Jump to content

Plymouth railway station: Difference between revisions

Coordinates: 50°22′40″N 4°08′35″W / 50.3778°N 4.1430°W / 50.3778; -4.1430
From Wikipedia, the free encyclopedia
Content deleted Content added
Brunel Plaza: merge citations
now third busiest in Devon, after Exeter Central and Exeter St Davids.
 
(29 intermediate revisions by 18 users not shown)
Line 4: Line 4:
{{Use British English|date=May 2017}}
{{Use British English|date=May 2017}}
{{Infobox station
{{Infobox station
| name = Plymouth
| name = Plymouth
| symbol_location = gb
| symbol_location = gb
| symbol = rail
| symbol = rail
| image = Plymouth (North Road) station (6395408523).jpg
| image = Plymouth station, North Road, Plymouth - geograph.org.uk - 6321329.jpg
| caption = Platforms and track layout from the east, with the main station building behind.
| borough = [[Plymouth]], [[Plymouth]]
| country = England
| borough = [[Plymouth]]
| coordinates = {{coord|50.3778|-4.1430|type:railwaystation_region:GB_scale:10000|display=inline,title}}
| country = England
| coordinates = {{coord|50.3778|-4.1430|type:railwaystation_region:GB_scale:10000|display=inline,title}}
| grid_name = [[Ordnance Survey National Grid|Grid reference]]
| grid_name = [[Ordnance Survey National Grid|Grid reference]]
| grid_position = {{gbmapscaled|SX476553|25|SX476553}}
| grid_position = {{gbmapscaled|SX476553|25|SX476553}}
| manager = [[Great Western Railway (train operating company)|Great Western Railway]]
| manager = [[Great Western Railway (train operating company)|Great Western Railway]]
| platforms = 6
| platforms = 6 (numbered 3-8)
| code = PLY
| code = PLY
| classification = [[United Kingdom railway station categories|DfT category]] C1
| classification = [[United Kingdom railway station categories|DfT category]] C1
| original = [[Great Western Railway|GWR]] and [[London and South Western Railway|LSWR]] Joint
| rebuilt =
| original = [[Great Western Railway|GWR]] and [[London and South Western Railway|LSWR]] Joint
| postgroup = [[Great Western Railway|GWR]] and [[Southern Railway (Great Britain)|SR]] Joint
| postgroup = [[Great Western Railway|GWR]] and [[Southern Railway (Great Britain)|SR]] Joint
| years = 1877
| years = 1877
| events = Opened
| events = Opened
| years1 = 1938
| years1 = 1938
| events1 = Rebuilding started
| events1 = Rebuilding started
| years2 = 1958
| years2 = 1958
| events2 = "North Road" name dropped
| events2 = ''North Road'' name dropped
| years3 = 1962
| years3 = 1962
| events3 = Rebuilding completed
| events3 = Rebuilding completed
| mpassengers = <!-- {{Rail pass box |pass_year=2017/18 |passengers={{decrease}} 2.449 million |interchange={{pad|1em}}{{decrease}} 90,299}}
| mpassengers =
{{Rail pass box |pass_year=2017/18 |passengers={{decrease}} 2.449 million |interchange={{pad|1em}}{{decrease}} 90,299}}
{{Rail pass box |pass_year=2018/19 |passengers={{decrease}} 2.416 million |interchange={{pad|1em}}{{decrease}} 79,912}}-->
{{Rail pass box |pass_year=2018/19 |passengers={{decrease}} 2.416 million |interchange={{pad|1em}}{{decrease}} 79,912}}
{{Rail pass box |pass_year=2019/20 |passengers={{decrease}} 2.372 million |interchange={{pad|1em}}{{increase}} 86,443}}
{{Rail pass box |pass_year=2019/20 |passengers={{decrease}} 2.372 million |interchange={{pad|1em}}{{increase}} 86,443}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 0.678 million |interchange={{pad|1em}}{{decrease}} 21,268}}
{{Rail pass box |pass_year=2020/21 |passengers={{decrease}} 0.678 million |interchange={{pad|1em}}{{decrease}} 21,268}}
{{Rail pass box |pass_year=2021/22 |passengers={{increase}} 1.992 million |interchange={{pad|1em}}{{increase}} 75,788}}
{{Rail pass box |pass_year=2021/22 |passengers={{increase}} 1.992 million |interchange={{pad|1em}}{{increase}} 75,788}}
{{Rail pass box |pass_year=2022/23 |passengers={{increase}} 2.313 million |interchange={{pad|1em}}{{increase}} 90,291}}
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
{{Rail pass box |pass_year=2023/24 |passengers={{increase}} 2.439 million |interchange={{pad|1em}}{{increase}} 0.121 million}}
| footnotes = Passenger statistics from the [[Office of Rail and Road]]
}}
}}


'''Plymouth railway station''' serves the city of [[Plymouth]], [[Devon]], [[England]]. It is on the northern edge of the city centre, close to the North Cross roundabout. It Is the second busiest station in the county of [[Devon]], and is the largest of the six surviving stations in Plymouth.
'''Plymouth railway station''' serves the city of [[Plymouth]], [[Devon]], [[England]]. It is on the northern edge of the city centre, close to the North Cross roundabout. It is the third busiest station in the county of [[Devon]] and the largest of the six surviving stations in Plymouth.


It is on the route from {{stn|London Paddington}} to {{stnlnk|Penzance}}, {{convert|245|mi|75|chain|mi km|lk=in}} from the zero point at {{stn|London Paddington}} via Box<ref>{{cite book |last=Padgett |first=David |editor-last=Munsey |editor-first=Myles |title=Railway Track Diagrams 3: Western & Wales |edition=6th |date=June 2018 |orig-year=1989 |publisher=Trackmaps |location=Frome |isbn=978-1-9996271-0-2 |at=map 9B }}</ref> and is also the usual terminus for the [[Tamar Valley Line]] services from {{stnlnk|Gunnislake}}. The station is managed by [[Great Western Railway (train operating company)|Great Western Railway]]. Services are operated by Great Western Railway and [[CrossCountry]].<ref name="GBTT135">{{cite web|title = National Rail Timetable 135 (Summer 2014)|publisher = Network Rail|url = http://www.networkrail.co.uk/browse%20documents/eNRT/May14/timetables/Table%20135.pdf|access-date = 2014-07-06|archive-url = https://web.archive.org/web/20150110055108/http://www.networkrail.co.uk/browse%20documents/eNRT/May14/timetables/Table%20135.pdf|archive-date = 10 January 2015|url-status = dead}}</ref>
Plymouth is a principal stop on the [[Exeter-Plymouth line]] and [[Cornish Main Line]]; it is located {{convert|245|mi|75|chain|mi km|lk=in}} from {{stn|London Paddington}}, via {{rws|Box}}.<ref>{{cite book |last=Padgett |first=David |editor-last=Munsey |editor-first=Myles |title=Railway Track Diagrams 3: Western & Wales |edition=6th |date=June 2018 |orig-year=1989 |publisher=Trackmaps |location=Frome |isbn=978-1-9996271-0-2 |at=map 9B }}</ref> It is also the usual terminus for the [[Tamar Valley Line]] services from {{stnlnk|Gunnislake}}. The station is served by [[Great Western Railway (train operating company)|Great Western Railway]] and [[CrossCountry]]; it is also managed by the former.<ref name="GBTT135">{{cite web|title = National Rail Timetable 135 (Summer 2014)|publisher = Network Rail|url = http://www.networkrail.co.uk/browse%20documents/eNRT/May14/timetables/Table%20135.pdf|access-date = 2014-07-06|archive-url = https://web.archive.org/web/20150110055108/http://www.networkrail.co.uk/browse%20documents/eNRT/May14/timetables/Table%20135.pdf|archive-date = 10 January 2015|url-status = dead}}</ref>


