Jump to content

Liverpool Central railway station: Difference between revisions

Coordinates: 53°24′16″N 2°58′47″W / 53.4045°N 2.9797°W / 53.4045; -2.9797
From Wikipedia, the free encyclopedia
Content deleted Content added
Jguiii (talk | contribs)
m Updated dead references
added 23-24 usage
 
(14 intermediate revisions by 12 users not shown)
Line 4: Line 4:
{{more citations needed|date=June 2014}} <!-- Article more needs inline citations, particularly for the history section. -->
{{more citations needed|date=June 2014}} <!-- Article more needs inline citations, particularly for the history section. -->
{{Infobox station
{{Infobox station
| name = Liverpool Central
| name = Liverpool Central
| symbol_location = gb
| symbol_location = gb
| symbol = liverpool
| symbol = liverpool
| image = Liverpool Central Station.jpg
| image = Liverpool Central Station.jpg
| caption = The concourse
| caption = The concourse
| borough = [[Liverpool]]
| borough = [[Liverpool]], [[Merseyside]], United Kingdom
| country = England
| country =
| coordinates = {{coord|53.4045|-2.9797|type:railwaystation_region:GB_scale:10000|display=inline,title}}
| coordinates = {{coord|53.4045|-2.9797|type:railwaystation_region:GB_scale:10000|display=inline,title}}
| grid_name = [[Ordnance Survey National Grid|Grid reference]]
| grid_name = [[Ordnance Survey National Grid|Grid reference]]
| grid_position = {{gbmapscaled|SJ349901|25|SJ349901}}
| grid_position = {{gbmapscaled|SJ349901|25|SJ349901}}
| manager = [[Merseyrail]]
| manager = [[Merseyrail]]
| platforms = 3
| platforms = 3
| code = LVC
| code = LVC
| zone = C1
| zone = C1
| classification = [[United Kingdom railway station categories|DfT category]] B
| classification = [[United Kingdom railway station categories|DfT category]] B
| transit_authority = [[Merseyside Passenger Transport Executive|Merseytravel]]
| transit_authority = [[Merseyside Passenger Transport Executive|Merseytravel]]
| years = 2 March 1874
| years = 2 March 1874
| events = Opened (High Level)
| events = Opened (High Level)
| years1 = 11 January 1892
| years1 = 11 January 1892
| events1 = Opened (Low Level)
| events1 = Opened (Low Level)
| years2 = 17 April 1972
| years2 = 17 April 1972
| events2 = Closed (High Level)
| events2 = Closed (High Level)
| years3 = 28 July 1975
| years3 = 28 July 1975
| events3 = Closed (Low Level)
| events3 = Closed (Low Level)
| years4 = 9 May 1977
| years4 = 9 May 1977
| events4 = Reopened (Low Level)
| events4 = Reopened (Low Level)
| years5 = 23 April 2012
| years5 = 23 April 2012
| events5 = Closed
| events5 = Closed
(Low Level refurbishment)
(Low Level refurbishment)
| years6 = 25 August 2012
| years6 = 25 August 2012
| events6 = Partially reopened
| events6 = Partially reopened
(concourse and Wirral line)
(concourse and Wirral line)
| years7 = 22 October 2012
| years7 = 22 October 2012
| events7 = Fully reopened
| events7 = Fully reopened
| mpassengers = {{Rail pass box |pass_year=2017/18 |passengers={{increase}} 16.465 million |interchange={{pad|1em}}{{decrease}} 0.321 million}}
| mpassengers = {{Rail pass box |pass_year=2019/20 |passengers={{increase}} 16.455 million |interchange={{pad|1em}}{{increase}} 0.649 million}}
{{Rail pass box |pass_year=2018/19 |passengers={{decrease}} 14.605 million |interchange={{pad|1em}}{{increase}} 0.577 million}}
