Port Hedland Power Station: Difference between revisions
Appearance
Content deleted Content added
BlueyTheDog (talk | contribs) Small grammar fix |
m References |
||
(27 intermediate revisions by 19 users not shown) | |||
Line 1: | Line 1: | ||
{{ |
{{Short description|Power station in Western Australia}} |
||
{{Use Australian English|date=May 2024}} |
|||
| name = Port Hedland Power Station |
|||
{{Use dmy dates|date=July 2019}} |
|||
| official_name = |
|||
{{Infobox power station |
|||
| image = Port Hedland Power Station.png |
|||
| |
| name = Port Hedland Power Station |
||
| |
| name_official = |
||
| |
| image = Port Hedland Power Station.png |
||
| |
| image_caption = Port Hedland Power Station |
||
⚫ | |||
| location_map_width = |
|||
| coordinates = {{coord|-20.424965|118.544538|format=dms|region:AU_type:landmark|display=inline,title}} |
|||
| location_map_text = |
|||
| |
| country = Australia |
||
| |
| location = [[Port Hedland]] |
||
| |
| status = O |
||
| |
| construction_began = |
||
⚫ | |||
| long_d = |
|||
| |
| decommissioned = |
||
| |
| cost = |
||
| |
| owner = |
||
⚫ | |||
| coordinates_type = type:landmark |
|||
⚫ | |||
| coordinates_display= inline,title |
|||
| |
| th_fuel_tertiary = |
||
⚫ | |||
| country = Australia |
|||
| ps_units_manu_model = |
|||
| location = [[Pilbara|Pilbara Region]] |
|||
| |
| ps_cogeneration = Yes |
||
| ps_combined_cycle = |
|||
| construction_began = |
|||
| ps_electrical_capacity = 210 [[Megawatt|MW]] |
|||
⚫ | |||
| |
| ps_electrical_cap_fac = |
||
| |
| website = |
||
| |
| extra = |
||
⚫ | |||
⚫ | |||
| developer = |
|||
| constructor = |
|||
⚫ | |||
| secondary_fuel = |
|||
| tertiary_fuel = |
|||
⚫ | |||
| turbine_manu_other = |
|||
| thermal_power_all = |
|||
| cogeneration_all = yes |
|||
| combined_cycle = |
|||
| ghg_emission = |
|||
| installed_capacity = 210 |
|||
| max_planned_cap = |
|||
| capacity_factor = |
|||
| average_annual_gen = |
|||
| net_generation = |
|||
| website = |
|||
| as_of = |
|||
| extra = |
|||
}} |
}} |
||
'''Port Hedland Power Station''' is a power station in [[Western Australia]] owned by [[APA Group (Australia)|APA Group]]. |
|||
⚫ | |||
⚫ | It consists of five 42 MW natural gas-fired turbine units located in two separate locations: two units are located at the [[BHP]] hot briquetted iron plant at [[Boodarie Station|Boodarie]] (which has been decommissioned); and three units are located in a standalone facility at [[Port Hedland]], connected by a 66 kV [[transmission line]]. The assets are operated from a central control point allowing them to operate as an integrated plant and Port Hedland is connected to the [[North West Interconnected System]]. |
||
Three dual fuel units were commissioned in 1995; two additional units were subsequently commissioned in 1998 |
|||
Three dual fuel units were commissioned in 1995; two additional units were subsequently commissioned in 1998. A 45 MW [[photovoltaic system|solar PV]] with a 36 MWh [[Battery energy storage system|battery]] opened in 2024.<ref>{{cite web |title=Cyclone resistant Port Hedland solar and big battery opened to provide power to BHP port facility |url=https://reneweconomy.com.au/cyclone-resistant-port-hedland-solar-and-big-battery-project-opened-to-provide-power-to-bhp-port-facility/ |website=RenewEconomy |language=en-AU |date=3 December 2024}}</ref> |
|||
⚫ | |||
⚫ | |||
*[http://alintaenergy.com.au/assets/generation/port-hedland/ Alinta Energy generation] |
|||
== See also == |
== See also == |
||
{{Portal|Energy|Australia}} |
|||
* [[APA Group (Australia)|APA Group]] |
|||
== References == |
|||
{{coord missing}} |
|||
{{Reflist}} |
|||
⚫ | |||
*[https://www.apa.com.au/our-services/other-energy-services/gas-fired-power-generation1/port-hedland-power-station/ Port Hedland Power Station] |
|||
⚫ | |||
[[Category:Natural gas-fired power stations in Western Australia]] |
[[Category:Natural gas-fired power stations in Western Australia]] |
||
[[Category:Port Hedland, Western Australia]] |
|||
[[Category:Energy infrastructure completed in 1995]] |
|||
[[Category:1995 establishments in Australia]] |
|||
{{Australia-powerstation-stub}} |
{{Australia-powerstation-stub}} |
Latest revision as of 10:57, 8 December 2024
Port Hedland Power Station | |
---|---|
Country | Australia |
Location | Port Hedland |
Coordinates | 20°25′30″S 118°32′40″E / 20.424965°S 118.544538°E |
Status | Operational |
Commission date | Three dual fuel units commissioned in 1995; two additional units commissioned in 1998 |
Owner | |
Operator | Alinta Energy |
Thermal power station | |
Primary fuel | Natural gas |
Cogeneration? | Yes |
Power generation | |
Units operational | 5 x 42 MW gas-fired turbine units, 45 MW solar, battery |
Nameplate capacity | 210 MW |
Port Hedland Power Station is a power station in Western Australia owned by APA Group.
It consists of five 42 MW natural gas-fired turbine units located in two separate locations: two units are located at the BHP hot briquetted iron plant at Boodarie (which has been decommissioned); and three units are located in a standalone facility at Port Hedland, connected by a 66 kV transmission line. The assets are operated from a central control point allowing them to operate as an integrated plant and Port Hedland is connected to the North West Interconnected System.
Three dual fuel units were commissioned in 1995; two additional units were subsequently commissioned in 1998. A 45 MW solar PV with a 36 MWh battery opened in 2024.[1]