminated in Philadelphia, but for several years afterward B&O locomotives and one B&O freight train a day ran to Cranford Junction.[12]: 174 [58] In 1973, the Jersey Central's car float yard was closed;[59] however, the B&O's car-float operation was later brought back to Staten Island at Saint George Yard, after having ended in September 1976. This car-float operation was taken over by the New York Dock Railway in September 1979, and ended the following year.[12]: 173
Only a few isolated industries on Staten Island continued to use rail services, and the yard at Saint George was essentially abandoned.[9]: 9 In April 1985, as a result of a decline in freight traffic, the Chessie System sold the Staten Island Railway to the New York, Susquehanna and Western Railway (NYS&W), a Delaware Otsego (DO) subsidiary, for $1.5 million via a promissory note payable for over ten years.[60] The NYS&W subsequently retained the Staten Island's freight operations, which served only ten customers by that time, and they had hopes of attracting more to boost profitability on the line.[60] In 1989, the NYS&W embargoed the trackage east of Elm Park on the North Shore Branch, ending all freight service to Saint George.
Procter & Gamble, the line's primary customer, closed in 1990, resulting in a further decline in freight traffic. On July 25, 1991, the Arthur Kill Bridge was removed from service, and the line's final freight train operated on April 21, 1992.[61] The North Shore Branch and the Arthur Kill Bridge were then taken over by Chessie's successor, CSX Transportation (CSX). The line and bridge were sold again in 1994 to the New York City Economic Development Corporation (NYCEDC), followed by a decade of false starts.[9]: 9
SIRT was transferred from the New York City Transit Authority's Surface Transit Division to its Department of Rapid Transit on July 26, 1993,[62] and that year the Dongan Hills station became accessible, making it compliant with the Americans with Disabilities Act of 1990.[63] MetroCards were accepted for fare payment at the St. George station beginning on March 31, 1994, and the station became the 50th MTA rapid transit station to accept them.[64] The Metropolitan Transportation Authority (MTA) restored the line's original name on April 2 of that year as the MTA Staten Island Railway (SIR).[9]: 9 [65] On July 4, 1997, the MTA eliminated fares for travel between Tompkinsville and Tottenville as part of the year's "One City, One Fare" fare reductions.[66] United Transportation Union Local 1440, the union representing SIR employees, was concerned about the fare reduction in part because of an expected increase in ridership.[67] No turnstiles were installed at the other stations on the line, and passengers at St. George began paying when entering and exiting;[68] fares had previously been collected on board by the conductor.[69] The removal of fares was blamed for an immediate spike in crime along the line.[70] Three afternoon express trains were added to the schedule on April 7, 1999, nearly doubling the previous express service. The express trains skipped stops between St. George and Great Kills.[71] A several-hundred-foot section of the easternmost portion of the North Shore Branch was reopened for passenger service to the Richmond County Bank Ballpark, home of the Staten Island Yankees minor-league baseball team, on June 24, 2001; the service was discontinued on June 18, 2010.[72] A new station building at Tompkinsville opened on January 20, 2010, with turnstiles installed to prevent passengers from exiting (free of charge) at Tompkinsville and walking the short distance to the St. George ferry terminal.[73]
Current use
[edit]Passenger service
[edit]Although the Staten Island Railway originally consisted of three lines, only the north-south Main Line is in passenger service. It has been grade-separated from all roads since the 1960s, but runs more or less at street level for a brief stretch north of Clifton, between the Grasmere and Old Town stations, and from south of the Pleasant Plains station to Tottenville—the end of the line. The terminus at St. George provides a direct connection with the Staten Island Ferry.[74] St. George has twelve tracks, ten of which are in service. Tottenville has a three-track yard to the east of the station, which itself has two tracks and an island platform.[75]: 102
Rolling stock consists of modified R44 subway-type cars built in early 1973,[56]: 53 added to the end of the R44 order of subway cars for New York City Transit; they were the last cars built by the St. Louis Car Company.[76][77] They are being replaced by seventy-five R211S subway cars,[78][79] which entered service on October 8, 2024.[80][81] The line also has four BL20G locomotives manufactured by Brookville, which were delivered in 2009 and are used for work service.[82] Heavy maintenance is performed at NYCT's Clifton Shops, and any work unable to be done at Clifton requires the cars to be trucked over the Verrazzano-Narrows Bridge to the subway's Coney Island Complex in Brooklyn. The right-of-way includes elevated, embankment and open-cut sections, as well as a tunnel near St. George.[75]: 102–103
The Staten Island Railway uses Baltimore & Ohio Railroad-style color position light signals dating back to its B&O days. In 2007, a $72-million project to enhance the old signal system was completed. The Signaling system was enhanced with an FRA-compliant 100 Hz, track-circuit-based automatic train control (ATC) signal system. As part of the project, forty R44 subway cars and four locomotives were modified with onboard cab signaling equipment for ATC bi-directional movement. A new rail control center and backup control center were built as part of the project.[83] The line uses NYC Transit-standard 600 V DC third-rail power.[84] Trains run up to 45 miles per hour (72 km/h) in passenger service, although trains are limited to 10 miles per hour (16 km/h) on tail tracks, sidings and in yards.[85]
Demetrius Crichlow has been the railway's president and chief officer since his appointment in October 2024.[86][87] The workforce, about 200 hourly employees, is represented by United Transportation Union Local 1440.[88]
Accessibility
[edit]Only the Dongan Hills, St. George, Great Kills, New Dorp and Tottenville stations have been renovated to comply with the Americans with Disabilities Act of 1990; these stations have elevators and/or ramps.[5][89] As part of the MTA's 2020–2024 capital plan, two additional stations are planned to be renovated to become ADA-accessible, Huguenot and Clifton.[90]