==History==
==History==
Line 56: Line 59:
The rebuilding work was resumed in 1956 to the designs of architect [[Howard Cavanagh]] and Ian Campbell<ref>{{cite book |last=Lawrence |first=David |date=2018 |title=British Rail Architecture 1948-97 |publisher=Crecy Publishing Ltd |page=62 |isbn=9780860936855 }}</ref> and the new station with its large office block, '[[Intercity House]]', was formally opened by Dr [[Richard Beeching]], the [[British Railways]] Chairman, on 26 March 1962.<ref name=Smith/><ref name=Oakley/> The office block was intended to be the northern point of Armada Way, counterbalancing the tower of the Civic Centre at the southern end, in the [[Patrick Abercrombie|Abercrombie]]/Paton-Watson 'Plan for Plymouth'.<ref>{{cite encyclopedia | last =Mosley | first =Brian | title =A Plan for Plymouth | encyclopedia =Encyclopedia of Plymouth History | publisher =Plymouth Data | url =http://www.plymouthdata.info/Plan%20for%20Plymouth.htm | access-date = 2008-08-22}}</ref> The station now had seven through platforms, although two of these were converted to terminal [[bay platform]]s in 1974. One of these at the west end is usually used for the [[Tamar Valley Line]] service<ref name=LiveTT>{{cite web| title =Plymouth| work =Live Departures and Arrivals| publisher =National Rail| url =http://www.livedepartureboards.co.uk/ldb/station.aspx?T=PLY| access-date = 2008-07-22}}</ref> but the longer east end bays were used for parcels and for [[Royal Mail]] trains until the withdrawal of this traffic from the area in 2003. Outside the station a car park was provided, which was rebuilt in its current multistorey form in the 1970s.<ref name=Oakley/> In recent times there have been updates to the station.<ref>{{cite news |newspaper=Evening Herald |title=Ten-year plan for redevelopment of Plymouth Rail Station is now underway, says council |first=Carl |last=Eve |date=10 April 2014 |url=http://www.plymouthherald.co.uk/year-plan-redevelopment-Plymouth-Rail-Station/story-20935751-detail/story.html |access-date=18 October 2014 |location=Plymouth |url-status=dead |archive-url=https://web.archive.org/web/20141018175659/http://www.plymouthherald.co.uk/year-plan-redevelopment-Plymouth-Rail-Station/story-20935751-detail/story.html |archive-date=18 October 2014 |df=dmy-all }}</ref>
The rebuilding work was resumed in 1956 to the designs of architect [[Howard Cavanagh]] and Ian Campbell<ref>{{cite book |last=Lawrence |first=David |date=2018 |title=British Rail Architecture 1948-97 |publisher=Crecy Publishing Ltd |page=62 |isbn=9780860936855 }}</ref> and the new station with its large office block, '[[Intercity House]]', was formally opened by Dr [[Richard Beeching]], the [[British Railways]] Chairman, on 26 March 1962.<ref name=Smith/><ref name=Oakley/> The office block was intended to be the northern point of Armada Way, counterbalancing the tower of the Civic Centre at the southern end, in the [[Patrick Abercrombie|Abercrombie]]/Paton-Watson 'Plan for Plymouth'.<ref>{{cite encyclopedia | last =Mosley | first =Brian | title =A Plan for Plymouth | encyclopedia =Encyclopedia of Plymouth History | publisher =Plymouth Data | url =http://www.plymouthdata.info/Plan%20for%20Plymouth.htm | access-date = 2008-08-22}}</ref> The station now had seven through platforms, although two of these were converted to terminal [[bay platform]]s in 1974. One of these at the west end is usually used for the [[Tamar Valley Line]] service<ref name=LiveTT>{{cite web| title =Plymouth| work =Live Departures and Arrivals| publisher =National Rail| url =http://www.livedepartureboards.co.uk/ldb/station.aspx?T=PLY| access-date = 2008-07-22}}</ref> but the longer east end bays were used for parcels and for [[Royal Mail]] trains until the withdrawal of this traffic from the area in 2003. Outside the station a car park was provided, which was rebuilt in its current multistorey form in the 1970s.<ref name=Oakley/> In recent times there have been updates to the station.<ref>{{cite news |newspaper=Evening Herald |title=Ten-year plan for redevelopment of Plymouth Rail Station is now underway, says council |first=Carl |last=Eve |date=10 April 2014 |url=http://www.plymouthherald.co.uk/year-plan-redevelopment-Plymouth-Rail-Station/story-20935751-detail/story.html |access-date=18 October 2014 |location=Plymouth |url-status=dead |archive-url=https://web.archive.org/web/20141018175659/http://www.plymouthherald.co.uk/year-plan-redevelopment-Plymouth-Rail-Station/story-20935751-detail/story.html |archive-date=18 October 2014 |df=dmy-all }}</ref>


[[South West Trains]] operated two trains per day to and from London Waterloo, one weekend service would continue to Penzance, but South West Trains services were withdrawn beyond Exeter St Davids in December 2009.<ref>{{cite web |title = Network Rail Report 2009 (Report from Network Rail, 2009)|publisher=Network Rail|url = https://www.networkrail.co.uk/browse20documentsStrategicBusinessPlanRoutePlans2009Route20122020Reading20to20Penzance.pdf|access-date=5 August 2016}}</ref>
[[South West Trains]] operated two trains per day to and from London Waterloo, one weekend service would continue to Penzance, but South West Trains services were withdrawn beyond Exeter St Davids in December 2009.<ref>{{cite web|title = Network Rail Report 2009 (Report from Network Rail, 2009)|publisher = Network Rail|url = https://www.networkrail.co.uk/browse20documentsStrategicBusinessPlanRoutePlans2009Route20122020Reading20to20Penzance.pdf|access-date = 5 August 2016}}{{Dead link|date=September 2023 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>