{{Rail pass box |pass_year=2019/20 |passengers={{increase}} 16.455 million |interchange={{pad|1em}}{{increase}} 0.649 million}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 3.606 million |interchange={{pad|1em}}{{decrease}} 0.172 million}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 3.606 million |interchange={{pad|1em}}{{decrease}} 0.172 million}}
{{Rail pass box |pass_year=2021/22 |passengers={{increase}} 10.747 million |interchange={{pad|1em}}{{increase}} 0.391 million}}
{{Rail pass box |pass_year=2021/22 |passengers={{increase}} 10.747 million |interchange={{pad|1em}}{{increase}} 0.391 million}}
{{Rail pass box |pass_year=2022/23 |passengers={{increase}} 11.402 million |interchange={{pad|1em}}{{increase}} 0.537 million}}
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
{{Rail pass box |pass_year=2023/24 |passengers={{increase}} 12.611 million |interchange={{pad|1em}}{{increase}} 0.600 million}}
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
}}
}}
'''Liverpool Central railway station''' in [[Liverpool]], England, forms a central hub of the [[Merseyrail]] network, being on both the [[Northern Line (Merseyrail)|Northern Line]] and the [[Wirral Line]]. The station is located underground on two levels, below the site of a former mainline terminus. It is the busiest station in Liverpool, though considerably smaller than [[Liverpool Lime Street railway station|Lime Street station]], the mainline terminus, and the busiest station to operate solely on the Merseyrail network. The station is the busiest underground station outside London serving 40,000 people daily. The station in passengers per platform is the busiest underground railway station in the United Kingdom at 5,217,547 per platform per annum and laying third in all stations, underground or overground.<ref>{{cite web |url=http://orr.gov.uk/statistics/published-stats/station-usage-estimates |title=Station usage estimates {{!}} Office of Rail Regulation |website=orr.gov.uk |url-status=dead |archive-url=https://web.archive.org/web/20140418080415/http://orr.gov.uk/statistics/published-stats/station-usage-estimates |archive-date=2014-04-18}} </ref>
'''Liverpool Central railway station''' in [[Liverpool]], England, forms a central hub of the [[Merseyrail]] network, being on both the [[Northern Line (Merseyrail)|Northern Line]] and the [[Wirral Line]]. The station is located underground on two levels, below the site of a former mainline terminus. It is the busiest station in Liverpool, though considerably smaller than [[Liverpool Lime Street railway station|Lime Street station]], the mainline terminus, and the busiest station to operate solely on the Merseyrail network. The station is the busiest underground station outside London serving 40,000 people daily. The station in passengers per platform is the busiest underground railway station in the United Kingdom outside of London at 3,979,547 per platform per annum and coming tenth out of all stations outside the capital, underground or overground.<ref>{{cite web |title=Station usage estimates {{!}} Office of Rail Regulation |url=http://orr.gov.uk/statistics/published-stats/station-usage-estimates |url-status=live |archive-url=https://web.archive.org/web/20240503142449/https://dataportal.orr.gov.uk/statistics/usage/estimates-of-station-usage |archive-date=2024-05-03 |access-date=2024-05-03 |website=orr.gov.uk}} </ref>


