Line 11 (Mumbai Metro): Difference between revisions
Cielquiparle (talk | contribs) |
|||
(17 intermediate revisions by 7 users not shown) | |||
Line 1: | Line 1: | ||
{{Short description|Rapid transit service in Maharashtra}} |
{{Short description|Rapid transit service in Maharashtra}} |
||
{{Multiple issues|{{copy edit|date=November 2024}} |
|||
{{update|date=November 2024}} |
|||
{{refimprove|date=November 2024}}}} |
|||
{{Use dmy dates|date=July 2019}} |
{{Use dmy dates|date=July 2019}} |
||
{{Infobox rail line |
{{Infobox rail line |
||
Line 17: | Line 20: | ||
| status = Approved |
| status = Approved |
||
| locale = [[Mumbai]], [[Maharashtra]], India |
| locale = [[Mumbai]], [[Maharashtra]], India |
||
Start = Anik Bus Depot |
|||
End |
|||
| end = [[Chhatrapati Shivaji Terminus railway station|CST]] |
|||
SPM Chowk |
|||
| stations = 10 |
|||
| routes = |
| routes = |
||
| daily_ridership = |
| daily_ridership = |
||
Line 52: | Line 56: | ||
}} |
}} |
||
'''Green Line 11''' (Extension) of the [[Mumbai Metro]] is part of the metro system for the city of Mumbai, India. The |
'''Green Line 11''' (Extension) of the [[Mumbai Metro]] is part of the metro system for the city of Mumbai, India. The project is expected to be completed around 2030.<ref>{{Cite news |last=Mehta |first=Manthank |date=17 February 2024 |title=Mumbai underground new metro to link Byculla, Crawford, Fort and Gateway |url=https://timesofindia.indiatimes.com/city/mumbai/mumbai-underground-new-metro-to-link-byculla-crawford-fort-and-gateway/articleshow/107771346.cms |access-date=2024-12-24 |work=Times of India}}</ref> |
||
The 12.68 km (7.9 mi) line from Wadala–CSMT is estimated to cost ₹8,739 crores. The Government of Maharashtra is keen to implement the Master Plan Corridors recommended by DMRC on a fast track mode and to complete them in the next 3 to 4 years.{{when|date=November 2024}} To start with, it is decided to take up the task of updating of DPRs{{what|date=November 2024}} and also preparation of new DPRs for the following potential elevated metro corridors. In January 2023, the government{{which|date=November 2024}} ordered that the rights to execute Line 11's construction be handed over to MMRCL (Mumbai Metro Rail Corporation), which further tweaked its alignment from an existing route (Wadala-CST) to a new route (Anik Bus Depot - Shyama Prasad Mukherjee Circle) passing through localities such as Nagpada Junction, Byculla, Bhendi Bazaar, and Crawford Market.{{cn|date=November 2024}} |
|||
⚫ | |||
⚫ | Initially a total of ten Stations |
||
⚫ | |||
⚫ | Initially, a total of ten Stations were planned for this extension. Out of ten stations, eight are underground and two are elevated. The concourse of all elevated stations is proposed along the roads with sufficient right of way. The stations accommodate the passengers from the eastern port area of Mumbai. The average inter-station distance is {{convert|1.27|km|mi|abbr=on}} approximately varying from {{convert|0.85|km|mi|abbr=on}} to {{convert|2.1|km|mi|abbr=on}} depending upon the site, operational and traffic constraints.{{cn|date=November 2024}} |
||
[[File:Metro line 11.jpg|thumb|Metro line 11]] |
[[File:Metro line 11.jpg|thumb|Metro line 11]] |
||
Line 87: | Line 93: | ||
| style="text-align:center;"|CGS Colony |
| style="text-align:center;"|CGS Colony |
||
| style="text-align:center;"|सीजीएस कॉलनी |
| style="text-align:center;"|सीजीएस कॉलनी |
||
| Proposed |
| style="text-align:center;"|Proposed |
||
| style="text-align:center;"| None |
| style="text-align:center;"| None |
||
|style="text-align:center;"|To Be Decided |
|style="text-align:center;"|To Be Decided |
||
Line 122: | Line 128: | ||
|style="text-align:center;"| Coal Bunder |
|style="text-align:center;"| Coal Bunder |
||
| style="text-align:center;"|कोळसा बंदर |
| style="text-align:center;"|कोळसा बंदर |
||
| Proposed |
| style="text-align:center;"|Proposed |
||
|style="text-align:center;"| None |
|style="text-align:center;"| None |
||
| style="text-align:center;"|To Be Decided |
| style="text-align:center;"|To Be Decided |
||
Line 129: | Line 135: | ||
| style="text-align:center;"|Reay Road |
| style="text-align:center;"|Reay Road |
||
|style="text-align:center;"| रे रोड |
|style="text-align:center;"| रे रोड |
||
| Proposed |
| style="text-align:center;"|Proposed |
||
| style="text-align:center;"|None |
| style="text-align:center;"|None |
||
| To Be Decided |
| To Be Decided |
||
Line 136: | Line 142: | ||
|style="text-align:center;"|Byculla |
|style="text-align:center;"|Byculla |
||
|style="text-align:center;"|भायखळा |
|style="text-align:center;"|भायखळा |
||
|Proposed |
|style="text-align:center;"|Proposed |
||
|style="text-align:center;"|None |
|style="text-align:center;"|None |
||
|To Be Decided |
|style="text-align:center;"|To Be Decided |
||
|- |
|- |
||
|style="text-align:center;"|11 |
|style="text-align:center;"|11 |
||
| style="text-align:center;"|Nagpada Junction |
| style="text-align:center;"|Nagpada Junction |
||
| style="text-align:center;"|नागपाडा जंक्शन |
| style="text-align:center;"|नागपाडा जंक्शन |
||
| Proposed |
| style="text-align:center;"|Proposed |
||
| style="text-align:center;"|None |
| style="text-align:center;"|None |
||