=== Accidents and incidents ===
=== Accidents and incidents ===
On 3 April 2016, [[British Rail Class 150|Class 150]] [[diesel multiple unit]] 150219 collided with a stationary [[InterCity 125]] High Speed Train at platform 6. [[British Rail Class 43 (HST)|Class 43 power car]] 43160 and the DMU were damaged.<ref name="BBC35954361">{{cite web |url=https://www.bbc.co.uk/news/uk-england-devon-35954361 |title=18 injured in 'low impact' Plymouth train crash |publisher=BBC News Online |access-date=3 April 2016}}</ref><ref name="PH29043817">{{cite web |url=http://www.plymouthherald.co.uk/Plymouth-train-crash-Investigation-launched-18/story-29043817-detail/story.html |title=Plymouth train crash: Investigation launched after 18 left injured by 'low-speed' collision |first=J |last=Lewis-Herald |publisher=Local World |work=The Herald |date=3 April 2016 |access-date=4 April 2016 }}{{dead link|date=March 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref><ref name="Plymouth">{{cite web |url=https://www.gov.uk/government/news/collision-at-plymouth-station |title=Collision at Plymouth station |publisher=Rail Accidents Investigation Branch |access-date=18 April 2016}}</ref> Forty-six people were injured; one seriously.<ref name="Final">{{cite web |url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/590956/R022017_170213_Plymouth.pdf |title=Report 02/2017 Collision at Plymouth station 3 April 2016 |publisher=Rail Accidents Investigation Branch |access-date=13 February 2016}}</ref>
On 3 April 2016, [[British Rail Class 150|Class 150]] [[diesel multiple unit]] 150219 collided with a stationary [[InterCity 125]] High Speed Train at platform 6. [[British Rail Class 43 (HST)|Class 43 power car]] 43160 and the DMU were damaged.<ref name="BBC35954361">{{cite news |url=https://www.bbc.co.uk/news/uk-england-devon-35954361 |title=18 injured in 'low impact' Plymouth train crash |work=BBC News |date=3 April 2016 |access-date=3 April 2016}}</ref><ref name="PH29043817">{{cite web |url=http://www.plymouthherald.co.uk/Plymouth-train-crash-Investigation-launched-18/story-29043817-detail/story.html |title=Plymouth train crash: Investigation launched after 18 left injured by 'low-speed' collision |first=J |last=Lewis-Herald |publisher=Local World |work=The Herald |date=3 April 2016 |access-date=4 April 2016 }}{{dead link|date=March 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref><ref name="Plymouth">{{cite web |url=https://www.gov.uk/government/news/collision-at-plymouth-station |title=Collision at Plymouth station |publisher=Rail Accidents Investigation Branch |access-date=18 April 2016}}</ref> Forty-six people were injured; one seriously.<ref name="Final">{{cite web |url=https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/590956/R022017_170213_Plymouth.pdf |title=Report 02/2017 Collision at Plymouth station 3 April 2016 |publisher=Rail Accidents Investigation Branch |access-date=13 February 2016}}</ref>


===GWR stationmasters===
{{div col}}
*Alfred Pearse 1877 - 1880<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Local Intelligence) | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000505/18800727/004/0002 |newspaper=Exeter and Plymouth Gazette Daily Telegrams |location=England |date=27 July 1880 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> (formerly station master at Exeter St Thomas, afterwards station master at Slough)
*Thomas C. Jenkin from 1880<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Presentation to Mr. Jenkin (late Station-Master at St Thomas) | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000265/18800909/008/0002 |newspaper=Western Times |location=England |date=9 September 1880 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> (formerly station master at Exeter St Thomas)
*Robert Davis 1882 - 1883<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=The New Superintendent at Reading | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000358/19050704/056/0002 |newspaper=Berkshire Chronicle |location=England |date=4 July 1905 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> (afterwards station master at Oxford)
*Gustavus Bell 1883<ref>{{cite journal |author=<!--Staff writer(s); no by-line.--> |date=1835 |title=1835-1910 Clerks Vol.5 |url=https://www.ancestry.co.uk/imageviewer/collections/1728/images/32167_626640_0068-00545?treeid=&personid=&hintid=&usePUB=true&usePUBJs=true&pId=344116 |journal=Great Western Railway |volume= |issue= |pages=540 |doi= |access-date=10 July 2021}}</ref> - ca. 1891
*Stephen Alfred Hunt until 1904
*Daniel Bailey 1904<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Local News | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000180/19050309/122/0007 |newspaper=Royal Cornwall Gazette |location=England |date=9 March 1905 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - 1911 (formerly station master at St Austell)
*Albert John Humphrey from 1911<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Mr. A.J. Humphrey | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0001617/19110518/037/0002 |newspaper=The Cornish Telegraph |location=England |date=18 May 1911|access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref>
*A.P. Watkins 1914 -1920<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Station Master’s New Post | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0003511/19280901/148/0012 |newspaper=Reading Standard |location=England |date=1 September 1928 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> (afterwards station master at Taunton)
*Henry Isaac Brereton 1920<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Railway Promotion. Penygraig Stationmaster Going to Plymouth | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000104/19200717/190/0013 |newspaper=Western Mail |location=England |date=17 July 1920 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - 1924 (formerly station master at Pen-y-graig)
*J.R.C. Williams 1924<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Mr. J.R.L. Williams | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0002498/19240919/098/0004 |newspaper=Kensington Post |location=England |date=19 September 1924 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - 1928
*H.F. Kelly 1928<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=New Plymouth Stationmaster| url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000329/19280928/102/0009 |newspaper=Western Morning News |location=England |date=28 September 1928 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - 1933
*Martin Blewett 1933<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Brothers Promoted | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000329/19330311/013/0006 |newspaper=Western Morning News |location=England |date=11 March 1933 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - 1938
*G.E. Nailor 1938<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=G.W.R. Stationmaster at Plymouth | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000329/19380511/106/0011 |newspaper=Western Morning News |location=England |date=11 May 1938 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - 1942 (formerly station master at Chippenham, afterwards station master at Swindon)
*G.H. Anthony from 1942<ref>{{cite news |author=<!--Staff writer(s); no by-line.--> |title=Personal | url=https://www.britishnewspaperarchive.co.uk/viewer/bl/0000265/19420102/087/0008 |newspaper=Western Times |location=England |date=2 January 1942 |access-date=10 July 2021 |via=British Newspaper Archive |url-access=subscription }}</ref> - ca. 1950
{{div col end}}
{{Plymouth lines}}
{{Plymouth lines}}