Liverpool Central is one of nine stations on the Merseyrail network to incorporate automatic [[ticket gate]]s. The main concourse is part of a shopping centre, and includes a closed subway link to the former [[Lewis's]] department store.
Liverpool Central is one of nine stations on the Merseyrail network to incorporate automatic [[ticket gate]]s.{{cn|date=November 2024}} The main concourse is part of a shopping centre, and includes a closed subway link to the former [[Lewis's]] department store.


== History ==
== History ==
Line 84: Line 84:
A street-level travel centre opened in November 2009, replacing the former ticket office and newsagents; this sells tickets, newspapers, food and drink. There are also toilets, [[Automated teller machine|cash machines]], free Wifi and food-vending machines. Escalators and lifts lead to the two Northern Line platforms and the deep-level Wirral Line platform. There are cycle racks for 30 cycles and secure storage for 16 cycles.<ref>{{cite web |title=Liverpool-central train station {{!}} timetable {{!}} ticket prices & facilities |url=http://www.merseyrail.org/plan-your-journey/stations/liverpool-central.aspx |url-status=dead |archive-url=https://web.archive.org/web/20170306205842/http://www.merseyrail.org/plan-your-journey/stations/liverpool-central.aspx |archive-date=6 March 2017 |access-date=13 November 2023 |website=merseyrail.org |language=en}}</ref>
A street-level travel centre opened in November 2009, replacing the former ticket office and newsagents; this sells tickets, newspapers, food and drink. There are also toilets, [[Automated teller machine|cash machines]], free Wifi and food-vending machines. Escalators and lifts lead to the two Northern Line platforms and the deep-level Wirral Line platform. There are cycle racks for 30 cycles and secure storage for 16 cycles.<ref>{{cite web |title=Liverpool-central train station {{!}} timetable {{!}} ticket prices & facilities |url=http://www.merseyrail.org/plan-your-journey/stations/liverpool-central.aspx |url-status=dead |archive-url=https://web.archive.org/web/20170306205842/http://www.merseyrail.org/plan-your-journey/stations/liverpool-central.aspx |archive-date=6 March 2017 |access-date=13 November 2023 |website=merseyrail.org |language=en}}</ref>


== Future==
== Future ==
The Liverpool City Region Long Term Rail Strategy document, produced by Merseytravel in 2014, states that it hopes to re-open the [[Wapping Tunnel]] to allow Liverpool Central to connect with [[Edge Hill railway station|Edge Hill]] and beyond.<ref name="LongTermPlan">{{cite web |title=Liverpool City Region Long Term Rail Strategy |url=http://moderngov.merseytravel.uk.net/documents/s12878/Enc.%201%20for%20Long%20Term%20Rail%20Strategy.pdf |url-status=dead |archive-url=https://web.archive.org/web/20160306122239/http://moderngov.merseytravel.uk.net/documents/s12878/Enc.%201%20for%20Long%20Term%20Rail%20Strategy.pdf |archive-date=6 March 2016 |access-date=13 November 2023 |publisher=[[Merseytravel]]}}</ref> Merseytravel commissioned a feasibility study into a new rail link between Central and Edge Hill, which was completed in May 2016. The report found that the Wapping Tunnel was in good condition—though suffering from flooding in places and requiring some remedial work—and that the concept of re-opening the tunnel was viable.<ref>{{cite web|url=https://www.merseytravel.gov.uk/about-us/disclosure-logs/Documents/RSN16726%20-%20EIR%20Request%20-%20Wapping%20Tunnel%20Feasbility%20Study.pdf|access-date=13 March 2018|title=Archived copy|archive-url=https://web.archive.org/web/20180303225425/https://www.merseytravel.gov.uk/about-us/disclosure-logs/Documents/RSN16726%20-%20EIR%20Request%20-%20Wapping%20Tunnel%20Feasbility%20Study.pdf|archive-date=3 March 2018|url-status=dead}}</ref>
The Liverpool City Region Long Term Rail Strategy document, produced by Merseytravel in 2014, states that it hopes to re-open the [[Wapping Tunnel]] to allow Liverpool Central to connect with [[Edge Hill railway station|Edge Hill]] and beyond.<ref name="LongTermPlan">{{cite web |title=Liverpool City Region Long Term Rail Strategy |url=http://moderngov.merseytravel.uk.net/documents/s12878/Enc.%201%20for%20Long%20Term%20Rail%20Strategy.pdf |url-status=dead |archive-url=https://web.archive.org/web/20160306122239/http://moderngov.merseytravel.uk.net/documents/s12878/Enc.%201%20for%20Long%20Term%20Rail%20Strategy.pdf |archive-date=6 March 2016 |access-date=13 November 2023 |publisher=[[Merseytravel]]}}</ref> Merseytravel commissioned a feasibility study into a new rail link between Central and Edge Hill, which was completed in May 2016. The report found that the Wapping Tunnel was in good condition—though suffering from flooding in places and requiring some remedial work—and that the concept of re-opening the tunnel was viable.<ref>{{cite web|url=https://www.merseytravel.gov.uk/about-us/disclosure-logs/Documents/RSN16726%20-%20EIR%20Request%20-%20Wapping%20Tunnel%20Feasbility%20Study.pdf|access-date=13 March 2018|title=Archived copy|archive-url=https://web.archive.org/web/20180303225425/https://www.merseytravel.gov.uk/about-us/disclosure-logs/Documents/RSN16726%20-%20EIR%20Request%20-%20Wapping%20Tunnel%20Feasbility%20Study.pdf|archive-date=3 March 2018|url-status=dead}}</ref>


