Jump to content

Mount Piper Power Station: Difference between revisions

Coordinates: 33°21′32″S 150°1′56″E / 33.35889°S 150.03222°E / -33.35889; 150.03222
From Wikipedia, the free encyclopedia
Content deleted Content added
Yobot (talk | contribs)
m Infobox standardisation per WP:BOTREQ + other fixes using AWB (10835)
m +plans
Tags: Mobile edit Mobile app edit iOS app edit App section source
 
(30 intermediate revisions by 19 users not shown)
Line 1: Line 1:
{{Short description|Coal-fired power station in Australia}}
{{Use dmy dates|date=October 2015}}
{{Use Australian English|date=October 2015}}
{{Infobox power station
{{Infobox power station
|name =Mount Piper Power Station
| name = Mount Piper Power Station
|image =
| image =
|country =[[Australia]]
| country = Australia
|location =[[New South Wales]]
| location = [[New South Wales]]
| coordinates = {{coord|33|21|32|S|150|1|56|E|type:landmark_region:AU|display=inline,title}}
|lat_d = 33
| owner = [[EnergyAustralia]]
|lat_m = 21
|lat_s = 32
| status = O
| th_fuel_primary = [[Coal]]
|lat_NS = S
| th_technology = [[Steam turbine]]
|long_d = 150
| ps_units_operational = 2 × {{convert|700|MW}}
|long_m = 1
| ps_units_manu_model = [[Toshiba|Tokyo Shibaura Electric]] (Japan)
|long_s = 56
| ps_electrical_capacity = 1,400
|long_EW = E
| ps_electrical_cap_fac = 56.60% <small>(average 2017-2021)</small>
|coordinates_type = type:landmark_region:AU
| ps_annual_generation = 6,941 GW·h <small>(average 2017-2021)</small>
|coordinates_display = title
| commissioned = 1993
|owner =[[EnergyAustralia]]
}}
|status =Baseload
'''Mount Piper Power Station''' is a [[coal]] powered power station with two [[steam turbines]] with a combined [[Electricity generation|generating]] capacity of 1,400 [[Megawatt|MW]] of [[electricity]]. It is located near [[Portland, New South Wales|Portland]], in the Central West of [[New South Wales]], [[Australia]] and owned by [[EnergyAustralia]], a subsidiary of [[CLP Group]]. On 23 September 2021, it was announced that the closure of the power station is being brought forward from 2042 to 2040 at the latest. The power station employs 250 workers.<ref>{{cite news |url=https://www.theage.com.au/business/companies/energyaustralia-to-close-nsw-coal-power-plant-early-20210923-p58u7p.html |title=EnergyAustralia to close NSW coal power plant early |first1=Nick |last1=Toscano |first2=Mike |last2=Foley |date=23 September 2021 |work=The Age}}</ref> In 2024, [[Peter Dutton#Energy and emissions|Peter Dutton]] said he intends, if elected, to build one of seven government-owned nuclear power plants on this site, to be operational by 2035–2037.<ref name="crno24">{{cite news |title=Peter Dutton reveals seven sites for proposed nuclear power plants |first1=Tom |last1=Crowley |first2=Jane |last2=Norman |date=2024-06-19 |work=ABC News |publisher=Australian Broadcasting Corporation |url=https://www.abc.net.au/news/2024-06-19/dutton-reveals-seven-sites-for-proposed-nuclear-power-plants/103995310 |access-date=2024-12-25 }}</ref>
|ps_fuel_primary = Coal
|technology = Steam turbine
|ps_combined_cycle =No
|ps_units_operational =2
|max_planned_cap =1400 [[Megawatt|MW]]
|commissioned =1993
|}}
'''Mount Piper Power Station''' is a [[coal]] powered power station with two [[steam turbines]] with a combined [[Electricity generation|generating]] capacity of 1,400 [[Megawatt|MW]] of [[electricity]]. It is located near [[Portland, New South Wales|Portland]], in the Central West of [[New South Wales]], [[Australia]] and owned by [[Delta Electricity]], a [[State-owned corporation|corporation]] owned by the [[New South Wales Government]].


==Construction==
==Construction==
The first generator (Unit 2) was completed in 1992, and the second (Unit 1) in 1993. Units 3 and 4, although planned, were not built. It was the last power station built by the Electricity Commission of New South Wales (a body since abolished). Much of the design work done was undertaken in-house by the Commission.
The first generator (Unit 2) was completed in 1992, and the second (Unit 1) in 1993. Units 3 and 4, although planned, were not built. It was the last power station built by the Electricity Commission of New South Wales (a body since abolished). Much of the design work done was undertaken in-house by the commission.