==Platform layout==
==Platform layout==
[[File:North Road 221128.jpg|thumb|left|Plymouth station from the east. A [[CrossCountry]] train is standing in platform 4.]]
[[File:Plymouth track diagram.png|thumb|left|Track layout in 2009]]
[[File:Plymouth track diagram.png|thumb|left|Track layout in 2009]]
The station has its entrance on the south side which gives access to the city centre. The west side of the station [[concourse]] is the ticket office, while on the north and east sides are various retail outlets selling food and newspapers.<ref>{{cite web| title =Plymouth| work =Station Facilities| publisher =National Rail| url =http://www.nationalrail.co.uk/stations/PLY/details.html#Station_Facilities| access-date = 2008-07-22}}</ref> The buffet on Platforms 7 and 8 is no longer in operation however there is a small café just beyond the ticket barriers serving hot drinks and hot food. The platform area is separated from the concourse by the ticket gates.
The station has its entrance on the south side which gives access to the city centre. The west side of the station [[concourse]] is the ticket office, while on the north and east sides are various retail outlets selling food and newspapers.<ref>{{cite web| title =Plymouth| work =Station Facilities| publisher =National Rail| url =http://www.nationalrail.co.uk/stations/PLY/details.html#Station_Facilities| access-date = 2008-07-22}}</ref> The buffet on Platforms 7 and 8 is no longer in operation however there is a small café just beyond the ticket barriers serving hot drinks and hot food. The platform area is separated from the concourse by the ticket gates.
Line 91: Line 77:


=== Brunel Plaza ===
=== Brunel Plaza ===
The railway station and surrounding area is undergoing a redevelopment in 2020-2024. [[Intercity House|Intercity Place]], an 11 floor tower next to the station, is being rebuilt for use by the [[University of Plymouth]] and the existing three-story car park is being replaced by a new six-story car park on the site of the current RISC{{clarify|reason=what is the RISC?|date=March 2023}} building which will be relocated to a new building to the west of the station. The old car park will then be demolished and turned into potential sites for more University buildings including a new accommodation block<ref>{{Cite web |last=Clark |first=Daniel |date=2022-06-16 |title=Plymouth railway station is set to get a new approach |url=https://www.plymouthherald.co.uk/news/plymouth-news/plymouth-railway-station-set-new-7206527 |access-date=2023-03-29 |website=PlymouthLive |language=en}}</ref> and a hotel. The construction works began in late 2020<ref>{{Cite web |last=Oldfield |first=Ed |last2=Telford |first2=William |date=2020-08-11 |title=Work begins on £80m Plymouth railway station redevelopment |url=https://www.business-live.co.uk/economic-development/work-begins-80m-plymouth-railway-18749592 |access-date=2023-03-29 |website=Business Live |language=en}}</ref>, the University building is due to open in 2023, the car park in 2024, and all other works are due to be completed by 2027.<ref>{{Cite web |last=Telford |first=William |date=2021-07-14 |title=Timeline revealed for £80m Plymouth Railway Station redevelopment |url=https://www.business-live.co.uk/economic-development/timeline-revealed-80m-plymouth-railway-21051685 |access-date=2023-03-29 |website=Business Live |language=en}}</ref>
The railway station and surrounding area is undergoing a redevelopment in 2020-2024. [[Intercity House|Intercity Place]], an 11 floor tower next to the station, is being rebuilt for use by the [[University of Plymouth]] and the existing three-story car park is being replaced by a new six-story car park on the site of the current Rail Incident Safety Centre building which will be relocated to a new building to the west of the station.<ref>{{Cite web |date=2021-02-15 |title=TCF Outline Business Case Plymouth Station: Station Forecourt Interchange |url=https://www.plymouth.gov.uk/sites/default/files/168%20-%20Plymouth%20Station%20Forecourt%20OBC.pdf |access-date=2023-03-29 |website=Plymouth City Council}}</ref> The old car park will then be demolished and turned into potential sites for more University buildings including a new accommodation block<ref>{{Cite web |last=Clark |first=Daniel |date=2022-06-16 |title=Plymouth railway station is set to get a new approach |url=https://www.plymouthherald.co.uk/news/plymouth-news/plymouth-railway-station-set-new-7206527 |access-date=2023-03-29 |website=PlymouthLive |language=en}}</ref> and a hotel. The construction works began in late 2020,<ref>{{Cite web |last1=Oldfield |first1=Ed |last2=Telford |first2=William |date=2020-08-11 |title=Work begins on £80m Plymouth railway station redevelopment |url=https://www.business-live.co.uk/economic-development/work-begins-80m-plymouth-railway-18749592 |access-date=2023-03-29 |website=Business Live |language=en}}</ref> the University building is due to open in 2023, the car park in 2024, and all other works are due to be completed by 2027.<ref>{{Cite web |last=Telford |first=William |date=2021-07-14 |title=Timeline revealed for £80m Plymouth Railway Station redevelopment |url=https://www.business-live.co.uk/economic-development/timeline-revealed-80m-plymouth-railway-21051685 |access-date=2023-03-29 |website=Business Live |language=en}}</ref>


==Services==
==Services==
Line 97: Line 83:
Plymouth is served by [[Great Western Railway (train operating company)|Great Western Railway]] trains on [[South Devon Main Line|the main line]] from [[London Paddington]], some of which terminate at Plymouth but many continue over the [[Cornish Main Line]] to {{Stnlnk|Penzance}} or, in the summer, {{stnlnk|Newquay}}. Services between London Paddington to Plymouth are at least hourly throughout the day. A number of named trains operate on this route including the ''[[Cornish Riviera Express|Cornish Riviera]]'', a fast London to Penzance daytime service, and the overnight ''[[Night Riviera]]'' service on the same route.
Plymouth is served by [[Great Western Railway (train operating company)|Great Western Railway]] trains on [[South Devon Main Line|the main line]] from [[London Paddington]], some of which terminate at Plymouth but many continue over the [[Cornish Main Line]] to {{Stnlnk|Penzance}} or, in the summer, {{stnlnk|Newquay}}. Services between London Paddington to Plymouth are at least hourly throughout the day. A number of named trains operate on this route including the ''[[Cornish Riviera Express|Cornish Riviera]]'', a fast London to Penzance daytime service, and the overnight ''[[Night Riviera]]'' service on the same route.


