Jump to content

Port Hedland Power Station: Difference between revisions

Coordinates: 20°25′30″S 118°32′40″E / 20.424965°S 118.544538°E / -20.424965; 118.544538
From Wikipedia, the free encyclopedia
Content deleted Content added
m cleanup (wikitables, html markup, layout, etc.)
m References
 
(16 intermediate revisions by 13 users not shown)
Line 1: Line 1:
{{Short description|Power station in Western Australia}}
{{Use Australian English|date=May 2024}}
{{Use dmy dates|date=July 2019}}
{{Infobox power station
{{Infobox power station
| name = Port Hedland Power Station
| name = Port Hedland Power Station
| name_official =
| name_official =
| image = Port Hedland Power Station.png
| image = Port Hedland Power Station.png
| image_size =
| image_caption = Port Hedland Power Station
| image_caption =
| image_alt =
| image_alt =
| location_map = Western Australia
| location_map_size =
| location_map_caption =
| coordinates = {{coord|-20.424965|118.544538|format=dms|region:AU_type:landmark|display=inline,title}}
| coordinates = {{coord|-20.424965|118.544538|format=dms|region:AU_type:landmark|display=inline,title}}
| country = Australia
| country = Australia
| location = [[Pilbara|Pilbara Region]]
| location = [[Port Hedland]]
| status = O
| status = O
| construction_began =
| construction_began =
Line 19: Line 18:
| owner =
| owner =
| operator = [[Alinta Energy]]
| operator = [[Alinta Energy]]
| th_fuel_primary = Natural gas
| th_fuel_primary = [[Natural gas]]
| th_fuel_tertiary =
| th_fuel_tertiary =
| ps_units_operational = 5 x 42MW gas-fired turbine units
| ps_units_operational = 5 x 42 MW gas-fired turbine units, 45 MW solar, battery
| ps_units_manu_model =
| ps_units_manu_model =
| th_cogeneration = yes
| ps_cogeneration = Yes
| th_combined_cycle =
| ps_combined_cycle =
| ps_electrical_capacity = 210 [[Megawatt|MW]]
| ps_electrical_capacity = 210 [[Megawatt|MW]]
| ps_electrical_cap_fac =
| ps_electrical_cap_fac =
Line 30: Line 29:
| extra =
| extra =
}}
}}
'''Port Hedland Power Station''' is a power station in [[Western Australia]] owned by [[APA Group (Australia)|APA Group]].
'''Port Hedland Power Station''' is a natural gas-fired power station in [[Western Australia]]. It consists of five 42MW gas-fired turbine units located in two separate locations: two units are located at the [[BHP Billiton]] hot briquetted iron (HBI) plant at Boodarie which has been decommissioned; and three units are located in a standalone facility at [[Port Hedland]], connected by a 66kV [[transmission line]]. The assets are operated from a central control point allowing them to operate as an integrated plant and Port Hedland is connected to the North West Interconnected System (NWIS).


It consists of five 42 MW natural gas-fired turbine units located in two separate locations: two units are located at the [[BHP]] hot briquetted iron plant at [[Boodarie Station|Boodarie]] (which has been decommissioned); and three units are located in a standalone facility at [[Port Hedland]], connected by a 66 kV [[transmission line]]. The assets are operated from a central control point allowing them to operate as an integrated plant and Port Hedland is connected to the [[North West Interconnected System]].
Three dual fuel units were commissioned in 1995; two additional units were subsequently commissioned in 1998

Three dual fuel units were commissioned in 1995; two additional units were subsequently commissioned in 1998. A 45 MW [[photovoltaic system|solar PV]] with a 36 MWh [[Battery energy storage system|battery]] opened in 2024.<ref>{{cite web |title=Cyclone resistant Port Hedland solar and big battery opened to provide power to BHP port facility |url=https://reneweconomy.com.au/cyclone-resistant-port-hedland-solar-and-big-battery-project-opened-to-provide-power-to-bhp-port-facility/ |website=RenewEconomy |language=en-AU |date=3 December 2024}}</ref>


== See also ==
== See also ==
{{Portal|Energy|Australia}}
{{Portal|Energy|Australia}}
* [[APA Group (Australia)|APA Group]]
* [[Alinta Energy]]

== References ==
{{Reflist}}

== External links ==
== External links ==
*[http://alintaenergy.com.au/assets/generation/port-hedland/ Alinta Energy generation]
*[https://www.apa.com.au/our-services/other-energy-services/gas-fired-power-generation1/port-hedland-power-station/ Port Hedland Power Station]


{{Energy in Western Australia}}
{{Energy in Western Australia}}


[[Category:Natural gas-fired power stations in Western Australia]]
[[Category:Natural gas-fired power stations in Western Australia]]
[[Category:Port Hedland, Western Australia]]
[[Category:Energy infrastructure completed in 1995]]
[[Category:1995 establishments in Australia]]





Latest revision as of 10:57, 8 December 2024

Port Hedland Power Station
Port Hedland Power Station
Map
CountryAustralia
LocationPort Hedland
Coordinates20°25′30″S 118°32′40″E / 20.424965°S 118.544538°E / -20.424965; 118.544538
StatusOperational
Commission dateThree dual fuel units commissioned in 1995; two additional units commissioned in 1998
Owner
OperatorAlinta Energy
Thermal power station
Primary fuelNatural gas
Cogeneration?Yes
Power generation
Units operational5 x 42 MW gas-fired turbine units, 45 MW solar, battery
Nameplate capacity210 MW

Port Hedland Power Station is a power station in Western Australia owned by APA Group.

It consists of five 42 MW natural gas-fired turbine units located in two separate locations: two units are located at the BHP hot briquetted iron plant at Boodarie (which has been decommissioned); and three units are located in a standalone facility at Port Hedland, connected by a 66 kV transmission line. The assets are operated from a central control point allowing them to operate as an integrated plant and Port Hedland is connected to the North West Interconnected System.

Three dual fuel units were commissioned in 1995; two additional units were subsequently commissioned in 1998. A 45 MW solar PV with a 36 MWh battery opened in 2024.[1]

See also

[edit]

References

[edit]
  1. ^ "Cyclone resistant Port Hedland solar and big battery opened to provide power to BHP port facility". RenewEconomy. 3 December 2024.
[edit]