Jump to content

Dhubri-Phulbari bridge: Difference between revisions

Coordinates: 25°58′29″N 89°57′58″E / 25.9746983°N 89.96618972222223°E / 25.9746983; 89.96618972222223
From Wikipedia, the free encyclopedia
Content deleted Content added
no references yet for the article per WP:TMSOURCE and WP:NOCITE
mNo edit summary
 
(7 intermediate revisions by 5 users not shown)
Line 1: Line 1:
{{Short description|Bridge being built in Assam, India}}
{{Short description|Bridge being built in Assam, India}}
{{Unreferenced|date=November 2023}}
{{More citations needed|date=February 2024}}
{{Use dmy dates|date=March 2019}}
{{Use dmy dates|date=March 2019}}
{{Use Indian English|date=March 2019}}
{{Use Indian English|date=March 2019}}
[[File:Dhubri-Phulbari bridge (near Phulbari end).jpg|thumb|right|alt=A reddish metal bridge supported by a row of narrow columns crosses horizontally over a stretch of river water, with a grass-covered mudbar in the foreground|A nearly-completed stretch of the bridge at Phulbari in March 2023]]
[[File:Dhubri-Phulbari bridge (near Phulbari end).jpg|thumb|right|alt=A reddish metal bridge supported by a row of narrow columns crosses horizontally over a stretch of river water, with a grass-covered mudbar in the foreground|An approach bridge constructed by Lasen&Toubro for the construction of Dhubri Phulbari Bridge]]


The '''Dhubri - Phulbari Bridge''' is an under-construction bridge over the [[Brahmaputra River]] between [[Assam]] and [[Meghalaya]] in [[North-East India]].
The '''Dhubri-Phulbari Bridge''' is an under-construction four lane extradosed cable stay bridge over the [[Brahmaputra River]] between [[Assam]] and [[Meghalaya]] in [[North-East India]].


The Dhubri - Phulbari bridge, to be completed by 2026–27, would be [[India]]’s second longest bridge over water after the [[Mumbai Trans Harbour Link]], and would span more than 19 km. This bridge, close to the Bangladesh border, will connect Assam's [[Dhubri]] with Meghalaya's [[Phulbari, Meghalaya|Phulbari]]. It will fill in a missing link of [[National Highway 127B (India)|National Highway 127B]], connecting Dhubri by road to [[Tura, Meghalaya|Tura]], [[Nongstoin]], and other towns in western and central Meghalaya. Civil works started in 2019–2020. The project is being funded by [[Japan International Cooperation Agency]] and it would be executed by [[National Highways and Infrastructure Development Corporation Limited|NHIDCL]].{{citation needed|date=March 2023}} It is one of 6 [[Brahmaputra_River#Bridges|proposed bridges]] on the Brahmaputra.
The Dhubri-Phulbari bridge, to be completed by 2028, would be India's second longest bridge over water after the [[Mumbai Trans Harbour Link]], and would span more than 19 km. This bridge, close to the Bangladesh border, will connect Assam's [[Dhubri]] with Meghalaya's [[Phulbari, Meghalaya|Phulbari]]. It will fill in a missing link of [[National Highway 127B (India)|National Highway 127B]], connecting Dhubri by road to [[Tura, Meghalaya|Tura]], [[Nongstoin]], and other towns in western and central Meghalaya. Civil works started in 2019–2020. The project is being funded by [[Japan International Cooperation Agency]], and it would be executed by [[National Highways and Infrastructure Development Corporation Limited|NHIDCL]].{{citation needed|date=March 2023}} It is one of 6 [[Brahmaputra River#Bridges|proposed bridges]] on the Brahmaputra.


[[Larsen and Toubro]] (L&T) acquired the construction contract for the project, which will feature a navigation bridge including 12.625 km approach [[viaduct]]s of 3.5 km on the Dubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides. {{citation needed|date=March 2023}}
[[Larsen and Toubro]] (L&T) acquired the construction contract for the project, which will feature a navigation bridge including 12.625&nbsp;km approach [[viaduct]]s of 3.5&nbsp;km on the [[Dhubri]] side and 2.2&nbsp;km on the Phulbari side, connected with approach roads and interchanges on both sides.<ref>https://themetrorailguy.com/dhubri-phulbari-bridge-status-update-news-design/</ref>


The bridge, to be built with a total cost of approximately Rs 4,997 [[crore]], will meet the long-standing demand of the people from Assam and Meghalaya who have depended on ferry services to travel between the two banks of the river. It will reduce the distance of 205 Km to be travelled by Road to 19 Km, which is the total length of the bridge.{{citation needed|date=March 2023}}
The bridge, to be built with a total cost of approximately Rs 4,997 [[crore]], will meet the long-standing demand of the people from Assam and Meghalaya who have depended on ferry services to travel between the two banks of the river. It will reduce the distance of 205 Km to be travelled by Road to 19 Km, which is the total length of the bridge.{{citation needed|date=March 2023}}


== See also ==
== See also ==
* [[Brahmaputra_River#Bridges|List of bridges on Brahmaputra River]]
* [[Brahmaputra River#Bridges|List of bridges on Brahmaputra River]]


==References==
==References==
Line 29: Line 29:
[[Category:Proposed bridges in India]]
[[Category:Proposed bridges in India]]
[[Category:Transport in Dhubri]]
[[Category:Transport in Dhubri]]


{{India-bridge-struct-stub}}
{{India-bridge-struct-stub}}

Latest revision as of 12:46, 1 December 2024

A reddish metal bridge supported by a row of narrow columns crosses horizontally over a stretch of river water, with a grass-covered mudbar in the foreground
An approach bridge constructed by Lasen&Toubro for the construction of Dhubri Phulbari Bridge

The Dhubri-Phulbari Bridge is an under-construction four lane extradosed cable stay bridge over the Brahmaputra River between Assam and Meghalaya in North-East India.

The Dhubri-Phulbari bridge, to be completed by 2028, would be India's second longest bridge over water after the Mumbai Trans Harbour Link, and would span more than 19 km. This bridge, close to the Bangladesh border, will connect Assam's Dhubri with Meghalaya's Phulbari. It will fill in a missing link of National Highway 127B, connecting Dhubri by road to Tura, Nongstoin, and other towns in western and central Meghalaya. Civil works started in 2019–2020. The project is being funded by Japan International Cooperation Agency, and it would be executed by NHIDCL.[citation needed] It is one of 6 proposed bridges on the Brahmaputra.

Larsen and Toubro (L&T) acquired the construction contract for the project, which will feature a navigation bridge including 12.625 km approach viaducts of 3.5 km on the Dhubri side and 2.2 km on the Phulbari side, connected with approach roads and interchanges on both sides.[1]

The bridge, to be built with a total cost of approximately Rs 4,997 crore, will meet the long-standing demand of the people from Assam and Meghalaya who have depended on ferry services to travel between the two banks of the river. It will reduce the distance of 205 Km to be travelled by Road to 19 Km, which is the total length of the bridge.[citation needed]

See also

[edit]

References

[edit]

25°58′29″N 89°57′58″E / 25.9746983°N 89.96618972222223°E / 25.9746983; 89.96618972222223