Plans were developed in 2006 to build a shopping complex on the site of the car park behind the former High Level station (bounded by the rear of the station, Cropper Street, Newington and Bold Street). Known as Central Village, it was to consist of a high-rise tower for residential and business use, retail outlets, bars and restaurants and was also to have a canal running the length of Bold Street.<ref>{{cite web |author=Katie Daubney |date=12 May 2009 |title=Go-ahead for Liverpool Central Village |url=http://www.planningresource.co.uk/news/905082/Go-ahead-Liverpool-Central-Village/ |url-status=dead |access-date=17 November 2009 |publisher=PlanningResource}}</ref> Development of the site was troubled, with delays caused by parties involved going into receivership and potential tenants pulling out. In September 2017, new owner Augur announced plans to develop the site while leaving space for the expansion of the station, potentially seeing new platforms built. Augur stated it had discussed its plans with Network Rail and Liverpool City Council, and hoped to have planning permission submitted during 2018.<ref>{{cite web|last1=Houghton|first1=Alistair|title=Revealed: Developer's Circus plans for Lewis's and expanded Liverpool Central|url=http://www.liverpoolecho.co.uk/news/liverpool-news/revealed-plans-lewiss-central-liverpool-13645237|website=Liverpool Echo|access-date=23 September 2017|date=20 September 2017}}</ref>
Plans were developed in 2006 to build a shopping complex on the site of the car park behind the former High Level station (bounded by the rear of the station, Cropper Street, Newington and Bold Street). Known as Central Village, it was to consist of a high-rise tower for residential and business use, retail outlets, bars and restaurants and was also to have a canal running the length of Bold Street.<ref>{{cite web |author=Katie Daubney |date=12 May 2009 |title=Go-ahead for Liverpool Central Village |url=http://www.planningresource.co.uk/news/905082/Go-ahead-Liverpool-Central-Village/ |access-date=17 November 2009 |publisher=PlanningResource}}{{dead link|date=November 2023}}</ref> Development of the site was troubled, with delays caused by parties involved going into receivership and potential tenants pulling out. In September 2017, new owner Augur announced plans to develop the site while leaving space for the expansion of the station, potentially seeing new platforms built. Augur stated it had discussed its plans with Network Rail and Liverpool City Council, and hoped to have planning permission submitted during 2018.<ref>{{cite web|last1=Houghton|first1=Alistair|title=Revealed: Developer's Circus plans for Lewis's and expanded Liverpool Central|url=http://www.liverpoolecho.co.uk/news/liverpool-news/revealed-plans-lewiss-central-liverpool-13645237|website=Liverpool Echo|access-date=23 September 2017|date=20 September 2017}}</ref>