The Prince's Bay, Huguenot, Annadale, Great Kills, Dongan Hills, and Arthur Kill stations have park-and-ride facilities.[91] The newest station on the Staten Island Railway, Arthur Kill, opened on January 21, 2017, and is ADA-compliant. The station is between (and has replaced) the now-demolished Atlantic and Nassau stations, which were in the poorest condition of all the stations on the line.[92][93]
Police
[edit]On June 1, 2005, the Staten Island Rapid Transit Police Department was disbanded and its 25 railroad police officers became part of the Metropolitan Transportation Authority Police Department. The MTA Police Department was created in 1998 with the merger of the Long Island Rail Road Police Department and the Metro-North Railroad Police Department. The MTA Police Department then opened its newest patrol district, Police District #9, which began covering the Staten Island Railway.[94][95]
Fare
[edit]The cash fare is $2.90, the same fare as the New York City Subway and MTA buses. Fares are paid on entry and exit only at St. George and Tompkinsville. Rides not originating or terminating at St. George or Tompkinsville are free. Fares are payable by MetroCard or OMNY. Since the card enables free transfers for a continuous ride on the subway and bus systems, for many riders there is effectively no fare for riding the SIR, as long as they do not need to make a second transfer. Riders can also transfer between a Staten Island bus, the SIR and a Manhattan bus (or subway) near South Ferry.[96] Because of this, the SIR's 2001 farebox recovery ratio was 0.16; for every dollar of expense, 16 cents was recovered in fares (the lowest ratio of MTA agencies).[97] The low farebox recovery ratio is part of the reason the MTA sought to merge the SIR with the subway to form MTA Subways in October 2002: to simplify accounting and subsidy of a single line.[98]
Before the 1997 introduction of the one-fare zone,[99] with the MetroCard's free transfers from the SIR to the subway system and MTA buses, fares were collected from passengers boarding at stops other than St. George by onboard conductors.[100] In the past, passengers had avoided paying the fare by exiting at Tompkinsville and walking a short distance to the St. George Ferry Terminal. As a result, the MTA installed turnstiles at Tompkinsville and a new station building, which opened on January 20, 2010.[73]
On October 23, 2017, it was announced that the MetroCard would be phased out and replaced by OMNY, a contactless fare payment system also by Cubic, with fare payment being made using Apple Pay, Google Pay, debit/credit cards with near-field communication technology, or radio-frequency identification cards.[101][102] The St. George and Tompkinsville stations, the only two Staten Island Railway stations with turnstiles, received OMNY readers in December 2019.[103]
Freight service
[edit]During the early 2000s, plans to reopen the Staten Island Rapid Transit line in New Jersey were announced by the Port Authority of New York and New Jersey (PANYNJ). Since the Central Railroad of New Jersey became a New Jersey Transit line, a new junction would be built to the former Lehigh Valley Railroad. So all New England and southern freight could pass through the New York metropolitan area, two rail tunnels from Brooklyn (one to Staten Island and the other to Greenville, New Jersey) were planned.[104]
On December 15, 2004, a $72 million project to reactivate freight service on Staten Island and repair the Arthur Kill Vertical Lift Bridge was announced by the NYCEDC and the PANYNJ. Projects on the Arthur Kill Bridge included repainting the steel superstructure and rehabilitating its lift mechanism.[105] In 2006, the freight line connection reopened from New Jersey to the Staten Island Railroad, including the Arthur Kill Bridge.[106] Regular service began on April 2, 2007 (16 years after it had closed)[107] to ship container freight from the Howland Hook Marine Terminal and other industrial businesses. The service at the marine terminal is part of the PANYNJ's ExpressRail system completed with of the single-track Chemical Coast connector.[108][109] Service is provided by and Conrail Shared Assets Operations (CRCX) for its co-owners, CSX, Norfolk Southern Railway.
As part of the project, a portion of the North Shore Branch was rehabilitated, the Arlington Yard was expanded, and 6,500 feet (1,981 m) of new track was laid along the Travis Branch to Staten Island Transfer Station at Fresh Kills.[110] Soon after service restarted on the line, Mayor Michael Bloomberg officially commemorated the reactivation on April 17, 2007.[111] As of 2019, the New York City Department of Sanitation's contractor was moving containers of municipal solid waste by barge from Queens and Manhattan to the Howland Hook Marine Terminal for transfer to rail there.[112]
Along the remainder of the North Shore Branch, there are still tracks and rail overpasses in some places.[113][114]: 15–17
Future plans
[edit]Annual passenger ridership | ||
---|---|---|
Year | Passengers | %± |
1860 | 63,641 | — |
1870 | 336,706 | +429.1% |
1880 | 390,151 | +15.9% |
1890 | 6,539,318 | +1576.1% |
1900 | 4,439,506 | -32.1% |
1901 | 4,212,303 | -5.1% |
1902 | 4,238,630 | +21.9% |
1903 | 4,302,858 | +2.1% |
1904 | 4,586,182 | +6.6% |
1905 | 4,724,041 | +3.0% |
1906 | 5,161,134 | +9.3% |
1907 | 5,944,696 | +15.2% |
1908 | 5,649,116 | −5.0% |
1909 | 5,237,373 | −7.3% |
1910 | 6,014,928 | +14.8% |
1911 | 6,218,316 | +3.4% |
1912 | 6,461,635 | +3.9% |
1913 | 6,636,336 | +2.7% |
1914 | 6,979,126 | +5.1% |
1915 | 6,943,302 | -0.5% |
1916 | 7,563,066 | +8.9% |
1917 | 8,378,779 | +10.8% |
1918 | 9,269,902 | +10.6% |
1919 | 10,204,511 | +10.1% |
1920 | 13,011,958 | +27.5% |
1921 | 11,181,785 | -14.1% |
1922 | 10,686,439 | -4.4% |
1923 | 11,130,382 | +4.2% |
1924 | 11,828,314 | +6.3% |
1925 | 12,443,909 | +5.2% |
1926 | 13,000,311 | +4.5% |
1927 | 13,384,913 | +3.0% |
1928 | 13,569,054 | +1.4% |
1929 | 14,783,080 | +9.0% |
1930 | 14,318,178 | -3.1% |
1931 | 12,999,636 | -9.2% |
1932 | 10,892,762 | -16.2% |
1933 | 9,710,103 | -10.9% |
1934 | 9,129,112 | -6.0% |
1935 | 8,757,275 | -4.1% |
1936 | 9,422,276 | +7.6% |
1937 | 8,735,704 | +7.3% |
1938 | 8,933,096 | +2.3% |
1939 | 8,636,683 | -3.3% |
1945 | 14,811,466 | +71.5% |
1946 | 13,578,376 | -8.3% |
1947 | 12,295,221 | -9.4% |
1948 | 8,696,218 | -29.3% |
1949 | 4,424,410 | -49.1% |
1950 | 3,878,071 | -12.3% |
1951 | 3,984,476 | +2.7% |
1964 | 6,400,000 | +60.6% |
1965 | 5,700,000 | -10.9% |
1968 | 5,330,000 | -6.5% |
1969 | 5,240,000 | +2.7% |
1970 | 4,760,000 | -19.5% |
1971 | 4,720,000 | -0.8% |
1972 | 4,100,000 | -13.1% |
1986 | 6,470,000 | +57.8% |
1988 | 6,230,000 | -3.7% |
1995 | 5,100,000 | -18.1% |
1996 | 4,900,000 | -3.9% |
1997 | 4,600,000 | -6.1% |
1998 | 4,108,000 | -10.7% |
1999 | 3,946,242 | -3.9% |
2000 | 4,088,000 | +3.6% |
2001 | 3,963,590 | -3.0% |
2002 | 3,594,677 | -9.3% |
2017 | 4,600,000 | +28% |