In 2009 Delta Electricity (the government owned enterprise that owns and manages the power station as a commercial entity) unofficially re-rated the units at Mount Piper from their original 660MW to 700MW.{{citation needed|date=December 2011}}
In 2009 Delta Electricity (the government owned enterprise that previously owned and managed the power station as a commercial entity) unofficially re-rated the units at Mount Piper from their original 660MW to 700MW.<ref>{{Cite web|title=Mt Piper Power Station Extension Environmental Assessment|url=https://waubrafoundation.org.au/wp-content/uploads/2015/05/05-Appendix-D-Mt-Piper-PS-Extension-EA_Noise_Sept-2009.pdf}}</ref>


In 2007 & early 2008 there was public talk of 'completing' the power station but using modern super-critical, dry-cooling tower, coal-fired units of up to 1000MW capacity which uses much less water from surrounding rivers..{{citation needed|date=December 2011}}
In 2007 & early 2008 there was public talk of 'completing' the power station by using modern super-critical, dry-cooling tower, coal-fired units of up to 1000MW capacity which uses much less water from surrounding rivers.<ref>{{Cite web|title=Mt Piper Power Station Extension|url=https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=MP09_0119%2120190708T035920.858%20GMT}}</ref>


On the 7th of April 2010 the [[New South Wales Department of Planning]] announced that approval had been given to [[Delta Electricity]] to 'complete' the station by installing 2000MW of new generating capacity.<ref>{{cite news|url=http://www.smh.com.au/environment/climate-change/approved-power-plant-with-emissions-equal-to-29m-cars-20100406-rpfx.html|title=Approved: power plant with emissions equal to 2.9m cars|first=Louise|last=Hall|date=7 April 2010|work=The Sydney Morning Herald}}</ref>
On 7 April 2010 the [[New South Wales Department of Planning]] announced that approval had been given to [[Delta Electricity]] to 'complete' the station by installing 2000MW of new generating capacity.<ref>{{cite news|url=http://www.smh.com.au/environment/climate-change/approved-power-plant-with-emissions-equal-to-29m-cars-20100406-rpfx.html|title=Approved: power plant with emissions equal to 2.9m cars|first=Louise|last=Hall|date=7 April 2010|work=The Sydney Morning Herald}}</ref>


==Technical==
==Technical==
Mount Piper draws its cooling water from [[Lyell Dam]] and [[Thomsons Creek Dam]], both purpose built for the station. Lyell Dam is located on the [[Coxs River]] {{convert|20|km}} away. Large pumps draw water from the dam and transfer it to a pipeline built between Thompsons Creek Dam and Mount Piper. The power station taking what water it needs and the excess flowing into Thompsons Creek Dam. When no pumps are in service the water supply to the power station is gravity fed from Thompsons Creek Dam.
Mount Piper draws its cooling water from [[Lyell Dam]] and [[Thomsons Creek Dam]], both purpose-built for the station. Lyell Dam is located on the [[Coxs River]] {{convert|20|km}} away. Large pumps draw water from the dam and transfer it to a pipeline built between Thompsons Creek Dam and Mount Piper. The power station taking what water it needs and the excess flowing into Thompsons Creek Dam. When no pumps are in service the water supply to the power station is gravity fed from Thompsons Creek Dam.


[[Carbon Monitoring for Action]] estimates this power station emits 9.08 million tonnes of [[greenhouse gases]] each year as a result of burning [[coal]].<ref>{{cite web|url=http://carma.org/plant/detail/29573|title=Carbon Monitoring for Action|accessdate=23 November 2008}}</ref> The Australian Government has announced the introduction of a [[Carbon Pollution Reduction Scheme]] commencing in 2010 to help combat [[climate change]]. It is expected to impact on emissions from power stations. The National Pollutant Inventory<ref>{{cite web|url=http://www.npi.gov.au/index.html|title=National Pollutant Inventory}}</ref> provides details of other pollutant emissions, but, as at 23 November 2008, not [[CO2]].
[[Carbon Monitoring for Action]] estimates this power station emits 9.08 million tonnes of [[greenhouse gases]] each year as a result of burning [[coal]].<ref>{{cite web|url=http://carma.org/plant/detail/29573|title=Carbon Monitoring for Action|access-date=23 November 2008}}</ref> The National Pollutant Inventory<ref>{{cite web|url=http://www.npi.gov.au/index.html|title=National Pollutant Inventory}}</ref> provides details of other pollutant emissions, but, as at 23 November 2008, not {{CO2|link=yes}}.