| style="text-align:center;"|To Be Decided |
| style="text-align:center;"|To Be Decided |
||
Line 150: | Line 156: | ||
| style="text-align:center;"|Bhendi Bazaar |
| style="text-align:center;"|Bhendi Bazaar |
||
|style="text-align:center;"| भेंडी बाजार |
|style="text-align:center;"| भेंडी बाजार |
||
| Proposed |
| style="text-align:center;"|Proposed |
||
| style="text-align:center;"|None |
| style="text-align:center;"|None |
||
| To Be Decided |
|style="text-align:center;"| To Be Decided |
||
|- |
|- |
||
|style="text-align:center;"|13 |
|style="text-align:center;"|13 |
||
Line 171: | Line 177: | ||
|style="text-align:center;"|Horniman Circle |
|style="text-align:center;"|Horniman Circle |
||
|style="text-align:center;"|हॉर्निमन सर्कल |
|style="text-align:center;"|हॉर्निमन सर्कल |
||
|Proposed |
|style="text-align:center;"|Proposed |
||
|style="text-align:center;"|None |
|style="text-align:center;"|None |
||
|To Be Decided |
|style="text-align:center;"|To Be Decided |
||
|- |
|- |
||
|style="text-align:center;"|16 |
|style="text-align:center;"|16 |
Latest revision as of 21:53, 24 December 2024
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Mumbai Metro Green Line 11 Extension | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Other name(s) | Bhakti Park (Wadala) to CSMT Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Approved | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Mumbai Metropolitan Region Development Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line number | Metro Line 11 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Mumbai, Maharashtra, India
Start = Anik Bus Depot End SPM Chowk | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 10 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Mumbai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | Mumbai Metro | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Owale & Gaimukh | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 12.68 km (7.88 mi) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Number of tracks | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | 2 Elevated , 8 Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Highest elevation | 3.90 m (12.8 ft) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Green Line 11 (Extension) of the Mumbai Metro is part of the metro system for the city of Mumbai, India. The project is expected to be completed around 2030.[1]
The 12.68 km (7.9 mi) line from Wadala–CSMT is estimated to cost ₹8,739 crores. The Government of Maharashtra is keen to implement the Master Plan Corridors recommended by DMRC on a fast track mode and to complete them in the next 3 to 4 years.[when?] To start with, it is decided to take up the task of updating of DPRs[clarification needed] and also preparation of new DPRs for the following potential elevated metro corridors. In January 2023, the government[which?] ordered that the rights to execute Line 11's construction be handed over to MMRCL (Mumbai Metro Rail Corporation), which further tweaked its alignment from an existing route (Wadala-CST) to a new route (Anik Bus Depot - Shyama Prasad Mukherjee Circle) passing through localities such as Nagpada Junction, Byculla, Bhendi Bazaar, and Crawford Market.[citation needed]
Stations
[edit]Initially, a total of ten Stations were planned for this extension. Out of ten stations, eight are underground and two are elevated. The concourse of all elevated stations is proposed along the roads with sufficient right of way. The stations accommodate the passengers from the eastern port area of Mumbai. The average inter-station distance is 1.27 km (0.79 mi) approximately varying from 0.85 km (0.53 mi) to 2.1 km (1.3 mi) depending upon the site, operational and traffic constraints.[citation needed]
Green Line 11 | |||||
---|---|---|---|---|---|
# | Station Name | Status | Connections | Layout | |
English | Marathi | ||||
1 | Anik Nagar Bus Depot | अणिक नगर बस आगार | Proposed | Line 4 (Under Construction) | Elevated |
2 | Bhakti Park (Wadala) | भक्ति पार्क (वडाळा) | Proposed | Line 4 (Under Construction) | Elevated |
3 | CGS Colony | सीजीएस कॉलनी | Proposed | None | To Be Decided |
4 | Ganesh Nagar | गणेश नगर | Proposed | None | To Be Decided |
5 | BPT Hospital | बीपीटी हॉस्पिटल | Proposed | None | To Be Decided |
6 | Sewri | शिवडी | Proposed | None | To Be Decided |
7 | Hay Bunder | गवत बंदर | Proposed | None | To Be Decided |
8 | Coal Bunder | कोळसा बंदर | Proposed | None | To Be Decided |
9 | Reay Road | रे रोड | Proposed | None | To Be Decided |
10 | Byculla | भायखळा | Proposed | None | To Be Decided |
11 | Nagpada Junction | नागपाडा जंक्शन | Proposed | None | To Be Decided |
12 | Bhendi Bazaar | भेंडी बाजार | Proposed | None | To Be Decided |
13 | Crawford Market | क्रॉफर्ड मार्केट | Proposed | None | To Be Decided |
14 | Chhatrapati Shivaji Maharaj Terminus | छत्रपती शिवाजी महाराज टर्मिनस | Proposed | Line 3 (Under Construction) | To Be Decided |
15 | Horniman Circle | हॉर्निमन सर्कल | Proposed | None | To Be Decided |
16 | SPM Circle | एसपीएम सर्कल | Proposed | None | To Be Decided |
References
[edit]- ^ Mehta, Manthank (17 February 2024). "Mumbai underground new metro to link Byculla, Crawford, Fort and Gateway". Times of India. Retrieved 24 December 2024.