2022 | 2,009,000 | -56% |
[115][116][117][118][119] |
Elected officials on Staten Island, including State Senator Diane Savino, have demanded the replacement of the railway's aging R44 cars.[127] Although the Metropolitan Transportation Authority initially planned to order R179s for the Staten Island Railway, it was later decided to overhaul R46s to replace the R44s.[128] However, the R46 overhaul plan was also dropped, and 75 R211S cars will replace the R44s.[129][130] In the meantime, the R44s are receiving intermittent rounds of scheduled maintenance to extend their usefulness until at least 2025.[131][132]
There has been discussion of building an in-fill station in the Rosebank neighborhood, which would bridge the longest gap between two stations (Grasmere and Clifton). The area was once home to the Rosebank station on the railway's now-defunct South Beach Branch, which was located east of the proposed station site.[127]: 17–18
Several proposals have been made to connect the SIR to the subway system, including the abandoned, unfinished Staten Island Tunnel and a line along the Verrazzano-Narrows Bridge using B Division cars and loading gauge, but economic, political and engineering difficulties have prevented these projects from realization.[133][134]
Possible branch restoration
[edit]In a 2006 report, the Staten Island Advance explored the restoration of passenger service on 5.1 miles (8.2 km) of the North Shore Branch between St. George and Arlington. Completion of a study is necessary to qualify the project for an estimated $360 million. A preliminary study found that ridership could reach 15,000 daily.[135] U.S. Senator Chuck Schumer of New York requested $4 million of federal funding for a detailed feasibility study.[136] In 2012, the MTA released an analysis of North Shore transportation solutions which included proposals for the reintroduction of heavy rail, light rail or bus rapid transit using the North Shore line's right-of-way. Other options included system management, which would improve existing bus service, and the possibility of future ferry and water taxi service. Bus rapid transit was preferred for its cost ($352 million in capital investment) and relative ease of implementation. In January 2018, the project had yet to receive funding.[137]: 61 As part of the 2015–2019 MTA Capital Program, $4 million was allocated for an analysis of Staten Island light rail.[138]
Branches and stations
[edit]Main Line stations
[edit]Station service legend | |
---|---|
Stops all times | |
Stops rush hours only | |
Stops rush hours in the peak direction only | |
Time period details | |
Station is compliant with the Americans with Disabilities Act | |
↑ | Station is compliant with the Americans with Disabilities Act in the indicated direction only |
↓ | |
Elevator access to mezzanine only |
- * Some local trains start at Huguenot during morning rush hours.[91]
Normal service |
Peak services | Station | Opened | Closed | Connections, notes | ||
---|---|---|---|---|---|---|---|
Lcl | AM exp | PM exp | |||||
St. George Terminal | March 7, 1886[139] | Staten Island Ferry to Whitehall Terminal NYCT Bus: S40, S42, S44, S46, S48, S51, S52, S61, S62, S66, S74, S76, S78, S81, S84, S86, S90, S91, S92, S94, S96, S98[140] | |||||
| | | | Tompkinsville | July 31, 1884[8] | NYCT Bus: S46, S48, S51, S61, S62, S66, S74, S76, S78, S81, S84, S86, S91, S92, S96, S98[140] | |||
| | | | Stapleton | July 31, 1884[8] | NYCT Bus: S51, S52, S74, S76, S78, S81, SIM30[140] | |||
| | | | Clifton | April 23, 1860[8] | NYCT Bus: S51[140]
Originally Vanderbilt's Landing; no access from last car northbound[91] | |||
| | | | Grasmere | 1886 | NYCT Bus: S53[140] | |||
| | | | Old Town | 1937[141] | Originally Old Town Road | |||
| | | | Dongan Hills | April 23, 1860[8] | Originally Garretson's | |||
| | | | Jefferson Avenue | 1937[142] | ||||
| | | | Grant City | April 23, 1860[8] | NYCT Bus: S51, S81[140] | |||
↑ | | | New Dorp | April 23, 1860[8] | NYCT Bus: S57, S76, S86[140] | |||
↑ | | | Oakwood Heights | April 23, 1860[8] | NYCT Bus: S57[140]
Originally Richmond,[143] then Court House,[144] then Oakwood | |||
↑ | | | Bay Terrace | Early 1900s | Replaced older Whitlock[145] | |||
Great Kills | April 23, 1860[8] | NYCT Bus: S54, SIM5, SIM6[140]
Southern terminus for select rush hour local trains[91] Originally Gifford's | |||||
* ↑ | Eltingville | April 23, 1860[8] | NYCT Bus: S59, S79 SBS, S89, SIM1, SIM7, SIM10, SIM22[140] | ||||
Woods of Arden | 1886 | c. 1894–1895 | Closed | ||||
* ↑ | Annadale | May 14, 1860[8] | NYCT Bus: S55,[140] SIM23 | ||||
* ↑ | Huguenot | June 2, 1860[8] | NYCT Bus: S55, SIM2[140] SIM24
Some northbound local a.m. rush hour trips begin at this station[91] Originally Bloomingview, then Huguenot Park | ||||
Prince's Bay | June 2, 1860[8] | NYCT Bus: S55, S56, SIM25[140]
Originally Lemon Creek, then Princes Bay | |||||
Pleasant Plains | June 2, 1860[8] | NYCT Bus: S55, SIM26[140] | |||||
Richmond Valley | June 2, 1860[8] | NYCT Bus: SIM26[140]
No access from last car[146] | |||||
Nassau | c. 1924[8] | January 21, 2017[147] | Replaced by Arthur Kill[147] | ||||
Arthur Kill | January 21, 2017[147][92] | NYCT Bus: S74, S78, S84[140] | |||||
Atlantic | c.1909–1911[148] | January 21, 2017[147] | Replaced by Arthur Kill[147] | ||||
Tottenville | June 2, 1860[8] | NYCT Bus: S74, S78, S84[140] |
Former stations
[edit]North Shore Branch
[edit]The North Shore Branch closed to passenger service at midnight on March 31, 1953.[8][50][51] A small portion of the western end is used for freight service as part of the ExpressRail intermodal network at the Howland Hook Marine Terminal. The network, which opened in 2007, connects to the Chemical Coast after crossing the Arthur Kill Vertical Lift Bridge.[111][149] The North Shore Branch served Procter & Gamble,[104] United States Gypsum,[150] shipbuilders and a car float at Saint George Yard.[12]: 173 A smaller eastern portion, which provided seasonal passenger service to the Richmond County Bank Ballpark station (where the Staten Island Yankees played), operated from June 24, 2001, to June 18, 2010.[151] In 2008, restoration was discussed along the mostly abandoned 6.1-mile (9.8 km) line as part of the island's light-rail plan.[135] An environmental impact assessment is being worked on for the implementation of a bus rapid transit line on the North Shore Branch.[152]
Miles | Name | Opened | Closed | Notes |
---|---|---|---|---|
0 | St. George | March 7, 1886 | ||
0.1 | RCB Ballpark | June 24, 2001 | June 18, 2010[151] | |
0.7 | New Brighton | February 23, 1886[20]: 691 | March 31, 1953[51] | |
1.2 | Sailors' Snug Harbor | February 23, 1886[20]: 691 | March 31, 1953[51] | |
1.8 | Livingston | February 23, 1886[20]: 691 | March 31, 1953[51] | |