Most [[CrossCountry]] trains from [[Scotland]] and the North of England via [[Bristol Temple Meads railway station|Bristol]] terminate at Plymouth, although a few continue to Penzance or, on summer weekends, Newquay.<ref>{{cite web |title = National Rail Timetable 51 (Summer 2014)|publisher= Network Rail|url = http://www.networkrail.co.uk/browse%20documents/eNRT/May14/timetables/Table%20051.pdf|access-date=2014-08-06}}</ref>
Most [[CrossCountry]] trains from [[Scotland]] and the North of England via [[Bristol Temple Meads railway station|Bristol]] terminate at Plymouth, although 2 continue to Penzance, and, on summer weekends, Newquay.<ref>{{cite web |title = National Rail Timetable 51 (Summer 2014)|publisher= Network Rail|url = http://www.networkrail.co.uk/browse%20documents/eNRT/May14/timetables/Table%20051.pdf|access-date=2014-08-06}}</ref> From Plymouth, most services terminate at {{rws|Edinburgh Waverley}} via {{rws|Birmingham New Street}}, however, 1 train per day operates towards both {{rws|Glasgow Central}} and {{rws|Aberdeen}} respectively.<ref>{{cite web|url=https://www.crosscountrytrains.co.uk/media-vnext/3nnfuejx/book1-v4-web-version.pdf|title=CrossCountry Timetable December 2023-June 2024|access-date=2024-03-12}}</ref>


Local services are provided by Great Western Railway along the Cornish Main Line, often extended eastwards to and from {{stnlnk|Newton Abbot}}, {{stnlnk|Exeter St Davids}} and beyond. Services are also provided on the [[Tamar Valley Line]] to {{stnlnk|Gunnislake}}.<ref name=GBTT139/>
Local services are provided by Great Western Railway along the Cornish Main Line, often extended eastwards to and from {{stnlnk|Newton Abbot}}, {{stnlnk|Exeter St Davids}} and beyond. Services are also provided on the [[Tamar Valley Line]] to {{stnlnk|Gunnislake}}.<ref name=GBTT139/>
Line 103: Line 89:
{{rail start}}
{{rail start}}
{{rail line one to two |previous={{stnlnk|Devonport}} |next1=|route1= [[Great Western Railway (train operating company)|Great Western Railway]] <br /><small> [[Tamar Valley Line]]</small> |col1={{FGW colour}} |next2={{stnlnk|Ivybridge}} |route2= [[Great Western Railway (train operating company)|Great Western Railway]] <br /><small> [[Exeter to Plymouth Line]]</small> |col2={{FGW colour}} }}
{{rail line one to two |previous={{stnlnk|Devonport}} |next1=|route1= [[Great Western Railway (train operating company)|Great Western Railway]] <br /><small> [[Tamar Valley Line]]</small> |col1={{FGW colour}} |next2={{stnlnk|Ivybridge}} |route2= [[Great Western Railway (train operating company)|Great Western Railway]] <br /><small> [[Exeter to Plymouth Line]]</small> |col2={{FGW colour}} }}
{{rail line|next={{stnlnk|Totnes}} |previous={{stnlnk|Liskeard}} |route=[[CrossCountry]]<br /><small> Cornwall and Plymouth to the North</small> |col={{XC colour}} }}
{{rail line|next={{stnlnk|Totnes}} |previous={{stnlnk|Liskeard}} or terminus |route=[[CrossCountry]]<br /><small> Cornwall and Plymouth to the North</small> |col={{XC colour}} }}
{{rail end}}
{{rail end}}


==Passenger volume==
==Passenger volume==
Plymouth has the third largest number of passengers starting or finishing their journey in Devon, after {{stnlnk|Exeter Central}} and {{stnlnk|Exeter St Davids}}. Comparing the year from April 2008 to that which started in April 2002, passenger numbers increased by 97%.<ref name=usage>{{cite web| title =Station Usage| work =Rail Statistics| url=http://www.rail-reg.gov.uk/server/show/nav.1529|publisher =Office of Rail Regulation| access-date = 2010-03-25}}</ref> However, recent years have seen little further growth.
Plymouth has the third largest number of passengers starting or finishing their journey in Devon, after {{stnlnk|Exeter Central}} and {{stnlnk|Exeter St Davids}}. Comparing the year from April 2008 to that which started in April 2002, passenger numbers increased by 97%.<ref name=usage>{{cite web| title =Station Usage| work =Rail Statistics| url =http://www.rail-reg.gov.uk/server/show/nav.1529| publisher =Office of Rail Regulation| access-date =2010-03-25| archive-date =4 July 2012| archive-url =https://web.archive.org/web/20120704101059/http://www.rail-reg.gov.uk/server/show/nav.1529| url-status =dead}}</ref> However, recent years have seen little further growth.
{| class="wikitable"
{| class="wikitable"
|-
|-
Line 129: Line 115:
The rebuilding work of 1938 meant more signalling alterations. On 22 January 1938, the timber West box was lifted up and moved to a new position clear of the proposed works, being brought back into use on 27 January 1938. At the other end of the station the East box was closed and a new {{convert|79|ft|m|1}} structure built, again on the north side of the line, which was brought into use on 25 June 1939.<ref name="MechSig" />
The rebuilding work of 1938 meant more signalling alterations. On 22 January 1938, the timber West box was lifted up and moved to a new position clear of the proposed works, being brought back into use on 27 January 1938. At the other end of the station the East box was closed and a new {{convert|79|ft|m|1}} structure built, again on the north side of the line, which was brought into use on 25 June 1939.<ref name="MechSig" />


