Jump to content

Kerjaya LRT station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
// Edit via Wikiplus
No edit summary
 
(19 intermediate revisions by 16 users not shown)
Line 1: Line 1:
{{unref|date=October 2016}}
{{more citations needed|date=October 2021}}
{{Infobox station
{{Infobox station
| style = Rapid KL
| name=Persiaran Kerjaya<br>Working Name:HICOM Glenmarie (S9)
| style2 = Shah Alam
| symbol_location = my
| name = {{KLRT color code|SA|09|bgcolor=white}} Kerjaya
| symbol = rapidkl
| type = [[File:Rapid KL Logo.svg|Rapid_KL_Logo|60px]] {{!}} ''Future'' [[Light rapid transit|LRT]] station
| native_name =
| symbol_location =
| type= [[rapid transit|LRT station]]
| logo=
| symbol =
| native_name =
| logo_size=
| image=
| logo =
| logo_size =
| image_size=
| image =
| image_caption=
| image_size =
| address=[[Glenmarie]], [[Shah Alam]], [[Selangor]]
| image_caption =
| country=[[Malaysia]]
| address = Glenmarie, [[Shah Alam]], [[Selangor]]
| coordinates=
| country = [[Malaysia]]
| line={{rint|my|rapidkl}} {{rint|my|11}}
| coordinates =
| other=
| line = {{rint|my|rapidkl}} {{rint|my|11}} {{rcb|KLRT|11|xroute}}
| platform=2 [[side platform]]s
| tracks=2
| other =
| platform = 2 [[side platform]]s
| parking=Available
| structure = Elevated
| bicycle=
| tracks = 2
| baggage_check=
| parking = Available
| passengers=
| pass_year=
| bicycle =
| baggage_check =
| pass_percent=
| passengers =
| pass_system=
| pass_year =
| opened=
| pass_percent =
| rebuilt=
| pass_system =
| electrified=
| ADA=
| opened =
| rebuilt =
| code={{KLRT color code|BUK|9}}
| electrified =
| owned=''[[Prasarana Malaysia]]''; operated by [[Rapid Rail]].
| accessible =
| zone=
| status = Under construction
| services={{s-rail|title=LRT 3}}
| code = {{KLRT color code|SA|09}}
{{rail line|system=Rapid Rail|route=Bandar Utama–Klang line|previous=Temasya|next=Stadium Shah Alam}}
| owned = ''[[Prasarana Malaysia]]''
| mpassengers=
| operator = [[Rapid Rail]]
| zone =
| services = {{Adjacent stations|system=Rapid KL|line=Shah Alam|left=Temasya|right=Stadium Shah Alam}}
| mpassengers =
}}
}}
The '''Persiaran Kerjaya LRT station''' is a [[Rapid transit|Light Rail Transit]] (LRT) [[Train station|station]] under planning that will serve the suburb of [[Glenmarie]] in [[Selangor]], [[Malaysia]]. It serves as one of the stations on LRT3 [[Bandar Utama–Klang line]]. The station is located at [[Persiaran Kerjaya, Glenmarie]].
The '''Kerjaya LRT station''' is a [[light rapid transit]] (LRT) station that serve the suburb of [[Shah Alam]] in [[Selangor]], [[Malaysia]]. It serves as one of the stations on the [[Shah Alam line]]. The station is an elevated [[metro station|rapid transit station]] in Glenmarie, [[Shah Alam]], [[Selangor]], [[Malaysia]], forming part of the [[Klang Valley Integrated Transit System]].<ref>{{cite web |url=http://lrt3.com.my/v14/index.php/2015-02-13-03-29-33/pelan-setiap-stesen |title=Pelan Setiap Stesen |publisher=Prasarana Malaysia |access-date=2015-05-17 |archive-url=https://web.archive.org/web/20150522013509/http://lrt3.com.my/v14/index.php/2015-02-13-03-29-33/pelan-setiap-stesen |archive-date=2015-05-22 |url-status=dead }}</ref>