2.4 | West Brighton | February 23, 1886[20]: 691 | March 31, 1953[51] | |
3.0 | Port Richmond | February 23, 1886[20]: 691 | March 31, 1953[51] | |
3.4 | Tower Hill | February 23, 1886[20]: 691 | March 31, 1953[51] | |
3.9 | Elm Park | February 23, 1886[20]: 691 | March 31, 1953[51] | |
4.3 | Lake Avenue | 1937[142] | March 31, 1953[51] | |
4.6 | Mariners Harbor | Summer 1886 | March 31, 1953[51] | Originally named Erastina |
4.9 | Harbor Road | 1935–1937[153] | March 31, 1953[51] | |
5.2 | Arlington | 1889–1890 | March 31, 1953[51] | |
6.1 | Port Ivory | 1906 | 1948[9]: 39 |
South Beach Branch
[edit]The South Beach Branch opened on January 1, 1888, to Arrochar,[22]: 257–258 [23] and was extended to South Beach in 1893.[24][27] The branch closed at midnight on March 31, 1953.[50][51] It was abandoned and demolished, except for a few segments: a concrete embankment at Clayton Street and Saint John's Avenue,[154] the Tompkins Avenue overpass, trestle over Robin Road in Arrochar[155] and a filled-in bridge under McClean Avenue.[156][157] This 4.1-mile (6.6 km) line left the Main Line at 40°37′08″N 74°04′18″W / 40.61889°N 74.07167°W (south of the Clifton station), and was east of the Main Line. Although the right-of-way has been redeveloped, most of it is still traceable on maps; Lily Pond Avenue is built over the right of way where it passes under the Staten Island Expressway.[158]
The Robin Road trestle is the only remaining intact trestle along the former line. Developers purchased the land on either side of its abutments during the early 2000s, and the developers, the New York City Department of Transportation, and the New York City Transit Authority all claimed ownership. Townhouses have been built on both sides of the trestle.[158][159]
Miles | Name | Opened | Closed |
---|---|---|---|
2.0 | Bachmann | January 1, 1888[22]: 257–258 [23] | 1937 |
2.1 | Rosebank | January 1, 1888[22]: 257–258 [23] | March 31, 1953[51] |
2.5 | Belair Road | January 1, 1888[22]: 257–258 [23] | March 31, 1953[51] |
2.7 | Fort Wadsworth | January 1, 1888[22]: 257–258 [23] | March 31, 1953[51] |
3.2 | Arrochar | January 1, 1888[22]: 257–258 [23] | March 31, 1953[51] |
3.5 | Cedar Avenue | 1931[160] | March 31, 1953[51] |
3.9 | South Beach | 1893[24] | March 31, 1953[51] |
4.1 | Wentworth Avenue | 1925[161] | March 31, 1953[51] |
Freight lines
[edit]Travis Branch
[edit]The Travis Branch, from Arlington Yard to Fresh Kills, runs along the island's West Shore. The branch was built in 1928 to serve Gulf Oil along the Arthur Kill, south from Arlington Yard into the marshes to Gulfport.[36] It was extended to Travis to serve the new Consolidated Edison power plant in 1957.[9]: 47 In 2005, the branch was renovated and extended from the old Con Edison plant to the Staten Island Transfer Station at Fresh Kills; regular service to the transfer station began in April 2007.[111]
Mount Loretto Spur
[edit]The Mount Loretto Spur is an abandoned branch whose purpose was to serve the Mount Loretto Children's Home. The spur diverged from the Main Line south of Pleasant Plains.[9]: 110 The B&O Railroad served the non-electrified branch, which had some industry and a passenger station, until 1950. Although its track was removed during the 1960s and 1970s, some ties were visible until the 1980s. A coal trestle is all that remains of the branch.[8]: 15
West Shore Line
[edit]South of the Richmond Valley station, a non-electrified spur, branched off the Tottenville-bound track. The spur, built in 1928, was called the West Shore Line by the B&O Railroad and delivered building materials to the Outerbridge Crossing construction site near Arthur Kill.[162] Years later, the track was used to serve a scrapyard owned by the Roselli Brothers.[9]: 111 This siding went out of service on June 14, 2011.[163] The track divided in two under Page Avenue, with the rails still in place.[164][165] The line's right-of-way, an easement on property owned by Nassau Metals, was later used by CSX.[164]: 1–2 Although sections of the old tracks have been removed, others remain in the overgrowth.[166]
See also
[edit]Notes
[edit]- ^ See this photo. The SIR bullet is shown at signage at the new Arthur Kill station.
- ^ The others are the PATCO Speedline, the Red and Blue Lines of the Chicago "L", and the PATH system.
References
[edit]- ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
- ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
- ^ a b "The MTA Network". mta.info. Metropolitan Transportation Authority. Archived from the original on July 8, 2018. Retrieved February 22, 2018.
- ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
- ^ a b "MTA Staten Island Railway General Information". mta.info. Metropolitan Transportation Authority. Retrieved October 8, 2015.
- ^ "No Positive Train Control for Staten Island Railway: Here's why". October 6, 2016. Retrieved January 14, 2019.
- ^ MTA News Conference – 6/29/2023, June 29, 2023, retrieved July 21, 2023
- ^ a b c d e f g h i j k l m n o p q r s t u v Leigh, Irvin; Matus, Paul (1965). Staten Island Rapid Transit, 1860–1965. Brooklyn, New York: Silver Leaf Rapid Transit. Archived from the original on May 30, 2015. Retrieved June 27, 2015.
- ^ a b c d e f g h i j k l m n o p q r Pitanza, Marc (2015). Staten Island Rapid Transit Images of Rail. Charleston, South Carolina: Arcadia Publishing. ISBN 978-1-4671-2338-9.
- ^ a b c d e f g h i j Roess, Roger P.; Sansome, Gene (2013). The Wheels That Drove New York: A History of the New York City Transit System. New York, New York: Springer Science+Business Media. ISBN 978-3-642-30484-2. Retrieved October 4, 2015.
- ^ "Ferry Boats Old And New". New York Daily Tribune. September 3, 1899. Retrieved January 16, 2019.
- ^ a b c d e f g h i j k l m Harwood, Herbert H. (2002). Royal Blue Line: The Classic B&O Train Between Washington and New York. Baltimore, Maryland: Johns Hopkins University Press. ISBN 978-0-8018-7061-3. Retrieved November 17, 2015.
- ^ a b Morris, Ira (1900). Morris's Memorial History of Staten Island, New York. Vol. 2. West New Brighton, New York: Memorial Publishing Company. OCLC 923774320.
- ^ Report of the Public Service Commission For the First District of the State of New York For the Year Ending December 31, 1913. Albany, New York: New York Public Service Commission. 1913. OCLC 82958977.
- ^ "A Railroad Charter in Peril". The New York Times. May 14, 1880. ISSN 0362-4331. Retrieved April 23, 2018.
- ^ St. George Historic District Staten Island (PDF). New York, New York: New York City Landmarks Preservation Commission. July 19, 1994. OCLC 35087982. Archived from the original (PDF) on March 16, 2018.
- ^ Goldfarb, David; Ferreri, James G. (2009). St. George. Charleston, South Carolina: Arcadia Publishing. ISBN 978-0-7385-6252-0.