Network Rail was scheduled to install an extra lift giving access to the Northern Line platforms in 2016/17.<ref>{{cite web |title=Access For All - A-Z of station improvements |url=https://www.networkrail.co.uk/improvements/access-for-all/stations#L |website=networkrail.co.uk |access-date=6 December 2016 |archive-url=https://web.archive.org/web/20161226154129/http://www.networkrail.co.uk/improvements/access-for-all/stations#L |archive-date=26 December 2016 |url-status=dead }}</ref> No work had begun by the end of 2016; the Transport Minister, [[Paul Maynard]], confirmed that owing to funding issues, work would not start until 2019 at the earliest.<ref>{{cite web |last1=Weston |first1=Alan |title=Blow for Liverpool Central users as cash squeeze hits plans |url=http://www.liverpoolecho.co.uk/news/liverpool-news/liverpool-central-improvement-plan-put-12278643 |website=Liverpool Echo |access-date=6 December 2016 |date=6 December 2016}}</ref>
Network Rail was scheduled to install an extra lift giving access to the Northern Line platforms in 2016/17.<ref>{{cite web |title=Access For All - A-Z of station improvements |url=https://www.networkrail.co.uk/improvements/access-for-all/stations#L |website=networkrail.co.uk |access-date=6 December 2016 |archive-url=https://web.archive.org/web/20161226154129/http://www.networkrail.co.uk/improvements/access-for-all/stations#L |archive-date=26 December 2016 |url-status=dead }}</ref> No work had begun by the end of 2016; the Transport Minister, [[Paul Maynard]], confirmed that owing to funding issues, work would not start until 2019 at the earliest.<ref>{{cite web |last1=Weston |first1=Alan |title=Blow for Liverpool Central users as cash squeeze hits plans |url=http://www.liverpoolecho.co.uk/news/liverpool-news/liverpool-central-improvement-plan-put-12278643 |website=Liverpool Echo |access-date=6 December 2016 |date=6 December 2016}}</ref>
Line 101: Line 101:
* 4 trains per hour to {{stnlnk|Southport}}
* 4 trains per hour to {{stnlnk|Southport}}
* 4 trains per hour to {{stnlnk|Ormskirk}}
* 4 trains per hour to {{stnlnk|Ormskirk}}
* 4 trains per hour to {{stnlnk|Kirkby}}
* 4 trains per hour to {{stnlnk|Headbolt Lane}}
* 4 trains per hour to {{stnlnk|Hunts Cross}} via {{stnlnk|Liverpool South Parkway}}
* 4 trains per hour to {{stnlnk|Hunts Cross}} via {{stnlnk|Liverpool South Parkway}}


Line 117: Line 117:
|access-date=22 December 2022
|access-date=22 December 2022
|publisher=Merseyrail
|publisher=Merseyrail
}}</ref> These services are all provided by Merseyrail's fleet of [[British Rail Class 507|Class 507]] and [[British Rail Class 508|Class 508]] [[Electric multiple unit|EMUs]].
}}</ref> These services are all provided by Merseyrail's fleet of [[British Rail Class 507|Class 507]] and [[British Rail Class 777|Class 777]] [[Electric multiple unit|EMUs]].


Northern Line Services use platforms 1 and 2 at the station. Usually trains to Kirkby and Hunts Cross depart from platform 1, and trains to Southport and Ormskirk use platform 2, although delays on the trains can cause these to change. All Wirral Line services depart from platform 3.
Northern Line Services use platforms 1 and 2 at the station. Usually trains to Kirkby and Hunts Cross depart from platform 1, and trains to Southport and Ormskirk use platform 2, although delays on the trains can cause these to change. All Wirral Line services depart from platform 3.

Latest revision as of 01:06, 23 November 2024

Liverpool Central
Merseyrail
The concourse
General information
LocationLiverpool, Merseyside, United Kingdom
Coordinates53°24′16″N 2°58′47″W / 53.4045°N 2.9797°W / 53.4045; -2.9797
Grid referenceSJ349901
Managed byMerseyrail
Transit authorityMerseytravel
Platforms3
Other information
Station codeLVC
Fare zoneC1
ClassificationDfT category B
Key dates
2 March 1874Opened (High Level)
11 January 1892Opened (Low Level)
17 April 1972Closed (High Level)
28 July 1975Closed (Low Level)
9 May 1977Reopened (Low Level)
23 April 2012Closed (Low Level refurbishment)
25 August 2012Partially reopened (concourse and Wirral line)
22 October 2012Fully reopened
Passengers
2019/20Increase 16.455 million
 Interchange Increase 0.649 million
2020/21Decrease 3.606 million
 Interchange Decrease 0.172 million
2021/22Increase 10.747 million
 Interchange Increase 0.391 million
2022/23Increase 11.402 million
 Interchange Increase 0.537 million
2023/24Increase 12.611 million
 Interchange Increase 0.600 million
Notes
Passenger statistics from the Office of Rail and Road