Both signal boxes were closed on 26 November 1960 when a new "Plymouth Panel Signal Box" was opened on the west end of the new Platform 1; the West box was subsequently demolished. [[Railway signal#Colour light signals|Multiple-aspect signals]] have controlled movements of trains throughout the Plymouth area since the opening of this new signal box in 1960. The adjacent boxes were initially at [[Laira TMD|Laira Junction]] in the east and [[Keyham railway station|Keyham]] in the west.<ref name="MechSig" /> The area of control was extended westwards on 2 July 1973 to meet the signal box at {{stnlnk|St Germans}}, which closed in 1998<ref>{{cite book |last=Pryer |first=GA |title=Signal Box Diagrams of the Great Western & Southern Railways, Volume 14: GWR Lines Plymouth and East Cornwall |publisher=GA Pryer |isbn=0-9532460-5-1 |location=Weymouth}}</ref> so the next signal box westwards is now at [[Liskeard railway station]]. Towards the end of 1973 several more signal boxes were closed eastwards from Plymouth, which meant that Plymouth controlled trains until they reached the outer signal of [[Totnes railway station|Totnes Signal Box]]. Totnes box closed on 9 November 1987<ref name="Oakley" /> when a new panel signal box at [[Exeter St Davids railway station|Exeter]] was opened. The [[Signal Box|Panel Signal Box]] at the station controls all trains between (but not at) {{stnlnk|Totnes}} in Devon, and {{stnlnk|Liskeard}} in [[Cornwall]].
Both signal boxes were closed on 26 November 1960 when a new "Plymouth Panel Signal Box" was opened on the west end of the new Platform 1; the West box was subsequently demolished. [[Railway signal#Colour light signals|Multiple-aspect signals]] have controlled movements of trains throughout the Plymouth area since the opening of this new signal box in 1960. The adjacent boxes were initially at [[Laira TMD|Laira Junction]] in the east and [[Keyham railway station|Keyham]] in the west.<ref name="MechSig" /> The area of control was extended westwards on 2 July 1973 to meet the signal box at {{stnlnk|St Germans}}, which closed in 1998<ref>{{cite book |last=Pryer |first=GA |title=Signal Box Diagrams of the Great Western & Southern Railways, Volume 14: GWR Lines Plymouth and East Cornwall |year=2000 |publisher=GA Pryer |isbn=0-9532460-5-1 |location=Weymouth}}</ref> so the next signal box westwards is now at [[Liskeard railway station]]. Towards the end of 1973 several more signal boxes were closed eastwards from Plymouth, which meant that Plymouth controlled trains until they reached the outer signal of [[Totnes railway station|Totnes Signal Box]]. Totnes box closed on 9 November 1987<ref name="Oakley" /> when a new panel signal box at [[Exeter St Davids railway station|Exeter]] was opened. The [[Signal Box|Panel Signal Box]] at the station controls all trains between (but not at) {{stnlnk|Totnes}} in Devon, and {{stnlnk|Liskeard}} in [[Cornwall]].


==See also==
==See also==

Latest revision as of 22:06, 23 November 2024

Plymouth
National Rail
Platforms and track layout from the east, with the main station building behind.
General information
LocationPlymouth
England
Coordinates50°22′40″N 4°08′35″W / 50.3778°N 4.1430°W / 50.3778; -4.1430
Grid referenceSX476553
Managed byGreat Western Railway
Platforms6 (numbered 3-8)
Other information
Station codePLY
ClassificationDfT category C1
History
Original companyGWR and LSWR Joint
Post-groupingGWR and SR Joint
Key dates
1877Opened
1938Rebuilding started
1958North Road name dropped
1962Rebuilding completed
Passengers
2019/20Decrease 2.372 million
 Interchange Increase 86,443
2020/21Decrease 0.678 million
 Interchange Decrease 21,268
2021/22Increase 1.992 million
 Interchange Increase 75,788
2022/23Increase 2.313 million
 Interchange Increase 90,291
2023/24Increase 2.439 million
 Interchange Increase 0.121 million
Notes
Passenger statistics from the Office of Rail and Road

Plymouth railway station serves the city of Plymouth, Devon, England. It is on the northern edge of the city centre, close to the North Cross roundabout. It is the third busiest station in the county of Devon and the largest of the six surviving stations in Plymouth.

Plymouth is a principal stop on the Exeter-Plymouth line and Cornish Main Line; it is located 245 miles 75 chains (245.94 mi; 395.8 km) from London Paddington, via Box.[1] It is also the usual terminus for the Tamar Valley Line services from Gunnislake. The station is served by Great Western Railway and CrossCountry; it is also managed by the former.[2]

History

[edit]
A GWR 'Small Prairie' 2-6-2T at Plymouth in 1958

Originally named Plymouth North Road, it was opened in 1877 as a joint station for the Great Western Railway (GWR) and the London and South Western Railway (LSWR). It was expanded in 1908 but a major rebuilding scheme that started in 1938 was delayed by the Second World War and was not completed until 1962. John Betjeman commented unfavourably on its new form in his introduction to The Book of the Great Western: Plymouth (North Road) dullest of stations and no less dull now it has been rebuilt in copybook contemporary.[3]

The first railway station in Plymouth was opened by the South Devon Railway on 2 April 1849[4] at Millbay, on the site now occupied by the Plymouth Pavilions. This company amalgamated with the GWR in 1876, just as the LSWR was completing its rival route from London to Plymouth.[5] North Road station was opened on 28 March 1877 to provide a joint facility for trains of both companies. It was just west of the earlier Mutley railway station, while at its west end a new junction allowed direct access to the Cornwall Railway and the LSWR's Devonport Kings Road railway station.

The station was built of wood and the platforms were fully covered by train sheds. It originally had just two through platforms but additional platforms were added in a scheme executed in 1908. Further major rebuilding work started in 1938; one signal box was replaced and the second moved to make way for the new works, and Houndiscombe Road bridge at the east end of the station was rebuilt. Work was soon stopped due to the Second World War but on North Road was increased when Millbay station had to be closed to passengers in 1941 following an air raid.[6]

Preceding station Historical railways Following station
Mutley   Great Western Railway   Plymouth Millbay
  Great Western Railway   Wingfield Villas
Mutley   London and South Western Railway   Devonport Kings Road

The old LSWR Friary station was closed from 15 September 1958, following which North Road was renamed as just 'Plymouth'.[7] Further closures during the next few years of former LSWR stations and GWR branch lines has left just six stations in the city (Devonport, Dockyard, Keyham and two in St Budeaux – Victoria Road and Ferry Road)[8] – although local passengers also come from stations a little further afield such as Saltash, St Germans, Menheniot and Ivybridge.[2]

The rebuilding work was resumed in 1956 to the designs of architect Howard Cavanagh and Ian Campbell[9] and the new station with its large office block, 'Intercity House', was formally opened by Dr Richard Beeching, the British Railways Chairman, on 26 March 1962.[6][7] The office block was intended to be the northern point of Armada Way, counterbalancing the tower of the Civic Centre at the southern end, in the Abercrombie/Paton-Watson 'Plan for Plymouth'.[10] The station now had seven through platforms, although two of these were converted to terminal bay platforms in 1974. One of these at the west end is usually used for the Tamar Valley Line service[11] but the longer east end bays were used for parcels and for Royal Mail trains until the withdrawal of this traffic from the area in 2003. Outside the station a car park was provided, which was rebuilt in its current multistorey form in the 1970s.[7] In recent times there have been updates to the station.[12]

South West Trains operated two trains per day to and from London Waterloo, one weekend service would continue to Penzance, but South West Trains services were withdrawn beyond Exeter St Davids in December 2009.[13]

Accidents and incidents

[edit]