- ^ "City and Suburban News; New-York. Brooklyn. Long Island. Staten Island. Westchester County. New-Jersey". The New York Times. March 18, 1884. ISSN 0362-4331. Retrieved April 23, 2018.
- ^ "City and Suburban News; New-York. Brooklyn. Long Island. Staten Island. New-Jersey". The New York Times. August 13, 1884. ISSN 0362-4331. Retrieved April 23, 2018.
- ^ a b c d e f g h i Preston, L. E. (1887). History of Richmond County (Staten Island), New York: From Its Discovery to the Present Time, Part 1. New York, New York: Memorial Publishing Company. OCLC 361409734.
- ^ "Affairs of Railroads; the Baltimore and Ohio Railroad to Enter New-York. Mr. Garrett Leases the Staten Island Rapid Transit Railroad and Will Connect His Road with That System". The New York Times. November 22, 1885. ISSN 0362-4331. Retrieved April 23, 2018.
- ^ a b c d e f g Sixth Annual Report of the Board of Railroad Commissioners of the State of New York for the Fiscal Year Ending September 30, 1888. Albany, New York: New York State Board of Railroad Commissioners. January 14, 1889.
- ^ a b c d e f g "Staten Island Improvements". The New York Times. September 1, 1888. ISSN 0362-4331. Retrieved April 23, 2018.
- ^ a b c Poor's Manual of Railroads. New York, New York: American Bank Note Company. 1895. pp. 340.
- ^ Moody, John (1915). Moody's Analyses of Investments. Part I, Steam Railroads. New York, New York: Moody's Investors Service. OCLC 8153859. Retrieved November 3, 2015.
- ^ a b "The Largest Drawbridge: Completion of the Big Span Across the Arthur Kill" (PDF). The New York Times. June 14, 1888. ISSN 0362-4331. Retrieved July 3, 2015.
- ^ a b "Staten Island Improvement" (PDF). The New York Times. September 1, 1888. ISSN 0362-4331. Retrieved July 3, 2015.
- ^ "Over The New Bridge: A Train Runs From Staten Island to New Jersey" (PDF). The New York Times. January 2, 1890. ISSN 0362-4331. Retrieved July 3, 2015.
- ^ "The Largest Drawbridge: Completion of the Big Span Across the Arthur Kill" (PDF). The New York Times. June 14, 1888. ISSN 0362-4331. Retrieved July 3, 2015.
- ^ a b Stover, John F. (1995). History of the Baltimore and Ohio Railroad. West Lafayette, Indiana: Purdue University Press. ISBN 978-1-55753-066-0. Retrieved November 1, 2015.
- ^ a b Bommer, Edward (July 3, 2004). "The Baltimore & Ohio Railroad in New Jersey". jcrhs.org. Jersey Central Railway Historical Society Chapter. Retrieved December 17, 2015.
- ^ Hilton, George Woodman (1964). The Staten Island Ferry. Berkeley, California: Howell-North Books. p. 29. OCLC 639351783.
- ^ a b "Opens New Service on Electrified Line; Staten Island Marks End of Steam Locomotives on Perth Amboy Division. Lunch Leads Ceremony Commends B. & O. for Prompt Action in Obeying the Law – Galloway Asks Cooperation". The New York Times. July 2, 1925. ISSN 0362-4331. Retrieved August 13, 2017.
- ^ "Electrical Rapid Transit Begins On Staten Island" (PDF). The New York Times. May 31, 1925. ISSN 0362-4331. Retrieved November 11, 2015.
- ^ "Baltimore and Ohio to Operate on Staten Island" (PDF). The New York Times. October 23, 1895. ISSN 0362-4331. Retrieved July 14, 2011.
- ^ a b "Staten Island Is To Be Oil Center Standard and Gulf Companies Engage in Large Developments There". Clarion-Ledger. Jackson, Mississippi. June 19, 1930. Retrieved January 16, 2019.
- ^ "Staten Island Opens Mile-Long Viaduct; Thirty-Four Grade Crossings Are Eliminated" (PDF). The New York Times. February 26, 1937. ISSN 0362-4331. Retrieved November 11, 2015.
- ^ Smith, Dorothy Valentine (1970). Staten Island: Gateway to New York. Philadelphia, Pennsylvania: Chilton Book Company. p. 217. ISBN 978-0-8019-5488-7.
- ^ "Staten Island Fire Wrecks Ferry Terminal, Kills 3; Damage Put at $2,000,000: 22 Go to Hospitals" (PDF). The New York Times. June 26, 1946. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ "Staten Island Fire Still Smoldering: City Acts to Vote $3,000,000 to Start Work on Terminal Costing $12,000,000" (PDF). The New York Times. June 27, 1946. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ Museum, Staten Island (September 1, 2014). Staten Island Ferry. Charleston, South Carolina: Arcadia Publishing. ISBN 978-1-4396-4706-6.
- ^ Cudahy, Brian J. (January 1, 1990). Over and Back: The History of Ferryboats in New York Harbor. New York, New York: Fordham University Press. p. 282. ISBN 978-0-8232-1245-3. Retrieved October 12, 2015.
- ^ "Staten Island–Laboratory Experiment In Socialized Transportation: How Below-Cost Competition From Money-Losing City Buses Has Made Impossible Continued Private Operation of Rail Passenger Service In New York's Island Borough". Railway Age. 133. New York, New York: 58–63. August 11, 1952.
- ^ "PSC Fails to Prevent S.I. Rail Service Cut" (PDF). The New York Times. September 3, 1948. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ "Road Cuts Service On Staten Island: Non-Rush-Hour Schedules Are Reduced by 50 % – Some Night Trains Taken Off" (PDF). The New York Times. September 6, 1948. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ "Staten Islanders Protest Train Cuts: Led by Borough President Hall, They Charge Overcrowding With Curtailed Service" (PDF). The New York Times. September 9, 1948. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ "Train Service Added For Staten Island" (PDF). The New York Times. September 14, 1948. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ "Ferry To Change Hands: Staten Island Rapid Transit Facility to be Run by Lessee" (PDF). The New York Times. September 23, 1948. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ "Ferry Line To Change Hands" (PDF). The New York Times. September 30, 1948. ISSN 0362-4331. Retrieved July 5, 2015.
- ^ a b c Drury, George H. (1994). The Historical Guide to North American Railroads: Histories, Figures, and Features of more than 160 Railroads Abandoned or Merged since 1930. Waukesha, Wisconsin: Kalmbach Publishing. pp. 312–314. ISBN 978-0-89024-072-4.
- ^ a b c d e f g h i j k l m n o p q r s t u "The Old Order Passeth: Rails Surrender To Roads: Passenger Runs on Two Lines of SIRT Will End at Midnight". Staten Island Advance. March 31, 1953. p. 1.
- ^ Ingalls, Leonard (September 8, 1954). "Staten Island Line Would Cease Runs: Railway Renews Bid to End All Passenger Service–Rejects Transit Union Plan" (PDF). The New York Times. ISSN 0362-4331. Retrieved October 11, 2015.