Liverpool Central railway station in Liverpool, England, forms a central hub of the Merseyrail network, being on both the Northern Line and the Wirral Line. The station is located underground on two levels, below the site of a former mainline terminus. It is the busiest station in Liverpool, though considerably smaller than Lime Street station, the mainline terminus, and the busiest station to operate solely on the Merseyrail network. The station is the busiest underground station outside London serving 40,000 people daily. The station in passengers per platform is the busiest underground railway station in the United Kingdom outside of London at 3,979,547 per platform per annum and coming tenth out of all stations outside the capital, underground or overground.[1]

Liverpool Central is one of nine stations on the Merseyrail network to incorporate automatic ticket gates.[citation needed] The main concourse is part of a shopping centre, and includes a closed subway link to the former Lewis's department store.

History

[edit]

High Level terminal station

[edit]

The original station, which was a large, above-ground terminal station, opened on 2 March 1874, at the end of the Cheshire Lines Committee (CLC) line to Manchester Central. It replaced Brunswick station as the CLC's Liverpool terminus, becoming the headquarters of the committee. The three-storey building fronted Ranelagh Street in the city centre, with a 65 feet (20 m) high, arched iron and glass train shed behind.

There were six platforms within the station, offering journeys to Manchester Central (in 45 minutes, making the route the quickest and most direct between Liverpool and Manchester), London St. Pancras, Hull, Harwich, Stockport Tiviot Dale, Southport Lord Street and an alternative London route to that of the Midland Railway, terminating at London Marylebone.

Until the nationalisation of Britain's railways, the station was always busy, but as with many other stations in the UK, it was closed under the Beeching Axe, as the routes served could be taken from nearby Liverpool Lime Street. In 1966, most services on the CLC route were diverted to Lime Street via the Hunts Cross chord, leaving only a dozen urban commuter trains per day to and from Gateacre. These final services were withdrawn on 17 April 1972, with a promise to reinstate the Gateacre route when the Merseyrail network was completed in 1978.

The High Level station was demolished in 1973, having served a short time as a car park, although some former station buildings remained while work was in progress on rebuilding the underground station in the mid-1970s. The area of the train shed now forms the centre of the stalled Central Village development.

Underground urban station

[edit]
A 1909 Railway Clearing House Junction Diagram showing railways in the vicinity of Liverpool Central – Low Level station (Mersey Railway) in purple; High Level station (Cheshire Lines) in orange

Liverpool Central Low Level underground terminal station opened on 11 January 1892, at the end of the Mersey Railway's route, via the Mersey Railway Tunnel from Birkenhead, when the route was extended from James Street station. The Mersey Railway platforms were underground, accessed from stairs within the High Level station and situated in roughly the same position as the escalators accessing the Northern Line today.

The Mersey Railway tunnel entering Central Low Level from the north of the station was aligned with the High Level station's approach tunnel from the south. This was to ensure minimum engineering work if ever the two tunnels were to be linked up—as did occur in the 1970s.

Merseyrail

[edit]

The Merseyrail network was created in the 1970s by merging separate railways into one integrated network. Central underground station would service the Northern and Wirral Lines.

A new loop tunnel was built in Liverpool city centre for Wirral Line trains, linking James Street station with Moorfields, Lime Street and Liverpool Central stations, and returning to James Street. A new deep-level underground platform was built at Liverpool Central as part of this loop tunnel.