On 3 April 2016, Class 150 diesel multiple unit 150219 collided with a stationary InterCity 125 High Speed Train at platform 6. Class 43 power car 43160 and the DMU were damaged.[14][15][16] Forty-six people were injured; one seriously.[17]

Railways in the Plymouth area
Plympton
(GWR)
Laira Junction
Laira TMD
Laira
 
LSWR Turnchapel Branch and
Cattewater and Sutton Harbour
Plymouth Friary
Mutley
(Joint)
Plymouth North Road
(Joint)
Plymouth Millbay
(GWR)
Devonport Albert Road
(GWR)
Devonport Kings Road
(LSWR)
Dockyard
(GWR)
Albert Road Halt
(LSWR)
Ford
(LSWR)
Camels Head Halt
(LSWR)
Weston Mill Halt
(LSWR)
Keyham
(GWR)
St Budeaux Ferry Road
(GWR)
St Budeaux Victoria Road
(LSWR)
GWR
LSWR

Platform layout

[edit]
Track layout in 2009

The station has its entrance on the south side which gives access to the city centre. The west side of the station concourse is the ticket office, while on the north and east sides are various retail outlets selling food and newspapers.[18] The buffet on Platforms 7 and 8 is no longer in operation however there is a small café just beyond the ticket barriers serving hot drinks and hot food. The platform area is separated from the concourse by the ticket gates.

The platforms that can be reached on the level from the concourse are numbered 1 to 4. Platforms 1 and 2 are east-facing bay platforms, not used by passenger trains. Platform 3 is a west-facing bay platform that is mainly used by local services to Gunnislake and sometimes Penzance.[11][19]

The remaining platforms are reached by a subway immediately inside the ticket gates; there are lifts to the subway on each of the groups of platforms.[7] They are all through tracks and are signalled so that trains can arrive and depart in either direction.[19] Platform 4 is used by most through services towards Penzance, but also for some trains towards London. Platforms 5 and 6 are either side of the middle island platform and are used by a variety of services, including Great Western Railway local trains and long distance CrossCountry services. Platforms 7 and 8 are either side of a second island platform; there is a small coffee shop facing the subway steps on this platform. Most Great Western Railway services to London Paddington depart from platform 7, but both these platforms are used by a variety of services from Cornwall towards London and the North as well as some local services.[11]

Beyond Platform 8 are two tracks, known as Park Sidings, which are used for stabling trains between services, but most trains are nowadays kept on the platform tracks between arrival and departure. There are some more sidings adjacent to platform 1. There is an extra track between platforms 4 and 5 for through goods trains and shunting manoeuvres.[19]

Brunel Plaza

[edit]

The railway station and surrounding area is undergoing a redevelopment in 2020-2024. Intercity Place, an 11 floor tower next to the station, is being rebuilt for use by the University of Plymouth and the existing three-story car park is being replaced by a new six-story car park on the site of the current Rail Incident Safety Centre building which will be relocated to a new building to the west of the station.[20] The old car park will then be demolished and turned into potential sites for more University buildings including a new accommodation block[21] and a hotel. The construction works began in late 2020,[22] the University building is due to open in 2023, the car park in 2024, and all other works are due to be completed by 2027.[23]

Services

[edit]
Great Western Railway services to Penzance on platforms 5 and 4 respectively

Plymouth is served by Great Western Railway trains on the main line from London Paddington, some of which terminate at Plymouth but many continue over the Cornish Main Line to Penzance or, in the summer, Newquay. Services between London Paddington to Plymouth are at least hourly throughout the day. A number of named trains operate on this route including the Cornish Riviera, a fast London to Penzance daytime service, and the overnight Night Riviera service on the same route.

Most CrossCountry trains from Scotland and the North of England via Bristol terminate at Plymouth, although 2 continue to Penzance, and, on summer weekends, Newquay.[24] From Plymouth, most services terminate at Edinburgh Waverley via Birmingham New Street, however, 1 train per day operates towards both Glasgow Central and Aberdeen respectively.[25]

Local services are provided by Great Western Railway along the Cornish Main Line, often extended eastwards to and from Newton Abbot, Exeter St Davids and beyond. Services are also provided on the Tamar Valley Line to Gunnislake.[8]

Preceding station National Rail National Rail Following station
Devonport   Great Western Railway
Tamar Valley Line
  Terminus
  Great Western Railway
Exeter to Plymouth Line
  Ivybridge
Liskeard or terminus   CrossCountry
Cornwall and Plymouth to the North
  Totnes

Passenger volume

[edit]

Plymouth has the third largest number of passengers starting or finishing their journey in Devon, after Exeter Central and Exeter St Davids. Comparing the year from April 2008 to that which started in April 2002, passenger numbers increased by 97%.[26] However, recent years have seen little further growth.

  2002–03 2004–05 2005–06 2006–07 2007–08 2008–09 2009–10 2010–11 2011–12 2012–13 2013–14 2014–15 2015–16 2016–17 2017–18 2018–19
Entries 721,187 767,066 822,804 929,105 1,018,941 1,344,641 1,139,359 1,200,541 1,298,373 1,289,658 1,222,732 1,247,624 1,243,781 1,254,726 1,224,547 1,208,188
Exits 710,487 751,945 806,207 916,808 1,007,910 1,344,640 1,139,359 1,200,541 1,298,373 1,289,658 1,222,732 1,247,624 1,243,781 1,254,726 1,224,547 1,208,188
Interchanges unknown 55,154 68,832 77,728 61,934 133,496 67,194 73,574 104,598 unknown 88,488 93,423 95,082 100,531 90,299 79,912
Total 1,431,674 1,585,165 1,697,843 1,923,686 2,088,785 2,822,777 2,345,912 2,474,656 2,701,344 2,579,316 2,533,952 2,588,671 2,582,644 2,609,983 2,539,393 2,496,288

The statistics cover twelve month periods that start in April.[26]

Signalling

[edit]
The signal box built in 1960

The station was originally controlled from two signal boxes. "North Road East" was on the north side of the line to the east of the station, while "North Road West" was on the south side of the line at the west end of the station where it could control the junction of the original lines to Millbay with the new Cornwall Loop Line to Devonport. The adjacent signal boxes were at Mutley to the east, Cornwall Junction on the Millbay line, and Devonport Junction at the far end of the Cornwall Loop.[27]

Both of the North Road signal boxes were closed in November 1908 and replaced by new ones with the same names. The West box was now on the north side of the line and had 59 levers, while the East box needed just 48. They were each 38 feet (11.6 m) long. Mutley box closed at the same time, the next box now being at Mannamead on the other side of Mutley Tunnel, which had opened about three years earlier.[27]