- ^ Bamberger, Werner (August 26, 1959). "New Bridge Opens Over Arthur Kill; B. & O. Vertical-Lift Span, Largest of Kind in World, Crossed by First Train". The New York Times. ISSN 0362-4331. Retrieved January 16, 2019.
- ^ Mazza, Frank (July 30, 1971). "Ronan Adds Lemon To His Loser Brew". New York Daily News. p. 36. Retrieved January 16, 2019.
- ^ "S.I 'Toonerville Trolley' Gets New Cars" (PDF). The New York Times. March 1, 1973. ISSN 0362-4331. Retrieved July 8, 2015.
- ^ a b 1968–1973, The Ten-Year Program at the Halfway Mark. New York, New York: Metropolitan Transportation Authority. 1973. hdl:2027/mdp.39015023095485. OCLC 25043775.
- ^ "SIRT Keeps Rolling Along. Rebuilding Program Nearing Completion". Staten Island Advance. April 18, 1993.
- ^ Commerce, United States Congress House Committee on Interstate and Foreign Commerce Subcommittee on Transportation and (1978). ConRail Authorization, Fiscal Year 1979: Hearings Before the Subcommittee on Transportation and Commerce of the Committee on Interstate and Foreign Commerce, House of Representatives, Ninety-fifth Congress, Second Session, on H.R. 11492 ... April 11, 12, and 17, 1978. U.S. Government Printing Office. pp. 107, 134.
- ^ Commerce, United States Congress Senate Committee on (1977). Recent Tanker Accidents: Hearings Before the Committee on Commerce, United States Senate, Ninety-fifth Congress, First Session ... U.S. Government Printing Office. p. 229.
- ^ a b Hartley, Scott (January 1988). "Regionals In Review – The Delaware Otsego Story". Trains. Vol. 48, no. 3. Kalmbach Publishing. p. 34. Retrieved October 8, 2024.
- ^ Tupaczewski, Paul R. (2002). New York, Susquehanna and Western In Color. Scotch Plains, New Jersey: Morning Sun Books, Inc. p. 114. ISBN 1-58248-070-2.
- ^ "SIRT Switched From One Division To Another. T.A. Reorganization Leaves Bus Service Without Manager". Staten Island Advance. July 27, 1993.
- ^ "Island Disabled Subject of SIRT Station Hearing. MTA To Discuss Dongan Hills Plans". Staten Island Advance. April 25, 1992.
- ^ "MetroCard Christened at St. George Station. Transit Officials Say Ferry Is Next In Line For New Fare System". Staten Island Advance. April 1, 1994.
- ^ "It's Island Railway, Not Rapid Transit. MTA Has New Names For Its Transportation Systems. Out With the Old In With the New". Staten Island Advance. April 2, 1994.
- ^ "Staten Island Railway Traverses Our Borough". Staten Island Advance. April 29, 2001.
- ^ "S.I. Railway: More May Ride Train For Free And That Has Workers Worried". Staten Island Advance. April 10, 1997.
- ^ "Free Rides To Most Stations On Staten Island Railway. Only Those Who Enter And Leave At St. George Pay For The Commute". Staten Island Advance. April 26, 1998.
- ^ "Railway Riders Will Pay Only At St. George. On-Board Collection Will Be Eliminated As Line Joins The City's One-Fare System July 4". Staten Island Advance. May 14, 1997.
- ^ "Free Ride to Commit a Crime. Elimination of Fare For Most on the Staten Island Railway Allows Trouble-Causing Youths to Get On and Off at Will". Staten Island Advance. August 22, 1999.
- ^ "3 Additional Express Runs Begin Tonight on Railway. New Trains Almost Double The Evening Express Service From St. George to Great Kills". Staten Island Advance. April 7, 1999.
- ^ "Evaluation of 2010 Service Reductions" (PDF). mta.info. Metropolitan Transportation Authority. September 23, 2011. Retrieved December 16, 2015.
- ^ a b Mooney, Jake (September 7, 2008). "Soon, It Won't Even Pay to Walk". The New York Times. ISSN 0362-4331. Retrieved October 8, 2015.
- ^ "The Railway and the Ferry Connection". mta.info. Metropolitan Transportation Authority. October 2015. Retrieved August 10, 2017.
- ^ a b Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC 1056711733.
- ^ Sansone, Gene (October 25, 2004). New York Subways: An Illustrated History of New York City's Transit Cars. Baltimore, Maryland: Johns Hopkins University Press. p. 257. ISBN 978-0-8018-7922-7.
- ^ Young, Andrew D.; Provenzo, Eugene F. Jr. (1978). The History of the St. Louis Car Company, "Quality Shops". Berkeley, California: Howell-North Books. p. 284. ISBN 978-0-8310-7114-1.
- ^ Matteo, Mike (June 26, 2024). "Staten Island Railway to get new cars by end of year, but some feel we don't deserve them". silive. Retrieved June 26, 2024.
- ^ Khalifeh, Ramsey (June 24, 2024). "Staten Island Railway to get new trains for first time in 50 years". Gothamist. Retrieved October 6, 2024.
- ^ Brachfeld, Ben (October 8, 2024). "New R211 subway cars roll into service on Staten Island Railway". amNewYork. Retrieved October 8, 2024.
- ^ Matteo, Mike (October 8, 2024). "New Staten Island Railway cars: First train takes inaugural ride Tuesday". silive. Retrieved October 8, 2024.
- ^ Pitanza, Marc (2015). Staten Island Rapid Transit. Images of America. Arcadia Publishing. p. 120. ISBN 978-1-4671-2338-9.
- ^ "Staten Island Signal Modernization" (PDF). Transit Resources. Retrieved December 16, 2015.
- ^ "Staten Island Line to Electrify". Electric Railway Journal. 63 (20). New York, New York: 776–777. May 17, 1924. OCLC 990315014.
- ^ Bascome, Erik (September 21, 2022). "MTA looking for ways to speed up Staten Island Railway". silive. Retrieved November 11, 2023.
- ^ Ley, Ana (October 23, 2024). "MTA Promotes New Subway President, Demetrius Crichlow, After 27 Years of Service". The New York Times. Retrieved October 23, 2024.
- ^ "MTA Chair and CEO Janno Lieber Appoints Demetrius Crichlow as the 12th President of New York City Transit".
- ^ "Proudly Serving the Riders of the MTA Staten Island Railway (SIRTOA)!". 1440.utu.org. UTU Local 1440. Archived from the original on February 28, 2015. Retrieved April 23, 2018.
- ^ "MTA Guide to Accessible Transit". mta.info. Metropolitan Transportation Authority. Retrieved April 22, 2018.
- ^ "Staten Island Railway Stations to get accessibility upgrades". siLive.com. Staten Island Advance. Retrieved September 3, 2019.
- ^ a b c d e "MTA Staten Island Railway Timetable, Effective September 13, 2020". Metropolitan Transportation Authority. Retrieved December 16, 2024.
