Jump to content

Petronas Tower 3: Difference between revisions

Coordinates: 3°09′24″N 101°42′40″E / 3.15667°N 101.71111°E / 3.15667; 101.71111
From Wikipedia, the free encyclopedia
Content deleted Content added
m Reverted 1 edit by 183.171.141.223 (talk) to last revision by LegendaryLim
No edit summary
 
(28 intermediate revisions by 13 users not shown)
Line 3: Line 3:
{{Use dmy dates|date=September 2014}}
{{Use dmy dates|date=September 2014}}
{{Infobox building
{{Infobox building
| mapframe-zoom = 16
| mapframe-zoom = 17
| name = Petronas Tower 3
| name = Petronas Tower 3
| native_name = Menara Petronas 3
| former_names = Carigali Tower (''Menara Carigali'')
| former_names = Carigali Tower (''Menara Carigali'')
| image = KL - Menara Carigali, KLCC.JPG
| image = KL- Petronas Tower 3 on a rainy morning.jpg
| image_size =
| image_size =
| caption = View from the KLCC Park
| caption =
| location = [[Kuala Lumpur City Centre]], [[Kuala Lumpur]], Malaysia
| location = [[Kuala Lumpur City Centre]], [[Kuala Lumpur]], Malaysia
| coordinates =
| coordinates =
| status = Complete
| status = {{green|Completed}}
| start_date = Late 2006
| start_date = Late 2006
| completion_date = 2011
| topped_out_date = 2011
| completion_date = 2012
| est_completion =
| est_completion =
| opening =
| opening =
| building_type = Office and retail
| building_type = Office and retail
| antenna_spire =
| antenna_spire =
| roof = {{convert|267|m|ft|abbr=on}}
| roof = {{convert|267|m|ft|abbr=on}}
| top_floor =
| top_floor = {{cvt|246|m}}
| floor_count = 60
| floor_count = 60
| elevator_count =
| elevator_count =
Line 33: Line 35:
}}
}}


The 60-storey '''Petronas Tower 3''', previously known as '''Carigali Tower''', is a [[skyscraper]] located within [[Kuala Lumpur City Centre|KLCC]] in [[Kuala Lumpur]], [[Malaysia]]. The building features a 6-level extension to the [[Suria KLCC]] shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of PETRONAS and some of the local subsidiaries of Multinational Corporations such as Microsoft Malaysia. Along with the [[Kuala Lumpur Convention Centre]] and the Binjai On The Park condominiums, the development of Lot C falls under Phase 2 of the KLCC project. Its development cost is reported at RM1 billion.<ref>{{cite news| title=KLCC Masterplan| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCC| url-status=dead| archiveurl=https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| archivedate=17 September 2009| df=dmy-all}}</ref><ref>{{cite news| title=KLCCP gets strong interest for Lot C project| url=http://biz.thestar.com.my/news/story.asp?file=/2010/7/14/business/6658758&sec=business| work=The Star| date=14 July 2010}}</ref>
'''Petronas Tower 3''', also known as '''Carigali Tower''', is a 60-story, 267-meter-tall [[skyscraper]] in [[Kuala Lumpur City Centre|KLCC]], [[Kuala Lumpur]], [[Malaysia]]. It is [[Malaysia]]'s [[List of tallest buildings in Malaysia|eighth tallest building]] and it is also part of the [[Petronas Towers]] complex. The 246-meter high building also features a 21-meter high crown-like structure on the top of the tower, making it 267-meter high. The building features a 6-level extension to the [[Suria KLCC]] shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of [[Petronas]] and some of the local subsidiaries of Multinational Corporations such as Microsoft Malaysia. Along with the [[Kuala Lumpur Convention Centre]] and the Binjai On The Park condominiums, the development of Lot C falls under Phase 2 of the KLCC project. Its development cost is reported at RM1 billion.<ref>{{cite news| title=KLCC Masterplan| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCC| url-status=dead| archiveurl=https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| archivedate=17 September 2009| df=dmy-all}}</ref><ref>{{cite news| title=KLCCP gets strong interest for Lot C project| url=http://biz.thestar.com.my/news/story.asp?file=/2010/7/14/business/6658758&sec=business| work=The Star| date=14 July 2010}}</ref>


The [[Marini's on 57|Marini’s on 57]] is located on the 57th floor of the building. It has a dedicated private lift that takes visitors directly to the rooftop bar and restaurant.
The [[Marini's on 57]] restaurant and bar is located on the 57th floor of the building. It has a dedicated private lift that takes visitors directly to the rooftop bar and restaurant.