== Operations ==
{| class="wikitable"
|+ style="text-align: left;"|Yearly generation (MWh) by unit
!Year
!Total
!MP1
!MP2
|-
|2011
|10,242,151
|5,163,830<ref>[https://nemlog.com.au/show/unit/20110101/20111231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|5,078,321<ref>[https://nemlog.com.au/show/unit/20110101/20111231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2012
|8,776,593
|3,942,534<ref>[https://nemlog.com.au/show/unit/20120101/20121231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|4,834,059<ref>[https://nemlog.com.au/show/unit/20120101/20121231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2013
|9,854,146
|5,340,532<ref>[https://nemlog.com.au/show/unit/20130101/20131231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|4,513,614<ref>[https://nemlog.com.au/show/unit/20130101/20131231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2014
|8,239,950
|4,187,273<ref>[https://nemlog.com.au/show/unit/20140101/20141231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|4,052,677<ref>[https://nemlog.com.au/show/unit/20140101/20141231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2015
|5,467,455
|2,796,720<ref>[https://nemlog.com.au/show/unit/20150101/20151231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|2,670,735<ref>[https://nemlog.com.au/show/unit/20150101/20151231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2016
|7,749,257
|3,372,276<ref>[https://nemlog.com.au/show/unit/20160101/20161231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|4,376,981<ref>[https://nemlog.com.au/show/unit/20160101/20161231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2017
|7,344,075
|4,189,078<ref>[https://nemlog.com.au/show/unit/20170101/20171231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|3,154,997<ref>[https://nemlog.com.au/show/unit/20170101/20171231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2018
|8,715,653
|3,835,639<ref>[https://nemlog.com.au/show/unit/20180101/20181231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|4,880,014<ref>[https://nemlog.com.au/show/unit/20180101/20181231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2019
|4,691,506
|2,423,968<ref>[https://nemlog.com.au/show/unit/20190101/20191231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|2,267,538<ref>[https://nemlog.com.au/show/unit/20190101/20191231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2020
|6,769,304
|3,005,181<ref>[https://nemlog.com.au/show/unit/20200101/20201231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|3,764,123<ref>[https://nemlog.com.au/show/unit/20200101/20201231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|-
|2021
|7,185,315
|3,870,977<ref>[https://nemlog.com.au/show/unit/20210101/20211231/?k1=MP1 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|3,314,338<ref>[https://nemlog.com.au/show/unit/20210101/20211231/?k1=MP2 Nem Log] {{dead link|date=June 2023|bot=InternetArchiveBot |fix-attempted=yes }}</ref>
|}


==See also==
==See also==
Line 47: Line 107:


== External links ==
== External links ==
*[[Delta Electricity]] page on [http://www.de.com.au/default.aspx?FolderID=190&ArticleID=263 Mount Piper]
* [[Delta Electricity]] page on [http://www.de.com.au/default.aspx?FolderID=190&ArticleID=263 Mount Piper]


{{Energy in New South Wales}}
{{EnergyNSW}}


[[Category:Coal-fired power stations in New South Wales]]
[[Category:Coal-fired power stations in New South Wales]]
[[Category:Energy in New South Wales]]


{{Australia-powerstation-stub}}

Latest revision as of 10:41, 25 December 2024

Mount Piper Power Station
Map
CountryAustralia
LocationNew South Wales
Coordinates33°21′32″S 150°1′56″E / 33.35889°S 150.03222°E / -33.35889; 150.03222
StatusOperational
Commission date1993
OwnerEnergyAustralia
Thermal power station
Primary fuelCoal
Turbine technologySteam turbine
Power generation
Units operational2 × 700 megawatts (940,000 hp)
Make and modelTokyo Shibaura Electric (Japan)
Nameplate capacity1,400 MW
Capacity factor56.60% (average 2017-2021)
Annual net output6,941 GW·h (average 2017-2021)
External links
CommonsRelated media on Commons

Mount Piper Power Station is a coal powered power station with two steam turbines with a combined generating capacity of 1,400 MW of electricity. It is located near Portland, in the Central West of New South Wales, Australia and owned by EnergyAustralia, a subsidiary of CLP Group. On 23 September 2021, it was announced that the closure of the power station is being brought forward from 2042 to 2040 at the latest. The power station employs 250 workers.[1] In 2024, Peter Dutton said he intends, if elected, to build one of seven government-owned nuclear power plants on this site, to be operational by 2035–2037.[2]

Construction

[edit]

The first generator (Unit 2) was completed in 1992, and the second (Unit 1) in 1993. Units 3 and 4, although planned, were not built. It was the last power station built by the Electricity Commission of New South Wales (a body since abolished). Much of the design work done was undertaken in-house by the commission.