- ^ a b "Groundbreaking for New MTA Staten Island Railway Arthur Kill Station in Tottenville". mta.info. Metropolitan Transportation Authority. October 18, 2013. Archived from the original on February 26, 2014. Retrieved August 11, 2017.
- ^ "Capital Program Oversight Committee Meeting June 2016" (PDF). mta.info. Metropolitan Transportation Authority. June 17, 2016. Retrieved June 17, 2016.
- ^ "MTA Staten Island Railway 2006 Preliminary Budget July Financial Plan 2006–2009" (PDF). mta.info. Metropolitan Transportation Authority. July 2006. Retrieved August 15, 2017.
- ^ "About The MTA Police". mta.info. Metropolitan Transportation Authority. Retrieved December 19, 2018.
- ^ "MTA Staten Island Railway Fare and Transfer Information". mta.info. Metropolitan Transportation Authority. Retrieved October 8, 2015.
- ^ "Regional Transportation Statistical Report" (PDF). nymtc.org. New York Metropolitan Transportation Council. January 2005. p. 57. Retrieved January 16, 2019.
- ^ Mangan, Dan (October 10, 2002). "MTA Plans Major Restructuring Job". New York Post. Retrieved January 16, 2019.
- ^ Giuliani, Rudolph (June 29, 1997). "Archives of Rudolph W. Giuliani Mayor's Message". nyc.gov. New York City Department of Records. Archived from the original on March 4, 2016. Retrieved December 5, 2011.
- ^ Linder, Bernard (January 2018). "Staten Island's 157-Year-Old Railroad" (PDF). The Bulletin. 61 (1). New York, New York: Electric Railroaders' Association: 1.
- ^ Rivoli, Dan (October 23, 2017). "MTA approves plan to scrap MetroCards for 'tap' payment system". NY Daily News. Retrieved October 24, 2017.
- ^ Barron, James (October 23, 2017). "New York to Replace MetroCard With Modern Way to Pay Transit Fares". The New York Times. ISSN 0362-4331. Retrieved October 24, 2017.
- ^ Bascome, Erik (June 5, 2020). "MTA: OMNY installation to be completed on time despite coronavirus outbreak". silive. Retrieved July 18, 2020.
- ^ a b "Case Study: Staten Island Railroad" (PDF). envisionfreight.com. Transportation Research Board of the National Academies. 2011. Archived from the original (PDF) on March 3, 2016. Retrieved January 16, 2019.
- ^ "Mayor Michael R. Bloomberg and Governor George E. Pataki Announce Reactivation of Staten Island Railroad". nyc.gov. Office of the Mayor. December 15, 2004. Retrieved April 23, 2018.[permanent dead link ]
- ^ Young, Deborah (October 5, 2006). "Riding the rails into the port's future". Staten Island Advance.
- ^ Broder, Jonathan (June 2016). "Staten Island Railroad" (PDF). Conrail Shared Track. Mount Laurel, New Jersey: 7. Archived from the original (PDF) on January 16, 2019. Retrieved January 16, 2019.
- ^ "STATEN ISLAND RAILROAD: CHEMICAL COAST LINE CONNECTOR" (PDF). American Association of Port Authorities. June 14, 2007. Retrieved December 16, 2014.
- ^ "Mayor Bloomberg Officially Reactivates the Staten Island Railroad" (Press release). City of New York. April 17, 2007. Archived from the original on December 23, 2007. Retrieved December 9, 2014.
- ^ "Staten Island Railroad Reactivation". nycedc.com. New York City Economic Development Corporation. April 17, 2007. Archived from the original on August 20, 2008. Retrieved March 7, 2009.
- ^ a b c "Mayor Bloomberg Officially Reactivates the Staten Island Railroad" (Press release). New York City Mayor's Office. April 17, 2007. Archived from the original on December 23, 2007. Retrieved January 28, 2010.
{{cite press release}}
: CS1 maint: bot: original URL status unknown (link) on December 23, 2007. - ^ "Appendix C – Rail Freight Capacity Analysis For Movement Of New York City Waste" (PDF). New York City Department of Sanitation. June 2018.
- ^ "North Shore Alternatives Analysis: Public Meeting Thursday, April 22, 2010 7:00 p.m." (PDF). zetlin.com. Metropolitan Transportation Authority. April 22, 2010. Archived from the original (PDF) on October 6, 2015. Retrieved July 31, 2015.
- ^ "Feasibility Study of the North Shore Railroad Right-of-Way Project Assessment Report March 2004" (PDF). library.wagner.edu. Office of the Staten Island Borough President, Port Authority of New York and New Jersey, URS, SYSTRA. March 2004. Archived from the original (PDF) on October 18, 2015. Retrieved August 6, 2015.
- ^ Fourteenth Annual Report For The Calendar Year 1934. New York State Transit Commission. 1934. p. 141.
- ^ Seventeenth Annual Report For The Calendar Year 1937. New York State Transit Commission. 1937. p. 241.
- ^ Nineteenth Annual Report For The Calendar Year 1939. New York State Transit Commission. 1939. p. 235.
- ^ "Staten Island–Laboratory Experiment In Socialized Transportation: how below-cost competition from money-losing city buses has made impossible continued private operation of rail passenger service in New York's island borough". Railway Age: 58–63. August 11, 1952 – via Google Books.
- ^ A view on the highway : an impact analysis of the proposed West Side Highway reconstruction from 155th Street to the George Washington Bridge. New York City Community Planning Board Twelve. 1974. p. 66, 68.
- ^ Annual Report. Tri-State Regional Planning Commission. 1972. p. 10.
- ^ Annual Report. Tri-State Regional Planning Commission. 1970. p. 7.
- ^ Linder, Bernard (January 2018). "Staten Island's 157-Year-Old Railroad" (PDF). Bulletin. 61 (1): 1.
- ^ 1968–1973, the Ten-year Program at the Halfway Mark. Metropolitan Transportation Authority. 1973. p. 9.
- ^ "MTA New York City Transit Staten Island Railway" (PDF). New York State Department of Transportation. 2002.
- ^ Jane's Urban Transport Systems. 2007. p. 447.
- ^ "STATEN ISLAND RAILWAY Financial and Ridership Reports – 2022 Year‐End Results".
- ^ a b Savino, Diane J. "Staten Island Railway Rider Report" (PDF). nysenate.gov. Diane Savino. Archived from the original (PDF) on July 17, 2014. Retrieved October 8, 2015.
- ^ "MTA Capital Program Milestones Report" (PDF). mta.info. Metropolitan Transportation Authority. November 2010. Archived from the original on January 3, 2011. Retrieved September 12, 2016.
{{cite web}}
: CS1 maint: bot: original URL status unknown (link) - ^ "R34211 Notice -Of- Addendum Addendum #3" (PDF). mta.info. Metropolitan Transportation Authority. August 11, 2016. Retrieved August 15, 2016.
- ^ "MTA Capital Program 2015–2019" (PDF). mta.info. Metropolitan Transportation Authority. October 28, 2015. Retrieved December 16, 2015.