The former CLC route was taken underground connecting to the underground Mersey Railway platforms. Another new tunnel, the Link Tunnel, allowed trains to continue northwards via Moorfields to the approach lines to Liverpool Exchange, creating one long line from Hunts Cross to Southport. Liverpool Exchange terminal station was closed in 1977; this route became the Northern Line. The rebuilt underground station was opened by British Rail in the same year.

In the original 1970s Merseyrail plan, southbound trains would have continued to Warrington and Manchester; however, services terminated at Garston, then later extended to Hunts Cross. Simultaneously, works to allow the Northern Line to be connected to the Victoria Tunnel, called the Edge Hill Spur, to connect the eastern section of the city to the city centre underground section were undertaken, then later abandoned. Trains would have operated from Central station to the east of the city and out to St Helens.

2012 refurbishment

[edit]

It was announced in September 2011 that, through a £40 million investment from Network Rail, Liverpool Central was to have a major refurbishment programme to improve the concourse and platforms. Works included new lighting, flooring, new toilet facilities and new escalators to the Northern Line platforms. The entire station closed for refurbishment on 23 April 2012. The station partly reopened on 25 August 2012, with the refurbishment of the main concourse and Wirral Line platform completed. The station fully reopened on 22 October 2012 with the work on the Northern Line platforms completed.[2][3]

Facilities

[edit]
Liverpool Central sign

A street-level travel centre opened in November 2009, replacing the former ticket office and newsagents; this sells tickets, newspapers, food and drink. There are also toilets, cash machines, free Wifi and food-vending machines. Escalators and lifts lead to the two Northern Line platforms and the deep-level Wirral Line platform. There are cycle racks for 30 cycles and secure storage for 16 cycles.[4]

Future

[edit]

The Liverpool City Region Long Term Rail Strategy document, produced by Merseytravel in 2014, states that it hopes to re-open the Wapping Tunnel to allow Liverpool Central to connect with Edge Hill and beyond.[5] Merseytravel commissioned a feasibility study into a new rail link between Central and Edge Hill, which was completed in May 2016. The report found that the Wapping Tunnel was in good condition—though suffering from flooding in places and requiring some remedial work—and that the concept of re-opening the tunnel was viable.[6]

Plans were developed in 2006 to build a shopping complex on the site of the car park behind the former High Level station (bounded by the rear of the station, Cropper Street, Newington and Bold Street). Known as Central Village, it was to consist of a high-rise tower for residential and business use, retail outlets, bars and restaurants and was also to have a canal running the length of Bold Street.[7] Development of the site was troubled, with delays caused by parties involved going into receivership and potential tenants pulling out. In September 2017, new owner Augur announced plans to develop the site while leaving space for the expansion of the station, potentially seeing new platforms built. Augur stated it had discussed its plans with Network Rail and Liverpool City Council, and hoped to have planning permission submitted during 2018.[8]

Network Rail was scheduled to install an extra lift giving access to the Northern Line platforms in 2016/17.[9] No work had begun by the end of 2016; the Transport Minister, Paul Maynard, confirmed that owing to funding issues, work would not start until 2019 at the earliest.[10]

The Liverpool Echo published an article in October 2018 which claimed that unless the station was redeveloped to increase capacity it would be facing restrictions on passenger movement. Merseyrail managing director Andy Heath suggested that by the mid 2020s passengers could end up having to queue upstairs as the platforms would have insufficient capacity. Merseyrail chairman Cllr Liam Robinson stated that, due to the potential size of the works, Merseytravel were in discussions with the government over their plans to expand the station. Plans could include a new concourse and new platforms as well as making use of a previously constructed but unused tunnel portal to the east of the underground station.[11]

Services

[edit]
The Northern Line platforms
Wirral Line platform

Both lines on the Merseyrail network, the Northern Line and the Wirral Line, serve the station.

On the Northern Line, off-peak service level is as follows:

On Sundays, frequencies are reduced to 2 trains per hour on all routes.