The rebuilding work of 1938 meant more signalling alterations. On 22 January 1938, the timber West box was lifted up and moved to a new position clear of the proposed works, being brought back into use on 27 January 1938. At the other end of the station the East box was closed and a new 79 feet (24.1 m) structure built, again on the north side of the line, which was brought into use on 25 June 1939.[27]

Both signal boxes were closed on 26 November 1960 when a new "Plymouth Panel Signal Box" was opened on the west end of the new Platform 1; the West box was subsequently demolished. Multiple-aspect signals have controlled movements of trains throughout the Plymouth area since the opening of this new signal box in 1960. The adjacent boxes were initially at Laira Junction in the east and Keyham in the west.[27] The area of control was extended westwards on 2 July 1973 to meet the signal box at St Germans, which closed in 1998[28] so the next signal box westwards is now at Liskeard railway station. Towards the end of 1973 several more signal boxes were closed eastwards from Plymouth, which meant that Plymouth controlled trains until they reached the outer signal of Totnes Signal Box. Totnes box closed on 9 November 1987[7] when a new panel signal box at Exeter was opened. The Panel Signal Box at the station controls all trains between (but not at) Totnes in Devon, and Liskeard in Cornwall.

See also

[edit]

References

[edit]
  1. ^ Padgett, David (June 2018) [1989]. Munsey, Myles (ed.). Railway Track Diagrams 3: Western & Wales (6th ed.). Frome: Trackmaps. map 9B. ISBN 978-1-9996271-0-2.
  2. ^ a b "National Rail Timetable 135 (Summer 2014)" (PDF). Network Rail. Archived from the original (PDF) on 10 January 2015. Retrieved 6 July 2014.
  3. ^ Perry, George, ed. (1970). 'The Book of the Great Western. London: Sunday Times Magazine. ISBN 0-7230-0018-2.
  4. ^ Gregory, R H (1982). The South Devon Railway. Salisbury: Oakwood Press. ISBN 0-85361-286-2.
  5. ^ MacDermot, E T (1931). History of the Great Western Railway, volume II 1863-1921. London: Great Western Railway.
  6. ^ a b Smith, Martin (1995). An Illustrated History of Plymouth's Railways. Caernarfon: Irwell Press. ISBN 1-871608-41-4.
  7. ^ a b c d e Oakley, Mike (2007). Devon Railway Stations. Wimbourne: The Dovecote Press. ISBN 978-1-904349-55-6.
  8. ^ a b "National Rail Timetable 139 (Summer 2014)" (PDF). Network Rail. Retrieved 6 August 2014.
  9. ^ Lawrence, David (2018). British Rail Architecture 1948-97. Crecy Publishing Ltd. p. 62. ISBN 9780860936855.
  10. ^ Mosley, Brian. "A Plan for Plymouth". Encyclopedia of Plymouth History. Plymouth Data. Retrieved 22 August 2008.
  11. ^ a b c "Plymouth". Live Departures and Arrivals. National Rail. Retrieved 22 July 2008.
  12. ^ Eve, Carl (10 April 2014). "Ten-year plan for redevelopment of Plymouth Rail Station is now underway, says council". Evening Herald. Plymouth. Archived from the original on 18 October 2014. Retrieved 18 October 2014.
  13. ^ "Network Rail Report 2009 (Report from Network Rail, 2009)" (PDF). Network Rail. Retrieved 5 August 2016.[permanent dead link]
  14. ^ "18 injured in 'low impact' Plymouth train crash". BBC News. 3 April 2016. Retrieved 3 April 2016.
  15. ^ Lewis-Herald, J (3 April 2016). "Plymouth train crash: Investigation launched after 18 left injured by 'low-speed' collision". The Herald. Local World. Retrieved 4 April 2016.[permanent dead link]
  16. ^ "Collision at Plymouth station". Rail Accidents Investigation Branch. Retrieved 18 April 2016.
  17. ^ "Report 02/2017 Collision at Plymouth station 3 April 2016" (PDF). Rail Accidents Investigation Branch. Retrieved 13 February 2016.
  18. ^ "Plymouth". Station Facilities. National Rail. Retrieved 22 July 2008.
  19. ^ a b c Jacobs, Gerald (2005). Railway Track Diagrams Book 3: Western. Bradford-on-Avon: Trackmaps. ISBN 0-9549866-1-X.
  20. ^ "TCF Outline Business Case Plymouth Station: Station Forecourt Interchange" (PDF). Plymouth City Council. 15 February 2021. Retrieved 29 March 2023.
  21. ^ Clark, Daniel (16 June 2022). "Plymouth railway station is set to get a new approach". PlymouthLive. Retrieved 29 March 2023.
  22. ^ Oldfield, Ed; Telford, William (11 August 2020). "Work begins on £80m Plymouth railway station redevelopment". Business Live. Retrieved 29 March 2023.
  23. ^ Telford, William (14 July 2021). "Timeline revealed for £80m Plymouth Railway Station redevelopment". Business Live. Retrieved 29 March 2023.
  24. ^ "National Rail Timetable 51 (Summer 2014)" (PDF). Network Rail. Retrieved 6 August 2014.
  25. ^ "CrossCountry Timetable December 2023-June 2024" (PDF). Retrieved 12 March 2024.
  26. ^ a b "Station Usage". Rail Statistics. Office of Rail Regulation. Archived from the original on 4 July 2012. Retrieved 25 March 2010.
  27. ^ a b c d Crozier, Larry (2000). Mechanical Signalling in Plymouth. Wallasey: Signalling Record Society. ISBN 1-873228-18-X.
  28. ^ Pryer, GA (2000). Signal Box Diagrams of the Great Western & Southern Railways, Volume 14: GWR Lines Plymouth and East Cornwall. Weymouth: GA Pryer. ISBN 0-9532460-5-1.

Further reading

[edit]
  • Beck, Keith; Copsey, John (1990). The Great Western in South Devon. Didcot: Wild Swan Publication. ISBN 0-906867-90-8.
  • Cooke, R A (1979). Track Layout Diagrams of the GWR and BR WR: Section 12, Plymouth. Harwell: R A Cooke.
  • Leitch, Russell (2002). Plymouth's Railways in the 1930s. Peterborough: Railway Correspondence and Travel Society. ISBN 0-901115-91-6.
  • Mosley, Brian. "Plymouth Station". Encyclopedia of Plymouth History. Plymouth Data. Archived from the original on 16 May 2008. Retrieved 22 August 2008.
[edit]
This station offers access to the South West Coast Path
Distance to path 1 mile (1.6 km)
Next station anticlockwise Kingswear 65 miles (105 km)
Next station clockwise Looe 21 miles (34 km)