In 2009 Delta Electricity (the government owned enterprise that previously owned and managed the power station as a commercial entity) unofficially re-rated the units at Mount Piper from their original 660MW to 700MW.[3]

In 2007 & early 2008 there was public talk of 'completing' the power station by using modern super-critical, dry-cooling tower, coal-fired units of up to 1000MW capacity which uses much less water from surrounding rivers.[4]

On 7 April 2010 the New South Wales Department of Planning announced that approval had been given to Delta Electricity to 'complete' the station by installing 2000MW of new generating capacity.[5]

Technical

[edit]

Mount Piper draws its cooling water from Lyell Dam and Thomsons Creek Dam, both purpose-built for the station. Lyell Dam is located on the Coxs River 20 kilometres (12 mi) away. Large pumps draw water from the dam and transfer it to a pipeline built between Thompsons Creek Dam and Mount Piper. The power station taking what water it needs and the excess flowing into Thompsons Creek Dam. When no pumps are in service the water supply to the power station is gravity fed from Thompsons Creek Dam.

Carbon Monitoring for Action estimates this power station emits 9.08 million tonnes of greenhouse gases each year as a result of burning coal.[6] The National Pollutant Inventory[7] provides details of other pollutant emissions, but, as at 23 November 2008, not CO2.

Operations

[edit]
Yearly generation (MWh) by unit
Year Total MP1 MP2
2011 10,242,151 5,163,830[8] 5,078,321[9]
2012 8,776,593 3,942,534[10] 4,834,059[11]
2013 9,854,146 5,340,532[12] 4,513,614[13]
2014 8,239,950 4,187,273[14] 4,052,677[15]
2015 5,467,455 2,796,720[16] 2,670,735[17]
2016 7,749,257 3,372,276[18] 4,376,981[19]
2017 7,344,075 4,189,078[20] 3,154,997[21]
2018 8,715,653 3,835,639[22] 4,880,014[23]
2019 4,691,506 2,423,968[24] 2,267,538[25]
2020 6,769,304 3,005,181[26] 3,764,123[27]
2021 7,185,315 3,870,977[28] 3,314,338[29]

See also

[edit]

References

[edit]
  1. ^ Toscano, Nick; Foley, Mike (23 September 2021). "EnergyAustralia to close NSW coal power plant early". The Age.
  2. ^ Crowley, Tom; Norman, Jane (19 June 2024). "Peter Dutton reveals seven sites for proposed nuclear power plants". ABC News. Australian Broadcasting Corporation. Retrieved 25 December 2024.
  3. ^ "Mt Piper Power Station Extension Environmental Assessment" (PDF).
  4. ^ "Mt Piper Power Station Extension".
  5. ^ Hall, Louise (7 April 2010). "Approved: power plant with emissions equal to 2.9m cars". The Sydney Morning Herald.
  6. ^ "Carbon Monitoring for Action". Retrieved 23 November 2008.
  7. ^ "National Pollutant Inventory".
  8. ^ Nem Log [permanent dead link]
  9. ^ Nem Log [permanent dead link]
  10. ^ Nem Log [permanent dead link]
  11. ^ Nem Log [permanent dead link]
  12. ^ Nem Log [permanent dead link]
  13. ^ Nem Log [permanent dead link]
  14. ^ Nem Log [permanent dead link]
  15. ^ Nem Log [permanent dead link]
  16. ^ Nem Log [permanent dead link]
  17. ^ Nem Log [permanent dead link]
  18. ^ Nem Log [permanent dead link]
  19. ^ Nem Log [permanent dead link]
  20. ^ Nem Log [permanent dead link]
  21. ^ Nem Log [permanent dead link]
  22. ^ Nem Log [permanent dead link]
  23. ^ Nem Log [permanent dead link]
  24. ^ Nem Log [permanent dead link]
  25. ^ Nem Log [permanent dead link]
  26. ^ Nem Log [permanent dead link]
  27. ^ Nem Log [permanent dead link]
  28. ^ Nem Log [permanent dead link]
  29. ^ Nem Log [permanent dead link]
[edit]