On the Wirral Line, off-peak service level is as follows:

During the evening and on Sundays, frequencies are reduced to 2 trains per hour on all routes.[12] These services are all provided by Merseyrail's fleet of Class 507 and Class 777 EMUs.

Northern Line Services use platforms 1 and 2 at the station. Usually trains to Kirkby and Hunts Cross depart from platform 1, and trains to Southport and Ormskirk use platform 2, although delays on the trains can cause these to change. All Wirral Line services depart from platform 3.

Northern to Wirral services

[edit]

Empty Coaching Stock (non-passenger) services have to reverse at Liverpool Central station, when going from Kirkdale Depot to Birkenhead North TMD and vice versa, making use of a single track chord known as the "Stock Interchange Line" linking Liverpool James Street station (Wirral Line) and Liverpool Central (Northern Line). No passenger services are scheduled to use the link, although it has seen very occasional use by charter trains.[13] This was the route taken by Wirral Line trains between Central L.L & James Street prior to the building of the Link & Loop tunnels in the 1970s.

Preceding station National Rail National Rail Following station
Moorfields
towards Southport,
Ormskirk or Headbolt Lane
  Merseyrail
Northern Line
Hunts Cross-Southport
  Brunswick
towards Hunts Cross
  Merseyrail
Northern Line
Liverpool-Kirkby/Ormskirk
  Terminus
Liverpool Lime Street
(one-way operation)
  Merseyrail
Wirral Line
  James Street
towards New Brighton, West Kirby,
Chester or Ellesmere Port

See also

[edit]

References

[edit]
  1. ^ "Station usage estimates | Office of Rail Regulation". orr.gov.uk. Archived from the original on 3 May 2024. Retrieved 3 May 2024.
  2. ^ "Liverpool underground stations get £40m overhaul". BBC News. 5 September 2011. Retrieved 5 September 2011.
  3. ^ Northern Line Reopening
  4. ^ "Liverpool-central train station | timetable | ticket prices & facilities". merseyrail.org. Archived from the original on 6 March 2017. Retrieved 13 November 2023.
  5. ^ "Liverpool City Region Long Term Rail Strategy" (PDF). Merseytravel. Archived from the original (PDF) on 6 March 2016. Retrieved 13 November 2023.
  6. ^ "Archived copy" (PDF). Archived from the original (PDF) on 3 March 2018. Retrieved 13 March 2018.{{cite web}}: CS1 maint: archived copy as title (link)
  7. ^ Katie Daubney (12 May 2009). "Go-ahead for Liverpool Central Village". PlanningResource. Retrieved 17 November 2009.[dead link]
  8. ^ Houghton, Alistair (20 September 2017). "Revealed: Developer's Circus plans for Lewis's and expanded Liverpool Central". Liverpool Echo. Retrieved 23 September 2017.
  9. ^ "Access For All - A-Z of station improvements". networkrail.co.uk. Archived from the original on 26 December 2016. Retrieved 6 December 2016.
  10. ^ Weston, Alan (6 December 2016). "Blow for Liverpool Central users as cash squeeze hits plans". Liverpool Echo. Retrieved 6 December 2016.
  11. ^ Houghton, Alistair (21 October 2018). "Photos that show why overcrowded Central Station needs to be rebuilt". Liverpool Echo. Retrieved 24 October 2018.
  12. ^ "Merseyrail Timetables". Merseyrail. Retrieved 22 December 2022.
  13. ^ "Third Rail Centenary Tracker"Heyevents 7 February 2016; Retrieved 18 May 2016

Further reading

[edit]
  • Hughes, John C. (October 2005). "The Liverpool Central Station Railway (Part One)". Back Track. Vol. 19, no. 10. Pendragon Publishing. ISSN 0955-5382.
  • Hughes, John C. (December 2005). "The Liverpool Central Station Railway (Part Two)". Back Track. Vol. 19, no. 12. Pendragon Publishing. ISSN 0955-5382.
[edit]