- ^ "MTA Twenty-Year Capital Needs Assessment 2015–2034" (PDF). mta.info. Metropolitan Transportation Authority. October 2013. Retrieved December 16, 2015.
- ^ "MTA 2014 Budget and 2014–2017 Financial Plan Adoption Materials" (PDF). mta.info. Metropolitan Transportation Authority. November 2013. p. II-84. Retrieved December 21, 2018.
- ^ Raskin, Joseph B. (2013). The Routes Not Taken: A Trip Through New York City's Unbuilt Subway System. New York, New York: Fordham University Press. doi:10.5422/fordham/9780823253692.001.0001. ISBN 978-0-82325-369-2.
- ^ Padnani, Amisha (January 18, 2019). "A Subway to Staten Island? How a Transit Dream Died". The New York Times.
- ^ a b Paulsen, Ken (July 12, 2008). "Reality check for Staten Island's rail plans". Staten Island Live. Archived from the original on October 3, 2008. Retrieved July 12, 2008.
- ^ "Schumer Throws Support Behind S.I. Light Rail System". ny1.com. NY1 News. June 16, 2006. Retrieved April 23, 2018.
- ^ "NYCT North Shore Alternatives Analysis: Alternatives Analysis Report" (PDF). mta.info. Metropolitan Transportation Authority. August 2012. Retrieved July 20, 2015.
- ^ "MTA Capital Program 2015–2019 Renew. Enhance. Expand. Amendment No. 2 As Proposed to the MTA Board May 2017" (PDF). mta.info. Metropolitan Transportation Authority. May 24, 2017. Retrieved May 24, 2017.
- ^ "Staten Island's Rapid Transit: The New System Which Lessens Time and Increases Facilities" (PDF). The New York Times. March 9, 1886. ISSN 0362-4331. Retrieved July 24, 2015.
- ^ a b c d e f g h i j k l m n o p q "Staten Island Bus Map" (PDF). Metropolitan Transportation Authority. January 2020. Retrieved December 1, 2020.
- ^ "The Staten Island Rapid Transit Railway Company Tariff Issued January 11, 1937 Effective February 15, 1937". Staten Island Rapid Transit Railway Company.
{{cite web}}
: Missing or empty|url=
(help) - ^ a b Seventeenth Annual Report For The Calendar Year 1937. Albany, New York: New York State Transit Commission. 1937. p. 23.
- ^ The Official Railway Guide: North American Freight Service Edition. New York, New York: National Railway Publication Company. June 1868.
- ^ Wiman, Erastus (December 16, 1885). Who Were There What They Said. The Staten Island Banquet to the President and Executives of the Baltimore and Ohio Railroad. New York, New York: American Bank Note Company. p. 105. OCLC 232661325. Retrieved October 2, 2015.
- ^ Reports of Decisions of the Public Service Commission, First District, of the State of New York, Volume 4. New York (State). Public Service Commission. First District, 1914, pgs 88–92
- ^ "Please Use The First Three Cars to Enter or Exit the Train at the Following Stations". mta.info. Metropolitan Transportation Authority. Retrieved August 14, 2017.
- ^ a b c d e "New Arthur Kill Station". mta.info (Press release). Metropolitan Transportation Authority. January 20, 2017. Retrieved January 20, 2017.
- ^ "Staten Island Rapid Transit Timetable No. 8 Effective October 8, 1921". gretschviking.net. Staten Island Rapid Transit Railway Company. October 16, 1921. Retrieved December 16, 2015.
- ^ "Staten Island Railroad: Chemical Coast Line Connector" (PDF). aapa-ports.org. American Association of Port Authorities. June 14, 2007. Retrieved December 16, 2014.
- ^ "New England Plaster". The Traffic World. 18 (23). Chicago, Illinois: Traffic Service Corporation. December 2, 1916.
- ^ a b "MTA Board Approves Service Changes". mta.info. Metropolitan Transportation Authority. March 2010. Archived from the original on March 28, 2010. Retrieved August 14, 2017.
- ^ "Transit & Bus Committee Meeting" (PDF). mta.info. Metropolitan Transportation Authority. July 23, 2018. pp. 185–186. Archived from the original (PDF) on April 24, 2019. Retrieved July 23, 2018.
- ^ "Staten Island Opens Mile-Long Viaduct: Thirty-four Grade Crossings Are Eliminated" (PDF). The New York Times. February 26, 1937. ISSN 0362-4331. Retrieved June 27, 2015.
- ^ "Saint John's Avenue Embankment". railfanning.org. Retrieved April 23, 2018.
- ^ Owen, Gary (2018). "Robin Road Trestle in 2018". gretschviking.net. Retrieved April 23, 2018.
- ^ "An Aerial View of the Filled in Right-of-way and the New Housing". gretschviking.net. Retrieved April 23, 2018.
- ^ "The Abandoned ROW at the McClean Avenue Bridge With the Major Avenue Overpass in the Distance". gretschviking.net. 1964. Retrieved April 23, 2018.
- ^ a b Shore Front Drive, North Shore Section, Richmond, New York City: Environmental Impact Statement. Babylon, New York: Federal Highway Administration. April 1973. pp. 25, 36, 53–54.
- ^ Dominowski, Michael (December 7, 2008). "Permission to Dream". silive.com. Retrieved October 8, 2015.
- ^ Eleventh Annual Report For The Calendar Year 1931. New York State Transit Commission. 1922. p. 75.
- ^ Bommer, Edward (2003). Stations and Places Along the Staten Island Rapid Transit. Retrieved November 19, 2015.
- ^ Ninth Annual Report December 31, 1929 (PDF). New York, New York: Port of New York Authority. 1929. p. 16. Archived from the original (PDF) on February 16, 2017. Retrieved April 2, 2018.
- ^ Erlitz, Jeffrey B. (January 2019). "Schematic Track and Interlocking Diagrams of the New York City Transit Authority, Staten Island Railway and South Brooklyn Railway" (PDF). trainsarefun.com. p. 295. Archived from the original (PDF) on March 15, 2019. Retrieved March 15, 2019.
- ^ a b "236 Richmond Valley Road – Staten Island, New York Environmental Assessment Statement – Analyses" (PDF). nyc.gov. New York City Department of City Planning. August 29, 2014. Retrieved December 14, 2017.
- ^ Pitanza, Marc (January 28, 2007). "Page Avenue Switch". nycsubway.org. Retrieved December 14, 2017.
- ^ Kensinger, Nathan (June 23, 2016). "Exploring Staten Island's changing Mill Creek". Curbed. Retrieved December 14, 2017.
External links
[edit]- Rail transportation in the New York metropolitan area
- Staten Island Railway
- 1899 establishments in New York City
- 600 V DC railway electrification
- Companies affiliated with the Baltimore and Ohio Railroad
- Companies based in Staten Island
- CSX Transportation
- Defunct New York (state) railroads
- Metropolitan Transportation Authority
- Railway companies established in 1873
- Rapid transit in New York (state)
- Standard gauge railways in the United States
- New York City Transit Authority