The station is marked as Station No. 9 along the RM9 billion line project with the line's maintenance [[train station|depot]] located in Johan Setia, [[Klang (city)|Klang]].<ref>{{cite web |url=http://www.mrt.com.my/lrt3/Bukit_Tinggi_Station.htm |title= Bukit Tinggi LRT Station |publisher=MRT Corp Malaysia}}</ref> Originally this LRT station was expected to be operational in February 2024, however the operational date for the entire [[Shah Alam Line]] has been delayed and expected to be operational by '''third quarter of 2025''' as mentioned by Transport Minister [[Anthony Loke]]. (previously expected to be operational by March 2025 as announced in 2023)<ref>{{Cite web |date=2024-07-29 |title=LRT3 Expected To Be Operational In Q3 Of 2025 - Loke |url=https://www.bernama.com/en/news.php?id=2323118 |access-date=2024-07-29 |website=BERNAMA |language=en}}</ref> It will have facilities such as public parking, kiosks, restrooms, elevators, taxi stand and feeder bus among others.<ref>{{cite web |url=http://lrt3.com.my/v14/index.php/mengenai-lrt3/jangka-masa-projek |title=Jangka Masa Projek LRT3 |publisher=Prasarana Malaysia |access-date=2015-05-17 |archive-url=https://web.archive.org/web/20150527001609/http://lrt3.com.my/v14/index.php/mengenai-lrt3/jangka-masa-projek |archive-date=2015-05-27 |url-status=dead }}</ref>

==Locality landmarks==
* [https://psa.mypolycc.edu.my/ Politeknik Premier Sultan Salahuddin Abdul Aziz Shah]
* HICOM-Glenmarie Industrial Park
* Kolej Komuniti Shah Alam
* [https://www.uowmkdu.edu.my/ UOW-KDU University Malaysia]
* The Glenz-Glenmarie Condominium
* Utropolis Marketplace Shopping Mall
* Utropolis Urbano residential
* [https://www.montfort.org.my/ Montfort Boys Town] Training Institute
* Pangsapuri Sri Kerjaya

==References==
{{Reflist}}


==External links==
==External links==
Line 42: Line 62:


{{Klang Valley train stations|state=collapsed}}
{{Klang Valley train stations|state=collapsed}}

{{coord missing|Malaysia}}
{{coord missing|Malaysia}}


[[Category:Railway stations in Selangor]]
[[Category:Rapid transit stations in Selangor]]
[[Category:Rapid transit stations in Selangor]]
[[Category:Bandar Utama-Klang Line]]
[[Category:Shah Alam Line]]



{{Malaysia-railstation-stub}}
{{Malaysia-metro-stub}}
{{metro-stub}}

Latest revision as of 08:51, 23 December 2024

 SA09  Kerjaya
Rapid_KL_Logo | Future LRT station
General information
LocationGlenmarie, Shah Alam, Selangor
Malaysia
Owned byPrasarana Malaysia
Operated byRapid Rail
Line(s)Rapid KL (brand) 11 Shah Alam
Platforms2 side platforms
Tracks2
Construction
Structure typeElevated
ParkingAvailable
Other information
StatusUnder construction
Station code SA09 
Services
Preceding station Following station
Temasya
towards Bandar Utama
Shah Alam Line
Future service (opening 2025)
Stadium Shah Alam
towards Johan Setia

The Kerjaya LRT station is a light rapid transit (LRT) station that serve the suburb of Shah Alam in Selangor, Malaysia. It serves as one of the stations on the Shah Alam line. The station is an elevated rapid transit station in Glenmarie, Shah Alam, Selangor, Malaysia, forming part of the Klang Valley Integrated Transit System.[1]

The station is marked as Station No. 9 along the RM9 billion line project with the line's maintenance depot located in Johan Setia, Klang.[2] Originally this LRT station was expected to be operational in February 2024, however the operational date for the entire Shah Alam Line has been delayed and expected to be operational by third quarter of 2025 as mentioned by Transport Minister Anthony Loke. (previously expected to be operational by March 2025 as announced in 2023)[3] It will have facilities such as public parking, kiosks, restrooms, elevators, taxi stand and feeder bus among others.[4]

Locality landmarks

[edit]

References

[edit]
  1. ^ "Pelan Setiap Stesen". Prasarana Malaysia. Archived from the original on 2015-05-22. Retrieved 2015-05-17.
  2. ^ "Bukit Tinggi LRT Station". MRT Corp Malaysia.
  3. ^ "LRT3 Expected To Be Operational In Q3 Of 2025 - Loke". BERNAMA. 2024-07-29. Retrieved 2024-07-29.
  4. ^ "Jangka Masa Projek LRT3". Prasarana Malaysia. Archived from the original on 2015-05-27. Retrieved 2015-05-17.
[edit]