==Construction==
==Construction==
Groundbreaking started in late 2006 and finished in February 2009. In January 2009, [[KLCC Properties]] Holdings Berhad (KLCCP) awarded an RM665mil contract for the superstructure to [[Daewoo]] Engineering and Construction, which began building the top structure in March 2009.<ref>{{cite news| title=Daewoo gets RM665m job from KLCCP| url=http://biz.thestar.com.my/news/story.asp?file=/2009/1/7/business/20090107173115&sec=business| work=The Star| date=7 January 2009}}</ref>
Construction started in late 2006 and completed in 2012. In January 2011, [[KLCC Properties]] Holdings Berhad (KLCCP) awarded an RM665mil contract for the superstructure to [[Daewoo]] Engineering and Construction, which began building the top structure in March 2009.<ref>{{cite news| title=Daewoo gets RM665m job from KLCCP| url=http://biz.thestar.com.my/news/story.asp?file=/2009/1/7/business/20090107173115&sec=business| work=The Star| date=7 January 2009}}</ref>
The retail mall section is expected to be ready by 2010, followed by the office block component by October 2011.<ref>{{cite news| title=KLCCP 2009 Annual Report - Chairman's Statement| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCCP| url-status=dead| archiveurl=https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| archivedate=17 September 2009| df=dmy-all}}</ref><ref>{{cite news| title=KLCC Property expects office rental income to boost profit| url=http://www.btimes.com.my/Current_News/BTIMES/articles/rup30a0f/Article/index_html| publisher=Business Times| date=1 July 2009}}{{dead link|date=March 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> The office tower will house {{convert|840000|sqft}} net lettable office space, while the retail portion of the building will measure {{convert|140000|sqft}}. The development will also feature a tunnel link to the adjacent [[Lot D1, KLCC]] for future development.<ref>{{cite news| title=KLCCP 2009 Annual Report - The Year In Review – New Developments| url=http://www.klcc.com.my/KLCCPCorp/KLCCP/pdf-AnnualReport2009/The%20Year%20In%20Review.pdf| publisher=KLCCP}}{{dead link|date=March 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>
The retail mall section is expected to be ready by 2010, followed by the office block component by October 2011.<ref>{{cite news| title=KLCCP 2009 Annual Report - Chairman's Statement| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCCP| url-status=dead| archiveurl=https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| archivedate=17 September 2009| df=dmy-all}}</ref><ref>{{cite news| title=KLCC Property expects office rental income to boost profit| url=http://www.btimes.com.my/Current_News/BTIMES/articles/rup30a0f/Article/index_html| publisher=Business Times| date=1 July 2009}}{{dead link|date=March 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> The office tower will house {{convert|840000|sqft}} net lettable office space, while the retail portion of the building will measure {{convert|140000|sqft}}. The development will also feature a tunnel link to the adjacent [[Lot D1, KLCC]] for future development.<ref>{{cite news| title=KLCCP 2009 Annual Report - The Year In Review – New Developments| url=http://www.klcc.com.my/KLCCPCorp/KLCCP/pdf-AnnualReport2009/The%20Year%20In%20Review.pdf| publisher=KLCCP}}{{dead link|date=March 2018 |bot=InternetArchiveBot |fix-attempted=yes }}</ref>


==See also==
==See also==
* [[Petronas Towers]]
* [[List of tallest buildings in Kuala Lumpur]]
* [[List of tallest buildings in Kuala Lumpur]]


Line 48: Line 51:


==External links==
==External links==
{{commons category}}
* [https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument KLCC official website]
* [https://web.archive.org/web/20090917063639/http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument KLCC official website]
* [http://www.emporis.com/application/?nav=building&lng=3&id=359523 KLCC Lot C on Emporis]
* {{usurped|1=[https://web.archive.org/web/20121105114122/http://www.emporis.com/application/?nav=building&lng=3&id=359523 KLCC Lot C on Emporis]}}


{{Skyscrapers in Malaysia}}
{{Skyscrapers in Malaysia}}
Line 59: Line 63:
[[Category:Modernist architecture in Malaysia]]
[[Category:Modernist architecture in Malaysia]]
[[Category:Skyscraper office buildings in Kuala Lumpur]]
[[Category:Skyscraper office buildings in Kuala Lumpur]]
[[Category:2012 establishments in Malaysia]]
[[Category:Office buildings completed in 2012]]

Latest revision as of 20:34, 3 December 2024

Petronas Tower 3
Menara Petronas 3
Map
Former namesCarigali Tower (Menara Carigali)
General information
StatusCompleted
TypeOffice and retail
LocationKuala Lumpur City Centre, Kuala Lumpur, Malaysia
Construction startedLate 2006
Topped-out2011
Completed2012
CostMYR 665 million for superstructure
OwnerKLCC Properties
ManagementKLCC Properties
Height
Roof267 m (876 ft)
Top floor246 m (807 ft)
Technical details
Floor count60
Floor area900,000-square-foot (84,000 m2)
Design and construction
Architect(s)Pelli Clarke Pelli Architects
DeveloperKLCC Property Holdings (KLCCP)
Main contractorDaewoo Engineering And Construction

Petronas Tower 3, also known as Carigali Tower, is a 60-story, 267-meter-tall skyscraper in KLCC, Kuala Lumpur, Malaysia. It is Malaysia's eighth tallest building and it is also part of the Petronas Towers complex. The 246-meter high building also features a 21-meter high crown-like structure on the top of the tower, making it 267-meter high. The building features a 6-level extension to the Suria KLCC shopping mall, while the rest of the floors above are solely made up of office spaces. It is the headquarters of Petronas Carigali, the E&P subsidiary of Petronas and some of the local subsidiaries of Multinational Corporations such as Microsoft Malaysia. Along with the Kuala Lumpur Convention Centre and the Binjai On The Park condominiums, the development of Lot C falls under Phase 2 of the KLCC project. Its development cost is reported at RM1 billion.[1][2]

The Marini's on 57 restaurant and bar is located on the 57th floor of the building. It has a dedicated private lift that takes visitors directly to the rooftop bar and restaurant.

Construction

[edit]

Construction started in late 2006 and completed in 2012. In January 2011, KLCC Properties Holdings Berhad (KLCCP) awarded an RM665mil contract for the superstructure to Daewoo Engineering and Construction, which began building the top structure in March 2009.[3] The retail mall section is expected to be ready by 2010, followed by the office block component by October 2011.[4][5] The office tower will house 840,000 square feet (78,000 m2) net lettable office space, while the retail portion of the building will measure 140,000 square feet (13,000 m2). The development will also feature a tunnel link to the adjacent Lot D1, KLCC for future development.[6]

See also

[edit]

References

[edit]
  1. ^ "KLCC Masterplan". KLCC. Archived from the original on 17 September 2009.
  2. ^ "KLCCP gets strong interest for Lot C project". The Star. 14 July 2010.
  3. ^ "Daewoo gets RM665m job from KLCCP". The Star. 7 January 2009.
  4. ^ "KLCCP 2009 Annual Report - Chairman's Statement". KLCCP. Archived from the original on 17 September 2009.
  5. ^ "KLCC Property expects office rental income to boost profit". Business Times. 1 July 2009.[permanent dead link]
  6. ^ "KLCCP 2009 Annual Report - The Year In Review – New Developments" (PDF). KLCCP.[permanent dead link]
[edit]

3°09′24″N 101°42′40″E / 3.15667°N 101.71111°E / 3.15667; 101.71111